AFRICAN DEVELOPMENT FUND MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & DEVELOPMENT (PADEP) PROJECT COMPLETION REPORT (PCR) RDGW/AHHD September 2018 Public Discosure Authorized Public Disclosure Authorized

Transcript of MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance...

Page 1: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

AFRICAN DEVELOPMENT FUND

MULTINATIONAL

SUPPORT TO ECOWAS FOR PEACE & DEVELOPMENT (PADEP)

PROJECT COMPLETION REPORT

(PCR)

RDGW/AHHD

September 2018

Pu

blic

Dis

cosu

re A

uth

ori

zed

Pu

blic

Dis

clo

sure

Au

tho

rize

d

Page 2: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

1

I BASIC DATA

A Report data

Report date Date of report: 23 March 2018

Mission date (if field mission) Dec 3, 2017 To: Dec 19,2017

Positions At approval At completion

Regional Director Janvier LITSE

Country Manager n/a

Sector Director Z. EL BAKRI Agnes SOUCAT

Sector Manager Youssouf MOHAMED Youssouf MOHAMED

Task Manager N. AKAGBUE Sandy JAMBAWAI, Social Development Expert,

SLFO

Alternate Task Manager S NGUESSAN Mariam YINUSA, Principal Financial Specialist

PCR Team Leader Paul DOUGNA, Consultant Socio-Economist

PCR Team Members

Chinelo OKWONKWO, Financial Analyst; Maïmouna DIOP LY, Chief Health and Social Protection Officer; Marine Celeste KIROMERA, Public Health Consultant; Sandy JAMBAWAI, Social Development Expert, SLFO.

C Project data

Project name: PADEP – Support to ECOWAS for Peace & Development

Project code:2100155003170 Instrument number(s): African Development Fund (ADF) Grant no. 2100155003170

Project type: Grant Sector: Social Development

Countries: Liberia, Sierra Leone, Guinea,

Ivory Coast, Guinea Bissau

Environmental categorization (1-3): 3

B Responsible Bank staff

PROJECT COMPLETION REPORT FOR PUBLIC SECTOR OPERATIONS (PCR)

AFRICAN DEVELOPMENT

BANK GROUP

Page 3: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

2

Processing milestones – Bank approved

financing only (add/delete rows depending

on the number of financing sources)

Key Events (Bank approved financing

only)

Disbursement and closing dates (Bank

approved financing only)

Financing source/ instrument1: Financing source/ instrument1: Financing source/ instrument1:

Date approved: 29 April 2004 Cancelled amounts: Original disbursement deadline: 30

December 2011

Date signed: 29 September 2004 Supplementary financing: Original closing date: 31 December 2011

Date of entry into force: 5 November

2004

Restructuring (specify date & amount

involved): June 2009 with no change on

project amount

Revised (if applicable) disbursement

deadline: 30 June 2013

Date effective for 1st disbursement: 28

March 2006

Extensions (specify dates): 2 s 31 December

2011(1st extension) and 31 December

2012(2nd extension)

Revised (if applicable) closing date: 31

December 2012

Date of actual 1st disbursement: 28

March 2006

Financing source/ instrument2: Financing source/ instrument2: Financing source/ instrument2:

Date approved: Cancelled amounts: Original disbursement deadline:

Date signed: Supplementary financing: Original closing date:

Date of entry into force: Restructuring (specify date & amount

involved):

Revised (if applicable) disbursement

deadline:

Date effective for 1st disbursement: Extensions (specify dates): Revised (if applicable) closing date:

Date of actual 1st disbursement:

Financing source/instrument (add/delete

rows depending on the number of financing

sources):

Committed amount

(UA):

Percentage

committed (%):

Uncommitted

amount (UA):

Percentage

uncommitted (%):

Financing source/ instrument1: 8,710,000 87.1 1,290,000 12,9

Financing source/ instrument2:

Government: (ECOWAS) n.a n.a n.a n.a

Other (eg. co-financiers). Add rows as

needed.

TOTAL 8 710 000 87.1 1 290 000 12,9

Co-financiers and other external partners:

Executing and implementing agency (ies): ECOWAS (PEACE FUND)

D Management review and comments

Report reviewed by Name Date reviewed Comments

Country Manager M.TARHOUNI, RDGW

Sector Manager Patience KURUNERI, AHHD.2

Regional Director(as chair of Country Team) Janvier LITSE, RDGW

Sector Director Oley DIBBA-WADDA, AHHD.0

Page 4: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

3

II Project performance assessment

A Relevance

1. Relevance of project development objective

Rating*

3 Overview: The development objective is to finance and support ECOWAS (Economic Community of

West African States) in promoting peace, particularly in member countries experiencing conflict, with

the aim of strengthening the institutional capacities of ECOWAS and its direct involvement in tackling

regional issues in peace building and refugee reinstallation.

Relevance (Strategies & Policies): The relevance of the development objective (DO) was in line with the Bank’s strategy for support to Fragile States and promoting Regional Integration in West Africa. The Bank’s support is also anchored in Article 55 of ECOWAS revised Treaty and its Conflict Prevention framework. Relevance (Beneficiaries): The project preparation process included a series of consultations with the partners, and took into

consideration the priority needs of beneficiaries. The latter were permanently involved at various

stages of project implementation for activities such as curriculum design, social infrastructure and

income generating activities.

* For all ratings in the PCR use the following scale: 4 (Highly satisfactory), 3 (Satisfactory), 2 (Unsatisfactory), 1 (Highly unsatisfactory)

2. Relevance of project design

Rating* Narrative assessment (max 250 words)

2 The project objective was to contribute to the promotion of peace in the ECOWAS member countries

through ECOWAS and civil society capacity building, and direct assistance to countries and refugees

in their host countries.

DESIGN: The initial project design proved to be unsuitable due to the fact that: a) the outlined objectives and activities were too diversified; b) resources earmarked were limited; c) some main implementing partners’ capacities were not assessed; d) the institutional arrangement established to identify micro-infrastructure to be built for refugees was too complex (5 levels of decision-making) and inefficient (operating costs amounting to 30% of project cost). Accordingly, the project was redesigned with the following provisions: a) partners that were identified for the implementation of the various components of the project were the most suitable in terms of their strengths and experience; b) implementation arrangements were simplified by reducing the decision making process from 5 stages to 1; c) number of activities reduced to meet available resources; and d) operating costs was reduced to 12%. IMPLEMENTATION: Overall opinion on implementation: implementation was challenging and slow-paced. The UNDP, the backstopping institution, failed to perform its role as expected. Additionally,

Page 5: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

4

the ECOWAS implementing unit performed poorly (no quarterly reports, no financial audits, backlog of delayed project activities, low level of collaboration with Bank missions and NGFO). The Bank pushed for the redesigning of some aspects of the project during the midterm evaluation. Notably, the change in implementation arrangements allowed for substantial resources to be reduced from operating costs and used towards the implementation of priority project activities. In general, the ECOWAS Commission implementing unit was unable to deliver any significant task despite assistance provided by the FO. It was, therefore, mainly through the actions of implementing partners and the very close and continuous oversight role of the Bank that project activities were implemented.

3. Lessons learned related to relevance

Key issues (max 5, add rows as needed)

Lessons learned Target audience

Project Scope The holistic nature of the intervention, which addressed issues of infrastructure, human resource development, data management and peace consolidation, contributed to achieving the set objectives.

ADB

Sustainability By anchoring main activities to member country institutions (Education for Peace) and using a demand driven approach for social infrastructures construction, the project achieved sustainability of its key outputs.

ADB, ECOWAS

Choice of UNDP as delegated work partners

The UNDP was not an appropriate choice as they did not have the required skills to manage the targeted activities. In addition, the UNDP received ADB resources without providing any justification of activity implemented.

ECOWAS

B Effectiveness

1. Progress towards the project’s development objective (project purpose)

Comments

Provide a brief description of the Project (components) and the context in which it was designed and implemented. State the

project development objective (usually the project purpose as set out in the RLF) and assess progress. Unanticipated outcomes

should also be accounted for, as well as specific reference of gender equality in the project. The consistency of the assumptions

that link the different levels of the results chain in the RLF should also be considered. Indicative max length: 400 words.

The Project’s purpose was to build the institutional capacity of ECOWAS and Civil Society in conflict

affected countries with a view to improve coordination, management and implementation of conflict

prevention actions within a context of good governance.

This idea was in response to the weak capacity of ECOWAS at that time to coordinate and manage conflict

prevention supported actions in the sub region, as well as that of civil society in promoting coordination

and the management of conflict prevention in West Africa.

In this light, the project was designed focusing on the key components of:

Page 6: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

5

1. Capacity Building for ECOWAS

2. Support to ECOWAS Peace and Development Programme

3. Support to Project Management

The support was able to improve the capacity of the direct beneficiaries within ECOWAS to be able to

better coordinate, manage and implement conflict prevention actions. This has been evident in the

increase of access to funds, the improvement in audit reports, and the use of improved policies in

accounting and finance and preventive diplomacy actions. It has also made the ECOWAS early warning

mechanism very operational and effective, providing real time early warning information to the

Commission for prompt conflict prevention, diplomacy and management actions.

The Project supported: a) the preparation and the full implementation of a new Peace and Democratic

Values Education programme ; b) the setting up and implementation of the ECOWAS volunteers program

and; c) the socio-economic reintegration of displaced, repatriated persons and refugees by providing on

one hand , identification documents, social infrastructure and skills training and, on other hand , seeds,

agriculture equipment, market construction/rehabilitation and access to funding income generating

activities (IGA).

In the design of the project the gender dimension was taken into account in the training and the number of refugees enrolled in the project. Thirty thousand women have been educated on issues relating to a peace culture and regional integration, about 25,000 women teachers trained. Different components and activities were well interrelated to create synergy. Support provided to

ECOWAS commission in Component 1 was meant to build its capacity to provide guidance and monitoring

to component 2 activities. The project also addressed peace issues by tackling the causes of conflict

(Education, Voice) and its consequences (refugee and displaced persons reintegration).

2. Outcome reporting

Outcome indicators (as per RLF; add more rows as needed)

Baseline value (Year)

Most recent value (A)

End target (B) (expected value at

project completion)

Progress towards target

(% realized) (A/B)

Narrative assessment (indicative max length: 50 words per outcome)

Core Sector

Indicator (Yes/No)

Outcome 1 capacity building

. 0

0

0

IT system installed and functioning in 4 early warning Zonal Bureaux. The Peace Fund is now operational. Humanitarian action and human rights protection is adopted and implemented.

Some IT system installed and functioning in 4 early warning Zonal Bureaux. The Peace Fund is operational and performing. Humanitarian action and human rights protection adopted and implemented.

70% 100% 100%

The Zonal Bureaux are functional. Computer accessories and software are installed, however planned VSAT were not procured as the PIU had not launched the procurement. The operationalisation of the Peace Fund provided the framework for ECOWAS’s financial response to emergencies.

Yes

Page 7: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

6

Outcome 2 ECOWAS Ecowas Youth Volunteers Program is in place

0 .

Volunteers Program established and 100 volunteers deployed.

Volunteers Program functioning and 100 volunteers deployed.

100%

The programme was prepared and endorsed. 100 volunteers experts in health and education sectors deployed in Guinea, Guinea Bissau, Liberia and Sierra Leone.

Yes

Outcome 3 New Education for peace and citizenship program

0 Education for peace curricula and teaching manuals prepared and distributed to 4 countries.

Education for peace curricula and teaching manuals prepared and distributed to 8 countries and in 31 local languages.

200% The revision of the curriculum to include citizen and democratic values, the production and distribution of teaching materials and the translation into local language made this tool available and accessible to a larger audience and users.

Yes

Outcome 4 Refugees social and economic life improved

0 300 000 refugees installed and empowered for IGA.

About 220 000 refugees installed and empowered for IGA.

73% Social infrastructure, social assistance, skills and entrepreneurship training, production equipment and tools were provided to facilitate refugees’ reinstallation.

Yes

Rating* (see IPR methodology)

Narrative assessment

2 Although complete data could not be obtained from activities for the project completion year and 2 years after project completion, there were some significant achievement such as: the Peace Education programme available widely in ECOWAS member countries and the acceptable quality of social infrastructure provided for the social and economic reintegration of refugees.

3. Output reporting

Output indicators (as specified in the RLF; add more rows as needed)

Most recent value

(A)

End target(B) (expected value at

project completion)

Progress towards target

(% realized)

(A/B)

Narrative assessment (indicative max length: 50 words per output)

Core Sector

Indicator (Yes/No)

Output 1 ECOWAS staff capacities reinforced

10 staff trained in Project and Financial Management. 20 on data collection and reporting. 20 emergency recovery policy. 5 Education for Peace and democratic values.

55 staffs trained (100%)

100%1sdzry’y(y-è_è_0011001100

00

Staff training was delivered as planned. Staff were effectively involved in delivering main expected outputs. However, staff trained in project management in order to support PADEP implementation subsequently left, which negatively and significantly impacted on the project execution and ECOWAS’s own project execution capacity.

Yes

Page 8: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

7

Output 2 Financial management mechanism for the Peace Fund established and performing satisfactorily

By Year 2 of the project, the Operations Manual of the Peace Fund validated by partners in the Peace and Development Programme.

Operation manual designed, adopted and in use.

100% The commonly agreed operation manual helped attract more funding from bilateral and multilateral donors. However, the Peace Fund is not a pool funding mechanism and therefore each donor used its own procedures.

Yes

Output 3 Regional policies

on humanitarian

assistance and

protection of

human rights

published

1 policy document prepared.

Policy document completed , adopted and 6600 copies handed to stakeholders.

100% This support improved on the capacity of CSOs and CBOs in the region for conflict prevention and led to the formation of the West African Civil Society Forum (WASCOF).

Yes

Output 4 Infrastructure in the 4 observation bureaux of the early warning system including VSAT system rehabilitated and equipped.

6 sites equipped and provided with adequate maintenance staff for the teleconferencing and videoconferencing communication system in Year 2 of the project. Scoreboard on conflict vulnerability indicators in the 15 countries within the early warning system updated, published.

18 Desktop 4 Laptops 18 Printers 5 Scanners 18 UPS 4 Photocopiers VSAT equipment 20 staffs trained

70% The provision of equipment in conjunction with staff training made zonal offices functional, especially in conflict and disaster early warning fields, to facilitate ECOWAS disaster preparedness and intervention. However, the VSAT system was not installed. The bidding process was unsuccessfully launched once and the low performing PIU was unable to complete any other procurement processes.

Yes

Page 9: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

8

Output 5 Volunteers pilot programme to support the re-insertion of communities launched and progressing satisfactorily

135 Youth Volunteers deployed to the pilot countries.

100 Youth Volunteers deployed

74% The pilot phase started 3 years later than planned and no other phase was carried out. Education and Health graduates were deployed to Guinea, Liberia and Sierra Leone, and who expressed great satisfaction in the services delivered by the volunteers.

Yes

Output 6 Civic Training programmes on promotion of a peace culture and respect of human rights prepared and implemented in the 15 countries

1 100 experts in education strategies, 3 000 trainers and specialists in school teaching programmes. 200 000 teachers, and 525 literacy teachers trained. New curricula training material provided to 90 000 learners.

144 teaching program specialists trained. Printed Teaching material: At national level: 120 000 Manuals. At regional level: 34 200 Manuals in French English and Portuguese produced Electronic distribution material also available to download at www.educationalapaix-ao.org/ 24 267 manuals in 31 local languages.

200% Change in teacher trainer strategy in the new area changed radically the targeted number to be trained during the project implementation period. Compared to objectives set at the appraisal, the Project achieved much more by: a) providing teaching manuals, and b) translating manuals into 31 local languages that became available for use in non-formal education programs of ECOWAS countries.

Yes

Output 7 Refugees and returnees supported to meet host countries policies

Refugees need identity documents (ID) in host countries and national passports.

More than 4000 refugees were identified and received attestation and ID cards.

n.a Identification documents ensure secure free movement in the asylum country. No end target was set in the appraisal report nor in the protocol signed with UNHCR given the difficulty in estimating the target population.

Yes

Page 10: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

9

Output 8 Housing and other basic social services provided to refugees and returnees

Many demand driven facilities: shelters and education and health facilities built for refugees and host communities.

About 400 permanent shelters, 378 boreholes, 24 schools and 12 health facilities gave access to about 33 000 beneficiaries .

60% Social infrastructure were provided based on demand driven approach and no end target was assigned at appraisal. However, protocols signed with DWP defined specific objectives such as the target of 20 000 beneficiaries.

Yes

Output 9 Economic infrastructure, access to finance and income generating activities

Markets rehabilitation, short –term skills training and IGA micro funding.

Markets, seeds harvest storage equipment, hustlers, coaching on IGA initiatives were provided.

100% The project responded to specific needs in terms of skills, access to financing and coaching to undertake profitable IGA. Around 3500 households were involved. This result is in line with DWP defined specific objectives in the protocol signed

Yes

Rating* (see IPR methodology)

Narrative assessment

3 Following the midterm review changes, project outputs were achieved to a large extent. A few, however, did not meet full expectations. The rehabilitation and equipment of 4 observation bureaux, the volunteer pilot program, and the provision of housing and social services to refugees all fell short of initial targets. However, policy elaboration, capacity building, curricula design and refugees socioeconomic reinstallation were all executed according to plan, albeit with significant delays. Intended beneficiaries as well as the 3 implementing partners (UNESCO, UNHCR and UNV) were efficiently involved in the delivery of set outputs.

4. Development Objective (DO) rating1

DO rating (derived from updated IPR)*

Narrative assessment (indicative max length: 250 words

PADEP was designed as a tool to support emergency activities and social and economic reintegration of displaced persons and refugees affected by war and political conflict in the West African region. As the major peacekeeping machinery in the region, ECOWAS was seen as the best “peacemaking” actor whose capacity needed to be strengthened to increase the efficiency of its role. By supporting the elaboration and dissemination of peace and democratic values education, the reinforcement of ECOWAS capacities in early warning and conflict prevention, the project had a positive impact on the building of conditions for peace in the region. The refugee reinstallation sub-projects have addressed the local communities’ demands for water and sanitation, health, and education, particularly school enrolment and improved access to basic social services. The empowerment of women through marketable skills acquisition and income generating activities has contributed to the improvement of women and their household incomes and wellbeing.

1 For operations using the old supervision report and rating system in SAP, the DO rating for the PCR shall be calculated using the IPR methodology.

Page 11: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

10

5. Beneficiaries (add rows as needed)

Actual (A) Planned (B) Progress towards target (% realized) (A/B)

% of women

Category (eg. farmers, students)

ECOWAS

IT equipment staff training

80 n.a ECOWAS Commission.

Civil society reinforced

6,000 CSOs and CBOs participating

30 50 Conflict prevention Organisation, Education for peace associations.

6 ECOWAS Member States

Cote d’Ivoire Guinea, Guinea Bissau Liberia and Togo to review their curriculum

100 Non applicable

Curriculum development department in Ministry of Education, Ministry of Social Protection, and Gender Ministry.

Refugee reintegration

2 200 000 displaced persons

40 60 Women and youth are the bulk of refugees and displaced persons.

6. Unanticipated or additional outcomes (add rows as needed)

Description Type (eg. gender, climate change, social, other)

Positive or negative

Impact on project (High, Medium,

Low)

1.Visibility and capacity enhanced, thereby attracting other additional funding and clients (UNFPA: requested for and funded deployment of senior midwives in Sierra Leone; France Volontaires and CONFEJES sought to sign cooperation agreements with ECOWAS Volunteers for partnerships). 2. Additional funding secured from other partners/donors (UNV, European Union). 3. Following the study on Civic Education, Ministry of Education in Cote d’Ivoire created a new area of specialisation to teach peace education from primary to high school. 4. Staff attrition and non- recruitment of staff or consultants undermined Project Management team capacity to deliver.

Institutional

Institutional

Social

Institutional

Positive

Positive

Positive

Negative

High

High

High

High

Page 12: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

11

7. Lessons learned related to effectiveness (Max 5 add rows as needed)

Key issues (max 5, add rows as needed) Lessons learned Target audience

1. Due to the slow implementation rate of the

project after 3 years, the midterm review

proposed substantial changes such as bringing

new implementing partners and deriving

resources from operating cost towards

development activities. Therefore, Education

for Peace and Citizenship component was able

to support curriculum design in 5 countries,

printing distribution and posting on websites

(ADB, ECOWAS and UNESCO) of ECOWAS

peace Education referential manual.

Information and training material related to

Peace and Citizenship were also translated

and produced in 31 West African languages,

which really expand the access to knowledge

about peace and Citizenship.

1. Dialogue with beneficiaries during project implementation can provide insights on the progressive impact or otherwise of the project and lead to early corrective interventions. 2. Need to carry out thorough assessment of implementation capacity requirements at appraisal, especially for multi-partner operations, in order to clearly designate roles and expected forms of involvement.

ECOWAS Commission

2. Project Implementation PIU staff attrition and ECOWAS Commission’s low responsiveness in providing staff for the project management team seriously hampered its oversight function

The design of future projects in collaboration with ECOWAS should appropriately take into account its low administrative capacity in project management.

ECOWAS Commission

C Efficiency

1. Timeliness

Planned project duration – years (A) (as per PAR)

Actual implementation time – years (B) (from effectiveness for 1st disb.)

Ratio of planned and actual implementation time (A/B)

Rating*

Six (6) years Eight (8) years 1.5 years 2

Narrative assessment(indicative max length: 250 words)

The project was planned for a period of six (6) years. However, implementation took additional 1.5 years. The

UNDP’s failure to perform its mandate was the main reason for the delay recorded during the first 4 years

(only 12% of disbursement in 2009). In addition, ECOWAS project Implementing Unit was not able to deliver

activities planned mainly because of ECOWAS‘s lack of action in recruiting staff and consultants, despite the

Bank’s constant reminders.

Page 13: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

12

2. Resource use efficiency

Median % physical implementation of RLF outputs financed by all financiers

(A) (see II.B.3)

Commitment rate (%) (B) (See table 1.C – Total commitment rate of all

financiers)

Ratio of the median percentage physical implementation and

commitment rate (A/B)

Rating*

n.a n.a n.a

Narrative assessment(indicative max length: 250 words)

Outputs delivered by delegated work partners were generally of good quality. Since the implementing partners belong to the UN system, no independent audit was carried out to assess their respective financial performances. The Bank, however, conducted several fact-finding missions to assess the quality of the construction of social infrastructure and the design and implementation of the Volunteers programme. Over the years, ADB missions revealed some technical errors in works in progress. Corrective measures proposed by the Bank were implemented by partners. In the case of social infrastructure, 3 years after handing over facilities to beneficiaries, it was noted that these facilities were in effective use and were being maintained in accordance with the norms of the beneficiary countries. Outstanding audits were cleared after the project completion and the independent auditors have not identified misuses in ADB resources directly managed by the ECOWAS Commission or EBID for operating cost. Long delays experienced at the onset of the project had however, due to price escalation, reduced the number of facilities and or training sessions. The project financial management is rated as unsatisfactory.

3. Cost benefit analysis

Economic Rate of Return (at appraisal)

Updated Economic Rate of Return (at completion)

Rating*

n.a n.a

Narrative assessment(indicative max length: 250 words)

Project main outputs are related to capacity building, strategies, design, curriculum development and refugee installation, all of which have social and institutional impact rather than economic impact.

4. Implementation Progress (IP)2

IP Rating (derived

from updated IPR) * Narrative comments (commenting specifically on those IP items that were rated Unsatisfactory or Highly Unsatisfactory, as per last IPR). (indicative max length: 500 words)

2 Even though the grant agreement on PADEP was signed on 4 November 2004, the effective execution of all components of PADEP started in May 2006. The rate of disbursement of the grant stood at 11.85% in March 2009 and evolved to 26% in June 2010 and 72% in June 2012. At closing of the project in January 2013, 87.1% of the grant had been disbursed. A PCR mission was organized in 2013 but could not be finalized due to audit backlogs. These backlogs were cleared in 2015.

2 For operations using the old supervision report and rating system in SAP, the IP ratings need to be converted from the 0-3 scale used in SAP to the 1-4 scale used in the IPR.

Page 14: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

13

5. Lessons learned related to efficiency

Key issues (max 5, add rows as needed) Lessons learned Target audience

1. Delegated works management

The delegated-works management approach

adopted for the project implementation at the

national level was a convenient arrangement at the

conceptual and design stages of the project in view

of the prevailing conditions in the sub-region, in

particular in some of the Member States where

government institutions barely existed. The

arrangement worked well with some implementing

partners (UNHCR, UNV, and UNESCO) despite the

delay in delivering the activities. However, the

arrangement failed to work with the UNDP. Despite

the mixed results due to different implementing

partners, the approach can be considered as

appropriate to the type of activities of such a project.

Bank, ECOWAS

2.Institutional Arrangement The separation of the finance and disbursement functions of the project from the PIU caused difficulties in project management and contributed significantly to delays in the execution of some aspects of the project.

Need for Project Implementation Units to merge both functions to enhance efficiency in project implementation.

D Sustainability

1. Financial sustainability

Rating* Narrative assessment (indicative max length: 250 words)

2 Education for peace program implemented by countries is now part of national education programs. Social infrastructure (shelters, schools health care centres) have been handed to beneficiaries, local communities, and states and will follow national rules and practices as far as maintenance is concerned. ECOWAS Volunteers program is expensive and it did not show great economic value. ECOWAS financial capacity to sustain the program is doubtful.

2. Institutional sustainability and strengthening of capacities

Rating* Narrative assessment (indicative max length: 250 words)

3 The project provided opportunities to ECOWAS to set up the Peace Fund that has since attracted

several donors. The donors’ contribution can be reinforced and scaled up if an appropriate and timely

reporting system is put in place in order to respond to emerging discontent of some donors. The

project also built ECOWAS capacity in designing and implementing the Volunteers program. The

institution is likely to pursue the expansion of this program. Scaling it up, however, will require donor

contribution and there will be a need to have a resource mobilization plan.

Page 15: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

14

3. Ownership and sustainability of partnerships

Rating* Narrative assessment (indicative max length: 250 words)

3 Through its Directorate of Youth Affairs, ECOWAS played an active role in designing and implementing

the Volunteers programs. ECOWAS has also increased over the year its direct involvement in technical

and political endorsement of the Peace and Citizenship Education. To a large extent, ECOWAS was a

key factor in developing and implementing these two major activities. The level of ownership was low

for refugee socioeconomic reintegration activities. Site selection for construction of community

facilities was done in collaboration with local authorities and direct beneficiaries. Clearing of a few of

the sites for construction work was carried out by communities and security was provided during and

after the construction in some areas as part of their contribution, which is a mark of ownership.

4. Environmental and social sustainability

Rating* Narrative assessment (indicative max length: 250 words)

3 The project had limited negative impact on the environment. The project, however, took measures to reduce the effects of soil disturbances during the construction of the community facilities and local accessible materials as well as local community labour was utilised in the construction work.

5. Lessons learned related to sustainability

Key issues (max 5, add rows as needed) Lessons learned Target audience

1. Ownership & Capacity The use of United Nations specialised agencies such as UNESCO and UNHCR and the use of the ECOWAS Secretariat immensely contributed to the successful implementation of the project. The UN Agencies also sub contracted Local Non-Governmental Organisations as was the case in Sierra Leone, or specialised Government Agencies as was the case in Liberia. All reflection, design and testing of Education for Peace curriculum were fully delegated to participating countries national curriculum development institutions. This enhanced the feeling of ownership of the project and was a means of building the capacity of the implementing partners.

ECOWAS /ADB

2. Community Involvement The beneficiaries were extensively involved in the implementation of the project. For example, in the construction of the shelters and other community facilities, they provided local materials and labour, and also established community based mechanisms for the maintenance of the completed facilities.

ECOWAS/ADB/member countries

3. Engagement with Local Authorities

The project also extensively engaged and sought the approval of the local authorities in the implementation of some components. For example, the local authorities, such as community leaders, were consulted for the different interventions.

ECOWAS/ADB

Page 16: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

15

III Performance of stakeholders

1. Bank performance

Rating* Narrative assessment by the Borrower on the Bank’s performance, as well as any other aspects of the project (both quantitative and qualitative). See guidance note on issues to cover. (indicative max length: 250 words)

3 The Bank played a significant role in taking necessary action to ensure the effective execution of the project. It provided leadership for changing the institutional settings and prioritization of activities to be delivered. To make up for the ECOWAS’s PIU weakness, the bank ensured a constant monitoring of implementing partners activities by organizing skills mix supervision and coaching from the field office (Abuja). On average, 2 supervision missions were undertaken annually and mission recommendations were adequately followed up. In addition to independent audit, the Bank also conducted audits on the project, recommendations of which assisted in project performance improvement. The Bank's performance is therefore commendable and satisfactory. The Bank assisted in fast tracking implementation by rendering routine technical support to the PIU especially on procurement & disbursement matters.

Comments to be inserted by the Bank on its own performance (both quantitative and qualitative). See guidance note on issues to cover. (indicative max length: 250 words)

The Bank at onset of implementation tried to ensure that the PIU had a good understanding of the project concept and implementation mechanism. This was made possible by the launch mission which was quite exhaustive and involved people with strong implementation experience. At implementation, the Bank conducted an average of 2 supervision missions per year with good skills mix (social sector specialists, procurement & financial specialists and architects) particularly to follow-up on the implementation of the civil works such as construction of shelters, wells and other community infrastructure. Due to the low performance of the ECOWAS team, the Bank took several initiatives (training ECOWAS PIU, constant monitoring of the project implementation, taking active part in preparing protocols to be signed with UN institutions and hired a long term consultant to assist the PIU).

Key issues (related to Bank performance, max 5, add rows as needed) Lessons learned

1. Too many and diversified activities while committed resources were limited.

1. Prioritizing key activities reduce problems in project implementation.

2. Institutional arrangement was unwieldy. 2. Assessing implementing partners’ ability to deliver is a precondition for success.

2. Borrower (ECOWAS) performance

Rating* Narrative assessment on the Borrower performance to be inserted by the Bank (both quantitative and qualitative, depending on available information). See guidance note.(indicative max length: 250 words)

1 The project has faced serious implementation challenges due to lack of implementation and reporting

capacity at ECOWAS following the resignation or departure of key staff during the most active phases

of the project execution. Despite efforts made by the Bank to facilitate the recruitment of staff for the

project, few actions were taken by the Commission to solve the staffing issues. Over the last 3 years,

none of the Bank requirements in project execution were fulfilled. For example, consolidated

procurement plan, quarterly progress reports and financial audits were rarely submitted to the Bank.

Consequently, the Bank did not approve the replenishment of the project special account in 2012 and

refused to grant any additional extension. The project was completed in June 2013.

Page 17: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

16

Key issues (related to Borrower performance, max 5, add rows as needed) Lessons learned

1. Low level of involvement of some departments in activities implementation.

1. Integration of projects activities in ECOWAS work program.

2. Weaknesses and backlogs in compliance with bank projects execution requirement (reporting auditing, financial responsibilities).

2. Strict application of Bank rules in terms of sanctions could have created more responsiveness from the PIU and the Commission

3. Performance of other stakeholders (UNHCR, UNESCO UNV)

Rating* Narrative assessment on the performance of other stakeholders, including co-financiers, contractors and service providers. See guidance note on issues to cover.(indicative max length: 250 words)

3 Apart from the UNDP, which failed to provide the expected assistance despite the reception of the

first installment of the agreed amount, UNESCO, UNV and UNHCR ,which were hired to replace the

UNDP, performed their roles as expected.. It is worth noting that the financial contribution made by

UNV to the Volunteers Program may be seen as a good model of partnership for ECOWAS and the

Bank.

Key issues (related to performance of

other stakeholders, max 5, add rows as needed)

Lessons learned(max 5) Target audience (for

lessons learned)

Government involvement in satisfactory Peace Education curriculum design with limited funds

Using national institutions (Curriculum and programme department) as key players to prepare policy in Education is a cost effective approach.

States, ECOWAS ADB

IV Summary of key lessons learned and recommendations

1. Key lessons learned

Key issues (max 5, add rows as needed) Key lessons learned Target audience

Low level of participation of ECOWAS Member countries and beneficiaries in their overseeing functions over the UN specialized institutions in project implementation.

Independent technical audit carried out during the project implementation helped ensure the quality of achievement and also increased ECOWAS and countries ownership.

ADB/ECOWAS commission

member countries

PADEP took off only after the midterm review i.e. 4 years after the project signing.

Carrying out the midterm review of non performing projects at an earlier date is highly recommended.

ADB

2. Key recommendations (with particular emphasis on ensuring sustainability of project benefits)

Key issue (max 10, add rows as needed) Key recommendation Responsible Deadline

1. Need for follow-up support in provision of social services to reintegrated refugees in Liberia and Sierra Leone

In view of the fact that the UNHCR’s mandate to support the refugees is winding down and most of them have reintegrated in the host communities, it is important for the UNHCR to consider working with the refugees to identify development partners such as NGOs and Local Councils that will assist to provide the additional services and support required.

UNHCR,ECOWAS on-going

Page 18: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

17

2. Recovery of resources paid to UNDP

ECOWAS has to take actions in accordance with the Protocol signed with the UNDP to recover USD680 000 received without fulfilment of its obligations.

PADEP 15 Feb 2018

3. Clear delineation of ECOWAS and Member states responsibility in social project implementation

The designation of the ECOWAS Commission for project implementation roles is not advisable in specific country contexts. Where the capacity exists, countries should lead the institutional arrangements and work with appropriate specialised partner organisations.

ADB, ECOWAS

V Overall PCR rating

Dimensions and criteria Rating*

DIMENSION A: RELEVANCE 3

Relevance of project development objective (II.A.1) 4

Relevance of project design (II.A.2) 2

DIMENSION B: EFFECTIVENESS 3

Development Objective (DO) (II.B.4) 3

DIMENSION C: EFFICIENCY 2

Timeliness (II.C.1) 2

Resource use efficiency (II.C.2) 2

Cost-benefit analysis (II.C.3) -

Implementation Progress (IP) (II.C.4) 2

DIMENSION D: SUSTAINABILITY 3

Financial sustainability (II.D.1) 2

Institutional sustainability and strengthening of capacities (II.D.2) 4

Ownership and sustainability of partnerships (II.D.3) 3

Environmental and social sustainability (II.D.4) 3

OVERALL PROJECT COMPLETION RATING 2.90

Page 19: MULTINATIONAL SUPPORT TO ECOWAS FOR PEACE & … · 3 II Project performance assessment A Relevance 1. Relevance of project development objective Rating* 3 Overview: The development

18

VI Acronyms and abbreviations

Acronym (add rows as needed) Full name

ADB African Development Bank

DWMA Delegated works management agency

EBID ECOWAS Bank for Investment and Development

ECOWAS

Economic Community of West African States

HCR

High Commission for Refugees

N.A

Not available

PADEP Peace and Development Project

UA ADB Group Unit of Account

UNDP United Nations Development Programme

UNESCO United Nations Educational, Scientific and Cultural Organization

UNV United Nations Volunteers

Required attachment: Updated Implementation Progress and Results Report (IPR) – the date should be the same as the PCR mission. The project was approved in 2004 and the IPR was not used