2X500 MW - NNTPP (NEYVELI) BHOOMI POOJA ON 30.06.2014 BY ESSAR PROJECTS
MW Projects
Transcript of MW Projects
-
8/12/2019 MW Projects
1/20
NOUR MWProjectsPresented to:
Saudi Telecom Company STC
Mobile Network Department
-
8/12/2019 MW Projects
2/20
Presentation Contents
Clients and Suppliers
Introduction to MW Turnkey Implementation
Capabilities Completed MW Projects
ProjectsSummary
Question Session
-
8/12/2019 MW Projects
3/20
Clients & Suppliers
Nour completed several MW Projects through largeManufacturers and Solution Providers, such as, LucentTechnologies International, Ericsson, Nokia and Motorola
Nour utilized the MW Equipments from HARRIS, NERA,ERICSSON, NOKIA, ALCATEL, P-COM and DMC
Nour completed the mentioned variety of projects for severalclients such as, Saudi Telecom Co., General IntelligenceDepartment, Public Security Directorate, Qatars Ministry ofInterior, Saudi Border Guard Forces, Saudi ConsolidatedElectric Company, Ministry of Defense & Civil Aviation andmuch more.
-
8/12/2019 MW Projects
4/20
MW TURNKEY
CAPABILITIES
Site & LOS
Survey
MW
Design
MW
Installation
& Testing
As-BuiltDocument
Production
System
Integration,
Operation,
Maintenance &Optimization
Civil Major &
Minor Design,
& Construction
Complete
Administrative,
Engineering &
Skilled Stuff
-
8/12/2019 MW Projects
5/20
Site & LOS Survey
Green Filed Site Survey: for availability of Main Power &suitability of Site-Lot for civil construction
Existing Site Survey: for availability of Floor Space,Communication Channels, DC Power, Sizing the HVAC,Tower Survey with existing loads, etc.
Line-of-Sight Survey: to verify the connection possibilitybetween the two sites under study utilizing DGPS Survey Set
Documentation: to gather all the collected information and tointroduce a Basic Analysis of sitessuitability
-
8/12/2019 MW Projects
6/20
MW Design
Verify the possible connectivity by means of Collected
Data along the path using Differential GPS, and to
compare it with the Digital Maps Data-Points as well
Finding the most suitable Antenna Heights and Mast
Height Design Optimization by suggestion of Space Diversity,
Frequency Diversity, Passive Repeaters, Passive
Reflectors, etc.
-
8/12/2019 MW Projects
7/20
MW System Installation, Power-up and Commissioning
MW System Testing (Connectivity and Stability Tests) overstandard periods to ensure the Application of Design Criteria
and to suggest necessary Corrective Action or Optimization MW Network Management System Installation, especially
the FarScan of Harris MW Radios
MW Installation & Testing
-
8/12/2019 MW Projects
8/20
Major Civil Design
Site Layout Design
Tower Analysis and Suggestion of Reinforcement (if necessary)
Electrical Network Design for Grounding, Power
Connectivity, Lightning Protection, etc.
Minor Civil Design
Antenna Mount and Feeder Gantry
Upgrading of Existing Sites to house the new equipment
Ability to Design a Roof-Top Site
-
8/12/2019 MW Projects
9/20
Civil Constructions
A Complete Site Construction, including Foundation
Casting, Tower Erection, Equipment & Generator Shelters
Erection, Site Fencing and Electrical Network Preparation
Shelter Preparation and Testing at Nour Warehouses
-
8/12/2019 MW Projects
10/20
As-Built Documentation
It is being prepared throughout the Construction and
Installation Process to Document any changes
As-Built Document is considered the most important
document in the Hand-Over Stage, Hence, it is Checkedcarefully and its Softcopy is saved on CD-Archives
-
8/12/2019 MW Projects
11/20
Operation & Maintenance
Specialized Engineers and Technicians to Operate and
Configure the Various Network Elements.
All the Necessary Test Equipment for Fault Finding and
Rapid Maintenance
Team Capability of Integrating the various elements to theNetworksManagement System
Equipment and Skills to Monitor the Site Performance for
Preventive Maintenance
Nour Offices are distributed in different cities of the
Kingdom, to ensure quick response to customer needs
-
8/12/2019 MW Projects
12/20
Completed MW Projects
1- MW Backbone Network for Saudi PSD (West)
2- MW Backbone Network for Saudi GID (West)
3- MW Network for Riyadh PSD (Central)
4- MW Network Upgrading for Lucent Technologies
5- Junction MW Network for Saudi Telecom Co.
6- MW Connectivity Links for GSM Base Stations ofLucent, Ericsson & Nokia Sites
-
8/12/2019 MW Projects
13/20
MW Network for PSD (West)
Client: Public Security Directorate
Location: Makkah, Jeddah and Taif
Period: 1998
MW Equipment: Alcatel PDH Radio
Frequency Band: 2 and 4 GHz
No. of Hops: 12 Hops
Job Description:
MW System Design MW Installation, Testing & Commissioning
Complete MoP and As-Built Documentation
-
8/12/2019 MW Projects
14/20
MW Network for GID (West)
Client: General Intelligence Department
Location: Makkah, Jeddah and Taif
Period: 1999
MW Equp.: Harris Quadralink 4 T1 PDH Radio
Frequency Band: 2 GHz
No. of Hops: 7 Hops
Job Description:
MW Installation, Testing & Commissioning Complete MoP and As-Built Documentation
Installation and Setup of Harris FarScan NMS
-
8/12/2019 MW Projects
15/20
MW Network for PSD (Center)
Client: Public Security Directorate (Central)
Location: Riyadh
Period: 2000
MW Equipment: Harris Microstar PDH 4E1
Frequency Band: 7 GHz
No. of Hops: 6 Hops
Job Description:
MW Installation, Testing & Commissioning Complete MoP and As-Built Documentation
Installation and Setup for Harris FarScan NMS
-
8/12/2019 MW Projects
16/20
MW System Upgrading
Client: Lucent Technologies International
Location: Kingdom Wide
Period: 1999
MW Equp.: Harris Microstar PDH Radio 16E1
Frequency Band: 7, 15, 23 and 38 GHz
No. of Hops: More than 120 Hops
Job Description:
Software Upgrading for 1+1 Protected System Complete Documentation and Inventory
-
8/12/2019 MW Projects
17/20
Junction MW Network for STC
Client: Saudi Telecom Co. ( Through LTII )
Location: Kingdom Wide Period: 1997 up to 1999
MW Equipment: NERA SDH STM-1 Radio
Frequency Band: 6 and 11 GHz
No. of Hops: 64 Hops
Job Description:
MW System Design and Optimization
MW Installation, Testing & Commissioning
Complete Frequency Plan, Interference Analysis, PropagationSurvey, MoP and As-Built Documentation
Setting-up the Space Diversity Delay Cable, Adjusting GroupDelay (ATDE) and Optimizing Diversity Spacing
Passive Re eater Ali nment
-
8/12/2019 MW Projects
18/20
GSM MW Connectivity (1 of 2)
Client: Saudi Telecom Co. (Direct Contracting)
Location: Kingdom Wide
Period: 2000 up to Present
MW Equipment: Microstar (Harris), Flexihopper (Nokia),Tel-link (P-COM) and Mini-link (Ericsson) PDH Radios 4, 8and 16 E1
Frequency Band: 7, 15, 23 and 38 GHz
No. of Hops: More than 500 Hops
-
8/12/2019 MW Projects
19/20
GSM MW Connectivity (2 of 2)
Job Description: Line-of-Sight Survey (Preliminary Design Step)
MW Documentation and Preparation of PAT Documents
Procurement of Materials (Radio, Cabling, Data Rack, etc.)
MW Systems Swap (low capacity to higher one)
Complete MW System Installation, Alignment, Panning andConfiguration
Alignment of Passive Repeaters
Performing Fade Margin and Stability Test.
MW Hop Testing (PAT to customerssatisfaction)
System Handover to O&M Department
-
8/12/2019 MW Projects
20/20
Questions & Answers Session