Mushtaq Hussain Resume Word Format

4
Mushtaq Hussain 5-A Woodside Ave. Unit 38, Danbury, CT, 06810-7130, USA; Phone: +1-203-730-1120, Mobile: +1-516-342-0597, Email: [email protected] Career Profile With several years of experience in engineering & technical roles within fast-paced & high-stressed environment. Expert in performing comprehensive field maintenance, overseeing project planning, & leading diverse teams. Equipped with a significant ability to leverage skills in project management & introduce new tools for cost/time savings & efficiency. Key Competencies Field Planning SAP System- R/3 Version 4.6C (PM & MM modules) Maintain KPI with GAP analysis Spare Management & Inventory- BOM/MDRM/SPIR Primavera (P6)- Turnaround Planning and Emergency Shutdown SHEM safety practices Expert in MS Office Professional Experience Sr. Planning Engineer (2013- May 2016) SABIC, IBN RUSHD, YANBU, SAUDI ARABIA Prime Responsibilities: Performed routine maintenance & planning activities; Handled emergency Shutdown; Operated SAP based validation & addition; Spares Managements; Constructed projects with Primavera P6; Supported Turn Around planning during preparation & execution phases; Issued monthly KPI report with gape analysis; Created service PR & follow up with GBS for creation of PO;

Transcript of Mushtaq Hussain Resume Word Format

Page 1: Mushtaq Hussain Resume Word Format

Mushtaq Hussain 5-A Woodside Ave. Unit 38, Danbury, CT, 06810-7130, USA; Phone: +1-203-730-1120, Mobile: +1-516-342-0597, Email: [email protected]

Career ProfileWith several years of experience in engineering & technical roles within fast-paced & high-stressed environment. Expert in performing comprehensive field maintenance, overseeing project planning, & leading diverse teams. Equipped with a significant ability to leverage skills in project management & introduce new tools for cost/time savings & efficiency.

Key Competencies Field Planning SAP System- R/3 Version 4.6C (PM & MM modules) Maintain KPI with GAP analysis Spare Management & Inventory- BOM/MDRM/SPIR Primavera (P6)- Turnaround Planning and Emergency Shutdown SHEM safety practices Expert in MS Office

Professional ExperienceSr. Planning Engineer (2013- May 2016)SABIC, IBN RUSHD, YANBU, SAUDI ARABIA Prime Responsibilities:

Performed routine maintenance & planning activities; Handled emergency Shutdown; Operated SAP based validation & addition; Spares Managements; Constructed projects with Primavera P6; Supported Turn Around planning during preparation & execution phases; Issued monthly KPI report with gape analysis; Created service PR & follow up with GBS for creation of PO;

Application tools SAP system R/3, VERSION 4.6C. both PM & MM modules; MDRM (Master Data Record Manager) Web based tool material

searching &creating material number; PRIMVERA

Planning Engineer (2004-2013)

Page 2: Mushtaq Hussain Resume Word Format

SABIC, IBN RUSHD, YANBU, SAUDI ARABIA Prime Responsibilities:

Released approved notification & process work orders for field maintenance & workshop; inspected site & equipment, checked spares/ equipment availability & plan/schedule accordingly;

Coordinated with other departments to prepare weekly & monthly plans, & scheduled according to priority, using SAP;

Lead daily meeting with operations, maintenance & reliability to resolve outstanding issues;

Created service /refurbish Purchase Requisition (PR), technical scope, for external vendors;

Coordinated with procurement & logistics to ensure material availability;

Lead team to ensure stakeholder satisfaction; Created Bill of Material for equipment & submit to SAP uploading team; Created service PR & followed up with GBS for creation PO; Implemented the Root Cause Analysis (RCA) Methodology; Performed a wide variety of field engineering/planning related tasks

within a fast-paced environment which included processing work orders, performing routine field maintenance, determining priorities &/or requirements, & performing in-depth equipment inspections;

Played a lead role in successful management of an emergency shutdown which required using Primavera (P6) for all shutdown activities;

Planed & execute for materials, equipment, & resources by effectively using SAP;

Overhauling & installation of pumps (centrifugal, sump, hydraulic), valve, compressors conveyers, blowers, & piping;

Controlled KPI’s, PM (preventive maintenance), EP (emergency percentage), RWR (rework rate), MHEA (man hours estimating accuracy), MHU (man hour utilization), & MBC (maintenance backlog completion);

Worked as Plant Maintenance, & Shift Supervisor as required to diagnose faults

Application tools: SAP system R/3, VERSION 4.6C. both PM & MM modules; MDRM (Master Data Record Manager), Web based material search &

create material number

Field Maintenance Supervisor (1996-2004)SABIC, IBN RUSHD YANBU, SAUDI ARABIA

Prime Responsibilities:

Page 3: Mushtaq Hussain Resume Word Format

Breakdown & preventative maintenance at waste water treatment plant;

Performed routine filter cleaning activities; Assessed pumps (centrifugal, reciprocating, boiler feed, waste water

sludge, HTM pumps & dosing pump); Overhauled different type of gear boxes, conveyers, blowers,

exchangers, agitators, screw conveyer, compressors, centrifugal chiller & polyester plant equipment i.e. frame, crimper, dryer, dancing roller frame & steam duct tilting station etc.

Other Responsibilities: Preventive Maintenance

o Scheduled monitoring & lubrication of equipment like pumps, blowers, extruders agitators

o Scheduled inspection, cleaning & repairs of air & oil filters, heat exchangers, oil & gas coolers, strainers & steam trap

Shift Maintenance Supervisor o Managed maintenance activities of the petrochemical plant (PTA,

aromatics, & acidic acid plant) & the polyester plant; o Managed a diverse group of people with Process Safety

Management & Mechanical integrity procedures;o Kept the entire complex running 24/7

Annual Shutdown Maintenanceo Prepared equipment for overhauling packages;o Arranged material according to BOM;o Supervised complete overhauling of scheduled equipment;o Supervised cleaning & jetting of pipes, vessels & tanks

Manager Maintenance (1984-May 1996)NATIONAL FIBERS LIMITED, KARACHI, PAKISTANJoined N.F.L in the capacity of Technical Officer & then got promoted as Dy. Manager Maintenance in 1989 & then got promoted as Manager Maintenance in 1998

Prime Responsibilities:

Erection & commissioning of National Fiber’s plant with vendor; Erection & commissioning of polymer line & Draw/ Fiber line (Zimmer

technologies) with vendors; Handled shift maintenance, & material planning dept. for annual

shutdown etc.; Supervised centralized maintenance overhauling work shop; Inspection of materials according to the equipment drawing.

Page 4: Mushtaq Hussain Resume Word Format

Education

Bachelors of Mechanical Engineering- N.E.D. University of Engineering & Technology, Pakistan

D.A.E Mechanical- Sindh Board of Technology Education, Pakistan