NAC lecture hall (1), Marshak lecture hall (2), Shepard hall (1), Baskerville hall (1)
-
Upload
terence-tyler -
Category
Documents
-
view
212 -
download
0
Transcript of NAC lecture hall (1), Marshak lecture hall (2), Shepard hall (1), Baskerville hall (1)
Proposal for keyless-keypad for CCNY lecture halls
NAC lecture hall (1), Marshak lecture hall (2), Shepard hall (1), Baskerville hall (1)
Installing keyless keypad in the mentioned halls to provide maximum security for the equipment in them.
What’s the proposal about?
Lockey 2435 Mechanical Keyless Lock Requires no wires, batteries nor electricity. $140.00 Combination code can be 2-7 digits
Sample of keyless-keypad
Lockey 2210 deadbolt $107.92 3-6 digit codes
Sample of keyless-keypad
Can be locked or unlocked by turning the thumb turn.
No combination code needed to lock this lock--just turn the knob.
To unlock, type in your secret code on the keypad and turn the knob.
Lockey 2435 Mechanical Keyless Lock
Advantages of using knob type keyless-keypad
The padlock has a free-spinning stainless steel core shaft that can’t be cut with a hacksaw.
The lock can be changed from right to left hand doors.
Advantages cont’d
Benefits of using keyless-keypad locks
Looking or replacing a stolen key Buying batteries Computer programming It is easy to change combination
No more worrying about:
The lock bolt is hacksaw proof
The outside knob spins freely under heavy torque(force) which protects the mechanism to avoid forced access
Intruder-proofed design
The combinations are completely mechanical
No batteries or electricity
100% automatic
Saves CCNY economically.Saves money for replacing stolen items in the lecture halls.
Maximum security
Benefit of keyless keypads for CCNY
They do not have to wait for security officers to bring keys and as a result having more time to cover their lecture materials.
Benefits for professors
Students would learn more material in a day.
Benefits for students
Contractor (works for 2-3 days): $1,500.00
Locks: 150.00 x 7 = $1050.00
Total spending: $2,550.00
Projected expenses