NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS...

17
NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 05/24/22 Page 1 NITS on OASIS Informal Comments

Transcript of NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS...

Page 1: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

NAESB OASIS Recommendation

Network Service on OASIS(NITS on OASIS)

04/10/23 Page 1NITS on OASIS Informal Comments

Page 2: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

NAESB ProcessA high level summary of the NAESB process:1. Subcommittee, made of volunteers from the industry, drafts

standards2. Once competed, the standard is sent to the Executive Committee

for approval– The standard is posted for a 30-day formal comment period prior to

the Executive Committee meeting3. The Executive Committee may approve, modify or reject the

recommendation. It may also remand the recommendation back to the subcommittee with instructions for modification.

4. Once approved by the Executive Committee the recommendation is submitted to the NAESB membership for ratificaiton.

5. After ratification by the membership, NAESB submits the new standards, along with any formal comments, to FERC

04/10/23 2NITS on OASIS Informal Comments

Page 3: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Informal Comments

The Wholesale Electric Quadrant OASIS Subcommittee is preparing a recommendation for NITS on OASIS. The subcommittee has requested informal comments from industry participants on a draft version of the new standards. The subcommittee will use the comments to modify and refine the draft standard before submitting it to the Executive Committee. Comments may be submitted by anyone.

The informal comment period ends on July 29, 2011.

04/10/23 3NITS on OASIS Informal Comments

Page 4: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

NITS on OASIS Recommendation- Recommendation Summary + 5 Parts

WEQ NITS Draft Recommendationhttp://www.naesb.org/pdf4/weq_oasis071911w1.doc

Proposed Revisions to the OASIS Acronym and Glossary (WEQ000): http://www.naesb.org/pdf4/weq_oasis070111reqcom_a4.doc

Proposed Revisions to the OASIS (WEQ001):

http://www.naesb.org/pdf4/weq_oasis070111reqcom_a1.doc

Proposed Revisions to the OASIS S&CPs (WEQ002): http://www.naesb.org/pdf4/weq_oasis070111reqcom_a2.doc

Proposed Revisions to the WEQ OASIS Data Dictionary (WEQ003): http://www.naesb.org/pdf4/weq_oasis070111reqcom_a3.doc

Proposed Revisions to the WEQ Implementation Guide (WEQ013): http://www.naesb.org/pdf4/weq_oasis070111reqcom_a6.doc

04/10/23 4NITS on OASIS Informal Comments

Page 5: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Overview

OASIS was developed initially to facilitate submission of Point-to-Point requests and to document the approval process. In Order 890, FERC decided that transmission providers and network customers should use OASIS to request designation of new network resources and to terminate designation of network resources. NAESB was given the responsibility for designing new templates.

04/10/23 5NITS on OASIS Informal Comments

Page 6: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Key Order 890 Requirements

Order 890 provided substantial guidance on treatment of a Designated Network Resource (DNR):

• Qualifications for a DNR• Attestation of DNR to be submitted through OASIS

with each request to designate a new network resource

• Temporary and Permanent Termination of a DNR• Concomitant evaluation of a request for temporary

undesignation of a DNR and a related request for transmission service

04/10/23 6NITS on OASIS Informal Comments

Page 7: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

pro forma OATT (link)

• Part III governs Network Integration Transmission Service (NITS)

• Section 29.2 governs the application process– Application on OASIS– Customer identification and eligibility– Network Load information– Network Resource information & attestation– Identification of customer-owned transmission– Term of service and customer attestation

04/10/23 7NITS on OASIS Informal Comments

Page 8: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

pro forma OATT (continued)

• Section 30: Network Resources– Rules for designation of a new network resource

(Section 30.2)– Termination of Network Resources (Section 30.3)

• Indefinite Termination• Temporary Termination• Evaluation of Temporary Termination concomitantly

with related service requests

• Section 31: Designation of Network Load

04/10/23 8NITS on OASIS Informal Comments

Page 9: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

NAESB NITS Recommendation• Application for Network Service placed on OASIS• Transactions (loads, DNRs, non-designated

resources) handled on OASIS on a customer-by-customer basis

• Optional provision for tracking scheduling rights• Customer may assign agent(s) to administer

OASIS transactions• New process facilitate handling of concomitant

evaluation of a single undesignation coupled with a single request for service

04/10/23 9NITS on OASIS Informal Comments

Page 10: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Technical Changes

• Pre-submittal work space will permit a customer to assemble information prior to official submittal (queuing) of request

• New templates – none of the existing templates are used for NITS (See WEQ-002)– XML templates instead of CSV– Different structure for making request

04/10/23 10NITS on OASIS Informal Comments

Page 11: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Data Structure for NITS

The general structure of the information conveyed in a given Input Template using the NITS CSV Format is shown below:

04/10/23 11NITS on OASIS Informal Comments

Page 12: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Flow Diagrams: NITS Application Process(WEQ-013)

04/10/23 12NITS on OASIS Informal Comments

Page 13: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

04/10/23 13NITS on OASIS Informal Comments

Page 14: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

04/10/23 14NITS on OASIS Informal Comments

Page 15: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

Flow Diagrams: Designate a Network Resource(WEQ-013)

04/10/23 15NITS on OASIS Informal Comments

Page 16: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

START

AddDNR(01) Process Map Note: This process map does not illustrate all possible NITS DNR Addition scenarios.

NITS Process Map: AddDNR (01)Typical Scenarios ONLY, 06-27-2011 Revision 1

Questions/Comments/Errata: e-mail [email protected] or [email protected](This box shall be removed prior to publication in the S&CP booklet.)

Customer: “Is the DNR already a defined named NITS Resource under the NITS Application [WEQ 002-6.3.2.12]

1No

Yes

Customer:Defines

Resource

OASIS Template:NewNITSRequest9 AddNITSDNR 9 NITSResourceDescription NITSNITSResourceForecast (optional) NITSResourceDesignation NITSResourceCapacity NITSSchedulingRights AuxiliaryTransmission (optional)

OASIS Template:INPUT Template9 REQUEST Template 9 DATA Template(s)

Key to WEQ-002 Data Template elements used in this Process Map:

Templates use a nested hierarchy. As shown in Example A below, to use a DATA template, a specific INPUT and REQUEST template must also be referenced. Hence, the scenarios here show the first three levels of the hierarchy.

OASIS Template:NewNITSRequest9 NewNITSApplication 9 NITSService NITSCustomer NITSAgent

Example A:

Example B:

In Example B below, the INPUT template is NewNITSRequest, the REQUEST template is NewNITSApplication, and the DATA templates are NITSService, NITSCustomer, and NITSAgent.

NOTE: The AuxiliaryTransmission data template is used only for resources identified as OFF_SYSTEM

Customer:References previously

defined Resource

OASIS Template:NewNITSRequest9 AddNITSDNR 9 NITSResourceDescription NITSNITSResourceForecast (optional) Go to

AddDNR (02)

04/10/23 16NITS on OASIS Informal Comments

Page 17: NAESB OASIS Recommendation Network Service on OASIS (NITS on OASIS) 2/10/2014Page 1NITS on OASIS Informal Comments.

From AddDNR

(02)

NITS Process Map: AddDNR (02)Typical Scenarios ONLY, 06-27-2011 Revision 1

Questions/Comments/Errata: e-mail [email protected] or [email protected](This box shall be removed prior to publication in the S&CP booklet.)

Customer: Does the AddDNR request require an update before TP assessment?

1Yes

No

AddDNR(02) Process Map Note: This process map does not illustrate all possible NITS DNR Addition scenarios.

OASIS Template:UpdateNITSRequest9 AddNITSDNR 9 NITSResourceDescription NITSNITSResourceForecast (optional) NITSResourceDesignation NITSResourceCapacity NITSSchedulingRights AuxiliaryTransmission (optional)

Customer:Updates DNR

Customer:Submits NITS

DNR request to Transmission

Provider

OASIS/ Transmission Provider: I s the DNR request Deficient?

2No

Yes

TP/ TSIP:Sets status of

NITS DNR request to RECEIVED

OASIS Template:UpdateNITSRequest9 AddNITSDNR ASSIGNMENT_REF (STATUS = QUEUED)

OASIS:Sets status of DNR request to COMPLETED

DNR request processed as described in Business Practice Standards, including the NITS Modification of ServiceState Diagram.

04/10/23 17NITS on OASIS Informal Comments