MV BERING ID
Inspected in port Shanghai from 26th to 28th Sept. 2013 by NCL
![Page 2: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/2.jpg)
Forward side view accommodation ladder
After view port side ship’s hull view
![Page 3: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/3.jpg)
Port side Load line mark view
Isolating valve inspected in order Fresh water filling pipe secured
![Page 4: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/4.jpg)
After winch well maintained After winch clutch level securing pin in place
After mooring line well maintained poop deck garbage station
![Page 5: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/5.jpg)
Poop deck bulkhead cracked coating Oxygen bottles well stored Well treated by ground and touch up
Air pipe valve hand wheel corroded s main deck in way of No.5 ch well maintained
![Page 6: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/6.jpg)
No.5 H s coaming view log stanchion s of no.5 hold maintained
Main deck s of No.5,4 H well maintained step in cross deck of No.5,4 corroded
![Page 7: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/7.jpg)
No.4 mast house view No.5 CH condition
No.5 cargo hold condition
![Page 8: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/8.jpg)
No.5 cargo hold condition view
No.5 cargo hold condition view
![Page 9: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/9.jpg)
No.5 cargo hold condition view
No.4 cargo hold condition view
![Page 10: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/10.jpg)
No.4 cargo hold condition view
No.4 cargo hold condition view
![Page 11: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/11.jpg)
No.4 cargo hold condition view
No.4 H s coaming well maintained No.4 H s main deck well maintained
![Page 12: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/12.jpg)
S side bulwark well maintained cross deck no.3,4 partly rusted
No.3 H s comaing load stanchion s of No.3 h maintained
![Page 13: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/13.jpg)
Log stanchion s of No.3 H maintained bulwark stiffener s of No.3 H corroded
No.2 cargo hold condition view
![Page 14: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/14.jpg)
No.2 cargo hold condition view
No.2 cargo hold condition view
![Page 15: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/15.jpg)
No.2 cargo hold condition view
No.2 cargo hold condition view
![Page 16: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/16.jpg)
Cross deck No.2,3 partly rusted Main deck s of No.2 H maintained
Log stanchion s of No.2 H well maintained Main deck s of No.2 H well maintained
![Page 17: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/17.jpg)
Main deck s of No.1 H well maintained log stanchion s of no.1 H well maintained
Cross deck fore of No.1 H partly rusted Star board side windlass view
![Page 18: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/18.jpg)
Port side windlass view forecastle deck maintained
Forecastle deck maintained Echo sounder in good order
![Page 19: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/19.jpg)
Dewater system control panel Autopilot station in order
Accommodation stair conditoin officer washing machines station in order
![Page 20: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/20.jpg)
Ship
Ship office condition officer bathing room
Office WC condition Office WC room condition
![Page 21: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/21.jpg)
Galley room condition Galley room condition
Office mess room condition office mess room condition
![Page 22: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/22.jpg)
Office room sofa condition accommodation alleyway
Crew WC crew bath device condition
![Page 23: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/23.jpg)
Gymnasium view crew washing machines
Port side Life raft view Bridge deck starboard side view
![Page 24: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/24.jpg)
Bridge deck star board view star board side life raft
Crew WC washing basin Crew staff bath device
![Page 25: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/25.jpg)
Aux. Boiler top view Aux. Boiler top view
Engine Grounding machine in work shop ME top view
![Page 26: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/26.jpg)
Incinerator view ME exhaust manifold
Spare parts store room spare parts store room
![Page 27: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/27.jpg)
New purifier control panel new Al Cap purifier installed in May 2013
AE fuel oil flow meter ME fuel oil flow meter
![Page 28: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/28.jpg)
New purifier feed oil pump Main air compressor
AE condition AE condition
![Page 29: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/29.jpg)
AE tank top condition view AE condition view
AE
AE tank top condition view ME port side scavenging deck view
![Page 30: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/30.jpg)
ME area tank top condition view ME port side view
Bilge water pump and pipe view storm valve condition view
![Page 31: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/31.jpg)
O.W.S condition view Engine room tank top condition view
OWS over boat valve ME port side view
![Page 32: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/32.jpg)
Engine room MGP control panel Quick close valve control station
Aux. Boiler exhaust pipe wasted Engine room funnel condition Which repaired by ship staff
![Page 33: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/33.jpg)
Funnel damper operation tested in order Engine vent damper tested in order
Batter for GMDSS in order life boat inspected in order
![Page 34: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/34.jpg)
Life boat engine tested in order incinerator tested in order
Deck crane inspected in order crane in side in cleaning condition
![Page 35: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/35.jpg)
Crane in side fire extinguishers to be inspected P side of No.1 H deck and stanchion maintained
No.1 CH condition view
![Page 36: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/36.jpg)
No1 cargo hold condition view
No.1 cargo hold condition view
![Page 37: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/37.jpg)
No.1 cargo hold condition view
No.1 cargo hold condition view
![Page 38: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/38.jpg)
No.3 Cargo hold condition view
No.3 cargo hold condition view
![Page 39: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/39.jpg)
No.3 cargo hold condition view
No.3 cargo hold condition view
![Page 40: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/40.jpg)
No.3 cargo hold condition view
No.3 cargo hold condition view
![Page 41: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/41.jpg)
No.3 H lower side view S side life boat launched in water
Deck crane hook condition view ME exhaust valve reconditioned
![Page 42: MV BERING ID Inspected in port Shanghai from 26 th to 28 th Sept. 2013 by NCL.](https://reader031.fdocuments.us/reader031/viewer/2022032516/56649c385503460f948e13ca/html5/thumbnails/42.jpg)
ME exhaust valve seat reconditioned Sopep materials inspected in order
Deck crane slewing bearing measure tools Ship ready for departure