JNNURM PROGRESS REVIEWJNNURM PROGRESS REVIEW

15th January 2009

Projects

State : Karnataka City : Mysore

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Abstract of Projects

Status of projects submitted under JnNURM for Mysore City

Sl. No.

Status of Projects No. of WorksAmount Rs.in

CroresRemarks

1 Projects approved by GoI9 1120.72

2 Projects Pending at GoI 9 610.50

Total 18 1731.22

KUWS & DB

MUDA KSCB KSRTC MCC Tourism Heritage

Sl. Status of Projects No. of Works

Amount Rs. in Crores

No. of Works

Amount Rs. in Crores

No. of Works

Amount Rs. in Crores

No. of Works

Amount Rs. in Crores

No. of Works

Amount Rs. in Crores

No. of

Works

Amount Rs. in Crores

No. of Works

Amount Rs. in Crores

1.

Projects approved by GoI

2 303.36 1 219.03 2 136.2 1 85.25 3 376.88

2 Projects pending at GoI

1 392.58 2 109.7 3 39.72 2 65.60 1 2.90

Total 3 695.94 3 328.73 2 136.2 1 85.25 6 416.60 2 65.60 1 22.90

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProjects Approved by GoI

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency Status

Sector: Water Supply

1. Remodeling of Water Supply distribution network, automation of system and providing integrated management system for Mysore city

194.54 KUWS & DB

2 Augmentation of bulk water supply from river Kabini .

108.82 KUWS & DB Process for acquiring 30 acres of land is initiated. Tender document are being prepared.

WORK FLOW CHART :

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProject Approved by GoI

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency Status

Sector: BSUP

3. Rehabilitation of 20 selected slums of Mysore City.(2788 houses)

17 selected slum rehabilitation

3 slums development works.

Project Cost : Rs. 67.58(In Crores)

45.27 KSCB In Phase-I, 1188 houses have been entrusted to Mysore Nirmithi Kendra at a cost of Rs.1.80 Lakhs per dwelling unit and 1170 houses have been entrusted to different empanelled contractors as approved in the SLEC meeting held on 25-10-08. Balance 430 houses decision to construct houses or to provide infrastructure to be decided

The following works have been started.

a. Mandakally - 480 Housesb. Roopanagar & Bogadi - 144 Housesc. Metagally - 276 Houses d. Hanchya Sathgally Block 1 - 180 Houses e. Hanchya Sathgally Block 2 - 186 HousesTotal 1266 Houses

4. Rehabilitation of 46 selected slums of Mysore city(2500 Houses)

90.93 KSCB As per the SLEC meeting held on 25-10-08,Tenders were finalized and the following pacakges were approved.a)Package II – 396 Housesb)Package III - 348 Housesc)Package VII – Providng Infrastructure to 5 slums.Out of 1244 houses, tenders have been called for 1000 houses on 20/12/08 for which land is awaited from Revenue department

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProject Approved by GoI

Sl. No.

Name of the ProjectAppr cost Rs.

in CroresImplementing

Agency Status

Sector: Transportation

5. Infrastructure Development of Transport System in Mysore

Tendered Cost:Rs. 108.90 crores

Work awarded on: 25.8.08

Contract period: 18 months excluding monsoon period (3 months)

85.25 KSRTC Work Commenced at1. Kuvempunagar .2. RS Naidunagar.3. Sathagalli.4. Moffosil Bus Station.5.Yelwala.6.CBS . Works yet to commence at 1.Chamundi Hills. An amount of Rs. 1005 lakhs has been spent as against the target of Rs 979 lakhs till the end of December 2008.

Sector: Solid Waste Management

6. Development of an integrated Municipal Solid Waste Management (MSW) plant for the city of Mysore

28.98 MCC The Project has been cleared in CSMC meeting held on 19/12/08. Action is taken to Commence IEC activity. Tender documents are being finalised.

Sector: Drainage

7 Remodeling of storm water drain in Mysore (104.67km)

347.28 MCC The Project has been cleared in CSMC meeting held on 19/12/08. Privatization of valleys is in progress.

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProject Approved by GoI

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency Status

Sector: Roads

8. Upgrading 2 lane outer ring road to 6 lane along with service road from Mysore-Bangalore road to Mysore-Nanjungud road (0 to 25 km-western side ) and upgrading 4 laned outer ring road to 6 lane along with service road from Mysore-Bangalore road to Mysore-Bannur road (0 to 7.49 km – Eastern side)

219.03 MUDA Approved by GOI on 15.02.08 in CSMC meeting. Central and State Govt,.share of Rs. 49.28 crores released vide Govt. order No. UDD 44 CSS 2007 dated 25-3-2008. Tender has been floated on 27-3-2008. Only one agency is qualified in Technical Bid and hence rejected by govt. ,Retender is called for four packages on 17-09-2008. The same Notification has been Questioned in the Honourable High Court Vide W.P No: 13270 of 2008. The Honorable High Court has passed an interim order stating that all further proceedings pursuant to the Notification dated 17-09.2008 will be subject to further order of this court. Further process on Notification is in Progress. Last date for receipt of bids 05/01/09

Sector: Others

9. Project Implementation Unit 0.62 MCC Public Health Engineer, Information Technology Officer and Human Resource Development officer have reported. Tender has been called for the remaining posts.

Total 1120.72

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProjects Pending at GoI

Sl. No.

Name of the ProjectAppr

cost Rs. in Crores

Implementing Agency

Status

Sector: Preservation of Water Bodies

1 Conservation on Natural lakes in Mysore-Packages 1 (4No. of Lakes)

6.63 MCC DPR submitted to GoI for approval. Central Water Commission to scrutiny the DPR.

2 Conservation on Natural lakes in Mysore-Package 2 (4 No. of Lakes)

6.46 MCC DPR submitted to GoI for approval. Central Water Commission to scrutiny the DPR.

Sector: Others

3 Setting up of new Modern Abattoirs 26.63 MCC The GOI has been requested to consider this project as an activity under SWM as it is not possible to consider under NABARD as MCC is an Urban area. The matter is under examination of GOI

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProjects Pending at GoI

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency Status

Sector: Roads

4 Construction of balance length of the outer ring road with a 6 lane road along with service road from Bannur road to Nanjungud road (Ch. 7.49km to 16.635km)

90.70 MUDA Final notification for land acquisition completed. Resubmitted to GOI for re-consideration.

Sector: Heritage and Urban Renewal

5 Development of Tourist Infrastructure In Mysore- Pakage1 development of Chamundi Hill

13.78 Tourism Department

DPR submitted to GOI. Awaiting approval from GoI.

Sector: Heritage and Urban Renewal

6 Development of 35 acres Heritage park in front of Lalith Mahal palace in K.C. Layout, Mysore

19.00 MUDA Discussed in CSMC meeting on 15.02.08 to be reconsidered after getting comments from heritage experts. Expert committee to be formed by GoI.

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sionProjects Pending at GoI

Sl. No.

Name of the ProjectAppr cost Rs.

in CroresImplementing

AgencyStatus

7 Conservation of Heritage Buildings. 2.90 Heritage DPR submitted to GOI. Awaiting approval from GoI.

8 Development of Heritage Core 51.82 Tourist Department

Awaiting approval from GoI.

Sector: Sewerage

9 Remodeling of the UGD network in old areas of the city and development of sewage treatment plant ( STP ) for the uncovered areas

392.58 KUWS&DB DPR submitted to GOI. Awaiting approval from GoI.

Total 610.50

REFORMS

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Projects in the pipeline for submission

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency

Status

Sector : BRTS/Roads/other urban transport

1 Restructuring of intermediate ring road and construction of subways in Mysore (27.49km of road and 2 No. of Subways)

20.00 MCC Negotiation underway with 2nd lowest bidder, M/s. CES, Bangalore.

2. Extension of 4 Railway under bridges (RUB’s) from 2 lane to 6 lane across outer ring road (western side) at ch. 1.15km, 1.95, 3.57km and 20.54km (On deposit basis to railways)

29.92 MUDA Railway department to submit estimate. DPR under preparation.

Sector : Heritage & Urban Renewal

3. Improvement of Urban forestry in Mysore (53 No. of Parks totaling to 103.04 acres)

19.00 MCC Submitted DPR to KUIDFC for placing before SLEC and was refused. Request has been made to KUIDFC vide letter No. MCC/SE/JnNURM/147/08-09 dated 01.10.08 to reconsider the project.

4. Providing Infrastructure facilities to heritage buildings and circles of Mysore

20.00 Heritage Department

DPR preparation under progress HUDCO are the consultants.

Jaw

ahar

lal N

ehru

N

atio

nal U

rban

Ren

ewal

Mis

sion

Projects in the pipeline for submission

Sl. No.

Name of the ProjectAppr cost

Rs. in Crores

Implementing Agency

Status

Sector: Water Supply

5. Strengthening of existing Hongalli II & III Stage WSS

47.50 KUWS & DB DPR to be submitted to KUIDFC

6. Augmentation of 50 MLD from III Phase Melapura.

29.50 KUWS & DB DPR finalised. MCC passes resolution. DPR to be submitted to KUIDFC from KWB.

7 Development of ZOO Infrastructure 23.00 Tourism DPR to be submitted to KUIDFC

Total 188.92