Page 1 of 19 MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. 2019-05-401 Design and Build Services Singletrack Trails: River Ridge Common Phase 3 July 19, 2019

Transcript of MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter...

Page 1: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

Page1of19

MUNICIPALITYOFTHEDISTRICTOFLUNENBURG

RFPNo.2019-05-401

DesignandBuildServicesSingletrackTrails:

RiverRidgeCommonPhase3

July19,2019

Page 2: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

Page2of19

1. PURPOSE..................................................................................................................................3

2. BACKGROUND.........................................................................................................................3

3. SCOPEOFWORKANDLEVELOFEFFORT.................................................................................4

4. GENERALCONSIDERATIONS,TECHNICALSPECIFICATIONS,ANDREFERENCESTANDARDS....6

5. WARRANTY..............................................................................................................................8

6. STEERINGCOMMITTEE............................................................................................................8

7. DELIVERABLES.........................................................................................................................8

8. DOCUMENTSACCOMPANYINGTHISRFP................................................................................9

9. SITEVISIT.................................................................................................................................9

10. INSTRUCTIONSTOPROPONENTS..........................................................................................9

11. REQUESTFORPROPOSALSREQUIREMENTS.......................................................................10

12. EVALUATION.......................................................................................................................13

13. GENERALTERMSANDCONDITIONS....................................................................................15

Page 3: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page3of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________1. PURPOSEThisRequestforProposal(hereafterreferredtoasthe“Proposal”orthe“RFP”)outlinestherequirementsoftheMunicipalityoftheDistrictofLunenburg(hereafterreferredtoasthe“Municipality”or“MODL”)withregardtodesignandbuildservicesbyqualifiedprofessionalfirmsandindividuals(hereafterreferredtoasthe“Proponent”)fornon-motorisedsharedusesingletracktrails.ThesesingletracktrailsmustbebuilttothebestpracticesustainabletrailstandardsoftheInternationalMountainBikeAssociation(“IMBA”)andtheUnitedStatesForestService(“USFS”),andgenerallymeettheIMBATrailClassificationfor“MoreDifficultBlueSquare”trails.TheprojectsiteislocatedontheRiverRidgeCommon(“RRC”)parkproperty,at4668Highway10inNewGermany,NovaScotia.2. BACKGROUNDMODListhethirdlargestruralmunicipalityinNovaScotiaintermsoftotalpropertyassessmentandencompassesageographicarearepresentingover432,000acres.AshortcommutetotheprovincialcapitalofHalifax,theMunicipalityishometoagrowingpopulationofover25,000andisconsideredoneofthe"hotspots"fordevelopmentandgrowthinNovaScotia.TheMunicipalitycurrentlyhasaworkforceof40employeeswhoworkinvariousdepartmentssuchasEngineeringandPublicWorks,EconomicDevelopment,Finance,Administration,PlanningandDevelopmentServices,Building/FireInspection,Recreation,andSolidWasteManagement.GovernanceofMODLisbolsteredbystrongpartnershipswithneighbouringmunicipalunits.RiverRidgeCommonisamulti-year,phaseddevelopmentofvariousparkcomponentsona115acreproperty,dividedbytheSouthShoreAnnapolisValley(rail)Trailinto2distinctparcels.The15acreLowerParkisaformergravelpit,situatedbetweenHighway10andtherailtrail.The100acreUpperParkareaisaformerwoodlot,tothenorthoftherailtrail,andistheprimaryfocusoftheworkdescribedinthisRFP(seeattachedmapsheetsofprojectsite).TheRiverRidgeCommontrailnetworkisintendedtoaccommodatevariousyear-round,non-motorisedactivities.Todate,intheUpperPark,existingformerwoodlotroadsandseveralnewsegmentsoftrailhavebeendevelopedintoanetworkofapproximately1.7kmofnon-motorised,graveltread2mwide,gentle,easy,obstacle-freetrail,whichmeetsthebestpracticeguidelinesfortrailaccessibilityforallusers.Additionaltrailsegmentsofthistypewillbeaddedinthenearfuture,asshownontheattachedtopographicalTrailSystemOverviewmap.TheproposedsingletracktrailsystemshouldbedevelopedandincorporatedintotheoverallRRCtrailnetwork,toinvitemoreadventuroususerstoexploreandexperiencetheparkbeyondtheeasygraveltrails,withasmoothprogressionoftechnicaltrailuseskills.Thesingletrackshouldpromoteapositive,fun,andsafeuserexperience,andencourageneweruserstobecomesingletracktrailaficionados.

Page 4: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page4of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________3. SCOPEOFWORKANDLEVELOFEFFORTInthiswork,theMODLisseekingto(A)planaconceptforoverallsingletracktraildevelopmentand(B)constructthefirstsegmentsofsingletracktrailontheRiverRidgeCommonUpperParkparcel.(A)SingletrackConceptPlanworkwillincludeconsultationwiththeRRCProjectManager(anexperiencedmountainbikerandtrailuser)toestablishageneral,high-levelconceptfortheoveralldevelopmentofasingletracktrailsystemintheUpperParkparcel:

• Thissystemiscurrentlytargetedtobeapproximately7-10+kmintotallengthat(future)finalbuildout,constructedinandaroundtheUpperPark’seasygraveltrailsystem.

o Thegentlegraveltrailsystem,asshownontheattachedtopographicalTrailSystemOverviewmap,isdefinedbybothexistingtrailsegmentsandaroutefortheremainderthathasbeenpreviouslymappedandflaggedontheground(tobeconstructedunderaseparatecontract).

• Fortheplanningwork,thesuccessfulproponentwillbeexpectedtodeliveraplan(atminimumadigitallyannotatedversionoftheattachedtopographicalTrailSystemOverviewmap),showing:

o Proposedsingletracktrailsystem(incl.developmentzonesandgeneralroutesforproposedtrailsegments),

o Locationsofpositiveandnegativecontrolpoints,o Approximatelocations,characteristics,andcostsofanyproposedstructures,ando Estimatedlengthoftrailandconstructioncostperlinealmetreofeachtrail

segment/developmentzone.

• TheSingletrackConceptPlanmustbereviewedandapprovedbytheRRCProjectManager/MODLbeforeconstructionworkmaycommence.

• Itisemphasizedthatthiscomponentoftheworkisnotadetailedplanningortrailmappinganddesignprocess,butisonlyintendedtoproduceabasicgeneralconceptplanandcostestimatesforthepark’ssingletracktrailsystem.ThiswillserveasareferencetohelptheMODLplantheoverallsingletracktraildevelopmentandconstructionprocessthroughpotentialmultiplephasesoffutureconstruction.

• ThisworkDOESNOTentailANYofthefollowing-publicorstakeholder(otherthanRRCProjectManager)consultation,formal(e.g.municipalplanninglevel)siteevaluation,strategiceconomicdevelopment,marketing,branding,signage,oranyworkotherthanthatdirectlyrelatedtosingletracktrailnetworkconceptplanning.

Page 5: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page5of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________(B)Singletrackconstructionworkwillincludefinallayoutandconstructionoftheinitialphaseofsingletrackdevelopmentonthesubjectproperty:

• Thesegment(s)oftrailtobeconstructedinthisphasewillbebasedontheplanningworkinitem(A)above,tomeettheoverallplanningandconstructionlevelofeffortshownbelow.

• Inlieuofextensivemappinganddesigndocumentationforthisconstructionwork,thesuccessfulProponentwillinsteaddevelopafinallayoutflaggedontheground,tobeapprovedbyRRCProjectManagerbeforeconstructionmaycommence.

• Constructionworkshallincludeclearingofthetrailcorridor,grubbing,shaping,andcompactionofthetrailtread.

Thecombinedtotallevelofeffortforbothcomponents(A)and(B)ofthisworkshallnotexceed$50,000.00(notinclusiveofNovaScotiaHST).Theconstructionworkincomponent(B)isthemainpriorityforthisproject,soitisexpectedthatthiswillcomprisethebulkoftheoveralllevelofeffort.Timeisoftheessence,andprojectconstructionworkmustbesubstantiallycompletedbyMarch6,2020.Anyfinalproofrolling/compactionoffinishedtrailbedmustbecompletedinsuitablydrysoilconditions;intheeventthatthiscannotbeachievedbeforethesubstantialcompletiondeadlineduetoprevailingweatherconditions,thechosencontractorandMODLwillnegotiateamutuallyagreed-uponextensionforthiscomponentoftheworkonly.

Page 6: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page6of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________4. GENERALCONSIDERATIONS,TECHNICALSPECIFICATIONS,ANDREFERENCESTANDARDSThefollowinggeneralconsiderationsapplytotheRRCsingletracktraildevelopmentprogram:

• SingletrackdevelopmentmustbeintegratedwiththeremainderoftheRRCtrailprogram,tothecurrentbestpracticesofsustainabletraildesignandconstruction,foroptimaluserexperience.

o Afundamentalplanningparameterisconfiguringthesingletracktrailsystemasaseriesoflinkedloopedsegmentsorzones,withoutersegment/zoneboundariesdefinedbythegraveltrailprogramand/orparkpropertyboundaries.

• Trailshouldgenerallybefocussedonclassicintermediatesingletrackcrosscountrymountainbikeriding,enjoyablyrideableinbothdirections,withoutanytechnicaltrailfeatures(suchaselevatedbridges,jumps,drops,etc.).AfterbecomingfamiliarwiththeRRCsingletracktrailsystem,mountainbikeusersofintermediateskillshouldbeabletogenerallyenjoythetrailswithoutoftenhavingtoputafootdownforsupportorwalkovermoretechnicalsections.

• Trailmayhaveamixed“hybrid”styleofoveralltrailflow(e.g.IMBA,2004,p.97),ablendof“openandflowing”and“tightandtechnical”styles,whichcanvarybetweensegments.Trailshouldbedesignedtoallownomorethanlowtomoderateratesofbikespeed,throughappropriateuseofcorralling,chokes,andturns.Thiswillhelpreducetheriskofhigh-speed,injuriouscollisionsorcrashes.

• Trailmustaccommodateshareduseforyear-roundactivitiesincludingwalking,running,mountainbiking,andsnowshoeing.

• Ifdeemedfeasible,overallplanningshouldincludesometrailsegmentsthatforman“UpperParkBoundaryTrail”thatgenerallyparallelstheperimeterofthesubjectUpperParkproperty.

• Trailshouldgenerallyworkwithlocaltopographyandterrainfeatures,andavoidflatand/orwetlocations,tominimiseoreliminaterequirementsforraisedtreadconstruction,culverts,retainingwalls,bridges,orotherassociatedbuilt-uptrailstructures.Anyrequiredstructuresshouldbesitedanddesignedtominimizeoverallsegment/zoneconstructioncosts.

• Trailshouldgenerallyberollingcontouralignmentwithflatorclimbingturns,outslopedtread,andappropriatelyspacedgradereversals/draindipsfordrainage.

Page 7: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page7of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

• TrailmustgenerallymeetthetheIMBATrailClassificationfor“MoreDifficultBlueSquare”trails(seeattacheddocument).

• Treeclearingshouldgenerallybeminimisedbysensible,low-impact,trailcorridorlayoutandsensitivitytotheecologicalvalueoftheprojectsite.Corridorlayout,includingtreeclearing,mustbeflaggedandapprovedbytheRRCProjectMangerbeforeagivensegmentmaybeconstructed.

• TheartificiallandformsoftheexistingErosionControlareamaybedesirableforinclusionintothesingletracktrailsystem.ThiscanbeexploredinconsultationwiththeRRCProjectManager.

ThefollowingspecificationsandreferencestandardsarearequirementoftheRFP:

• Trailmustbedesignedandconstructedtocurrentbestpracticeforsustainabletrails,astypifiedby:o “TrailConstructionandMaintenanceNotebook”,UnitedStatesForestService,

currentversion.(https://www.fhwa.dot.gov/environment/recreational_trails/publications/fs_publications/07232806/toc.cfm).

o “TrailSolutions:IMBA’sGuidetoBuildingSweetSingletrack”,InternationalMountainBicyclingAssociation.BoulderCOUSA,2004.

• TrailmustmeetcriteriaforuptoIMBA“MoreDifficult/BlueSquare”levelofdifficulty(IMBA,2004,p.75)-seeattachedreferencetable.

• Trailcorridortohavemin.0.6mtreadwidth,2-2.5mvegetationclearingwidth,and3.0mvegetationclearingheight.

• Allpruningofvegetationshallbedonetoaboriculturebestpractices.

• Trailsurfaceconstructedofcompacted,firm,stablenativemineralsoil.

• Trailincorporatesappropriatetrailway,positivedrainage,andothertrailstructuresasneeded.

• Trailsonsteepersideslopesmustbefullbenchcuttonativemineralsoil.

• Clearedvegetationandsurficialorganicmaterialwithintrailrightofwaytoberemovedandplacedrandomlyoutsidetrailcorridor.

Page 8: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page8of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________5. WARRANTYThewarrantyperiodof12monthswillcommenceonthedatetheprojectreceivesaConstructionCompletionLetteridentifyingthateachofthesitesaresubstantiallycompleteandreadyforuse.TheOwnerwillestablishthiscompletiondate.6. STEERINGCOMMITTEEThisprojectwillbemanagedbyaSteeringCommitteeconsistingofMODLRecreationServicesstaffandtheRRCProjectManagerordesignate.7. DELIVERABLESReportingtotheRRCProjectManager(orMODLTrailsandOpenSpaceCoordinator/otherMODLdesignate),thesuccessfulProponent’sprojectworkwillentail:

1. ConductastartupsiteinspectionwiththeProjectManagerordesignate,toreviewpotentialareasforsingletrackdevelopmentonthesubjectpropertyandidentifyanyspecificconcernsorrequirements.

2. SubmitdraftSingletrackConceptPlan(asdescribedinSection3)toProjectManagerfor

reviewandapproval.

3. FollowingapprovaloftheSingletrackConceptPlan,layoutoftheinitialsegment(s)of

singletrackforconstruction,flaggingtheproposedtrailcorridorontheground.

4. ConductaflaggedtrailcorridorwalkthroughwiththeProjectManagerordesignatefor

approvalbeforecommencingclearingandconstructionactivities.

5. Constructthetrails.PeriodicallyreviewprogressandqualitywiththeMODLProject

Manageronsite,onamutuallyagreed-uponschedule.

6. Conductanas-builtwalkthroughwiththeProjectManagerordesignateforsubstantial

completioncertification.

Page 9: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page9of19RiverRidgeCommonPhase3RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________8. DOCUMENTSACCOMPANYINGTHISRFP• PricingBreakdownForm(.pdf)• Thefollowingattacheddocumentsshouldbeprinted/viewedincolour:

o RRCLocatorMap(11x17size.pdf)o RRCProjectOverviewMap(11x17size.pdf)o RRCTrailSystemOverviewMap(A1size.pdf)o IMBATrailClassificationSystem(project-specificannotationinRED)

9. SITEVISITProponentscanarrangetoviewtheprojectsitewiththeMunicipality’sProjectManagerbeforesubmittingaproposal.ContactinformationforRRCProjectManager:

ThomasChalmersP.Eng. SnowOwlConsultingInc.(tel)9022980521 (email)[email protected]

Apre-submissionsitevisitisnon-mandatory;Proponentsshallbedeemedtohavefamiliarizedthemselveswiththeexistingsite,workingconditions,andallotherconditionswhichmayaffectperformanceoftheContract.Nopleaofignoranceofsuchconditionsasaresultoffailuretomakeallnecessaryexaminationswillbeacceptedasabasisforanyclaimsforextracompensationoranextensionoftime.10. INSTRUCTIONSTOPROPONENTS

.1 SubmissionofRFPRequestforProposalsshallbereceivedonorbefore2:00pmonJuly19,2019localtime,attheMunicipalOffice,210AberdeenRoad,Bridgewater,NovaScotia.Latesubmissionswillnotbeacceptedandwillbereturnedunopened.Faxedore-mailedsubmissionswillnotbeaccepted.NoProposalmaybewithdrawnafterclosing.Priortoclosing,aProposalmaybewithdrawnuponwrittenrequestsignedbyanOfficeroftheProponent’scompany.TheRequestforProposalshallbeaddressedtothefollowingcontactperson: LauraBarkhouse,TrailsandOpenSpaceCoordinator MunicipalityoftheDistrictofLunenburg 210AberdeenRoad Bridgewater,NovaScotia B4V4G8

Page 10: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page10of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

ProponentsshallsubmitProposalsinoriginalform(minimumofthree),plusthreecopies.Theoriginalsshallbemarked“Original”andtheduplicatecopiesshallbemarked“Copy”andshallincludeduplicatecopiesofeveryAppendixtotheProposal.Proposalsshallbeenclosedinaplainenvelope,sealedandwithoutanyidentifyingmarksandshallbelabeled: REQUESTFORPROPOSALS–DesignandBuildServices,SingletrackTrails:

RiverRidgeCommonPhase3–RFPNo.2019-05-401

.2 EnquiriesAllenquiriesrelatedtothisRFPshallbedirectedtothefollowingpersonortheirdesignate.Informationobtainedfromanyothersourceisnotofficial: ThomasChalmers,P.Eng. RRCProjectManager Phonenumber:(902)298-0521 Email:[email protected],2019.

11. REQUESTFORPROPOSALSREQUIREMENTS

.1 MethodologyandWorkPlanSubmitaworkplanoutliningstepstocompletethescopeofworkanddeliverablesentailedinthisRFP.

.2 ProjectSchedule

AprojectscheduleoutliningthetimeframesofassociatedworkandtaskstobeundertakenbytheProponent.

.3 ContactName

ThenameofthecontactpersonfortheProponentwhoshallhavetheresponsibilityofdiscussinganyprojectmatterswiththeMunicipality.

.4 History/CompanyBioofProponent

Abriefhistory/companybiooftheProponent,includingeachprofessionalorfirmiftheProponentisaconsortiumorjointventure.

Page 11: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page11of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

.5 PreviousWork/ExperienceAlistingofpreviousworkexperienceonaminimumofthreeprojectsofasimilarnatureandmagnitudeconductedwithinthelastfiveyears.Includereferencesandcontactinformationforeachproject.

.6 ProposedSub-contractors

Proposedsub-contractors,ifany,mustbelistedincludingtheirresponsibilities,reportingstructure,professionalqualifications,experience,expertise,andtheproposedroleandtimeallocationtothisproject.

.7 PricingBreakdownandBidFormProjectpricingandotherdetailsmustbepresentedasthebreakdownshownontheattachedPricingBreakdownandBidDetailsForm:

1. Proponentsmustprovidepricingandquantitiestomeetthelevelofeffortprescribed(seeSection3)fortheprojectwork.Thismustincludepricingtobothdevelopthesingletrackmasterplanandconstructthefirstsegment(s)ofsingletracktrail,asseparatelineitems.Proponentsshouldallocatealevelofeffortforeachofthesetasks,adescriptionofthetypeofinitialtrailbuildsegment(s)proposed,priceperlinealmetreoftheinitialbuild,andatotalminimumlengthoftrailtobeconstructedduringthisinitialbuild,attheprescribedlevelofeffort.Proponentsareencouragedtousethedescriptionoftheproposedinitialbuildtoconveythequalityandnatureoftheproducttheyintendtobuildforthisprice.Thiscouldalsoincludeinformationonwhatbuildcharacteristicsarenotincludedinthisprice.Iftheproponentwishestofurtherbreakdowntheinitialbuildpricingintovarioussegmentsofdifferingstyle/character,theyarewelcometodoso,andaddanextrapageasneededtoshowthis.

2. Descriptionofequipmentandlabourtobeusedontheproject,andunitratesforthese(hourly/dailyrate).ThismaybeusedbyMODLtoevaluateandallocatebidsand/oranypotentialprojectchanges/extraworkduringthecourseoftheproject.

Page 12: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page12of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

3. (NonMandatory)Estimatesofpotentialsingletrackbuildcostsfortheoverallprojectsite.Proponentsshoulddescribeandprovidecostestimatesforvarioustrailtype/buildqualityoptionsorconstructionconditions(e.g.varyingsideslopes,nativeterraincharacteristics)thatcouldreasonablybeexpectedduringthecourseofdevelopingacompletesystemofsingletrackforthesite.Forinstance,aretheredifferentdegreesofconstructionconditions(easy,moderate,difficult)tobeexpected?Whatfactorsdictatetheseconditions?Howcouldtrailconstructioncostsperlinealmetrevarywiththeseconditions?Whatstyleand/orqualityoftrailcouldbepotentiallyconstructedatvariouslevelsofpricing?Proponentsareencouragedtousethissectioninaflexiblefashiontoconveyvariousapproachesandassociatedlevelsofexpenditure,basedontheirexpertise,asappliedtothegeneralcharacteristicsoftheRRCsite.ThiswillbeusedbyMODLtoevaluatethecostsofvariousstylesandoptionsfortrailconstructionthatcouldbedevelopedonthesubjectproperty,andtoevaluate/assesstheProponent’soverallapproachtosingletrackplanningandconstructionforRiverRidgeCommon.

.8 ProponentExpectations

AlistofpreliminaryinformationtheProponentexpectstheMunicipalitytoprovideifnecessary.

.9 Certificatesa. AClearanceLetter/LetterofGoodStandingfromtheWorkers’Compensation

BoardofNovaScotia.b. ACertificateofRecognitionasissuedbyNovaScotiaConstructionSafety

Association(NSCSA)oranoccupationhealthandsafetyorganizationwithasafetyauditprocedurerecognizedandapprovedbyNovaScotiaDepartmentofLabourandWorkplaceDevelopment(NSLWD).

c. Copiesofageneralliabilityinsurancepolicywithlimitsofnotlessthantwomilliondollars($2,000,000.00)inclusiveperoccurrenceforbodilyinjury,deathanddamagetopropertyincludinglossofusethereof,withapropertydamagedeductibleoffivehundreddollars($500.00).

Page 13: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page13of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________12. EVALUATION

.1 ReviewCommitteeInaccordancewiththeMunicipality’sPurchasingPolicy,theRequestforProposalwillbeevaluatedbyaReviewCommittee.TheReviewCommitteewillmakearecommendationtoMunicipalCouncilontheawardoftheProposalandsubsequentcontract.EvaluationofProposalsshallbecompletedusingthebestvaluedeterminationinaccordancewiththefollowingcriteria:.2 MandatoryCriteriaSubmissionswillfirstbeevaluatedtoestablishcompliancewiththemandatoryclausesofthisRFP.Submissionsnotmeetingthemandatoryrequirementswillreceivenofurtherconsiderationduringtheevaluationprocess.Thefollowingarethemandatoryrequirements:

• Proposalsshallbesubmittedbythedeadline.

• ProposalsshallbesubmittedasperSection10ofthisRFP.

• ProposalsshallbeinaccordancewithalltermsandconditionsasperSection11.

.3 EvaluationProcessEachProposalwillbeevaluatedusingthefollowingprocess:

• Stage1:verifyeachbid’scompliancetotheMandatoryCriteriaidentifiedinSection10anddisqualifyanybidsthatfailtomeetthese.

Stage2:AllproposalswhichpassStage1willbeevaluatedandrankedagainsttheweightedProposalEvaluationCriteria,RiskEvaluation,andCostEvaluationbelow:

.4 EvaluationCriteriaAllproposalsmustcomplywithallrequirementsoutlinedinthisdocumentandallsubmissionswillbeevaluatedandrankedagainstthefollowingcriteriaandassociatedweights.40%Design/BuildTeamInformation:

•Teamcompositionandrepresentationbyallnecessarydisciplines,includingdesign,andconstruction;•Relevantexperienceincompletingassignmentsofsimilarscopeandcomplexity,and;•Experienceoftheproponentandkeyteammemberswithsimilarprojectsandtherangeofspecifiedservices;•Completenessofconsultingteamanddemonstratedexperience/expertiseofallindividualmembers;•Proposedorganizationalstructureandcoordinationoftheindividualteammembersincludingreportingrelationships,identificationofleadmembers,andcommunications;•Availabilityofback-uppersonneland/orprovisiontoaccessspecializedskills;

Page 14: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page14of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

•Resultsofreferencechecksforpreviousprojects.

30%ProjectApproach,Methodology&Management:•Approachtothescopeofthecreative,technicalandservicesrequired;•Understandingofprojectrequirements;•Managementofprojectandsuitabilityoftheproposedworkplan,includingworkprogramcomponents,Ganttchartoftimescheduleandmatrixofpersonnelshowinganticipatedhoursofinvolvement;•CompliancewiththeScopeofWork;•Provisionsforinvolvement,inputandevaluationoftheSteeringCommittee;•Abilitytomeettheprojecttimelines.

30%Proposedcosts,valueformoneyandacceptanceoftermsandconditions:•Feesforservicesrequiredandanycontingenciesifapplicable;•Valueformoneyrepresentedbytheproposedlevelofeffort,thebalancebetween“soft”(design,management,etc.)and“hard”(trailway,structures,etc.)costsandotherconsiderationsinregardstocosteffectivedesignandcontractingsolutions.

.5 RiskEvaluationTheMunicipalityreservestherighttodeductpointsfromtheProposalEvaluationCriteria(AppendixA),basedonanassessmentofrisk.Riskevaluationcategoriesareasfollows:

• Lowrisk:exceptionsoromissionstoRFPtermsandconditionsand/orformatindicatenoriskorlowrisktosuccessfulcompletionofproject;(-0)to(-5)points.

• Mediumrisk:exceptionsoromissionstoRFPtermsandconditionsand/orformatindicatearisktosuccessfulcompletionofprojectthatcanbemitigatedusingMODLresources;(-5)to(-25)points.

• Highrisk:exceptionsoromissionstoRFPtermsandconditionsand/orformatindicatearisktosuccessfulcompletionofprojectthatcanbemitigatedbutwillrequiresignificantMODLresources;(-26)to(-50)points.

• Unacceptablerisk:exceptionsoromissionstoRFPtermsandconditionsand/orformatindicateahighprobabilityofprojectfailure;(-50)to(-100)points.

.6 CostEvaluationTheMunicipalityreservestherighttodeductpointsfromtheProposalEvaluationCriteria,basedonanassessmentofthecostproposal.Unlessotherwisestatedinthisdocumentoritsaddenda,theproposalwiththelowestcostshallreceivethemaximumpointsallowed.Allotherproposalsshallreceiveacostscorebasedontheircostrelationshiptothelowest.Thepointsforthefinancialevaluationwillbeallocatedasfollows:

Page 15: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page15of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

LowestPrice/CostProposalxMaximumPriceScore=PriceScoreExample:Twotechnicallycompliantbidsarereceivedandthemaximumavailablepointsequal25.

Bid1:$100,000Bid2:$130,000

Bid1beingthelowest,wouldachieveascoreof25points.Bid2wouldachieveascoreof19.2points,calculatedasfollows:

$100,000/$130,000x25=19.2Note:Iftheresultisanegativenumber,thescoreassignedwillbe0.

.7 OtherCriteriaAsperSection12.1theMunicipalityreservestherighttochoosetheproposalthatprovidesthebestoverallvaluetotheMunicipalityintermsofmeritandpriceratio.TheMunicipalitymay,initssolediscretion,choosetorejectanyorallProposals.

.8 ContractNoticeinwritingtotheProponentoftheacceptanceofitsproposalbytheMunicipalityandthesubsequentfullexecutionofawrittencontractandPurchaseOrderwillconstituteacontractforservices.NoProponentwillacquireanylegalorequitablerightsorprivilegestothegoodsorservicesuntiltheoccurrenceofbothevents.

13. GENERALTERMSANDCONDITIONS

.1 AcceptanceofProposalsTheMunicipalityreservestheright,atitssolediscretion,torejectanyandallProposals.TheRequestforProposalsshouldnotbeconstruedasacontractforthepurchaseofgoodsorservices.TheMunicipalityreservestherighttoacceptanyProposalthatitconsiderstobeinitsbestinterestortorejectanyorallProposals,astheMunicipalitydeemstobeinitsbestinterest.PricewillonlybeonefactorwhichMODLwillconsiderinselectingaProponent.OtherfactorsmayincludebestvalueforMODL;theamountoflocalproducts/servicesprovidedbytheProponent;thesafetyrecordoftheProponent;thequalificationsoftheProponent;andpreviousperformancehistoryinrelationtoMODL.

Notermsorconditionsshallbeimplied,basedonanyindustrytradepracticeorcustom,anypracticeorpolicyoftheProposalorMunicipalityorotherwise,whichisinconsistentorconflictswithprovisionscontainedinthisdocument.TheMunicipalityalsoreservestherighttowaiveformality,informalityortechnicalitywiththeacceptanceofaProposalforthiscontract.MODLreservestherighttodevelopall,some,ornoneoftheprojectthatis

Page 16: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page16of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

thesubjectofthisproposal.AnyProposalnotsupportedbytheinformationrequestedinthisRequestforProposalsmayberejected.MODLalsoreservestherighttonegotiatewithanyProponentwhohassubmittedaProposal.TheMunicipalitymaywaiveminordifferencesintheProposals,providedthedifferencesdonotviolatetheProposalintent.Notermsorconditionsshallbeimplied,basedonanyindustrytradepracticeorcustom,anypracticeorpolicyoftheProposalorMunicipalityorotherwise,whichisinconsistentorconflictswithprovisionscontainedinthisdocumentTheMunicipalityalsoreservestherighttowaiveformality,informality,ortechnicalityinanyProposal.

.2 LiabilityofErrorsWhileMODLhasmadeconsiderableefforttoensureanaccuraterepresentationofinformationinthisRFP,theinformationcontainedinthisRFPissuppliedsolelyasaguidelineforProponents.TheinformationisnotguaranteedorwarrantedtobeaccuratebyMODL,norisitnecessarilycomprehensiveorexhaustive.NothinginthisRFPisintendedtorelieveProponentsfromformingtheirownopinionsandconclusionswithrespecttomattersaddressedinthisRFP.

.3 InformationCollectedTheProponentisadvisedthatallinformationcollectedandmaterialdevelopedinregardtoallworkcarriedoutbyMODLshallbecomethepropertyofMODL.

.4 ConfidentialityAlldocuments,information,andmaterialdevelopedbytheProponentshallbetreatedasconfidentialunlessdeterminedotherwise,inwriting,byMODL.ProponentsareadvisedthatanyinformationprovidedbyMODListobetreatedasconfidentialandshallnotbeprovidedtoathirdpartywithoutpriorwrittenapprovaloftheChiefAdministrativeOfficeroftheMunicipality.

.5 OwnershipofProposalsandFreedomofInformationAlldocuments,includingProposals,submittedtoMODLbecomethepropertyofMODLandaresubjecttodisclosureundertheNovaScotiaFreedomofInformationandProtectionofPrivacyAct(FOIPOP).BysubmittingaProposal,theproponenttherebyagreestopublicdisclosureofitscontentssubjecttoFOIPOPcriteria.AnyinformationtheProponentconsiders“personalinformation”becauseofitsproprietarynatureshouldbemarkedas“Confidential”andwillbesubjecttoappropriateconsiderationasdefinedwithintheNovaScotiaFreedomofInformationandProtectionofPrivacyAct.

Page 17: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page17of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

.6 Proponent’sExpensesMODLisnotliableforcostsincurredbytheProponentinrespondingtothisRFP.Proponentsaresolelyresponsiblefortheirownexpensesinpreparation,delivery,orpresentationofProposalsandforanysubsequentnegotiationswithMODL.

.7 ChangesandAmendmentsAllProponentswillbenotifiedinwritingregardinganychangesmadetotheRFPoranyappendices,oranychangeintheclosingdateortime.WhenchangesoccurwithinfivebusinessdaysofthecloseoftheRFP,theclosingdatemaybeextendedtoallowforasuitablenumberofpreparationdaysbetweentherevisedclosingdateandtheissuanceofthechange..8 PaymentPaymentsforprojectworkshallbebasedonmonthlyprogressinvoices,submittedasapplicationforpaymentbythesuccessfulProponentforapprovalbytheRRCProjectManagerordesignate.Progresspaymentsshallbesubjecttoa10%holdbackasprescribedbytheBuilder’sLienActofNovaScotia.TheprojectpaymentschedulewillbedevelopedfromtheprogressscheduleandcostbreakdownsubmittedbythesuccessfulProponentaspartoftheirresponsetothisRFP,andagreeduponbyallpartiespriortotheexecutionofawrittencontractforthiswork..9 PerformanceMODLreservestherighttoremoveProponentsduetoqualityofworkand/orservice.ProponentswillbenotifiedofanyproblemsinwritingfromMODLandbegiventheopportunitytorespond.MODLcanthendetermineiftheProponentshouldberemovedfromthequalifiedcontractorslistforthoseservices.MODLshallbethesolejudgeinthismatter.MODLmayterminatethePurchaseOrderinwriting,andwithoutfurtherliability,intheeventMODL,initssolediscretion,determinesthattheProponenthasneglected,failed,orrefusedtoproceedsafelyandpromptlywiththeworktobeprovidedbytheProponentpursuanttothePurchaseOrderorcontravenedanyoftheProponent’sobligations.

.10 IndemnificationTheProponentshalldefend,indemnifyandsaveharmlessMODLitselectedofficials,officers,employeesandagentsfromandagainstanyandallclaimsofanynature,actions,causesofaction,losses,expenses,fines,costs(includinglegalcosts),interestordamagesofeverynatureandkindwhatsoever,includingbutnotlimitedtobodilyinjury,sickness,diseaseordeathortodamagetoordestructionoftangiblepropertyincludinglossof

Page 18: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page18of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

revenueorincurredexpenseresultingfromdisruptionofservice,arisingoutoforallegedlyattributabletothenegligence,acts,errors,omissions,misfeasance,nonfeasance,fraudorwillfulmisconductoftheProponent,itsdirectors,officers,employees,agents,contractorsandsubcontractors,oranyofthem,inconnectionwithorinanywayrelatedtothedeliveryorperformanceofthisContract.ThisindemnityshallbeinadditiontoandnotinlieuofanyinsurancetobeprovidedbytheSupplierinaccordancewiththisContract,andshallsurvivethisContract.TheProponentagreestodefend,indemnifyandsaveharmlessMODLfromandagainstanyandallclaimsofanynature,actions,causesofaction,losses,expenses,fines,costs(includinglegalcosts),interestordamagesofeverynatureandkindwhatsoeverarisingoutoforrelatedtotheProponent’sstatuswiththeWorkers’CompensationBoardofNovaScotia.ThisindemnityshallbeinadditiontoandnotinlieuofanyproofofWorkers’CompensationBoardofNovaScotiastatusandcompliancetobeprovidedbytheProponentinaccordancewiththisContract,andshallsurvivethisContract.

.11 InsuranceTheProponentand/ortheProponent’sconsultingdesignfirmshalltakeoutandkeepinforceProfessionalLiabilityinsuranceintheamountof$2,000,000/occurrenceprovidingcoverageforacts,errorsandomissionsarisingfromtheirprofessionalservicesperformedunderthisAgreement.ThepolicySIR/deductibleshallnotexceed$100,000perclaimandifthepolicyhasanaggregatelimit,theamountoftheaggregateshallbedoubletherequiredperclaimlimit.ThepolicyshallbeunderwrittenbyaninsurerlicensedtoconductbusinessintheProvinceofNovaScotiaandacceptabletotheMODL.Thepolicyshallberenewedfor2yearsaftercontracttermination.AcertificateofinsuranceevidencingrenewalistobemaintainedeachandeveryyearbytheProponentandprovidedtotheMODLuponrequest.Ifthepolicyistobealtered,reducedincoverage,cancelledornon-renewedforanyreason,30daynoticeofsaidcancellationornon-renewalmustbeprovidedtoMODL.MODLhastherighttorequestthatanExtendedReportingEndorsementbepurchasedbytheProponentattheProponent’ssoleexpense.MODLshallbenamedasadditionalinsured.Thepolicyshallcontainaprovisionforcrossliabilityinrespectofthenamedinsured.

TheProponentshalltakeoutandkeepinforceStandardFormAutomobileLiabilityInsurancethatcomplieswithallrequirementsofthecurrentlegislationoftheProvinceofNovaScotia,havinganinclusivelimitofnotlessthan$2,000,000peroccurrenceforThirdPartyLiability,inrespectoftheuseoroperationofvehiclesowned,operatedorleasedbytheContractor.

Page 19: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburg Page19of19RiverRidgeCommonPhase3SingletrackDesign-BuildRFPNo.2019-05-401July19,2019_____________________________________________________________________________________

TheProponentshalltakeoutandkeepinforce-ownedautomobilecoveragewithalimitofatleasttwomilliondollars($2,000,000)withadeductiblenotexceeding$2,000includingcontractualnon-ownedcoverage.

.12 Worker’sCompensationIfrequested,theProponentandallsubcontractors,ifany,shallholdaClearanceLetter/LetterofGoodStandingfromtheWorker’sCompensationBoardofNovaScotia,validforthedurationoftheperiodtheyperformworkforthisproject.ItshallbetheresponsibilityoftheProponenttoensurecoverageisinplacefortheiremployeesand/ortheirsubcontractors.

.13 SafetyTheProponentwillberesponsibleforworkplacesafetyfortheScopeofWork,pertheNovaScotiaOccupationalHealthandSafetyActanditsRegulations,andtheMunicipality’sSiteSafetyPolicyandManualofProcedures.Allsub-contractors,ifany,shallholdavalidCertificateofRecognitionasissuedbyoneofthefollowing:NovaScotiaConstructionSafetyAssociation,NovaScotiaTruckingSafetyAssociation,oranoccupationalhealthandsafetyorganizationwithasafetyauditprocedurerecognizedandapprovedbytheWorker’sCompensationBoardofNovaScotia.Thesub-contractor(s)shallmaintaintheCertificateofRecognitionduringthecourseoftheproject.TheProponentshalltakeallnecessaryprecautionstoensurethesafetyofthepublicandshallprovideandmaintainanyrequiredsignage,barrierguards,etc.TheProponentshallensurethepublicdoesnotcomeintocontactwiththeproject.TheProponentshallberesponsibleforensuringalltrafficcontrolsareincompliancewiththemostrecentversionoftheTemporaryWorkplaceTrafficControlManual..14 SubstitutionsNosubstitutionsfortheteammembersinrelationtotheworktasksoutlinedintheproposalshallbepermittedwithoutwrittenpermissionfromMODL.

--END--

Page 20: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburgRiverRidgeCommon PRICINGBREAKDOWNANDBIDDETAILS Page1of2SingletrackDesign-Build RFPNo.2019-05-401 July19,2019

PART 1 SINGLETRACKMASTERPLANANDINTIALDESIGN-BUILD(Proponentmayattachadditionalpagesifdesired.)

ITEMNO.

UNITOFMEASURE

EST.QUANTITY

UNITPRICE TOTALPRICE

1 LumpSum 1

2 Linealmetre

PROJECTTOTAL$(HST/OtherApplicableTaxesNotIncluded)

PART 2 PROJECTEQUIPMENTANDLABOURRATES(Proponentmayattachadditionalpagesifdesired.)

ITEMNO.

RATE(SpecifyHourly/

Daily)

1

2

3

4

5

6

7

8

DESCRIPTION

SingletrackMasterPlan-perRFPDocuments

Finallayoutandconstructionofinitialsingletracktrailsegments-perRFPDocuments-additionaldescription/details/buildqualityinformationasfollows:

ITEM(Labour/EquipmentType)

DESCRIPTION(Model/Size/Capacity/Etc.)

Page 21: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

MunicipalityoftheDistrictofLunenburgRiverRidgeCommon PRICINGBREAKDOWNANDBIDDETAILS Page2of2SingletrackDesign-Build RFPNo.2019-05-401 May14,2019

PART 3 ESTIMATEOFTYPICALSINGLETRACKTRAILCONSTRUCTIONCOSTSFORPROJECTSITEOVERALLNonMandatory(Proponentmayattachadditionalpagesifdesired.)

ITEMNO.

UNITOFMEASURE UNITPRICE TOTALPRICE

1 Linealmetre

2 Linealmetre

3 Linealmetre

4 Linealmetre

5 Linealmetre

6 Linealmetre

7 Linealmetre

8 Linealmetre

PROPONENTNAME

PROPONENTSIGNATURE

SINGLETRACKSEGMENTDESCRIPTION(Trailtype/buildquality/construction

conditions/location/etc.)

Page 22: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe
Page 23: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe
Page 24: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

55

55

6065

70

75

80

85

90

95

100

105

6570

75

80

85

9095

10050

55

60

65

70

75

80

85

90

95

100

60.00

45.00

50.00

55.00

60.00

60.00

WAYPOINT OR PLACE OF INTEREST

WOODLOT ROAD TO TRAIL CONVERSION (IN PROGRESS)

EXISTING WOODLOT ROAD TO ABANDON

EXISTINGGULLY

EXISTINGPARKING LOT

INDIAN BROOK

ROSS BROOK

PARK BOUNDARY

PARK BOUNDARY

EXISTING RAIL TRAIL

INDIAN BROOK

LEGEND

HWY 10

FALKENHAM LA

NE

RIDGEVIEW DRIVE

1

2

3

4

5

6

7

8

LOWERPARK

UPPERPARK

MIDDLEPARK

ACCESSGATE

ROCK BARRICADE

ROCKBOLLARDS

NEW TRAIL (FUTURE CONCEPT)NEW TRAIL (IN PROGRESS)

X REFERENCE LOCATION

EXISTING TRAILEXISTING MAINTENANCE ROAD

ACCESS GATE

MAJOR CONTOURS: 5m INTERVALTHIS MAP IS INTENDED FOR PLANNING PURPOSES ONLY

RIVER RIDGE COMMONUPPER PARK TRAIL SYSTEMOVERVIEW

Municipality of the District of Lunenburg

EXISTING EROSIONCONTROL AREA

THIS MAP IS INTENDED FOR VIEWING IN COLOUR

0 30 60

1:1500 SNOWOWL.ca

Page 25: MUNICIPALITY OF THE DISTRICT OF LUNENBURG RFP No. … · This Request for Proposal (hereafter referred to as the “Proposal” or the “RFP”) outlines the ... , fun, and safe

Scanned with CamScanner

FROM: “Trail Solutions: IMBA’s Guide to Building Sweet Singletrack”, International Mountain Bicycling Association. Boulder CO USA, 2004, p.75.
RRC Singletrack Program