My work log

2
Product Work Log Name_________________Robert Sweatt______________________________ Product __________Instructional Fishing Video_________________ Date/Time: 22 September: 12:00 pm – 4:00 pm 23 September: 4:30 am. – 3:30 pm. 23 September: 7:00 pm – 8:30 pm 18 March: 3:30 pm – 4:30 pm 9 April: 4:30 pm – 8:00 pm Activity: Commentary: Practicing and testing conditions of ponds in Florida before I began fishing. Fishing and filming on Lake Jackson in Orlando, Florida. Gathering footage for video. Met with Mr. Kitterman as he taught me how to use a baitcaster. RE-gathering footage for the video on my pond behind my house. Comment/ Suggestions:

Transcript of My work log

Page 1: My work log

Product Work Log

Name_________________Robert Sweatt______________________________

Product __________Instructional Fishing Video_________________

Date/Time:

22 September: 12:00 pm – 4:00 pm

23 September: 4:30 am. – 3:30 pm.

23 September: 7:00 pm – 8:30 pm

18 March: 3:30 pm – 4:30 pm

9 April: 4:30 pm – 8:00 pm

10 April: 5:00 pm- 6:15 pm

Activity:

Commentary: Practicing and testing conditions of ponds in Florida before I began fishing.

Fishing and filming on Lake Jackson in Orlando, Florida.

Gathering footage for video.

Met with Mr. Kitterman as he taught me how to use a baitcaster.

RE-gathering footage for the video on my pond behind my house.

Last minute footage is being filmed for the video.

Comment/Suggestions:

Page 2: My work log

15 April: 3:15 pm – 6:45 pm

Editing video and getting it ready for Senior Boards.