    Nairobi rivers are increasingly choking with uncollected garbage; human waste from informal settlements; industrial waste in the

    form of gaseous emissions, liquid effluence and solids waste; agro-chemicals, and other wastes especially petro-chemicals and

    metals from micro-enterprises the Jua-kali; and over-flowing sewers. This situation has occasioned spread of water-borne

    diseases, loss of sustainable livelihoods, loss of biodiversity, reduced availability and access to safe potable water, and the

    insidious effects of toxic substances and heavy metal poisoning which affects human productivity.

    The Nairobi River Basin Programme

    Nairobi River Basin Programme (NRBP) is a multi-stakeholder initiative that brings together the

    Government of Kenya, UNEP, UN-Habitat, UNDP, the private sector and civil society. The vision ofNairobi River Basin Programme (NRBP) is a restored riverine eco-system with clean water for the

    capital city and a healthier environment for the people of Nairobi. The objective of the NRBP is

    to rehabilitate, restore and manage the Nairobi River ecosystem in order to provide improved

    livelihoods, especially for the poor, enhanced biodiversity, and a sustainable supply of water for

    domestic and industrial, recreational and emergency uses. NRBP as an initiative was launched by

    UNEP in 1999 as a three-phased programme. The first two phases established benchmarks,

    identified interventions and mobilized the participation of Nairobi residents.

    Fou r Main objectives:

    (i) To demonstrate how industrial and socio-economic factors contribute to pollution of Nairobi rivers;

    (ii) To increase access to information and awareness in order to address the above factors;

    (iii) To strengthen capacity development amongst stakeholders to tackle environmental challenges; (iv) To improve water and

    environmental quality of the river basin.

    Phase I(October 19 99 to March 2000) constituted a situation assessment of water quality, a preliminary public awareness and

    education campaign, community outreach through pilot income-generation projects, and capacity building amongst stakeholders.

    It also developed an Environmental Management Information System (EMIS)...More>>

    Phase II(June 2001 to December 2 003 ) was a pilot initiative focusing on a tributary of the Nairobi River system the

    Motoine/Ngong River. Pollution monitoring and assessment was limited to a section of the Motoine/Ngong River basin 22 kmupstream of Nairobi Dam, the Dam itself, and 25 km downstream to the confluence with the Athi River. The aim of this phase was

    not only to address the problem of pollution in Nairobis rivers but also to put in place community education and information

    programmes to enable capacity building amongst key grassroots stakeholders. It enlisted the support and collaboration of a

    number of civil society organizations and local authority departments in designing and implementing activities aimed at restoring

    the ecological integrity of the Nairobi River....More>>

    Phase III(January 200 5 to December 20 08) recognizes the benchmarks laid down by NRBP phases I and II as pillars to achieve itslong-term vision of a restored, rehabilitated, and managed water quality and the riverine eco-system with clean water for the

    capital city and a healthier urban environment for the people of Nairobi. Capacity building and increased access to vital and

    relevant information and methodologies have since been identified as pillar for sustainably achieving the NRBPs vision.

    Community involvement and empowerment of youth and civil society organizations, the private sector, other non-governmental

    organizations, and relevant government agencies is key to the success of the programme geared towards achieving the Millennium

    Development Goal (MDG) Goal 7, and in particular Targets 9 & 10...More>>

    Scope of Work

    Coordinate collaboration, co-operation and partnership building efforts between different stakeholders within the Nairobi

    River Basin, such as, relevant UN agencies, departments of the Government of Kenya, Nairobi Dam Trust, development

    partners, private sector, Nairobi City Council, and civil society to ensure achievement of planned NRBP outputs;

    Develop fund-raising proposals and business plans jointly with stakeholders to complement extra-budgetary activities of

    NRBP-Phase III;

    Implementation of Information and Communications Strategy for NRBP-Phase III, including:

    managing the website for the Nairobi River Basin Programme (NRBP) ensuring regular updates of information and

    database, including posting of a monthly e-newsletter on NRBP activities;

    collaborate with the local media houses to implement the information and communication strategy of NRBP for

    effective public awareness and education.

    Provide technical support to grassroots communities, especially through youth groups, within the Nairobi River Basin to developCommunity Action Plans (CAPs) as a means of achieving intended outputs of the NRBP-Phase III;

    Achievements

    ROBI RIVER BASIN http://www.unep.org/roa/nairobi_river_basin/About_Nairobi_Riv

    7/21/2010

  • 8/8/2019 Nairobi River Basin

    2/2

    NRBP has generated sufficient public interest by creating environmental awareness and change of attitude and behavior

    among citys residents. As a result, the private sector partners have expressed the desire to work within the framework of

    NRBP to reclaim, rehabilitate and restore these rivers. Programme activities include: tree-planting; bee-keeping;

    mushroom growing; development of ablution blocks in informal settlements; solid waste management; promotion of

    cleaner production in industry; water quality monitoring; integrated environmental management and urban planning; and

    restoration of Nairobi Dam.

    The private sector has identified specific areas as entry points into the NRBP-Phase III framework. Their participation in

    NRBP started in earnest with the launching of the Nairobi Dam Trust Initiative in March 2004, an event which attracted

    high-level political leadership Kenyas Vice President. UN agencies were represented at the level of the executive

    directors of UNEP and UN-Habitat, and UNDPs Deputy Resident Representative.

    The private sector has committed to engage in water quality monitoring, waste (solid and liquid) management, catchments

    rehabilitation, creation of public awareness, rehabilitation and restoration of Nairobi Dam. The private sector has

    supported the development of An Intervention Plan to address these priority areas of the NRBP-Phase III. They have

    mobilised KSh. 10 Million in cash for the project, and continues to receive more pledged and contribution in cash and kind.

    The Belgian Government has contributed US $ 1 Million for rehabilitation and restoration of the NRBP. The Government of

    Kenya has indicated it will provide KSh.150 Million (US $ 2 Million) to support the rehabilitation of Nairobi Dam and 2.5.

    Kilometre stretch from Museum Hill R/about to Race-Course Rd Junction - to be completed by December 2007.

    Challenges and Opportunities

    Nairobi City has been expanding without proper environmental planning. Expansion of citys infrastructure in terms of

    urban services has not matched the growth of its population. This challenge can only be reversed through an integratedenvironmental management and urban planning process.

    The NRBP presents plenty of opportunities for:

    (i) a comprehensive waste management programme;

    (ii) improved water catchments for Nairobi rivers;(iii) an established water quality monitoring protocol;

    (iv) a restored and rehabilitated Nairobi Dam;

    (v) an environmentally sensitive and aware public;

    (vi) a sustainable business plan for Nairobi River Basin;

    (vii) changed attitude and behaviour towards Nairobis environment;

    (viii) a dynamic strategic partnership between private sector, GOK, UN-Agencies and development partners;

    (ix) enhanced capacities to support environmental reporting;

    (x) a Tool-Kit for replication and experience sharing in other African cities.

    The momentum of support currently being received from both the private sector and the Government of Kenya need to be

    maintained. This can be achieved through an effective and well-targeted Information and Communication Strategy.

    Short-term goals must be identified regularly in order to exact their achievements.The formula of Adopt-A-Mile should be carefully defined, and recognition of every adopter assured, so that the activity

    becomes a major resource mobilisation strategy.

    The Exit Strategy should be maintained through increased involvement for the City Council of Nairobi, Ministry of

    Environment and the Private sector participation.

    Mid-term review needs to be conducted, and a process of developing a Tool-Kit initiated in good time to replicate the

    experience of the NRBP to other cities in Africa.