NAAC 7 EEE

1
It is informed to department faculty that, under Criteria 7 of SSR, the following files were allotted to the following faculty. The file has to be updated with clear purpose, process and outcome well defined. The relevant information can be taken from NAAC SSR, VU Manual and ISO Manual. The soft copies are present in \\10.0.1.2\user\EEE\MANUALS File No. Name of Faculty 1 & 2 DVSB Chaitanya & A Sreehari babu 3 PVS Sobhan & M Subbarao 4 K Balakrishna 7 A Naveenreddy 8 J Jithendranath 12 & 13 G Sreenivasarao 19 J Suresh & M Sandeep 20 S Suman & Ch Umamahesh 22 A Vijaybabu & B Satheeshbabu The above allotted files are to be completed on or before 17/07/2015.

description

czZ

Transcript of NAAC 7 EEE

Page 1: NAAC 7 EEE

It is informed to department faculty that, under Criteria 7 of SSR, the following files were allotted to the following faculty. The file has to be updated with clear purpose, process and outcome well defined. The relevant information can be taken from NAAC SSR, VU Manual and ISO Manual.

The soft copies are present in \\10.0.1.2\user\EEE\MANUALS

File No. Name of Faculty1 & 2 DVSB Chaitanya & A Sreehari babu3 PVS Sobhan & M Subbarao

4 K Balakrishna

7 A Naveenreddy

8 J Jithendranath

12 & 13 G Sreenivasarao

19 J Suresh & M Sandeep

20 S Suman & Ch Umamahesh

22 A Vijaybabu & B Satheeshbabu

The above allotted files are to be completed on or before 17/07/2015.