    PROPOSED 100 INTAKE MEDICAL C

    ATTACHED TO REGIONAL HOSPI

    NAHAN (H. P.)

    TENDER FOR

    SOIL INVESTIGATION, TOPOGRAP

    & HYDRO-GEOLOGICAL SURVEY W

    DATE OF ISSUE:

    LAST DATE & TIME OF SUBMISSION: 26

    May 2015

  • 7/25/2019 NAHAN_08_05_2015

    2/32

  • 7/25/2019 NAHAN_08_05_2015

    3/32

    Name of W

    CONTENTS:

    S. No.1 No

    2 Co

    3 Ins

    4 Bri

    5 Pr

    6 Sc

    7 Ge

    8 Co

    9PriGeSu

    ork: Soil Investigation, TopograHydro-geological Survey w

    DESCRIPTIONice inviting bids

    ntents

    tructions

    f Description of Project

    qualifying Criteria

    pe of Work

    neral Conditions of Contract

    mpletion Time and Mode of Payment

    e Bid for Topographical,otechnical and Hydro geologicalvey

    2

    2

    2

  • 7/25/2019 NAHAN_08_05_2015

    4/32

    Tender forHydr

    Proposed 100 In

    Offers are hereby invited b

    Education, Nahan (owner

    agency shall carry out the

    Survey for the above site

    time period and mode of p

    Complete set of tender

    www.hsccltd.co.in interested

    The interested agencies/fir

    www.hsccltd.co.in and sudocument fee of Rs. 500/- thr

    will be the responsibility of a

    downloaded.

    The offer shall be submitteTopographical, and Hydro

    College Attached To Regio

    ENVELOPE MARKED NO.

    Shall contain cost of tenRs.8,000/- (refundable) in t(I di ) Ltd bl t N

    Soil Investigation, Topogrageological Survey Works

    take Medical College Attache

    ospital At Nahan (H. P.)

    HSCC (India) Ltd. for and on behalf of

    ) from competent* Survey/Soil Investi

    Soil Investigation, Topographical Surve

    s per enclosed scope of work, general

    yments etc.

    ocuments has been made available o

    pplicants may download the same.

    s may download the tender document

    mit complete set of tender documentsough demand draft in favor of HSCC (India)

    plicants/firms to ensure that complete tend

    in sealed covers marked Tender for Seological Survey Works for Proposed 1

    nal Hospital at Nahan (H. P.) as detaile

    1

    er of Rs.500/- (non-refundable) andhe form of either demand draft or pay orD lhi

    f

    n

    e

    d

    d

  • 7/25/2019 NAHAN_08_05_2015

    5/32

    These sealed envelopessubmitted within due date

    Dy. General Manager (Civil)

    HSCC (India) Ltd.,

    Plot no. E-6(A),

    Sector-1, Noida (U.P.) Pin-2

    Last Date for the submis

    Bids shall be opened in theDistt.Gautam Budh Nagar, Ut

    of the bidders representatives

    Department of Medical Educati

    application without assigning

    Prospective bidders are requ

    clarifications /addendum/ corr

    advertisement will not be ma

    Cost of tender form is Rs.500

    In case of last date of receiv

    will be received on the next w

    Conditional tenders and tend

    The bids shall be valid for

    1 to 3 marked above should be seatime, by registered post or by hand to the f

    ,

    1301

    ion of bid document is 26/05/2015 up

    ffice of HSCC (India) Ltd, Plot No. 6(A), Btar Pradesh, Pin - 201301, at 16:00 hrs on th

    who may wish to be present.

    on, Govt. of H.P /HSCC reserve the right

    any reason or incurring any liability whatsoe

    ested to regularly scan through HSCC web

    igendum if any will be notified on the compa

    e for it.

    .00 (Rs. Five Hundred Only)

    d of tender is declared /happened to be a p

    orking day.

    rs not filled in figure and words are liable to

    0 days from the last date of submission.

    Dy. G

    l o

    l

    t

    s

    n

    b

    e

  • 7/25/2019 NAHAN_08_05_2015

    6/32

    Brief Description of Proj

    Proposed 100 Intake MediNahan. The total coveredland area to be surveyed is

    ct:

    cal College Attached To Regional Hospitrea of proposed blocks is about 44,800about 25 acres.

    a

  • 7/25/2019 NAHAN_08_05_2015

    7/32

    Pre Qualifying Criteria

    Following is the pre qualific

    Contractors working withOrganizations and Institute

    1. Average Annual finathe previous financileast 30% of the esti

    2. Experience of havinending last day ofshould be either of t

    a) Three similar40% of the eor

    b) Two similar c50% of the eor

    c) One similar c80% of the e

    3. Similar works here

    All bidders should suPerformance Certificatedisqualify the bidder.

    The estimated cost of t

    The competent authoritcondition/criteria for pre-qu

    ation criteria for the tenderers:

    PWD, Railways, MES, P & T Deptt., Sts or in reputed private Sector Firms who

    ncial turnover during the last three yearsl year, i.e. for FYs 2011-12, 2012-13 &mated cost.

    successfully completed similar works dmonth previous to the one in which ae following;

    completed works consisting not less thatimated cost.

    ompleted works consisting not less thatimated cost.

    ompleted works consisting not less thatimated cost.

    ean works mentioned in Scope of Wor

    mit the proof of works executed ass. Absence of submitting the same alo

    e work is Rs.4,00,000/- (Rupees Four L

    to pre-qualify shall have the palification if it considers expedient to do

    h

    , 2

    n

    n

  • 7/25/2019 NAHAN_08_05_2015

    8/32

    A. TOPOGRAPHICAL

    The Scope of work is

    1. Carrying out topogra

    permanent G.T.S. ben

    2. Establishment and caround them includin

    concreting work and 1

    M.S. flat 40 mm x 3 m

    etc.). The reduced l

    bench mark pillars as

    drawing for the constr

    for the construction of

    3. Spot leveling of total a

    contour intervals at 0.

    4. To locate on the surv

    temporary structures

    telecommunication li

    drainage line and also

    SCOPE OF WORK

    SURVEY & COLLECTION OF FIELD DAT

    SUBMISSION

    etailed as under: -

    hical survey including transferring the leve

    chmark

    nstruction of 8 nos. bench mark/grid pillall labour and materials for excavation, fo

    2 mm thick M.S. plate of size 200 mm x 20

    m, 2 nos. welded with each plate grouting a

    vel with respect to M.S.L. shall be engrav

    well as corresponding reference be given

    uction of Bench Mark is attached along with

    Bench Mark.

    rea of land/plot by taking spot levels at 5 m

    m.

    ey plan in A1/A0 sheet to the scale of 1:2

    along with existing storm, sewer & water li

    es/poles, trees of various girths, roads,

    any other important features etc. adjacent a

    l

    0

    e

    c

    n

  • 7/25/2019 NAHAN_08_05_2015

    9/32

    c) Maximum, mini

    10 years.

    d) Daily maximum

    e) High Flood leve

    6. Existing water supply

    i) Locatio

    under

    the proj

    ii) Total w

    day.

    iii) Feasibi

    7. Existing Fire fighting

    the project site bound

    i) Locatio

    ii) Existin

    locatio

    iii) Feasibi

    iv) Local

    8. Details about Sewerindicating the followin

    i) Locatio

    ii) Invert l

    iii) Cross

    mum, average, hourly, daily, monthly and a

    , minimum and average temperature for last

    l near site

    source data shall be collected and supplied

    n and alignment of potable water source

    urvey along with size and residual pressure

    ect site boundary.

    ater storage capacity in existing tanks & de

    lity to connect proposed water supply from e

    ystem data shall be collected and supplied

    ry as under : -

    n and capacity of existing fire storage tank &

    fire ring main location, alignment, dia

    of hydrants etc.

    lity to connect fire line nearest to the propos

    ye-laws of the area.

    and storm water drain / nallah passing thdetails:-

    n and alignment of drain / nallah

    vel / L-Section of the drain / nallah indicatin

    ection of the nallah / drain at suitable locati

    n

    t

    x

    r

  • 7/25/2019 NAHAN_08_05_2015

    10/32

    10. Details of Municipal/P

    i) Locatio

    running

    for sew

    ii) Locatiorunning

    iii) Feasibi

    11. Details of the propose

    as under: -

    i) Alignm

    ii) L-Secti

    betwee

    iii) Cross-

    centre

    iv) Crown

    road.

    v) Details

    any.

    12. Details of the existing

    the site including the fi) Cross

    ii) Part el

    iii) Length,

    details

    blic sewer line:

    n, material, diameter and alignment of t

    in and around the project site. Location fo

    erage of the proposed Complex.

    n of manholes with size, ground level and iaround/near the project site.

    lity to connect proposed sewer with existing

    d approach road connecting main road to p

    nt of the road

    on of the road indicating ground levels at

    n main road and entrance of project site.

    ection of the road extending up to 10 m di

    f road with levels at 5m. c/c.

    level of the main road at the junctions with

    - such as L.S. & C.S., Bed level, H.F.L. etc.

    boundary wall, temporary and permanent

    llowing shall be collected and supplied: - ection of the wall

    vations and cross-section of the buildings al

    , width, height, area and no of stories of

    of materials used in construction

    r

    s

    s

    s

    s

  • 7/25/2019 NAHAN_08_05_2015

    11/32

    13. All survey, grid levels

    computer through digi

    immediately.

    14 On completion of all fithe agency shall s

    observations and dra

    agency shall visit to

    Agencys comments i

    shall incorporate the

    six copies of the det

    drawings (the drawin

    obtained from HSCC

    diskette/ CD. The age

    or an authenticated c

    15 Description and photo

    the work awarded.

    16 Plot has to be cleare

    start of the work and

    17 The any above is not

    draft report and obtai

    same without an extra

    18 P t h ll b

    shall be done by Total Station and contour p

    itization process and the soft copy shall b

    ldwork, collection of pertinent field data andbmit a formal draft report containing

    ings, in triplicate for review of Supervising

    Supervising Agencys office for detail disc

    f any. After discussion with the Supervisi

    greed modifications in the draft report at th

    iled final report (plastic coated with spiral

    s shall bear the logo of HSCC and the for

    ) along with a set of reproducible drawi

    ncy shall also submit along with report a cop

    py of the same duly certified by Engineer.

    s of general surrounding and plot and of the

    of all vegetation including shrubs, bushes,

    ll removed vegetation to be thrown as per H

    relevant or not covered in the report to be

    the above from HSCC/Client. Otherwise a

    cost or paid accordingly.

    f t l b t t t d t

    l

    A

    u

    n

    e

    n

    y

    ,

    S

    h

  • 7/25/2019 NAHAN_08_05_2015

    12/32

    B. GEOTECH

    1.01 Detailed Geo-technic

    of a detailed Geo-tecfoundations for buildin

    1.02 Item wise list of in

    quantities are given

    rates in figures as w

    actually executed.

    1.03 The work shall includ

    engineering supervisi

    required to carry out

    interpretation of data c

    1.04 The Agency shall mak

    of bore holes, trial pit

    drawings/sketches su

    locations with respect

    reference lines will be

    1.05 All the field and labor

    Standards codes. The

    the field records (co

    ICAL INVESTIGATION AND REPORT SU

    l Investigation is to be carried out of the are

    nical report which shall be the basis for thgs and structures.

    estigations to be conducted along with

    t Schedule of Quantities against which the

    ll as in words. However, payment shall be

    e mobilisation of all necessary equipmen

    n and technical personnel, skilled and u

    the entire field as well as laboratory inv

    llected and preparation of a Geo-technical r

    e their own arrangements for locating the c

    s, dynamic cone penetration tests and oth

    plied to him and for determining the reduc

    to the single bench mark indicated by the E

    indicated to him.

    tory data shall be recorded in the proforma

    Agency shall submit to the HSCC one copy

    ntersigned by the Engineer) soon after

    a

    t

    e

    e

  • 7/25/2019 NAHAN_08_05_2015

    13/32

    1.07 The Agency shall carr

    explicitly mentioned u

    Engineer.

    1.08 FIELD INVESTIGATION

    1.08.1 BORING

    a) Bore holes

    subsoil profile

    identification

    fixed with the

    subsoil profile,

    number of pr

    payment shall

    of the bore ho

    with the provisi

    b) All borehole

    construction d

    strictly as per I

    additional Sta

    No extra paym

    site data shall

    by fax/ courier

    plan and the s

    strata and the

    y out all work meant within Para 1.01 of this

    nder the scope. All work shall be executed

    - SOIL

    shall be taken at specified locations to obta

    , its nature and strength and to collect

    nd conducting laboratory tests. The sequ

    approval of the Engineer and on ascertaini

    the Engineer shall reserve the right to in

    posed Bore holes by any limit. Howeve

    be made as per actual quantities executed.

    les shall be 150 mm and boring shall be c

    ions of IS: 1892.

    s shall extend up to 15.0 to 30.0 Mtr. depths

    awings or as directed by the Engineer. Th

    IS: 1892. When the boreholes are to be ter

    dard Penetration Test shall be carried out

    ent shall be made for carrying out Standar

    e made available to HSCC as and when each

    /speed post/ hand delivery showing locatio

    oil data along with visual description. The

    ature of variations shall also be included.

    i

    s

    n

    c

    r

    m

  • 7/25/2019 NAHAN_08_05_2015

    14/32

    1.08.2 PLATE LOAD

    Plate load test

    pit of size 2.0

    soil. The size

    and 25 mm thiThe reaction t

    A seating load

    time. The load

    load or one-te

    4, 6.25,9,16 a

    The test shall

    25mm has o

    required for p

    results shall co

    1.08.3 SAMPLING

    1.08.3.1 General

    All the acces

    conform to IS:

    field shall be cl

    1.08.3.2 Disturbed Samp

    Disturbed soil

    samples weig

    below ground

    EST

    shall be conducted to determine the allow

    square shall be excavated up to a depth

    f plate should be of 0.75mX0.75m. It shoul

    ick. Load shall be applied on this plate bythe jack shall be provided by means of loa

    of 7 kN/m2 shall be first applied which shall

    shall then be applied in increments of 20

    th of the ultimate load. The settlement shal

    d 25 minutes and thereafter at hourly inter

    be conducted until failure or at least until

    curred. The specifications for the equi

    rforming this test, test procedure, field obs

    nform to IS: 1888-1982

    sories required for sampling and the me

    2132. All the disturbed and undisturbed s

    assified at the site as per IS: 1498.

    le

    samples shall be collected from bore holes

    ing approximately 1 Kg. shall be collected

    level and at every identifiable change of s

    d

    l

    l

    t

    t

    t

  • 7/25/2019 NAHAN_08_05_2015

    15/32

    soil is obtain

    physical stren

    1.08.3.3 Undisturbed Sa

    In each boreh

    and depths of

    Engineer. Un

    Samples shall

    moisture conte

    The specificati

    procedure sha

    shall be done

    1.08.3.4 One of the m

    bore holes as

    1.08.3.5 a) Sub-soil water

    Sub-soil wate

    thereon. Repr

    encountered in

    b) Chemical anal

    turbidity; sulphmatter and sus

    c) Standard Penet

    This test shall

    d) etc. Undisturbed samples shall be co

    th and settlement properties of the soil.

    ple

    le undisturbed sample shall be collected a

    1.0 m, 4.0 m, 7.0 m, 10.0 m, 13.0 m, 15.0

    isturbed samples shall be of 100 mm di

    be collected in such a manner that the stru

    nt do not get altered.

    ions for the accessories required for sam

    ll conform to IS: 1892 and IS: 2132. Undis

    sing compressed air technique mentioned i

    thods shall be adopted for determining th

    er IS: 6935 and as per the instructions of th

    samples

    samples shall be collected for carrying

    sentative samples of ground water shall be

    boreholes before the addition of water to ai

    lysis of water samples shall include dete

    ate; carbonate; nitrate and chloride contenpended

    ration Test

    be conducted in all types of soil deposits

    t

    a

    c

    p

    e

    e

    r

  • 7/25/2019 NAHAN_08_05_2015

    16/32

    size cone att

    conducted up t

    considered w

    specifications

    test procedurePart - II.

    1.08.4 Earth Resisti

    Resistivity of s

    Engineer. Mea

    1.9 LABORATORY

    1.9.1 Essential Req

    a) Tests indic

    rock samples

    b) Laboratory

    the requireme

    work. The test

    1.9.2 Tests

    Tests as indic

    conducted. Tha) Tests o

    -

    -

    -

    ched to the bottom of a string of drill r

    o the specified depth or refusal whichever is

    en the blow count exceeds 150 for 30

    or the equipment and accessories required

    , field observation and reporting of results sh

    ity of soil

    oil /earth shall be measured at 2 locations

    surements shall be carried out as per IS-30

    TESTING

    uirements

    ted in the schedule of items shall be perfo

    s per relevant IS codes.

    tests shall be conducted using approved a

    ts of Indian Standards or other approved st

    shall be conducted at an approved laborat

    ted in this specification and as called for

    se tests shall include but not be limited to tn Disturbed and Undisturbed samples: -

    Visual and Engineering Classification

    Sieve analysis and Hydrometer analysis

    Liquid Plastic and Shrinkage limits

    o

    r

    a

  • 7/25/2019 NAHAN_08_05_2015

    17/32

    b) Tests o

    -

    -

    -

    --

    c) Uncon

    d) Consoli

    e) Consoli

    f) Consol

    1.9.3 Salient Test

    a) Chemical a

    sulphate (both

    salinity and an

    soil shall be in

    b) Chemical a

    properties suc

    at 250 C and

    SO4), Chloridefoundation mate

    as ppm by wei

    1.10 REPORT

    n undisturbed samples

    Bulk density and moisture content

    Relative density (for sand)

    Unconfined compression test

    Box shear test (in case of sand)Tri-axial shear tests: (depending on the

    conditions on undisturbed or re-moulded sa

    olidated undrained

    dated undrained test with the measurement

    idated drained.

    idation Test (In case of cohesive soil)

    Requirement

    alysis of sub-soil shall include determination

    SO3 and SO4), chloride and nitrate c

    y other chemical harmful to the foundation

    icated as percentage (%).

    nalysis of sub-soil water sample include t

    as colour, odour, turbidity, pH value and s

    chemical contents such as Carbonates, S

    s, Nitrates, Organic matter and any otherrial. The contents such as Sulphates, Saltpet

    ht.

    o

    h

    c

  • 7/25/2019 NAHAN_08_05_2015

    18/32

    graphical form

    and theoretica

    calculations fo

    copies of the r

    the cover page

    b) The Agenc

    office for a d

    report. During

    modifications t

    incorporate in

    draft report ap

    binding with pl

    the graphs, ta

    c) The detaile

    shall encompa

    different types

    shall acquaint

    information re

    1.10.2 Data to be fu

    The report (in

    following: -

    , practical results both in tabular as well as

    l considerations for the interpretation of tes

    r the conclusions drawn, etc. Initially the A

    port in draft form for the Supervising Agenc

    of the reports shall be got approved by the

    s qualified Geotechnical Engineer shall vi

    tailed discussion on Supervising Agencys

    the discussions, Supervising Agency s

    hat need to be done in the draft report. The

    his report the agreed modifications and aft

    proved, six copies of the detailed final repo

    astic covers) shall be submitted along with o

    les, etc.

    final report based on field observation, in-

    ss theoretical as well as practical considera

    of structures envisaged in the area under in

    himself about the type of structures, fou

    uired from the Engineer.

    rnished

    soft as well as hard copy) shall also include

    g

    t

    h

    r

    e

    n

    s

    t

    v

  • 7/25/2019 NAHAN_08_05_2015

    19/32

    levels and co

    stratum, positi

    samples collec

    c) A set of lonorder to give

    (each soil profi

    d) Past observ

    with similar soi

    e) Plot of Sta

    with depth for i

    f) Results of al

    alongwith all t

    conclusions an

    g) For all tri-a

    envelops shal

    magnitude of

    shall be furnis

    h) Soil resistivi

    i) For all conso

    ordinates showing the classification and

    ion of ground water table, various in-sit

    ted at different depths and the rock stratum,

    itudinal and transverse soil profiles connecclear picture of the variation of the subsoi

    le to be submitted in separate sheets).

    ations and historical data, if available, for th

    l profile or with similar structures in the surro

    dard Penetration Test (N values both unc

    dentified areas.

    l laboratory tests summarised (i) for each s

    e relevant charts, tables, graphs, figures,

    d photographs of representative rock cores

    xial shear tests stress vs strain diagrams

    l be furnished. If back pressure is app

    he same shall be indicated. The value of

    ed for all tests alongwith relevant calculatio

    ty Test results

    lidation tests the following curves shall be f

    l

    u

    o

    l

    m

  • 7/25/2019 NAHAN_08_05_2015

    20/32

    The point sho

    The procedure

    and settlemen

    and 90% prim

    shall also be c

    1.10.3 Recommend

    Recommendat

    structure and f

    limited to the f

    1.10.3.1 For shallow fo

    The following sh

    i. Net saf

    strip fo

    founda

    shear f

    adopte

    storeye

    ii. Net sa

    founda

    shear f

    adopte

    Found

    iii. Rate a

    ing the initial condition of the soil shall be m

    adopted for calculating the compression in

    of soil strata shall be clearly specified. Th

    ary consolidation along with secondary s

    lculated.

    ations

    ions shall be given area wise duly consi

    oundation in the area. The recommendation

    llowing:-

    ndations

    all be indicated with comprehensive supporting

    e allowable bearing pressure for isolated

    otings of suitable sizes ( Varying from

    ion depth as per site condition below groun

    ilure and settlement criteria, giving reasons

    in the calculations. Such Footings to b

    d buildings are proposed.

    fe allowable bearing pressure for Raft

    ion depth as per site condition below groun

    ilure and settlement criteria, giving reasons

    in the calculations. Such Footings to

    tion giving data for modulus of Sub grade R

    d magnitude of settlement expected of the s

    a

    d

    e

    d

    a

    d

    e

    d

    t

  • 7/25/2019 NAHAN_08_05_2015

    21/32

    C. GR

    The scope of work includes

    area and a study of the envi

    water source for domestic

    proposed site is approximatetube well and rain water-ha

    assessment of the capacity a

    The detailed scope of work

    1. With the objective to

    vertical electrical sounupto 150 meters or w

    resistivity meter will

    analysed, computed a

    curves shall be drawn

    the curves drawn b

    information.

    2. Full details of the exis

    depth and yield expec

    3. Best point selection o

    plot plan with co-ordin

    got done by your repr

    4. Apparent resistivity of

    layer. Correlation of d

    5. Detailed design and s

    6. Recommended drillin

    7. Expected yield of tube

    8. Suggest number of tu

    9. Recommended capa

    individual bore well, ty

    UND WATER / RAIN WATER HARVESTI

    conducting Geo-physical and Geo-hydrolog

    onmental conditions that may affect the fit

    and non-domestic purpose. The total wa

    ly 2 lakh liters per day. The alternative souvesting scheme be assessed scientifically.

    d dependability of the different sources to

    will be as below:

    eet total water requirement at least 4 poi

    ding to ascertain suitability for locating tubehatever suitable in and around project site.

    be used for the study. The resistivity dat

    nd plotted on log-log graph paper with mod

    for each vertical electrical sounding. Geop

    computer and using auxiliary charts sh

    ting underground sources of water, nature

    ted from tube well or open dug wells in entir

    the field for the tube well drilling. The same

    ate. The exact bench markings for individua

    sentative at site as directed by Engineer.

    existing sub-Geoelectrical layers and corre

    ta with CGWB data.

    ecification for tube wells.

    depth and drilling techniques of each tube

    well in (litre /hr) and rate of withdrawal.

    e wells required to meet total water require

    city (discharge, head) of submersible p

    pe of material and dia. of pipe for tube well.

    i

    r

    w A

    a

    l

    s

    u

  • 7/25/2019 NAHAN_08_05_2015

    22/32

    The quality of surfac

    parameters) standard

    or being semi-salty o

    range regarding perc

    salt content once wat

    The study report shal

    well as samples of the

    16. Contents of the report

    A. The Geo-hydrological

    a. Introduction

    b. Location of the

    c. Objectives of

    d. Applied Metho

    e. Available basi

    f. Ground Water

    g. Geology of the

    h. Information an

    i. Delineation of

    j. Assessment of

    k. Water produci

    wells/ Dug well

    l. Correlation of t

    m. Number of tub

    n. Spacing betwe

    o. Specification o

    of pipe for tub

    p. Details of rain

    q. Recommendat

    as well as Ground water is to be tested

    . The scope of water analysis is not limited

    r salty. It should also include chemical and

    ntage salt content shall be given which sh

    r is actually pumped out.

    l also include the required Geo-electrical s

    curves used for matching.

    .

    investigation report should have the followin

    Study Area

    round Water studies

    dologies

    Data

    level

    area

    d details of existing ground water sources.

    potential ground water bearing zones

    hydraulic parameters of aquifers

    g capabilities of aquifers likely to be tappe

    ls in liters/hour

    he data obtained from site with data from C

    wells/ dug wells to meet the water require

    en tube wells/ dug wells.

    f tube wells/ dug wells and type of pump set,

    well.

    ater harvesting scheme.

    ions.

    a

    t

    o

    e

    ,

  • 7/25/2019 NAHAN_08_05_2015

    23/32

    The General Conditions of

    1.0 Security Deposit

    Security deposit at the rate

    the same shall be releasesite. However no interest s

    for the period retained by H

    1.1 Delay and extension

    If the work is delayed byEmployer is beyond the A

    such event contributing to

    nevertheless use constantl

    shall do all that may be rea

    work.

    Request for extension of tithe happening of the event

    such request, the period fo

    a fair and reasonable exten

    of work for which separate

    it shall be the sole discretio

    The decision of HSCC in r

    writing within a reasonable

    such extension granted by

    1.2 Compensation payabl

    eneral Conditions of Contract

    ontract are as under.

    of 5% of the amount of each running bill

    after six months of the successful compall be payable to the Agency for the amou

    SCC.

    force majure or any other cause in the aencys control, they shall immediately up

    delays give notice thereof in writing to

    y their best endeavors to prevent or make

    onably required to the satisfaction of HSC

    e shall be made by the Agency in writingcausing delay. The survey Agency shall a

    which extension is required. In any such

    sion of time for completion of individual ite

    period of completion is specified in the co

    of the Employer to grant or refuse such e

    egard to the extension will be communica

    time but no compensation or any extra am

    SCC.

    for delay in completion and risk prejud

  • 7/25/2019 NAHAN_08_05_2015

    24/32

    1.3 Risk Prejudice Clause

    In case progress of any par

    time during the execution

    fortnights notice in writing a

    the job within the time mut

    work falling within their sco

    failure to remedy the situati

    withhold that portion of theafter giving one weeks noti

    1.4 Arbitration

    If at any time any doubt, q

    the Agency and HSCC upo

    parties may give the other nor difference and the same

    HSCC or his nominee as S

    final, conclusive and bindin

    specify the dispute or disp

    with the amount or amounts

    1.5 Jurisdiction of Court

    All disputes arising out of

    Territory of Delhi only.

    1.6 Termination of Contra

    HSCC reserves the right to

    contractual obligation(s) or

    Agency shall be paid for t

    determine the credit to be

    Agency. The Agency shall

    t of Agencys work is found to be unsatisfa

    is-a-vis, the terms of contract, HSCC sha

    sking for their plans for remedying the situ

    ually agreed, subject however to the con

    e of work shall be completed within the s

    on as per agreed time with HSCC, HSCC

    work and get the same done at the risk ance.

    uestion, dispute or difference whatsoever

    n or relating to or in connection with this

    otice in writing of the existence of such doshall be referred to the Chairman - cum

    le Arbitrator. The decision of the sole arbit

    upon the parties to dispute. The party inv

    tes to be referred to the arbitration unde

    claimed in respect of each of dispute.

    the contract shall have the jurisdiction of

    ct

    terminate, or postpone the work on acco

    any sufficient cause, HSCC being sole jud

    e useful work done upto the date of term

    given to the detailer for the value of the w

    ive HSCC all the data, compiled report, d

  • 7/25/2019 NAHAN_08_05_2015

    25/32

    between HSCC and the Ag

    job will be entrusted to him i

    1.8 Discussions with HSC

    The Agency shall make t

    discussions with HSCC. Th

    to HSCC as may be requi

    HSCC officials connected w

    The Agency shall get appro

    from HSCC. However, such

    of the total responsibility

    obligations under this contr

    1.9 Guarantee and liabilit

    The Agency shall be liable

    solely attributable to Agen

    limitation specified by HSC

    2.0 Periodical Progress R

    The Agency shall prepare a

    performed by them. Such s

    by HSCC shall not be de

    completion of the assignme

    2.1 Unit Rates

    The Lump sum / Unit rates

    The rate shall include cost

    taxes, royalties, octroi, serv

    of work under this contract

    ency for with without any prior notice to h

    in future by HSCC.

    C and Approvals

    hemselves available at reasonable notic

    e Agency shall also provide assistance, a

    ired from time to time for discussions wi

    ith the work.

    ved the work done by him at every stage

    approval by HSCC shall not be deemed t

    of the correctness and soundness of

    ct.

    of the Agency

    for all consequence of errors and omissio

    y or on the part of their employees to the

    .

    eport

    nd submit periodical progress reports and

    ubmissions of reports and review and app

    med to absolve the responsibilities of th

    nt.

    quoted shall remain firm throughout the v

    of materials, labor, tools and equipment

    ice tax etc. payable on all transactions for

    . The rates shall be given in the schedule

  • 7/25/2019 NAHAN_08_05_2015

    26/32

    2.4 Income tax

    Income tax shall be deduct

    2.4 Computerized output

    The Agency shall prepare a

    report work, data, and oth

    completion of job. All drawi

    2.5 Water for construction

    The Agency shall make hi

    work and nothing will be pai

    2.6 Power

    The Agency shall make

    required and make necessa

    2.7 Return of earnest Mon

    Earnest Money of the unsuperiod.

    d from Agencys bill as per rules.

    CD of the complete work assigned to the

    er documents & the same shall be subm

    gs shall be on AUTOCAD and in A1 & A4

    purposes

    / their own arrangements for unfiltered w

    d for the same.

    is own arrangements for obtaining ele

    ry payments directly to the departments co

    ey

    ccessful bidders shall be returned after the

  • 7/25/2019 NAHAN_08_05_2015

    27/32

    COMPLETIO

    Completion Time

    Total time period for comp

    letter of award. The work is

    Table-1

    S.N. Particulars (a)

    1.

    Topographicalplan with Contours

    (as per Scope of

    Work)

    2.

    Geotechnical

    Investigations (as

    per Scope of

    Work)

    3.

    Hydro Geological

    Survey (as per

    Scope of Work)

    N TIME SCHEDULE AND MODE OF PAY

    letion of job will be as per following from

    to be done in phases in order of priority as

    Completion TimeSubmission of Draft

    Report (b)

    2 months from

    date of award of

    work

    6 weeks from date of

    award of work

    2 months from

    date of award ofwork

    6 weeks from date of

    award of work

    2 months from

    date of award of

    work

    6 weeks from date of

    award of work

  • 7/25/2019 NAHAN_08_05_2015

    28/32

    MODE OF PAYMENT

    Table-2

    S.No.

    1. For subm

    S.N. 1 to

    2. For subm

    S.N. 1 to

    approval f

    3. On submi

    final repo

    4. On submi

    includingcomplete i

    Stage of Work

    ission of draft Reports of all items from

    in Table -1 & col. (a)

    ission of final Reports of all items from

    3 in Table -1& col. (c) after receiving

    rom HSCC

    ission of field information along with all

    ts as required/as per scope of work

    ssion of all drawings and technical report

    photographs, basic calculation sheets,in all respects, in a CD.

  • 7/25/2019 NAHAN_08_05_2015

    29/32

    Price Bid for Topographical, Geotechnical and

    S.No. Descript ion

    1 Topographical Survey, Collection of f ield a

    (a) Site Survey and Collection of Field Datarea ear marked in enclosed layout drawin

    (b) Construction of Bench Mark andproviding fencing around them as per drg

    2 Soil boring, sampling, chemical analysi

    Boring of holes of 150mm dia. In all typesbut including boulders, gravels etc. upto thor refusal whichever is met earlier completshall take care of following subheads.)

    (a) Conducting standard penetration test iand also at change of strata as per IS cod

    (b) Col lect ing disturbed and undisturbed salso at change of strata from the bore-hole

    (c) Recording of water table in bore hole ascope of work.

    (d) Conducting necessary tests on samplelaboratory tests include chemical analysis

    (e) Collection of water samples from bore

    3 Plate Load Test

    Conducting plate load tests using 750mmbe continued till 25mm settlement in norm

    special cases such dense gravel, gravel aof the soil whichever is earlier as per IS:18

    28

    ydro geological Survey forProposed 100 Intake Medical CollegNahan (H. P.)

    Unit Quantity

    nd report Submission:

    a as per defined scope of work of the g . Acre 25

    supplied. No 8

    s and report submission

    RM 100

    of soil excluding soft and hard rock e depth of 30m below the existig G.L.

    e in all respects. (The quoted rate

    all bore holes at intervals of 1.5 m s of practices

    mples of soil at 1.5m interval and s.

    fter completion of boring as per

    s collected from each hole. The of soil and water as per scope.

    oles for chemical test and analysis.

    Each 1

    x 750mm square plate. Test should l circumstances and 50mm in

    d sand mixture is obtained or failure 88 or refusal whichever is earlier

  • 7/25/2019 NAHAN_08_05_2015

    30/32

    Price Bid for Topographical, Geotechnical and

    S.No. Descript ion

    4 Rock Sampling

    Boring of holes of 150mm dia. Into hard rodepth lesser than 30 meter below the existearlier complete in all respects

    5 Other penetration tests:

    Conducting static cone penetration test asand depth upto 10.0 m or refusal whichev

    Conducting Dynamic cone penetration testindicated and depth upto 10.0m or refusal

    Conducting field density test as specifiedlocations.

    6 Ground water investigation

    Ground water investigation by Geo-physicavailability of ground water at site as per sfollowings:

    (a) Collection of geophysical field data at 42-3 no of tube wells/dug wells.

    (b) Collection of data from existing underg

    (c) Collection of water samples f rom 2 no lsources and getting them tested (Physical,location. Suggesting design of tube wells/

    (d) Suggested design for Rain water Harv

    7Conducting soil resistivity test as per IS 30part of draft and final report.

    Total

    29

    ydro geological Survey forProposed 100 Intake Medical CollegNahan (H. P.)

    Unit Quantity

    Metre 10

    cks in case hard rock is met at a ing G.L. or refusal whichever is met

    specified and in locations indicated r is earlier Each 5

    as specified and in locations whichever is earlier. Each 5

    t 1.5m, 2.5m and 3.5m depth at eachEach 5

    Lumpsum 1

    l equipments for assessment of cope of work specified including the

    no of required locations to suggest

    ound water sources,.

    ocations of existing underground , Chemical & Bacteriological) at every ug wells

    sting System

    43 and submission of test results as Each 2

  • 7/25/2019 NAHAN_08_05_2015

    31/32

    30

  • 7/25/2019 NAHAN_08_05_2015

    32/32

    TEACHING

    BLOCK-A

    TEACHING

    BLOCK-B

    RESIDENT

    HOSTEL

    BOYS

    HOSTELWARD

    BLOCK-2ADMINISTRATION

    O.T.

    BLOCK

    TYPE

    -IV

    TYPE

    -V

    GIRLS

    HOSTEL

    LECTURE

    THEATRE

    AUDITORIUM

    LIBRARY

    PROPOSED MEDICAL COLLEGE AT NAHAN

    (H.P)

    SURVRY AREA = 24.25 ACRES(approx.)

    WARD

    BLOCK-1

    TYPE-III

    26m

    15m

    46 m3

    0m

    13m

    21m

    28m

    19m

    18m

    25m

    54m

    22m

    EXISTING HOSPITAL

    EXISTING

    BLOCK

    EXISTING

    BLOCK

    2 4

    m

    6m

    SITE AREA = 24.25 ACRES(approx.)

    PROPOSED BLOCKS

    TOTAL BUILTUP AREA = 44800 sq.m.