N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF...

22
N.A. ZUBERI N.A. ZUBERI MANAGING DIRECTOR MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 October 22, 2011 CONVERSION OF EXISTING THERMAL CONVERSION OF EXISTING THERMAL POWER PLANTS POWER PLANTS TO COAL” TO COAL” INTERNATIONAL COAL CONFERENCE INTERNATIONAL COAL CONFERENCE

Transcript of N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF...

Page 1: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

N.A. ZUBERIN.A. ZUBERI

MANAGING DIRECTORMANAGING DIRECTOR

PRIVATE POWER & INFRASTRUCTURE BOARDPRIVATE POWER & INFRASTRUCTURE BOARD

October 22, 2011October 22, 2011

““CONVERSION OF EXISTING CONVERSION OF EXISTING THERMAL POWER PLANTS THERMAL POWER PLANTS

TO COAL”TO COAL”

INTERNATIONAL COAL CONFERENCEINTERNATIONAL COAL CONFERENCE

Page 2: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

C O N T E N T S

Overview of Pakistan Power Sector

Power Plants for Coal Conversion

Issues on Conversion of Power Plants to Coal

Implementation Mechanism for Converting Plants to Coal

Key Features of Mechanism for Converting GENCOs/IPPs to Coal

Conclusion

Page 3: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

MW %

Public Sector

WAPDA/SHYDO/

NA/AJK 11,603 52

PAEC 462 2

Sub-Total 12,065 54

Private Sector

IPPs 8,508 38

KESC 1,756 8

Sub-Total 10,264 46

G. Total 22,329 100

Public SectorThermal

4,900 MW

Nuclear462 MW

Public Sector Hydel

6,703 MW

IPPs10,039 MW

PAKISTAN POWER SECTOR

TOTAL INSTALLED CAPACITY

Page 4: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

STEAM TURBINE POWER PLANTS

GAS TURBINE POWER PLANTS

COMBINED CYCLE POWER PLANTS

RECIPROCATION ENGINES

POWER GENERATIOINPOWER GENERATIOIN TECHNOLOGIESTECHNOLOGIES

Page 5: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

MARDANWARSAK

BANNU

DAUDKHEL

BURHANNEW RAWAT

I.S.P.R

MANGLA

TARBELA

GAKHAR

SAHOWALAK.S.KAKU

RAVI

JAPANKELN.ABAD

SABA

YOUSAF WALA

VEHARI

KAPCO

ROUSCH

UCH

AES

N.G.P.SM.GARH

GUDDU

LIBERTY

DADU

HALARD

LAKHRA

JAMSHORO

KOTRI

HUBCO

KDA-33(KESC)

500 kV Grid Station

220 kV Grid Station

500/220 kV Grid Station

Hydel Power Station

Thermal Power Station

IPPs at 220, 500 kV

IPPs at 132 kV

500 kV T/LINE

220 kV T/LINE

(240)

(3408)

(1000)

(107)

(120)

(195)

(1350)

(310)

CHEP(184)

(355)

(1348)HCPC(126)

(548)

(1655)

(212)

(150)

(850)

(174)(1200)

GAZI BAROTHA

(1450)

CHASNUPPGATTI

BUND RD:

M.GARHGUDDU

JAMSHORO

PAKISTAN POWER SECTOR – TRANSMISSION SYSTEM

G.AHMAD

Page 6: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

PAKISTAN POWER SECTOR PAKISTAN POWER SECTOR FUEL MIX (2009-10)FUEL MIX (2009-10)

Page 7: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

60% power generation based on gas & furnace oil

Gas becoming scarce

Exorbitant cost of imported oil/HSD

Double-edged sword of gas depletion and higher oil prices

resulted in huge circular debt running in billions

The panacea lies in converting thermal power plants to cheaper

fuels such as coal

EXISTING POWER SECTOR SITUATION EXISTING POWER SECTOR SITUATION

Page 8: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

For conventional steam turbine thermal units, the possible option

is to convert them to coal

The benefit of converting the furnace oil plants would be through

savings on fuel cost component

Expedite import of gas or use alternative fuels available such as

LNG for gas turbine or reciprocating engine

POSSIBLE SOLUTIONS TO IMPROVE POSSIBLE SOLUTIONS TO IMPROVE PAKISTAN SECTORPAKISTAN SECTOR

Page 9: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

CANDIDATE PLANTS FOR COAL CANDIDATE PLANTS FOR COAL CONVERSIONCONVERSION

Capacity (MW)

Installed Derated

JAMSHORO 850 675

Guddu unit 3,4* 640 580

M.Garh 1370 1130

SPS faisalabad 1,2* 132 100

NGPS Multan Unit 1,2,3 195 120

Sub Total GENCOs 3187 2605

HUBCO Unit 1,2,3,4 1292 1200

AES Lalpir 362 348

AES Pakgen 362 348

SABA Power 134 126

Sub-Total IPPs 2150 2022

Total 5337 4627

Page 10: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

Involvement of new Capital Costs

Outage time to dismantle old boilers and

assemble/commission new ones

Additional auxiliary consumption thereby reducing the net

generation capacity

Higher O&M costs

Limitation of space for coal storage & ash handling

Probable reduction of efficiency

Availability of coal, and

Environment degradation

ISSUES ON CONVERSION OF STEAM ISSUES ON CONVERSION OF STEAM POWER PLANTS TO COALPOWER PLANTS TO COAL

Page 11: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

Conversion of GENCOs plants to cheaper fuels is

visualized through induction of private sector

contractor(s) in Public Sector Power Stations (concept

approved)

IPPs’ conversion is visualized through devising a

Policy Regime (in process of approval)

IMPLEMENTATION MECHANISM FOR IMPLEMENTATION MECHANISM FOR CONVERSION TO CHEAPER FUELSCONVERSION TO CHEAPER FUELS

Page 12: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

CONVERSION OF GENCOs TO CHEAPER FUEL THROUGH CONVERSION OF GENCOs TO CHEAPER FUEL THROUGH

INDUCTION OF PRIVATE SECTOR GENERATIONINDUCTION OF PRIVATE SECTOR GENERATION

KEY FEATURESKEY FEATURES

Induction of O&M Contractor for 10 years through open bidding

No retrenchment of existing staff;

No capital expenditure and no payment of mobilization advance by

GENCOs / Government of Pakistan (GOP)

No upward revision of tariff due to induction of O&M Contractor;

Evaluation & Selection of O&M Contractor through a criteria based on

benefit sharing, percentage of which to be determined through bidding

process;

Page 13: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

CONVERSION OF IPPS ON CHEAPER FUELSCONVERSION OF IPPS ON CHEAPER FUELS SALIENT FEATURESSALIENT FEATURES

IPPs to carry out due diligence/feasibility study individually for cheaper

alternative fuels as per their technologies.

IPPs be given one year (or less if their conversion plan require less time)

for conversion during which they will be provided half of their Escalable

tariff component (which covers their returns etc) and full Non-Escalable

tariff component (which covers their debt servicing).

Any saving that would be achieved due to switching of fuels be shared

equally amongst the IPPs and the power purchaser.

Page 14: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

CONCLUSION

Conversion of existing thermal power plants to

coal will develop the market for new coal mines –

hence eliminate the MARKET RISK especially for

development of Thar Coal

Page 15: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Page 16: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

THANKSTHANKS

Page 17: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

US$ Billion

Costs 1st year Benefits 1st Year Net Benefits

GENCOs 1.180 3.599 2.419

IPPs 0.805 2.519 1.714

Total 1.985 6.118 4.133

PROBABLE BENEFITS FROM CONVERSION OF PROBABLE BENEFITS FROM CONVERSION OF SUITABLE CANDIDATE PROJECTS TO COALSUITABLE CANDIDATE PROJECTS TO COAL

Page 18: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

BACKUP SLIDESBACKUP SLIDES

Page 19: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

CONVERSION ON CHEAPER FUELSCONVERSION ON CHEAPER FUELSSALIENT FEATURESSALIENT FEATURES

Power Purchaser be allowed to legalize the arrangement and any

extensions in the Term of Power Purchase Agreements with IPPs pursuant

to 1994 Policy through Side Agreements without requiring any approval

from any government agency / regulator. For IPPs pursuant to 2002 Policy

necessary permission of regular shall be needed.

Power Purchaser to have right to negotiate and schedule outage timings

and number of units at a time for conversion, as well as fix priority of IPPs

if more than one IPP approach to it for conversion, and the feasibility study

favours one over the other.

Customs duty at the rate of 5% on the import of equipment, machinery and

spares for carrying out Balancing, Modernization and Replacement (BMR).

Page 20: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

PRE-DEVELOPMENT OF COAL MARKET – A BASIC INGREDIENT FOR DEVELOPMENT OF SINDH COAL

Conversion of existing thermal power plants will pre-develop the

market for new coal mines – hence eliminating the MARKET RISK

especially for development of Thar Coal. As such we expect fullest

support of GOS in our venture.

Page 21: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

COST – BENEFIT ANALYSIS (GENCOS)COST – BENEFIT ANALYSIS (GENCOS)

Costs

Capital Cost US$ 1.15 billion

Increase in O& M expenses US$ 0.032 billion

Environmental mitigation cost (10% of total O&M) US$ 0.001 billion

Total Costs US$ 1.180 billion

Benefits

Fuel Cost Saving using imported coal US$ 3.599 billion

Net BenefitsNet Benefits US$ 2.419 billionUS$ 2.419 billion

Page 22: N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.

COST – BENEFIT ANALYSIS (IPPS)COST – BENEFIT ANALYSIS (IPPS)

Costs

Capital Cost US$ 0.774 billion

Increase in O& M expenses US$ 0.030 billion

Environmental mitigation cost (10% of total O&M) US$ 0.001 billion

Total Costs US$ 0.805 billion

Benefits

Fuel Cost Saving using imported coal US$ 2.519 billion

Net BenefitsNet Benefits US$ 1.714 billionUS$ 1.714 billion