Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA...
Transcript of Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA...
![Page 1: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/1.jpg)
Nabeel Khalfan
Khalid Hashim
Electricity and Water Authority
![Page 2: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/2.jpg)
Category Quantity
Area 767 km2
Population 1,316,000
Peak load in
2015 3441 MW
Electricity
Generated
Consumption
Per Capita
(EWA Only)
(2014)
16259.61
GWh
12460
kWh/capita
Estimated Peak
load growth rate 7- 8 % /year
![Page 3: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/3.jpg)
3
0
2
4
6
8
10
12
2000
3000
4000
5000
6000
7000
8000
Solar Radiation
Daily Average Sunshine Hours
W h
r/m
2
hrs
Monthly Average Daily Global Radiation and average
Sunshine hours
9.2
hrs
5180
Whr/m2
Parameter Values
GHI 5.4 𝑘𝑊ℎ
𝑚2𝑑𝑎𝑦
DNI 1994 𝑘𝑊ℎ
𝑚2/𝑦𝑒𝑎𝑟
![Page 4: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/4.jpg)
4
Wind summary – Bahrain
Average speeds:
10 m 4.37 m/s
80 m 6.41m/s 100 m 6.67m/s
![Page 5: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/5.jpg)
EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the
required feasibility Studies and supervision
Establishment of 5 MW pilot plant utilizing photovoltaics and wind
turbines.
Performance Assessment for the pilot plant to prepare the future
action plans for the Utility and individual scale RE generation.
19/01/2017 5
![Page 6: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/6.jpg)
6
Establishment of a 5MW Renewable Energies Pilot Plant
Project Description & Scope
5 MW Pilot Plant with combined Technologies (solar
and wind)
3 MW PV solar power
2 MW Wind power
Location: Addur
Expected Completion: 3rd Quarter 2017
Benefits of the Project Diversification of energy production sources.
Lessening dependence on fossil fuels as a single source for
energy.
Protecting the environment through reduction of emitted
gases produced by fossil fuel fired power stations.
Creating more local employment opportunities in the
services sector to support RE technologies.
![Page 7: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/7.jpg)
National Target and Future Plans
Bahraini cabinet approved recently the national plan to raise energy efficiency and the national plan for renewable energy.
According to the plan, the target is to raise the use of renewable energy sources by 5% of the total national energy consumption by the year 2025.
The plan also aims at increasing renewable energy use to 10% by 2035.
![Page 8: Nabeel Khalfan Khalid Hashim Electricity and Water Authority · EWA Pilot Plant and RE Plan EWA Cooperating with International RE Consultation firms for the required feasibility Studies](https://reader034.fdocuments.us/reader034/viewer/2022050405/5f82343b3193772f066fef1b/html5/thumbnails/8.jpg)
19/01/2017 8
Thank You