1. INTRODUCTION

1.1 Project background

Taylor’s Lakeside University Campus (here in after the “client”) is desirous to build a musical

theater at the middle of the lake. The site of the proposed musical theater sits on estimating

50m x 50m area of the existing land.

There will be a water platform constructed in the middle of the lake between commercial block

and the educational block of Taylors Lakeside University campus. The platform will with the size

of 10x10m . There will be a bridge/ walk way connecting the side of the lake to the platform

1.2 Objectives & Benefits-cut cost as the management of taylor’s lakeside campus do not have to fork out money to rent stages, tents as well as the pa system

-it benefit taylor’s lakeside campus as we do not have a formal and propal performance stage

- on the other hand, it is able to promote or also encourage the performing arts club to perform more as many talented people are pretty shy to show out their talent

1.3 Management chart

2. SITE LOCATION AND CONDITONS

CLIENT

Architect Engineer Landscape Architect

Contractor Quantity Surveyor

Page 3: Musical Theater

2.1 SITE LOCATION

The project site is located in middle of the lake of Taylor’s Lakeside University, and

comes under the local council of Majlis Perbandaran Subang Jaya.

2.2 SITE CONDITIONS

The site is currently not under any construction and the water at the lake is calm and it is

regularly treated thou the lake is under-utilized by the client.

3.0 SCOPE OF PROJECT

3.1 The scopes of works consist of the following:

Civil and structural (external works) for the water platform of the musical theatre of

the middle of the lake. The infra works consist of earthwork, water reticulation,

sewerage, drainage, storm water treatment device, all walk way and landscaping

works.

Walkway/bridge that connects from the side of the lake to the platform.

Edit on the side walkway to a multipurpose stairways( for walkway + seating)

4.0 OVERALL SCOPE OF WORK

4.1 ARCHTECT

DESIGN THE OVERALL STRUCTURE OF THE MUSICAL THEATRE AND DECIDE ON SELECTED

MATERIALS TO USE THROUGHOUT THE PROJECT.

4.2 ENGINEER

PLAN THE earthwork, water reticulation, sewerage, drainage, all walk way and

landscaping works of the project.

4.3 QUANTITY SURVEYOR

ESTIMATE THE COST OF THE OVERALL PROJECT AND PREPARE ALL THE CONTRACTS BETWEEN

THE CLIENT AND THE CONSTRUCTION TEAM.

4.4 LANDSCAPE ARCHITECT

Page 4: Musical Theater

DESIGN THE OVERALL SITE LAYOUT of the public spaces and managing the storm water

devices

4.5 CONTRACTOR

DELIVER THE PROJECT TO CLIENT’S REQUIREMENTS THAT IS TO THE BRIEF, BUDGET AND

PROGRAMME. PREPARE TENDER FOR SUB-CONTRACTOR AND SELECT THE MOST SUITABLE

PRICE AND SKILL

5.0 CONCEPT DESIGN –STRUCTURAL

5.1 DESIGN CONCEPT – STRUCTURAL

Overall, the design shall be based on the concept that it is

Safe;

Cost-effective;

Economical;

Easily and timely constructible; and

Minimal maintenance required.

6.0 Alternative Plans

a. Napping zone (bean bag room, board game zone)b. Water sport centre (kayaking, swan boat)c. Rock Climbing Zone (on the lake)d. Rock Climbing Zone (above LT20)e. Bin Chute ( from level 8 to level 2)f. Musical Theatre (on the lake)g. Mini Garden ( on the roof)h. Multipurpose mini sport arena (above staff car park)

7.0 Procedure before construction

No. Procedure Time toComplete

AssociatedCost

Page 5: Musical Theater

1Submission to Local Authority through OSC (OneStop Center of the Municipality of Subang Jaya)Agency: Municipality of Subang Jaya (MPSJ)

1 Day MYR 480

2 Obtain Development Order (DO) from Planning Dept

28 Days No charge

3 Obtain Water ApprovalAgency: Water Authority SYABAS

14 Days No charge

4 Obtain Hoarding & Signboard Approval 7 Days MYR 1,514

5 Obtain RORO Bin Approval Agency: Municipality of Subang Jaya (MPSJ)

7 Days No charge

6 Request Water Clearance Agency: Water Authority SYABAS

1 Day MYR 1,000

7 Water Inspection Agency: Water Authority SYABAS

1 Day No charge

8 Water Report Agency: Water Authority SYABAS

11 Days No charge

9 Deposit G1-G21 Forms and F Form to OSC Agency: Municipality of Subang Jaya (MPSJ)

1 Day No charge

10 Deposit G1-G21 Forms and F Form to Board ofArchitect/Engineer MalaysiaAgency: Board of Architect/Engineer Malaysia

1 Day No charge

11 Obtain Water Connection Agency: Water Authority SYABAS

1 Day MYR 30

12 Obtain Landscape Approval Agency: Municipality of Subang Jaya (MPSJ)

7 Days No charge

13 Obtain Street Lighting Approval Agency: Municipality of Subang Jaya (MPSJ)

7 Days No charge

14 Obtain Building Plan Approval Agency: Municipality of Subang Jaya (MPSJ)

17 Days MYR 1,301