1
Winter 2019 | Deck Specialist | 33 This large waterfront deck held some interesting construction challenges. The first was transport- ing the material to the work zone. With no way to mechanically move the lumber to the lake side, every piece had to be hand-balmed from the rear Wood Deck $25K - $50K WWG Design & Build Fenelon Falls, Ontario, Canada www.wwgdesignandbuild.com Designer: Jon Witt 1ST of the house, down to the embankment and to the water’s edge. The design mandate was to create a platform that would allow uses of the area during the spring high water season. The highwater level is 8 inches below the deck surface, but only for a few weeks each year. Once the deck area was complete, the builder then had o figure out the meandering path and stair system to traverse the steep hill, which has large outcrops of granite bedrock. Decking is fas- tened by the CAMO edge-fastening system for a clean barefoot approved finish. NADRA National Deck Competition Awards 2019

Transcript of NADRA National Deck · 2020-01-03 · NADRA National Deck Competition Awards 2019. NADU DECK...

Page 1: NADRA National Deck · 2020-01-03 · NADRA National Deck Competition Awards 2019. NADU DECK CONTEST WINNERS • TO OUTDOOR 2020 DECK EXPO RECAP Winter2019 SPECIALIST Ideas & Strategies

Winter 2019 | Deck Specialist | 33

This large waterfront deck held some interesting construction challenges. The first was transport-ing the material to the work zone. With no way to mechanically move the lumber to the lake side, every piece had to be hand-balmed from the rear

Wood Deck $25K - $50K

WWG Design & Build Fenelon Falls, Ontario, Canadawww.wwgdesignandbuild.com Designer: Jon Witt

1ST of the house, down to the embankment and to the water’s edge. The design mandate was to create a platform that would allow uses of the area during the spring high water season. The highwater level is 8 inches below the deck surface, but only for a few weeks each year.

Once the deck area was complete, the builder then had o figure out the meandering path and stair system to traverse the steep hill, which has large outcrops of granite bedrock. Decking is fas-tened by the CAMO edge-fastening system for a clean barefoot approved finish.