Multi Sectoral Development Plan ::: Goalpara District
1
MULTI- SECTORAL
DISTRICT DEVELOPMENT PLAN
FOR MINORITY
CONCENTRATION DISTRICT
2008-2009 to 2011-2012
DISTRICT : GOALPARA
STATE ASSAM
Tele # (03663)240030(O), (03663)240028(R), Fax #(03663)240314(O)
Email: [email protected] Web: www.goalpara.nic.in
-
5/22/2018 Multi Sector
3/102
Multi Sectoral Development Plan ::: Goalpara District
2
MULTI-SECTORAL DISTRICT DEVELOPMENT PLAN
GOALPARA
INDEX
PARTICULARS PAGE NOChapter-1 Synopsis 4
Chapter-2 Critical Gaps And Development Deficits (Baseline Survey) 5 - 9
Chapter-3 Planning Process and plan 10
Chapter-4 Interventions 11 - 22
Chapter-5 Summary of plan allocation (under each category) proposed
under MSDP(Table-I).
Financial and physical phasing for next three years under
MSDP( Table-II)
26 - 27
28 - 30
Chapter-6 Beneficiary Selection and Asset Management 31
Chapter-7 Monitoring and Evaluation 32
Annexure-1 Unit cost of Home Solar lighting systems 33 - 34
Annexure-2 Unit cost of IAY houses 35 - 36
Annexures-
3A, 3B, 3C
Health Sector Development
Unit cost for
a) Design of Health sub-centres
b) Design of 24 X 7 labour rooms
c) Design of Female wards
37 - 38
39 - 41
42 - 43
Annexures-
4A, 4B, 4C
Safe drinking water
i) Chemical analysis report
ii) Piped water supply scheme (PWSS) at
Nayapara, Goalpara.
ii) Piped water supply scheme (PWSS) at Lakhipur.
44
45 - 47
48 - 50
-
5/22/2018 Multi Sector
4/102
Multi Sectoral Development Plan ::: Goalpara District
3
Annexures-
5A, 5B
Employment generating activities
a) Handloom & Textiles sector
Unit cost for
i) Establishment of Common facility centres (CFC).ii) Skill up gradation training on weaving.
iii) Skill up gradation training on dyeing.
iv) Skill up gradation training on designing.
5155
56 - 57
Annexures
6A, 6B, 6C,
6D, 6E, 6F,
6G
b) Animal Husbandary &Veterinary sector
Unit cost for
i) Broiler farming
ii) Goatery farming
iii) Dairy farming
iv) Piggery farming
v) Training
vi) Pig breading farm.
vii) Mini cattle breading farm ( Dairy farm)
58 -61
6264
65 - 68
6971
72
73-75
76-78
Annexures-7 & 8
c) Organised marketing sector (forward linkagesestablishment)
i) Establishment of 16 nos.rural SHG-Haats
ii) Construction of market comprising 190 nos of
room for vendors at Haseela-beel.
7981
82 - 83
Annexure-9 d) Infrastructure Development of ITI building at
Goalpara.
i) Electrical trade.
ii) Mechanical trade.
84 - 89
Annexure- 10 Education sector development.
Unit cost for Construction of additional class rooms for
high schools, high Madrassa and higher secondary school in
minority concentrated areas.
90 - 93
Annexure- 11 Reply of Para wise clarification / information on MSDP as
sought by Govt.of India.94- 95
Annexure-12 A brief profile of Goalpara District 96-101
-
5/22/2018 Multi Sector
5/102
Multi Sectoral Development Plan ::: Goalpara District
4
CHAPTER 1The Synopsis
The DistrictGoalpara District is one of 90 Minority concentration districts in the country and classified in
category A i.e. the district is having both Socio-Economic and Basic amenities parameters
below national average.
The SurveyBased on the guidelines of Ministry of Minority Affairs, Government of India, base line survey
of the district was carried out by Omeo Kumar Das Institute of Social Changes, Guwahati,
Assam. On the basis of the survey the Multi Sectoral Development Plan for Minorities has been
drafted for the district.
The Gaps & PrioritiesPlan schemes covering prioritized critical gaps and development indicators are proposed underthis programme. Priorities have been given on pucca housing, better infrastructure of schools,
basic health, critical infrastructure linkages that are required for optimizing services, skill
development, marketing facilities which are required for improving living conditions besides
beneficiary oriented schemes for creating income generating activities especially for the female.
Partners in the processWhile preparing the schemes, views of the members of the District Level Committee on PMs
New 15 pt. programme have been obtained along with the PRIS.
The Plan/Project has been approved by the District Level Committee. The MSDP, which will
change the socio-economic scenario of the minority people of Goalpara District, may be
implemented successfully only through joint effort and responsibility of the Govt. functionaries
as well as PRIS.
Evaluation & MonitoringProper evaluation and external monitoring will be carried out at the time of implementation.
There is no doubt that inclusive growth, accelerated development and improvement in the quality
of life of the people will be arrived at in the District of Goalpara with the help of all.
Gaon Panchayats having more than 25% Minority Population in the District
Baladmari Kumri Kalpani Chandamari Sidhabari Kalyanpur
Agia Badahapur Damra Sri Surjyagiri Baguan Katholbari
Takimai Haguripara Hashdoba N/Simlitola Gaurnagar
Kalisabhita Guriadhap Simulbari Harimura Kalsabhanga
Tarangapur Kathuri Monkola Karipara Rajmita
Jaleswar Fofonga Tukura Baladmari Char Messelkhowa
Krishnai Manikpur Molandubi Mornai Jeera
Dhaigoan Dhamar Bapurvita Jurigoan Dhupdhara Faringapara
Chunari Shaktola Aoulatoli Kahibari Rowkhowa
Kalisabhita Khankhowa Kharmuza Ambari Ramharirchar
Ambari Bashbari Baguan Tiplai Rowmari
Nolonga Markula Matia Simllitola Buduchar
-
5/22/2018 Multi Sector
6/102
Multi Sectoral Development Plan ::: Goalpara District
5
CHAPTER 2
CRITICAL GAPS & DEVELOPMENT DEFICITS(THE BASELINE SURVEY)
At the time of preparation of the plan following aspects have been
considered:
1. Goalpara district has been selected in Multi Sectoral Development Plan for the economic &
educational upliftment of Minority Concentrated Districts and was classified in A category.
Under A category, the district was found to be below national average in socio-economic &
infrastructural parameters. As per the guidelines, the emphasis has been given to poverty
alleviation, generation of employment, literacy & infrastructure.
2. The plan size is as per the outlay of Rs. 57.60 crore prescribed for the district.
3. The scheme predominantly focuses on rural areas.
4. Socio-economic and infrastructural development of the district has been considered for
improving the quality of life of the people and reducing the imbalances during the 11th five-year
plan. While this has been the principal objective, it has been kept in mind that at the time of
making interventions under the MSDP, the minority concentrated areas are given preference.
Although no location specific details in few sectors have been indicated in the plan, at the time of
implementation of the schemes, minority dominated areas will be chosen for the implementation
of the scheme. In sectors where achieving 100% saturation will not be possible during this plan
period, it is proposed to address intervention only in the areas with substantial minority
population under MSDP.
5. The baseline survey by Omeo Kumar Das Institute of Social Changes, Guwahati, Assam has
identified priority areas for the multi-sectoral development for the district. The findings of the
survey formed critical input for the formulation of MSDP.
-
5/22/2018 Multi Sector
7/102
Multi Sectoral Development Plan ::: Goalpara District
6
Ranking of deficits in order of priority as per baseline survey
Sl
no
Indicators Survey
results
India (NSS
2004-05)
Gap between
all India and
District
Priority
1 2 3=1-2 4
I) Socio-economic indicators
1 Rate of literacy 70.00 67.30 2.70 7
2 Rate of female literacy 64.84 57.10 7.74 9
3 Work participation rate 53.68 38.00 15.68 10
4 Female work participation rate 14.52 21.50 -6.98 6
II) Basic amenities indicators
5 Percentage of pucca houses 21.89 59.40 -37.51 2
6 Percentage of households with
access to safe drinking water
70.22 87.90 -17.68 5
7 Percentage of households with
sanitation facilities.
16.33 39.20 -22.87 4
8 Percentage of electrified
households
15.11 67.90 -52.79 1
III)Health indicators
9 Percentage of fully vaccinated
children
50.30 43.50 6.80 8
10 Percentage of institutional
delivery.
15.02 38.70 -23.68 3
Most important facilities lacking in the villages:
In the Goalpara district the transport & communication, drinking water supply and health
facilities are the most important facilities lacking in the villages. However, the households across
all religious groups placed road communication and drinking water supply ahead of health
facilities as shown in the household database.
Other Findings of Survey:
*The Assam Human Development (AHDR), 2003 states that Goalpara is one of the lowest
ranked districts of Assam. The district ranks 18 in respect of HDI with an index value of 0.308
which is below the state average of 0.407. In terms of income, education and health this district
occupies 14th, 18thand 16thplaces respectively.
*Taking cognizance of the development deficits pointed out above, the first priority of
multisector development plan for rural Goalpara should be expansion of rural electrification. As
the present survey has clearly pointed out, nearly one third of the villages in the district are yet to
be provided with electricity connection. In addition, poverty is a factor to restrict a large section
of the households from availingthe facility in the villages having electricity connection.
-
5/22/2018 Multi Sector
8/102
Multi Sectoral Development Plan ::: Goalpara District
7
*Compared to the national scenario, the second priority area for an effective development
intervention in the district should be rural housing, making provision for pucca houses for rural
poor of the district under the existing centrally sponsored housing programme. As pointed out in
the table above, the different between the existing scenario of the district and the national
average is quite prominent.
*The present sample survey has reflected that majority of the rural households have access to the
Govt. health service providers, although the access is not always easy primarily because of poor
road connectivity, the issue of child delivery deserves adequate attention on priority basis.This
issue, besides access to the services, involves behavioral change , specially of the predominant
religious minority community of the district. Therefore, multi sector development plan forr the
district must address this sensitive dimension in a gradual process.
* Safe drinking water is still one major problem in the Goalpara Municipal Board & Lakhipur
Town, and therefore, the multisector development plan of the district may adequately emphasize
on this one important issue.
* Although the literacy rate in the district is found a little above the national average,the present
baseline survey has reflected that the rural areas are highly deprived of required education
infrastructureleading to a relatively poor rate of illiteracy . The requirements are better education
infrastructure, scholarship etc.In addition to incentives, the religious minority along side the ST
& SC population should be sensitized . While aiming at promotion of literacy in the district,
special emphasis shoul be on girl in order to address the issue of female literacy.
* The immunization status of the surveyed population shows that only about 50% of the children
in the age group of 0-5 years have been fully immunized which needs to be addressed with
serious concern. The quality service delivery and immunization of vaccinationis found poor. In
most of the cases the parents are not aware of the secod and third doses of vaccines.
Immunization therefore, should be adequate emphasized through existing programme of NRHM.
* The survey indicates that more than 87% of the families are reported to be BPL butonly a little more than 55% of them have BPL ration card.
* Preference for self- employment among the underemployed is more prevalent thansalaried jobs in the sample villages. This means that Govt. needs to create morefacilities for skill development training and make provisions of real services to keepthe enthusiasm level high for the people in self employment endeavour, which is
grossly missing in most of the State departments in the State.
a) percentage distribution of workforce by main industryMain industry Hindu Muslim Christian
Male Female
Total Male Female
Total Male Female
Total
Cultivation 26.6 2.2 28.8 23.4 1.7 25.0 23.3 3.9 27.1
Livestock 0.6 0.6 0.9 0.3 0.3 1.2 0.8
Horticulture 1.1 1.1 .8 .8 1.6 .8 2.3
Fishing 1.0 1.0
Forestry 0.4 0.4
Poultry 0.4 0.4 0.1 0.1 0.8 0.8Mining & quarrying 3.9 0.7 4.6 5.8 0.4 6.2 9.3 0.8 10.1
-
5/22/2018 Multi Sector
9/102
Multi Sectoral Development Plan ::: Goalpara District
8
Agricultural basedmanufacturing
1.3 0.7 2.0 0.3 0.3 0.5
Non- agricultural
based manufacturing
3.7 2.8 6.5 1.8 0.3 2.1 6.2 1.6 7.8
Electricity, gas &
water supply
0.2 0.2 0.4 0.4
b) Percentage distribution of sample households by own land.
Hindu Muslim Christian
SC ST OBC General Total General Total ST Total
Land less 0.3 0.3 1.5 1.5
Marginal 20.9 24.3 14.9 17.1 77.1 87.2 87.2 87.7 87.7
Small 2.0 8.9 2.3 3.7 16.9 6.7 6.7 12.3 12.3
c) percentage distribution of sample households by own cultivated land.
Hindu Muslim Christian
SC ST OBC General Total General Total ST Total
Land less 17.1 14.3 10.6 13.7 55.7 54.7 54.7 45.2 45.2
Marginal 4.6 15.1 6.6 6.3 32.6 37.1 37.1 47.9 47.9
Small 1.7 4.6 .9 1.1 8.3 6.1 6.1 6.8 6.8
d) Distribution of households across religion and caste who own livestock.
livestockHindu Muslim Christian All
totalSC ST OBC General Total General Total ST Total
Milch animal 7.46 16.45 7.97 10.03 41.90 52.70 52.70 5.40 5.40 100.00
Graught animal 2.37 23.70 9.00 6.16 41.23 55.45 55.45 3.32 3.32 100.00
Young cattle 7.92 19.06 5.28 10.26 42.52 53.67 53.67 3.81 3.81 100.00
Goats 12.02 19.58 7.65 8.20 46.45 50.82 50.82 2.73 2.73 100.00
Sheep 4.76 4.76 - - 9.52 90.48 90.48 - - 100.00
Cock/Hen/Duck 5.62 17.71 5.62 5.40 34.34 57.88 57.88 7.78 7.78 100.00
Pigs 7.69 56.04 9.89 1.10 74.73 1.10 1.10 24.18 24.18 100.00
Others - - - - - 100.00 100.00 - - 100.00
e) Percentage distribution of the sample population by level of literacy
Educational Level Hindu Muslim Christian
Male Female Total Male Female Total Male Female Total
Illiterate 13.9 25.7 19.9 33.7 43.8 38.4 19.9 30.5 25.0
Below primary 8.6 8.9 8.8 16.2 15.9 16.0 15.3 17.1 16.2
Primary 16.8 14.5 15.6 18.1 13.1 15.7 18.2 17.7 17.9
Middle 21.8 22.3 22.0 18.6 16.3 17.5 17.6 18.3 17.9
Management / Com.
School course(vocational)
0.4 0.2 0.2 0.1 0.1
-
5/22/2018 Multi Sector
10/102
Multi Sectoral Development Plan ::: Goalpara District
9
Metric / high school 27.3 20.8 24.0 7.7 8.1 7.9 23.9 15.9 20.0
Higher secondary 8.6 6.5 7.5 3.5 1.9 2.8 4.0 .6 2.4
Tech. Diploma belowdegree
0.1 0.1
Tech/professional degree 0.1 0.3 0.2 0.1 0.0
Graduate degree (General) 2.0 0.7 1.3 1.9 0.5 1.2 0.6 0.3
Post graduate (General) 0.1 0.3 0.2 0.1 0.0
Others 0.1 0.1 0.1 0.1 0.3 0.2 0.6 0.3
Total 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
f) Distribution of households(%) by housing status
Hindu Muslim Christian
SC ST OBC General Total General Total ST TotalOwn 16.3 23.7 15.4 17.1 72.6 89.5 89.5 74.0 74.0
Indira Awas /
Govt. Provided
7.1 12.3 3.4 4.3 27.1 9.6 9.6 26.0 26.0
Rented 0.3 0.3 0.8 0.8
Total 23.4 36.0 18.9 21.7 100.0 100.0 100.0 100.0 100.0
g) Distribution of households with Electricity connection
Religion CasteHouse electrified
Yes No Total
Hindu
SC 5.1 18.3 23.4
ST 8.6 27.4 36.0OBC 6.0 12.9 18.9
General 7.7 14.0 21.7
Total 27.4 72.6 100.0
Muslim General 5.2 94.8 100.0
Total 5.2 94.8 100.0
ChristianST 20.5 79.5 100.0
Total 20.5 79.5 100.0
h) Distribution of nonelectrified households by source of light
Religion Caste
Source of light
Oil lamp Lantern Lamp +others
Oil lamp+ others
Lantern+ others
Total
Hindu
SC 18.5 6.7 25.2
ST 26.8 .4 9.8 .4 .4 37.8
OBC 11.0 5.9 .8 17.7
General 14.2 5.1 19.3
Total 70.5 .4 27.6 1.2 .4 100.0
MuslimGeneral 61.3 .4 37.6 .7 100.0
Total 61.3 .4 37.6 .7 100.0
ChristianST 60.3 3.4 36.2 100.0
Total 60.0 3.4 36.2 100.0
-
5/22/2018 Multi Sector
11/102
Multi Sectoral Development Plan ::: Goalpara District
10
CHAPTER 3
PLANNING PROCESS AND PLAN
Based on the base line survey by the Omeo Kumar Das Institute of Social Changes andDevelopment the following points are verified at the time of preparation of proposalby the various departments and development deficits and critical gaps identifiedconcerned.
They have not been sanctioned or proposed under any other scheme/programme.
There is no duplication with other public funded schemes being implemented in thedistrict with similar objectives.
That these do not involve any recurring cost and do not include maintenance liabilities.
Guidelines and norms fixed by the Government of India and various central assistance
schemes are being followed strictly with respect to the cost estimate, plan formulationand implementation strategies, etc
Synergy and topping up of various existing programmes, etc followed strictly
Guidelines & Norms followed
Critical Gaps & Development Deficits.. Plan Guidelines & Norms followed..
1. Electrified Households (Priority rank-1) Solar Energy System for rural household in remote areas as
per Guidelines of Assam Energy Development Agency
under MNES2. Houses with Pucca Walls (Priority rank-
2)
IAY Guidelines and Norms with BPL waitlist on the
identified minority concentrated Gaon Panchayats based on
base line survey
3. Health & Immunization (Priority rank-
3 & 8)
NRHM guidelines & norms in the identified minority
concentrated Gaon Panchayats based on base line survey
4. Safe Drinking Water & Sanitaion
(Priority rank-4 & 5)
Norms on the basis of APWD(B) for 2004-05 and rates
earmarked by the CPHE/ACE(LAZ).Safe drinking water
is still one major problem in the Goalpara (Nayapara) &
Lakhipur.
5. Work Participation
a. Animal Husbandary & Veterinery
b. Handloom & Textile
c. Organized & Market Development
(Priority rank-6 & 10)
a.Unit Cost rates on the basis of NABARD guidelines for
more employment opportunity in rural areas through SHGs.
b. Unit Cost rates on the basis of Ministry of textile,
Govt.of India guidelines for more employment opportunity
in rural areas through SHG.
c.Norms on the basis of APWD(B) schedule rates for
2004-05 for more employment opportunity in rural &
urban areas.
6. Literacy: (Priority rank 7 & 9) SSA guidelines and identified minority concentrated Gaon
Panchayats based on base line survey.
-
5/22/2018 Multi Sector
12/102
Multi Sectoral Development Plan ::: Goalpara District
11
CHAPTER- 4
INTERVENTIONS
* INTERVENTIONS AS PER FINDINGS OF THE BASE LINE (BL) SURVEY: As per the BLsurvey, the following have been identified as priority areas and each priority area as identified
has been attempted to be addressed in the following manner:
a) Electricity in houses (Priority rank-1):
Under various rural electrification programmes, all the villages in the district are being electrified
in a phased manner. The emphasis now is on giving connection to maximum number of
households. No additional funds are needed, hence no allocation is proposed under MSDP.
However, it is proposed to make provision for solar energy systems for rural households in
remote areas like chars and along foothills of Meghalaya. The details and the unit cost of the
scheme are enclosed at Annexure -1.
b) Houses with Pucca walls (Priority rank-2):
The district lags far behind the national average in terms of the number of people having houses
with puccca walls by 37.51%. As per the requirement of houseless people who are to be provided
with houses under IAY at the present rate of fund allocation by the rural development
department, all the houseless people can not be provided with Pucca Houses under IAY before
the completion of the 11th five year plan. Thus there will be substantial gap. Accordingly top
priority has been accorded for fund allocation for housing by topping up the centrally sponsored
scheme of Indira Awas Yojana (IAY).
The statement showing priority wise IAY wait list with Bharat Nirman block wise & GP wise in
Goalpara district.
Rongjuli Development T.D Block:
Sl
no
Name of GP Total nos of IAY
wait list with
Bharat Nuirman
beneficiaries
Total nos of minority
beneficiaries
% minority IAY
beneficiaries
1 Ambari 2012 nos 1421 nos 70.62%2 Tiplai 1698 nos 1185 nos 69.75%
3 Simlitola 2108 nos 1066 nos 50.56%
4 Dhupdhara 870 nos 385 nos 44.25%
5 Khutabari 1485 nos 597 nos 40.20%
6 Kothakuthi 800 nos 310 nos 38.75%
7 Dhanubhanga 869 nos 322 nos 37.05%
8 Kahibari 617 nos 214 nos 34.68%
9 Rongjuli 982 nos 174 nos 17.82%
Total 11441 nos 5656 nos 49.43%
-
5/22/2018 Multi Sector
13/102
Multi Sectoral Development Plan ::: Goalpara District
12
Kushdhowa Development T.D. block:Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Baguan
Kathalbari
402 nos 252 nos 62.68%
2 Damra 1547 nos 660 nos 42.66%
3 Puranibhita 1376 nos 484 nos 35.17%
4 Darranggirri 1376 nos 389 nos 17.05%
5 Lela 981 nos 189 nos 19.26%
6 Kushdhowa 632 nos 105 nos 16.61%
7 Majjakhili 1011 nos 107 nos 10.58%
8 Dudhnoi 1080 nos 19 nos 1.75%
Total 8405 nos 2205 nos 26.04%
Matia Development Block:
Slno
Name of GP Total nos of IAY wait listwith Bharat Nirman
beneficiaries
Total nos ofminority
beneficiaries
% minority IAYbeneficiaries
1 N/Simlitola 2732 nos 2616 nos 95.75%
2 Buduchar 2110 nos 1966 nos 93.17%
3 Baladmari Char 2056 nos 1735 nos 84.38%
4 Sidhabari 2441 nos 1969 nos 80.66%
5 Surjyagiri 2544 nos 1993 nos 78.34%
6 Karipara 834 nos 503 nos 60.31%
7 Mornoi 1055 nos 580 nos 54.97%
8 Harimura 1642 nos 713 nos 43.42%9 Matia 823 nos 319 nos 38.76%
10 Dolgoma -
Kadamtola
683 nos 71 nos 10.39%
11 Bakaitary 626 nos 53 nos 8.46%
Total 17546 nos 12518 nos 71.34%
Krishnai Development Block:Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Manikpur
Bhelakhamar
1363 nos 1246 nos 91.41%
2 Molandibi 2415 nos 1976 nos 81.82%
3 Krishnai 2202 nos 1657 nos 75.24%
4 Fofonga 1458 nos 1055 nos 72.35%
5 Tukura
Bormohara
1125 nos 719 nos 63.91%
6 Meselkhowa 1236 nos 774 nos 62.62%
7 Jira 1330 nos 665 nos 50%
8 Dhaigoan 1110 nos 401 nos 36.12%
9 Dirmajakhili
Salpara
1785 nos 92 nos 5.15%
Total 14024 nos 8585 nos 61.21%
-
5/22/2018 Multi Sector
14/102
Multi Sectoral Development Plan ::: Goalpara District
13
Lakhipur Development Block:Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Saktola 1376 nos 1351 nos 98.11%
2 Kholsabhanga 750 nos 727 nos 96.93%3 Rowkhowa 887 nos 846 nos 95.37%
4 Aolatoli 1039 nos 1133 nos 91.70%
5 Foringapara 834 nos 759 nos 91%
6 Bapurbhita
Jurigoan
1670 nos 1476 nos 88.38%
7 Chunari 1163 nos 1022 nos 87.87%
8 Dhamar 1641nos 577 nos 35.16%
9 Dodan 689 nos 105 nos 15.23%
10 Joyramkuchi 947 nos 129 nos 13.62%
11 Pukhuripara 736 nos 73 nos 9.91%Total 11732 nos 8198 nos 69.87%
Balijana Development Block:Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Kalpani
Chandamari
650 nos 580 nos 89.23%
2 Kumri 38 nos 31 nos 81.54%
3 Baladmari 794 nos 641 nos 80.73%
4 Badahpur 165 nos 114 nos 69.09%
5 Kalyanpur 1298 nos 741 nos 57.08%
6 Agai 222 nos 97 nos 43.69%
7 Bordamal 167 nos 68 nos 40.71%
8 Balijana 237 nos 75 nos 31.64%
9 Dwarka 108 nos 24 nos 22.22%
10 Dariduri 683 nos 33 nos 4.83%
Total 4362 nos 2404 nos 55.11%
Kharmuza Development Block:Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Khankhowa 1129 nos 1129 nos 100%
2 Ramharir Char 1107 nos 1107 nos 100%
3 Ambari 2233 nos 2233 nos 100%
4 Bashbari 1673 nos 1673 nos 100%
5 Rowmari 2029 nos 2029 nos 100%
6 Nolonga 2696 nos 2690 nos 99.77%
7 Kharmuza 1984 nos 1978 nos 99.69%
8 Markula 1887 nos 1835 nos 97.24%
9 Baguan 1138 nos 712 nos 62.56%
Total 15876 nos 15386 nos 96.91%
-
5/22/2018 Multi Sector
15/102
Multi Sectoral Development Plan ::: Goalpara District
14
Jaleswar Development Block:
Sl
no
Name of GP Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
1 Haguripara 1316 nos 1316 nos 100%
2 Katarihara 1872 nos 1872 nos 100%
3 Kathuri 1319 nos 1319 nos 100%
4 Monkola
Saildhara
608 nos 608 nos 100%
5 Rajmita 3031 nos 3020 nos 99.63%
6 Simlabari 3124 nos 3100 nos 99.23%
7 Tarangapur 2543 nos 2521 nos 99.13%
8 Jaleswar 2092 nos 2070 nos 98.94%
9 Gaurnagar 2171 nos 2140 nos 98.57%
10 Gosaidubi 1523 nos 1500 nos 98.48%
11 Takimari 1241 nos 1220 98.30%
12 Guriadhap 976 nos 950 nos 97.33%
13 Khalisavita 2419 nos 2315 nos 95.70%
14 Hasdoba 1616 nos 1400 nos 86.63%
Total 25,851 nos 25,351nos 98.06%
Block wise total IAY wait list with increasing order and percentage:Sl
no
Name of block Total nos of IAY wait list
with Bharat Nirman
beneficiaries
Total nos of
minority
beneficiaries
% minority IAY
beneficiaries
with increasing
order.
1 Jaleswar 25,851 nos 25,351nos 98.06%
2 Kharmuza 15,876 nos 15,386 nos 96.91%
3 Matia 17,546 nos 12,518 nos 71.34%
4 Lakhipur 11,732 nos 8198 nos 69.87%
5 Krishnai 14,024 nos 8585 nos 61.21%
6 Balijana 4362 nos 2404 nos 55.11%
7 Rongjuli 11441 nos 5656 nos 49.43%
8 Kushdhowa 8405 nos 2205 nos 26.04%
Total 1,09,237 nos 80,303 nos 73.47%
-
5/22/2018 Multi Sector
16/102
Multi Sectoral Development Plan ::: Goalpara District
15
The present source of fund allocation under this sector as indicated by the table below shows that
under the existing fund sources only 24158 households out of the IAY waitlist with Bharat
Nirman of 1,09,237 numbers will get IAY houses by the year 2011-2012.
Total No. of houseless families
requiring house as per Bharat Nirman
beneficiaries.
Financial year Year wise coverage of
families under IAY.
1,09,237
2007-2008 4802
2008-2009 4839
2009-2010 4839
2010-2011 4839
2011-2012 4839
Total 24158
Thus remaining wait list will not be covered by the end of 11 th five year plan. Out of the gap,
7500 households are proposed to be benefited from identified villages having substantial
minority population wherein the minority beneficiaries shall be limited to around 60% and the
remaining from other communities in minority concentrated Gaon Panchayats. Provision has
been made at the unit cost Rs.38, 500.00 as approved by GOI under IAY (Annexure-2)
c) Health Indicators: (Priority rank 3 and 8)
One of the most important areas of concern as per the BL survey is institutional delivery and
percentage of fully vaccinated children where the district lags behind the national average by
23.68%. The actual situation in respect of the vaccination in the district is quite good and the
district fares better than the State and national average.The single most important reason for the
poor institutional delivery is lack of proper labour rooms, female wards and sub-centres to
conduct deliveries.
-
5/22/2018 Multi Sector
17/102
Multi Sectoral Development Plan ::: Goalpara District
16
-
5/22/2018 Multi Sector
18/102
Multi Sectoral Development Plan ::: Goalpara District
17
There are 69 numbers of Sub-Centres which are functioning in rented houses in Goalpara which
are often inadequate in space and other facilites. Out of those Sub-Centres, 34 numbers of Sub-
Centres are under construction under 12thFinance Commission Award and another 13 shall be
started shortly. At the present rate of work, it will not be possible to achieve 100% saturation
within 11thfive year plan period and therefore, it is proposed to construct buildings for 22 sub-
centres which are buildingless, through MSDP fund. The construction is proposed at the designand unit cost of 7.5 lakhs approved by the State Govt. under NRHM. The design and the costing
are as detailed in Annexure 3(A).The Sub-Centres which are proposed for construction of building are as follows:-
Sl.No Name of Sub Centre Population Availability of land
1 Khagrabari SC 7600 Available
2 Titapara SC 5200 Available
3 Bangaljhar SC 3700 Available
4 Lempara SC 1549 Available
5 Tiapara Char SC 5200 Available6 Chotipara SC 3660 Available
7 Ketkibari SC 2735 Available
8 Rokhapara SC 3254 Available
9 Darighopa SC 4215 Available
10 Bhetaipara SC 2968 Available
11 Garuchatka SC 5026 Available
12 Barpathar SC 4750 Available
13 Checapani SC 2005 Available
14 Salpara SC 4417 Available
15 Kaliashastra SC 3875 Available16 Khamari SC 2008 Available
17 Jaybhum SC 6856 Available
18 Daikhowa SC 5672 Available
19 Sonamoyee SC 5299 Available
20 Polashkandi SC 2516 Available
21 Meservita SC 4299 Available
22 Pub-Kathuri SC 7897 AvailableIn Goalpara, there are 36 (Thirty Six) numbers of Health Institutions where the delivery should
be performed. Out of these 36 institutions, 5 nos. are BPHC, 14 nos. are SD, 12 nos. are MPHC,
2 nos. are SHC, 1 is FRU, 1 is M.C.H, 1 is Civil Hospital & 151 nos. of Sub-Centre. The data of
total expected birth & actual institutional delivery is given below:
Total Population : 9,69,363 (projected)
Birth Rate (Assam) : 2.46%
Total expected birth : 23,846
Nos. of Institutional Delivery (2007-08) : 9,728
The above-mentioned data indicates that less than 50% of total delivery occurs in health
institutions. This problem may be eradicated by developing the infrastructure of health
institutions by providing 35 number of wards to each of the 35 numbers of Health Institutions
(excluding 200 Bedded Civil Hospital, Goalpara) and additional Labour Rooms in identified 15
institutions. The institutions where addl. Labour room is required are:
-
5/22/2018 Multi Sector
19/102
Multi Sectoral Development Plan ::: Goalpara District
18
Sl.
No.
Name of the Health
Institution
Average
Delivery/MonthJustification
1 Matia BPHC 15
Poor infrastructure for
conducting delivery
2 Agia BPHC 40
3 Mornai BPHC 25
4 Maternal & Child HealthCentre,Goalpara
16
5 Lakhipur BPHC 140An additional Labour
Room is required as
delivery load is high
6 Dudhnoi FRU 85
7 Joleswar SHC 75
8 Krishnai MPHC 60
9 Khutabari MPHC 0
Insufficient
infrastructure for
conducting delivery.
10 Dohela Majjakhili SD 0
11 Bardamol SD 0
12 Daranggiri SD 3
13 Kushdhowa SD 014 Badahpur SD 3
15 Dhumerghat SD 0
Further, List of 35 Health Institutions where addl. female ward is required for better ante-
natal, natal and post-natal care is as follows:
NAME OF HEALTH INSTITUTIONS
Maternal & Child Health
Centre , Goalpara
Dilmajakhili SD Rongjuli BPHC
Agia BPHC Dohela Majjakhili SD Dudhnoi FRUBadahpur SD Harimura SD Bikali SD
Bardamal SD Lakhipur BPHC Ambari SD
Baguan SD Baida SHC Damra MPHC
Ambari Bazar SD Jaleswar SHC Khutabari MPHC
Joypur MPHC Chaibari MPHC Simlitola MPHC
Kharmuza MPHC Chunari SD Darrangiri MPHC
Messelkhowa MPHC Dhumerghat SD Tiplai MPHC
Mornoi BPHC Matia BPHC Thabalpara MPHC
Krishnai MPHC Bahati MPHC Kushdhowa SD
Khardang MPHC Dolgoma SD
The construction of the labour room @ Rs 6.00 lakhs and the female ward @ Rs 7.00 lakhs is
proposed at the design and unit cost approved by the State Govt. under NRHM. The design and
the costing are as detailed in Annexure 3(B) and 3(C).
d) Sanitation facilities: ( Priority rank-4)
The district lags behind the national average by 22.87% as per BL survey, which means that a
substantial number of households are without W/C toilets. However, the district is under total
-
5/22/2018 Multi Sector
20/102
Multi Sectoral Development Plan ::: Goalpara District
19
sanitation campaign and there are adequate funds to cover all the left out families, hence no
allocation is proposed under MSDP.
e) Safe drinking water (Priority rank-5)
The District lags behind the national average by 17.68 % as per baseline survey report. Thedistrict is being covered under RGDWM programme and all rural areas are likely to be covered
with 2012 as per population norms for safe drinking water source.
However, there are large areas adjoining and outside Goalpara and Lakhipur towns with
substantial minority concentration and without any safe drinking water source.
Further, due to heavy iron content in the water in these areas ( Chemical Analysis report at
Annexure 4(A)) , it is proposed to provide two PWSS in these areas along with the Iron
filteration plant; One at Nayapara ( Goalpara ) and other at Lakhipur, both areas with substantial
minority population. The details of the schemes are given in Annexure 4(B)and 4(C).The
schemes are very essential for providing safe drinking water source to the people in these areas.
f) Work participation rate including female work participation rate (priority
rank 6 & 10).
The district lags behind the national average by 6.98% as per BL survey. The important
recommendations of the survey report on this sector are as follows:
* Enhancement of female work participation rate in the district is to be fourth priority of the
multi-sector development plan for Goalpara. The present baseline survey provides sufficient
insinghts for effective planning for greater female work participation in the district. For instance,
besides highlighting the problems of self-employed people in the district, the baseline survey has
clearly pointed out the kind of skill sought by the people.
* Preference for selfemployment among the underemployed or unemployed is more prevalent
than salaried jobs in the sample villages. This means that Govt. needs to create more facilites for
skill development training and make provisions of real services to keep the enthusiasm level high
for the people in self employment endeavour, which isgrassly missing in most of the State
department in the State.
The employment potential of land based activities is limited. With the increase in population and
limited land resources, it is imperative to find alternative employment opportunities. In this
context, the rural Non-Farm Sector (RNFS) assumes great significance. A substantial portion of
surplus rural labour can be absorbed in this sector. This will also facilitate provision of effective
source of income generation to women who constitute nearly 50% of the rural population and areunable to move to distant places for a job. The cottage and village industries are important
-
5/22/2018 Multi Sector
21/102
Multi Sectoral Development Plan ::: Goalpara District
20
activities for village economy and provide gainful employment to unemployed population of
rural areas. Keeping above observations in mind, the following interventions are proposed in the
minority concentrated areas.
It is proposed to create more opportunities of employment through the following interventions:
i) HANDLOOM SECTOR DEVELOPMENT:
The handloom weavers are active in 345 villages and 9 small towns. There are 9 (nine ) major
pockets in the district, (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv)
Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola. For the
Development of the sector, a two pronged approached is proposed:-
Development of common infrastructure:-The main problem of this sector is lack of adequate
dyeing and allied facilities in the district. For the development of this sector, a provision forestablishing a Common Facility Centre and Handloom Dyeing Unitat each of the nine Pockets is
made under MSDP as detailed in Annexure - 5 (A).
Skill up Gradation Cum Construction of Workshed to the weavers:- Training and retraining
are critical inputs for handloom weavers to produce diversified products with improve quality to
meet changing market trends and requirements. The training is proposed in disciplines of
weaving, dyeing and designing alongwith construction of workshed for each weavers as detailed
in Annexure5 (B)The proposals for the development of Common Facility Centre and skill up gradation Cum
Construction of Workshed are prepared as per the norms prescribed under the guidelines of
Integrated HandloomDevelopment Scheme of Ministry of Textiles, Govt. of India.
ii) ANIMAL HUSBANDARY SECTOR DEVELOPMENT:
There are 220 numbers of SHGs in Goalpara district in A.H & Veterinary sector out of which
200 nos of SHGs will be involved in MSDP. These groups mainly belong to minority community
out of which Muslim prefer Poultry, Goatery and Dairy farming while Christians (Garos) prefer
Dairy & Piggery farming. To increase meat, milk and egg production in the district and the
income generating level of the SHGs, four types of Animal Husbandary activities are proposed
for farming with skill upgradation (capacity building). Proposed activities are:
a) Dairy farming
b) Goatery farming
c) Broiler farming and
d) Piggery farming
-
5/22/2018 Multi Sector
22/102
Multi Sectoral Development Plan ::: Goalpara District
21
In addition to the above activities two breading farms proposed to establish at Govt. Fodder farm
Rakhyasini ( Matia ) and Kuchdhowa ( Govt. piggery farm campus) in Piggery sector and two
mini dairy farms are proposed to establish at State Vety. Dispensary campus Ambari and State
Vety. Dispensary Campus , Joyramkuchi ( Jaleswar ) in dairy sector, both these breading farms
will be run by the SHGs of the respective locality and total numbers of SHG involve is
4(four).The breading farms are as follows:
a)Pig Breeding farm.
b)Mini cattle Breeding farm ( Dairy Farm).
For each of the above sub - sectors, a total of 50 SHGs comprising of 500 members are proposed
to be benefited in the minority concentrated areas. The unit costs based on NABARD guidelines
are enclosed at Annexure 6(A), 6(B), 6(C), 6(D), 6(F) &6(G).
Further, the training is proposed for skill upgradation of these 200 SHGs. The details are at
Annexure 6(E).
iii) ORGANIZED MARKET SECTOR (FORWARD LINKAGE DEVELOPMENT:
A) SHG HAATS:
There are 5644 number of SHGs in the rural areas of our district. However, there is a difficulty in
getting a remunerative price due to lack of organized markets and consequent bargaining power
of SHGs. To overcome this and to increase rural incomes, it is proposed to construct SHG Haats
at 16(sixteen) identified minority concentrated locations for providing organized markets to the
SHGs and a large numbers of SHGs will be benefited directly on rotation basis. The SHG Haats
are proposed at Chunari Bazaar, Nidanpur, Rangapani Bazaar, Krishnai, Bashbari Bazaar,
Kaljani Bazzar, Makri Bazaar, Agia, Dudhnoi Bazaar, Darrangiri, Nabagata Simlitola, in front of
Matia Block office, Milanpur, Borpathar, Gaurnagar Bazaar and Jaleswar. The details of the
scheme are at Annexure-7. The unit cost for a 12outlet Haat is proposed @ Rs.12.50 lakhs
based on APWD schedule.
B) MARKET AT HASILA BEEL:
Goalpara town is the Dist. Head Quarter of Goalpara District of Assam. The mighty river
Brahmaputra following areas the north and west boundary blessed Goalpara to be a fertile
agricultural land meeting the demand of its boundary district. But due to lack of proper Market
Place, the venders are running their business in road side spaces of the town. About 250 retail
venders of vegetable, Fish, Mutton & Chicken are running their business in the road side of the
town and create traffic snarls, accidents, garbage problem etc, leading to closed drains
unhygienic working conditions and open to exploitation by both police and Municipal tax
-
5/22/2018 Multi Sector
23/102
Multi Sectoral Development Plan ::: Goalpara District
22
collectors .The venders have no permanent settlement to setup there shopping houses because
they are mainly BPL people.
So, the provision of proper market place outside the town area would help the venders of
vegetable, chicken, Mutton etc. who are mainly from minority community and BPL families.
This scheme would upgrade their skills and also settle their business to progress their livelihood.
10 Bigha, 2 katha and 6 lessa land is available for market at Hasila beel.
The people from all communities including minorities shall be benefited in the proposed Hasila
Market. The minority population to be benefited is expected to be with in 60% to 70%.
To provide organized hygenic market to these vendors, it is proposed to construct Hasila Beel
Market with 190 outets and a lot of open space at a total cost of Rs 194.833 lakhs as per APWD
schedule. Out of total cost of this, 95% is proposed from MSDP and 5% is proposed to be
provided by beneficiaries. The details are at Annexure 8.
v) Upgradation of ITI:
A very large proportion of the population of minority communities is engaged in low level
technical work and earns its livelihood as artisans and labourers. Provision of technical training
to such people would upgrade their skills and earning capacity. The ITI situated in the district
does not have sufficient building of its own and is being run with a lot of constraints. To provide
better training and self employment generation skills to the minorities, it is proposed to establish
two workshops at a cost of Rs. 101.13 lakhs only as per APWD schedule. Presently, the students
have to go to ITI, Boangaigoan and to private Workshops for training. The details are at
Annexure-9.
g) Literacy (Priority 7 & 9)
The lower primary (LP)/Elementary schools of the district are being covered for additional class
room under SSA. So, no proposal is made for additional class room for Elementary schools.
However, the high and the higher secondary schools are not covered and there is a high rate of
dropout due to lack of classrooms at high and higher secondary school level. This has resulted in
poor overall literacy level including female litracy.
It is proposed to construct 258 additional class rooms keeping in view the 1:40 norms for
classrooms for students. The size of the room is proposed to be 8m X 6.24 m as per SEBA
(Secondary Education Board of Assam) norms. The unit cost has been worked out to be Rs.2.55
lakhs based on SSA rates. The details of the estimate are enclosed at Annexure 10.
-
5/22/2018 Multi Sector
24/102
Multi Sectoral Development Plan ::: Goalpara District
23
LIST OF SCHOOLS REQUIRING ADDL. CLASSROOM
Sl.No. Name of SchoolTotal No. of
Students
Total No. ofMinorityStudents
MinorityP/C
No. ofExisting
Classroom
No. ofClassroomrequired as
per rule
No. of Addl.Class room,
required
1 2 3 4 5 6 7 8
1 Dupdhara H.S. 835 139 16.65% 19 21 2
2 Dupdhara Girls H.S. 530 225 45% 8 13 53 Dudhnoi Girls High School 740 22 2.97% 15 19 4
4 Derek H.S. 400 400 100% 5 10 55 Bagun Girls H.S. 280 146 52% 3 7 4
6 Bakaitari High School 285 25 9% 9 7 -
7 Dhaundhanga H.S. 310 30 9.50% 5 8 38 Nehru Vidyapith H.S 279 15 5.37% 5 7 2
9 Baladmari High School 815 371 45.52% 18 20 210 Amjonga High School 650 Nil Nil 14 16 2
11 Maj-Jakhili H.S. 408 18 4.60% 12 10 -
12 Ambari Bazar H.S. 453 453 100% 5 11 613 Indira High School 324 Nil Nil 4 8 4
14 Gossaidubi High School 265 260 98.11% 3 7 4
15 Foringapara H.S. 240 240 100% 3 6 316 Nishangram H.S. 380 350 97% 5 10 517 Simlitola High School 658 51 8% 12 16 4
18 Bapuji H.S. 260 128 49.80% 4 7 319 Padupara Anchalik Mad. H.S 320 320 100% 7 8 120 Agia Balijana Girls H.S. 421 3 0.70% 7 10 3
21 Fatengapara H.S. 282 282 100% 3 8 522 Batabari High School 195 195 100% 3 5 2
23 Takimari H.S. 256 241 87% 4 6 224 Lower Chotipara H.S. 210 210 100% 3 5 2
25 Dirmajakhili High School 250 Nil Nil 5 6 126 Bardamal High School 250 Nil Nil 7 6 -
-
5/22/2018 Multi Sector
25/102
Multi Sectoral Development Plan ::: Goalpara District
24
27 Kushdhowa High School 352 42 12% 4 8 4
28 Karipara High School. 321 205 60% 4 8 429 Don-Bosco High School 750 490 65% 16 19 330 Krishnai Habraghat H.S. 884 675 76% 12 22 1031 Tiplai H.S. 491 160 32.80% 9 12 3
32 Bashbari H. S. 242 242 100% 4 6 233 Lakhipur Girls H.S. 310 184 87.60% 6 8 2
34 Dubapara High School 361 224 62% 4 9 535 Bagdoba Besimari H.S 640 135 21% 12 16 4
36 Bahati H.S. 183 92 52% 12 5 -37 Bapurbhita H.S. 195 150 77.00% 4 6 238 Central Girls H.S. 566 247 43.60% 12 14 2
39 Rakhalkilla H. S. 260 260 100% 5 7 240 Puthimari H.S. 500 376 75% 12 13 1
41 Dudhnoi H.S. 580 50 9% 12 15 3
42 Dohikata Bhojmala H. School 280 125 44.64% 6 7 143 Tarangapur H.S. 280 256 98.50% 4 7 344 Dhumerghat H.S. 386 210 55% 5 10 5
45 Goalpara Girls H.S. 113 108 96% 6 3 -46 Folimari High School 280 280 100% 3 7 4
47 Jaleswar Girls H.S. 250 205 100% 3 6 348 Goalpara Vidyapith H.S. 512 212 41.40% 10 12 2
49 Krishnai Girls H.S. 516 326 56% 9 13 4
50 Simulbari High School 237 226 96% 5 6 151 Bagun High School 462 224 48.50% 8 12 452 S.B.P. Memo. H.S.School 756 340 45% 12 19 7
53 Darrangiri H.S.School 510 Nil Nil 10 13 354 Khalisabhita H.S.School. 513 473 92% 5 13 8
55 Lakhipur H.S. School 714 463 54.80% 11 18 7
56 Jaleswar H.S. School 544 538 99% 7 14 757 Rangjuli H. S. School 970 Nil Nil 16 24 858 Krishnai Mad. H.S.School. 634 630 99% 8 16 8
-
5/22/2018 Multi Sector
26/102
Multi Sectoral Development Plan ::: Goalpara District
25
59 Balbala High School. 353 122 35% 7 9 2
60 Dalgoma H.S.School 810 346 42.72% 16 20 461 P.R.Govt. H.S. & M.P. School 836 543 65% 15 21 6
62 J. N. Memo. H.S.School 1238 248 20% 21 31 1063 Chunari H.S. School 752 660 88% 12 19 7
64 Kharmuza H.S. School 495 437 88% 7 12 5
65 Rajmita High Madrassa 222 222 100% 4 6 2
66 RakhaldubiHigh Madrassa 749 749 100% 11 18 7
67 Katarihara Giris H/Mad 195 195 100% 3 5 2
68 Pud-Kathuri H.Mad. 260 260 100% 3 6 369 Nayapara High Mad. 205 205 100% 3 5 2
70 Aolatoli High Madrassa 250 250 100% 3 6 3
71 Katarihara Title Madrassa 150 150 100% 2 4 2
72 Katarihara Sr. Madrassa 525 525 100% 10 13 3
73 Meserbhita Nasiria Arabic College. 560 560 100% 10 14 4G. Total 32439 17488 571 814 258
In respect of above High schools , Higher Secondary schools and high Madrassa these are functioning under Govt . of Assam and the Principals ,
Head Masters and Superientendents with staff of the schools are drawing salary from the Govt. of Assam.
-
5/22/2018 Multi Sector
27/102
Multi Sectoral Development Plan ::: Goalpara District
26
TABLE-I
MULTI- SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA
( Rs. In lakhs)
Sl no Activity Output Quantity Unit cost Financialallocation
(A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME
1 Upgradation of existing ITI Creation additional class room of twotrades 1 101.13 101.13
( B) TOPPING UP OF CENTRALLY SPONSERED SCHEMES .
2 IAY Construction of houses for families
living below poverty line.
7500 0.385 2887.50
3 Accelerated water supply
programme.
a) Construction of new pipe water
supply scheme at Nayapara
1 135.00 135.00
b) Construction of new pipe water
supply scheme at Lakhipur
1 66.90 66.90
(C) BRIDGING CRITICAL INFRASTRUCTURE GAP
4
a) Construction of
subcentres
Construction of subcentres which are
not having Govt. building.
22 7.5 165.00
b) labour room An additional labour room is required
as delivery load is high.
15 6.00 90.00
c)Female wards forMPHC/S.H.C/S.D/BPHC/P
HCs
To provide Health care facilities to theareas where such facilities are still
lacking.
35 7.00 245.00
5
Assistance to handloom
weavers
Looms & Accessories, Construction of
workshed & skill upgradation training
in weaving, design development andin dying.
looms 50 nos, Jacquard 50 nos
,Warping drum 5 nos , workshed
180 nos with training.
- 62.98
Construction of common
facilily centre for
1) CFC , (i) Bausiatari, (ii) Gojapara,
(iii) Godharbori (Muslim Para), (iv)
CFC 9, Loom 90 nos, J. machine
90 nos, W . drum 18 nos ,
17.42 156.78
-
5/22/2018 Multi Sector
28/102
Multi Sectoral Development Plan ::: Goalpara District
27
upliftment of handloom
weavers at eight pokets.
Shakumari, (v) Bhalukdubhi, (vi)
Bagdoba , (vii) Rongsai (viii) Baguan
& (ix) Simlitola Looms ,Jacquard
machine, Warping drump , Dyeng
equipments etc.
Winding charkha 90 nos
6 Dairy schemeGoatery schemeBroiler scheme and
Piggery scheme for self
employment.Pig breeding farm
Mini cattle breeding farm
(dairy farm)
Assistance for setting of Dairy unit ,
Goatery unit , Broiler unit and Piggery
unit including training. .
2) to gear up SHG.( Kuchdhowa andRakhyashini)
3) to gear up SHG ( Ambari State
Vety Dispensary, Joyramkuchi State
Vety. Dispensary.
1) Dairy 50 unit , 2) Goatery 50
unit , 3) Boiler 50 unit and
piggery 50 unit including training
4) 2 units5) 2 units
1) 3.70 lacs , 2)
3.00 lacs , 3)
2.97 lacs ,4) 3.10lacs 5) training
Rs.1.00 lacs foreach scheme.
6) 19.515 X 2
7)19.515 X 2
578.65
39.03
39.03
7 Organized market
Development
a) Construction of Market at Hasila
Beel
1 185.10 185.10
b) Construction of SHGs Haats in
rural areas.16 12.50 200.00
8 Upgradation & strengtheningof High and HigherSecondary schools
Construction of additional class rooms 258 2.55 657.90
9 Installation of solar lights Solar energy systems for rural householdsin remote areas like chars and along
foothills of Meghalaya
2400 1450.00 34.80
10 Sub total 5644.80
11 Contingency @2% 115.20
12 Grand total 5760.00
-
5/22/2018 Multi Sector
29/102
Multi Sectoral Development Plan ::: Goalpara District
28
TABLE-IIMULTI SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA
( Rs. In lakhs)
Sl
no
Activity Output Quantity Unit cost Financial allocation
Total 2008-09 2009-10 2010-11
Phy Fin Phy Fin phy fin
(A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME
1 Upgradation of
existing ITI
Creation additional class room
of two trades
1 101.13 101.13 1
50.565
30.339
20.226
(B) TOPPING UP OF CENTRALLY SPONSORED SCHEMES.
2 IAY Construction of houses for
families living below poverty
line.
7500 0.385 2887.50
4000
1540
2500
962.50
1000
385
(C) BRIDGING CRITICAL INFRASTRUCTURE GAP.
3
Accelerated Pipe
water supply
programme.
a) Construction of new pipe
water supply scheme at
Nayapara , Goalpara .
1 135.00 135.00
67.5
40.5
27
b) Construction of new pipe
water supply scheme atLakhipur
1 66.90 66.90
33.4
5
20.0
7
13.3
8
4 a) Construction of
subcentres
Construction of subcentres
which are not run in Govt.
building .
22 7.5 165.0011
82.5 7
52.5 4
30
b) labour room An additional labour room is
required as delivery load is high.( institutional delivery)
15 6.00 90.00 848 5
30 2
12
-
5/22/2018 Multi Sector
30/102
Multi Sectoral Development Plan ::: Goalpara District
29
c)Female wards
for
MPHC/S.H.C/S.D
/BPHC/PHCs
To provide Health care facilities
to the areas where such facilities
are still lacking .( percentage of
fully vaccinated children)
35 7.00 245.0018
126
10
70 7
49
5 Assistance tohandloom weavers
Looms & Accessories,Construction of workshed &
skill upgradation training in
weaving, design developmentand in dying.
looms 50 nos,Jacquard 50 nos
,Warping drum 5 nos ,
workshed 180 noswith training.
- 62.98
31.49
18.894
12.596
Construction ofcommon facilily
centre for
upliftment of
handloom weavers
at eight pokets.
1) CFC , (i) Bausiatari, (ii)Gojapara, (iii) Godharbori
(Muslim Para), (iv) Shakumari,
(v) Bhalukdubhi, (vi) Bagdoba ,
(vii) Rongsai (viii) Baguan &
(ix) Simlitola, Looms ,Jacquard
machine, Warping drump ,
Dyeng equipments etc.
CFC 9, Loom 90 nos,J. machine 90 nos, W
. drump 18 nos ,
Winding charkha 90
nos
17.42 156.78 5
87.10 2
34.84 2
34.84
6 Dairy schemeGoatery scheme
Broiler scheme
and
Piggery scheme
for self
employment.
Assistance for setting of Dairyunit , Goatery unit , Broiler unit
and Piggery unit including
training. .
1) Dairy 50 unit , 2)Goatery 50 unit , 3)
Boiler 50 unit and
piggery 50 unit
including training
1) 3.70 lacs ,2) 3.00 lacs ,
3) 2.97 lacs
,4) 3.10 lacs
5) training
Rs.1.00 lacs
for each
scheme.
578.65
290.00
188.65
100.00
Pig breeding farm
Mini cattle
breeding farm (
dairy farm
2) to gear up SHG.( Kuchdhowa
and Rakhyashini)
3) to gear up SHG ( Ambari
State Vety Dispensary,
Joyramkuchi State Vety.
Dispensary.
4) 2 units
5) 2 units
6) 19.515 X 2
7) 19.515 X 2
39.03
39.03
1
119.515
19.515
1
111.709
11.709
7.806
7.806
-
5/22/2018 Multi Sector
31/102
Multi Sectoral Development Plan ::: Goalpara District
30
7 Organized market
Development.
a) Construction of Market at
Hasila Beel1 185.10 185.10
92.55
50.55
42.00
b) Construction of SHGs Haats
in rural areas.
16 12.50 200.00 8100
450 4
50
8 Upgradation &
strengthening of
High and Higher
Secondary schools
Construction of additional class
rooms258 2.55 657.90
129
328.95
77
197.37
52
131.58
9 Installation of
solar lights
Solar energy systems for rural
households in remote areas like
chars and along foothills of
Meghalaya
2400 1450.00 34.80
1200
17.40
720
10.44
480
6.96
10 Sub total 5644.80
2934.535
1780.071
930.194
11 Contingency @2% 115.20
57.6
34.6
23.0
12 Grand Total 5760.00
2992.135
1814.671
953.194
-
5/22/2018 Multi Sector
32/102
Multi Sectoral Development Plan ::: Goalpara District
31
CHAPTER-6BENEFICIARIES SELECTION & ASSETS MANAGEMENT
Selection and creation of assets:
Any kind of assets/infrastructure to be developed or created under the MSDP will be
constructed as per the laid out Government norms and procedures wherein the PRI
like ZP, AP and Gaon Panchayat will be involved for the selection of individual
beneficiaries, distribution and monitoring, etc as per GoI norms and procedures.
For IAY, the allotment shall be strictly based on BPL waitlist in identified
minority concentrated Gaon Panchayats. The PRI institutions will monitor andsupervise the construction, etc.
Major benefit to women SHGs in minority concentrated areas.
Line departments like Fishery, Animal Husbandry, Agriculture, Handloom etc
will be associated.
Financial institutions like the banks and NABARD shall be involved.
Training is to be provided by reputed Govt training institutes or approved
NGOs. All existing rules, specifications and regulation by GoI and the Govt of Assam
shall be followed.
Assets maintenance
All the assets/building/infrastructure etc will be at the disposal of individual or
department concerned as the case may be. All these assets will be registered and
handed over to the concerned individual beneficiary or department for proper up
keeping and further maintenance. Assets register will be maintained centrally from
the office of the Deputy Commissioner and by the department concerned. The PRIs,
line departments, SHGs, NGOs etc shall be taken into confidence while handing over
the assets.
-
5/22/2018 Multi Sector
33/102
Multi Sectoral Development Plan ::: Goalpara District
32
CHAPTER-7
MONITORING & EVALUATION
There is a committee to oversee the implementation of MSDP in the district with
Deputy Commissioner as the Chairman as District Level Committee for implementation
of the Prime Ministers New 15 Point Programme for the Welfare of Minorities as
constituted by the State as per direction of Ministry of Minority Affairs.
There is a District Vigilance & Monitoring Committee to review the progress of the
scheme.
District Vigilance Council headed by the Commissioner of the Division to take care ofthe progress.
Moreover, following external agencies will be involved for the monitoring and
evaluation of the same:-
1. Directorate of Monitoring & Evaluation, Government of Assam
2. National Institute of Rural Development, Guwahati
3. State Institute of Rural Development, Guwahati
4. Assam Agricultural University, Jorhat
5. Indian Institute of Entrepreneurship, Guwahati
6. Weavers Service & Training Center, Guwahati
7. Krishi Vigyan Kendra, Dudhnoi
Transparency and Publicity
IT enabled monitoring cell with direct NIC network.
Transparency and publicity of information and extensive use of ICT enabled uses.
-
5/22/2018 Multi Sector
34/102
Multi Sectoral Development Plan ::: Goalpara District
33
ANNEXURE -1
INSTALLATION OF SOLAR LIGHT BY AEDA UNDER MNES
i) Proposed for Solar photovoitaic systems to be executed by AEDA (Assam Energy
Development Agency) under MNES. After a very detailed and in depth deliberation with local
community and local authorities , it has emerged that the Solar Home lighting Systems with two
lights is the most effective and efficient systems to address the particular need of lighting
problems in the villages in the char areas and foothill areas of Goalpara .
It was decided to install individual Solar Home lighting Systems at 2400 nos of households. It
was concluded that Solar Home lighting Systems with 9W CFL luminary will be the most
suitable for each household.
ii) Brief description of two point solar home systems: Sunlight is directly converted into DC
electricity by the SPV module mounted on the metal support structure . The generated electricity
charges a better through an electronic charge controller in the day time and two of burning the
CFL daily is 4-5 hours and the system will be designed to have three days autonomy. The light
output of a 9W CFL is equivalent to that of a 60W incandescent lamp.
System Specifications:
Sl no Item Qnty. Specification.
1 SPV Module ( with support
structure)
1 12V, 37Wp
2 Storage Battery 1 12V,40AH Low maintenance Tubular
Plate Batteries
3 Charge Controller ( Battery
over charge and deep
discharge controller)
1 10 amps
4 Luminaries 2 9W DC CFL
5 Cables and accessories 1 set
System Cost:
1 Item Price(Rs.)
1 12V,37Wp Solar Module 12V,40AH Tubular
Plate Battery 2 nos of 9W CFL Luminaries 1 No
of charge Controller Cables and Accessories
with 2 years Warranty
Rs.12,500.00
-
5/22/2018 Multi Sector
35/102
Multi Sectoral Development Plan ::: Goalpara District
34
Project Cost:
Sl no Item Amount (Rs.)
1 Project cost for 2400 nos of SPV Home Lighting
systems including supply , installation andcommissioning at site @ Rs.12,500.00 per
system
Rs.3,00,00,000.00
2 Service charge to AEDA @Rs.200.00 per
system for 2400 systems
Rs.4,80,000.00
Total project cost Rs.3,04,80,000.00
Project funding : MNES= 90%, MSDP= 10% plus service charge
Sl no Item Contribution per
system (Rs.)
Total contribution for 274 nos
of systems(Rs.)
1 MNES share
a)System cost
Rs.11,250.00 Rs.2,70,00,000.00
Total MNES share Rs.2,70,00,000.00
2 (A)MSDP sharei) system costii) Administrative
charge to AEDA
Rs.1,250.00
Rs.200.00
Rs.30,00,000.00
Rs.4,80,000.00
3 Total MSDP share (B) Rs.34,80,000.00
4 Total project cost (A+ B) Rs.3,04,80,000.00
Fund requirement from MSDP= Rs.34,80,000.00
-
5/22/2018 Multi Sector
36/102
Multi Sectoral Development Plan ::: Goalpara District
35
ANNEXURE -2
UNIT COST OF IAY HOUSE
-
5/22/2018 Multi Sector
37/102
Multi Sectoral Development Plan ::: Goalpara District
36
-
5/22/2018 Multi Sector
38/102
Multi Sectoral Development Plan ::: Goalpara District
37
ANNEXURE -3(A)
UNIT COST OF SUB-CENTRE
-
5/22/2018 Multi Sector
39/102
Multi Sectoral Development Plan ::: Goalpara District
38
DESIGN OF SUB-CENTRE
-
5/22/2018 Multi Sector
40/102
Multi Sectoral Development Plan ::: Goalpara District
39
ANNEXURE -3(B)
UNIT COST OF LABOUR ROOM
-
5/22/2018 Multi Sector
41/102
Multi Sectoral Development Plan ::: Goalpara District
40
DESIGN OF LABOUR ROOM
-
5/22/2018 Multi Sector
42/102
Multi Sectoral Development Plan ::: Goalpara District
41
-
5/22/2018 Multi Sector
43/102
Multi Sectoral Development Plan ::: Goalpara District
42
ANNEXURE -3(C)
UNIT COST OF FEMALE WARD
-
5/22/2018 Multi Sector
44/102
Multi Sectoral Development Plan ::: Goalpara District
43
DESIGN OF FEMALE WARD
-
5/22/2018 Multi Sector
45/102
Multi Sectoral Development Plan ::: Goalpara District
44
ANNEXURE -4(A)
CHEMICAL ANALYSIS REPORT
-
5/22/2018 Multi Sector
46/102
Multi Sectoral Development Plan ::: Goalpara District
45
ANNEXURE -4(B)
NAYAPARA PWSSREPORT
Name of proposed PWSS : Nayapara PWSSProposed Cost : Rs. 135.00 Lakh
Programme : Mul ti -Sectoral Development
Programme for M inori ty Concentrated
District.INTRODUCTION:
Nayapara & adjoining area outside the Goalpara Town which are not included in
Rajib Gandhi National Rural Drinking Water Mission is a water scared one & even in some
cases ordinary HTW does not work. The area is a thickly populated one and does not have anyorganised water supply scheme for the people. There is a long standing demand of the people for
good quality drinking.
Source Proposed :
Considering the plain topography of the area, there is no likelihood to met with
rocky , hence boring of a deep tube well with ordinary rig may be feasible.
Quality of Ground Water :
The ground water contains excess iron, hence this ground water can be used as
source of the scheme after proper treatment by filtration process.
Land & Electricity :
A land plot measuring 4 Katha is available to set up various components of the
scheme. So, land will not be a problem for the proposed scheme. Moreover, power required to
run the scheme can be obtained from nearby power line running nearby the proposed scheme.
The proposal for an amount of Rs.135.00 Lakh (Rupees One Crore, Thirty Five
Lakh) Only for Nayapara PWSS under Multi Sectoral Development Programme for Minority
Concreted District, is submitted for according necessary Administrative Approval.
Executive Engineer(PHE),
Goalpara Division, Goalpara
-
5/22/2018 Multi Sector
47/102
Multi Sectoral Development Plan ::: Goalpara District
46
PROFORMA
1. Name of Scheme : : Nayapara PWSS
-
5/22/2018 Multi Sector
48/102
Multi Sectoral Development Plan ::: Goalpara District
47
CALCULATION OF COST DETAILS OF NAYAPARA PWSS
(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE
(PHE Approved Rates. )
Sl.No.
Item of Work Amount ( Rs.)
1 Deep Tube Well (By DTH /Rotary Rotary Rig) Size 200 mm x
200 mm750,000.00
2 Raw Water Pumping Main- 150 mm dia GI 78,675.00
3Raw Water Pump Set: ( Submersible Pump Set) HP- 15.00 HP 200,000.00
4Raw cum Clear water Pump House. Size: 25.00 Sqm. 150,000.00
5 Installation of Clear water Pump set -40 H.P. Centrifugal Pump
Set. - 250,000.00
6 Rapid Sand Filter - Size : 20.00sqm 800,000.00
7Clear Water Reservoir- Size : 5,00,000 Litre. 3,250,000.00
8 Clear Water Pumping Main- LS 100,000.00
9Distribution System. Total Length : 12.00 KM 4,200,000.00
10Overhead RCC Reservoir. 2,00,000 litres 3,400,000.00
11Internal Electrification. - Raw Cum ClearWaterPump House 10,000.00
12 T & P Materials 20,000.00
13 Detail Survey 5,000.00
14 Trial Run of the scheme. 10,000.00
15 Chemical Dosing arrangement 30,000.00
Total = Rs. 13,253,675.00
Add 2% Contingency = Rs. 265,073.50
Grand Total = Rs. 13,518,748.50
Say, = Rs. 13,500,000.00
( Rupees One crore & Thir ty F ive Lakh ) Only(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE
(PHE Approved Rates. )
Executive Engineer(PHE),Goalpara Division, Goalpara
-
5/22/2018 Multi Sector
49/102
Multi Sectoral Development Plan ::: Goalpara District
48
ANNEXURE -4(C)
LAKHIPUR PWSSREPORT
Name of proposed PWSS : Lakhipur PWSS.
Name of Dev. of Block : Lakhipur
Proposed Cost : Rs. 66.90 Lakh
Programme : Mul ti -Sectoral Development
Programme for M inori ty Concentrated
District.Location:
Proposed Lakhipur PWSS is situated in Lakhipur Development Block under 38
Goalpara West L.A.C. The proposed scheme is about 50 Km away towards West direction fromGoalpara District Head Quarter. Ward No.1(One) complete and Ward No.2(Two) in Partly is
considered in the proposal to cover with the scheme.
Need of the project:
The area isadjoining and outside Lakhipur Town and is not come in purview to
cover the population with Drinking water Facility under Rajib Gandhi National Drinking Water
Mission. Drinking water facility is the main problem of the locality as there is no organised
water supply arrangement in the area. The two wards of the proposed PWSS are contiguous
in nature and can easily be covered with piped water supply scheme.
Source Proposed :Considering the plain topography of the area, there is no likelihood to met with
rocky , hence boring of a deep tube well with ordinary rig may be feasible.
Quality of Ground Water :
The ground water contains excess iron, hence this ground water can be used as
source of the scheme after proper treatment by filtration process.
Land & Electricity :
A land plot measuring 2 Katha 10 Lessa is available to set up various components
of the scheme. So, land will not be a problem for the proposed scheme. Moreover, power
required to run the scheme can be obtained from nearby power line running nearby the
proposed scheme.
The proposal for an amount of Rs.66.90 Lakh (Rupees Sixty Six Lakh & Ninety
Thousand) Only for Lakhipur PWSS under Multi Sectoral Development Programme for
Minority Concreted District, is submitted for according necessary Administrative Approval..
Executive Engineer(PHE),Goalpara Division, Goalpara
-
5/22/2018 Multi Sector
50/102
Multi Sectoral Development Plan ::: Goalpara District
49
-
5/22/2018 Multi Sector
51/102
Multi Sectoral Development Plan ::: Goalpara District
50
ABSTRACT OF COST- DETAILS OF LAKHIPUR PWSS
(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE
(PHE Approved Rates. )
Item of Work Amount ( Rs.)
1. Source : Installation of DTW- (By Rotary /DTH Rig) : Rs. 6,25,000.00
2. Raw Water cum Clear water Pump House- : Rs. 1,00,000.00
3. Raw water pumping Main : : Rs. 44,741.00
4. Raw water Pump Set ( 1 No. 8 HP S/Pump Set )- : Rs. 1,50,000.00
5. Treatment Plant- 6.00 Sqm : Rs. 4,50,000.00
6. Under Ground Reservoir- Size- 200,000 litres : Rs. 12,00,000.00
7. Distribution System. Total Length = 8.00Km : Rs. 28,00,000.00
8. Clear Water Pumping Main- : Rs 1,55,884.0
9. Clear water pump Set.( 10 HP Centrifugal Pump) : Rs. 1,70,000.00
10. Accomodation cum storage. : Rs. 1,00,000.0011. External Power connection. : Rs. 3,15,000.00
12. Internal Electrification. : Rs. 1,00,000.00
13. Site Development . (Low Site) : Rs. 88,000.00
14. Compound Fencing : Rs. 1,50,000.00
15. Approach Road (Depressed Approach) : Rs. 50,000.00
16. Detail Survey : Rs. 10,000.00
17. Materials for Tools and Plants : Rs. 20,000.00
18. Trial Run of the scheme : Rs. 10,000.00
19. Construction of RCC Sign Board : Rs 10,000.00
20. Chemical Dosing Arrangement : Rs 10,000.00
-------------------------------------------------Total : Rs. 65,58,625.00
Add 2% for Contingencies : Rs. 1,31,172.50
-----------------------------------------------
Grand Total = Rs. 66,89,797.50
Say, : Rs. 66,90,000.00
(Rupees Six ty Six Lakh Ninety Thousand ) only
(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE(PHE
Approved Rates. )
Executive Engineer(PHE),Goalpara Division, Goalpara
-
5/22/2018 Multi Sector
52/102
Multi Sectoral Development Plan ::: Goalpara District
51
ANNEXURE - 5 (A)
COMMON FACILITY CENTRE FOR MINORITY HANDLOOM
WEAVERS UNDER MULTISECTORAL DEVELOPMENTPROJECT
Handloom weaving is a traditional cottage industry in Assam. In spite of mill made products the
handloom product have their own special attraction. To work together common facilitiy centres
are proposed for the minority weavers. In the common facility centre the weavers can do the
works of weaving preparatory, weaving, dyeing and finishing. There will be 9 (nine) nos. of
common facility centres in the Goalpara district in the villages (i) Bausiatari, (ii) Gojapara, (iii)
Godharbori (Muslim Para), (iv) Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii)
Baguan & (ix) Simlitola respectively. The common facility centre will be maintained by a
consortium formed on the pattern of Integrated Handloom Development Scheme. It is proposed
to provide the facilities to all weavers on user charges basis.
Sl.
no.
Components Space
Reqd.
Name of equipments &
others
Qnty Rate in
Rs.
Total
Amount
1. Weaving
workshop
90 sq. mtr Fly Shuttle framelooms
a) Accessories like
bobbin, pirn, heald frame,
healdwires, and reed of
different count.
b) Jacquards of different
capacity with harness,
card, card punching
machin etc.
c) Charkha
d) Warping drum with
creel stand & accessories.
e) Misc. Expenses
including documentation
10 nos
10 sets
10 nos
10 nos
02 nos
8000/-
2000/-
7000/-
2000/-
16000/-
80,000/-
20,000/-
70,000/-
20,000/-
32,000/-
50,000/-
-
5/22/2018 Multi Sector
53/102
Multi Sectoral Development Plan ::: Goalpara District
52
2. Dyeing shed 21.90
Sq. mtr
Dyeing tubs, stirring rod,
gas cylinder and burner,
bucket, mug, measuring
cylinder, measuring
beaker, watch glass,
Dyestuff and chemical etc.
1,00,000/- 1,00,000/
-
3. Office room 9.36
sq.mtr
Furniture, showcase,
product display stand etc.
1,00,000/- 1,00,000/
-
4. Working
capital
Yarn (cotton, silk, acrylic
etc.)
1,00,000/- 1,00,000/
-
5. Training for
10 nos of
weavers for 2
months
Stipend, honorarium to
master trainer, raw
material etc.
1,20,000/- 1,20,000/
-
Total cost for construction of building Rs. 10.50 lacs
Total cost for equipments and others (sl. no 1 to 5) Rs 6.92 lacs
Total cost for 1 Common Facility Centre of Rs. 17.42 lacs
Total cost for 9 nos. of Common Facility Centre is 9 x Rs.17.42 lacs = Rs, 156.78 lacs
N.B:
1.Unit cost as per guideli ne of I ntegrated Handloom Development Scheme of
M ini stry of Textil e, Govt. of I ndia.
2. The cost of Bu il ding mater ials as per APWD schedule of rate for 2004-05.
SPECIFICATION
1. Plinth foundation : - 75 mm thick c.c. prop. 1:4:8 over 1st class brick flat.
2. Plinth wall : - 250 mm thick 1st class brick/stone masonry/c.c. works.
a) Outer wall : - Works in cement mortar prop. 1:5 and 12 mm cement plaster 1:5
and by exposed faces over plate as per first direction of the Deptt.
b) Inner wall : -125 mm thick 1st class brick work/stone masonry work/ c.c work
as per marginal sketch in cement mortar in prop.1:5.
3. Post : - 130 mm x 130 mm R.C. post with 4 nos. 12 mm main Rods and 6
mm stirrup @ 15cm c/c prop. 1:2:4 complete with all necessary
shuttering, curing.
4. Lintel/ Beam : - 130 mm x 130 mm R.C. lintel with 4 nos. 10 mm main Rods and
6 mm stirrup @ 15 cm c/c prop.l:2:4 complete with all necessary
-
5/22/2018 Multi Sector
54/102
Multi Sectoral Development Plan ::: Goalpara District
53
shuttering, curing etc. foundation tie 800 mm x 150 mm size with 4
nos. 12 mm M.S. rod.
5. Floor : - 65 mm thick c.c. floor in prop. 1:3:6 with stone aggregates Up to
32 mm size over one 1st class brick flat soling and 12 mm thick
cement plastering in prop. 1:2 on top including trawl finishing with
neat cement watering, curing etc. complete as per direction.
6. Wall : - 125 mm thick 1st class brick nogged wall in cement mortar Prop.
1:5 from plinth up to post plate with cement plaster 12 mm thick on
both faces in prop. 1:5 including colour/white washing with or more
coats complete as directed.
OR
100 mm thick c.c. wall in cement mortar in prop. 1:3 with 13 mm thick
cement plaster on both faces in prop. 1:5 up to window grill and rest white
wall and cement plaster in prop. 1:8 complete as directed.
7. Doors and Windows : 38 mm thick 1st. class local wood doors and windows as per
design and drawing with Iron Gratings in the windows.
8. Roofing : - 0.63 mm lst thickness (in mm}C.I/A.C sheet roofing over out of
MS black iron tubes of ISI approved make.
9. Ceiling : - 4 mm A.C. building board with painting! Hessian cloth Ceiling
with two coats approved paints.
10. Miscellaneous : - C. C. apron and drain, cupboard socket doors and windows
leaves to be painted with one coat of primer two coats of enamel
paints of approved shed
11. Height of plinth : - 600mm
12. Height of building : - 3650 mm from the plinth up to top post plate
-
5/22/2018 Multi Sector
55/102
Multi Sectoral Development Plan ::: Goalpara District
54
Preliminary Estimate of Common Facility Centre
General Abstract of Cost as per APWD scheduleSL
NO.
ITEM OF WORKS AMOUNT
Rs. P.
1. TOTAL PLINTH AREA OF THE BUILDING : 156.24 SQ.M.
RATE AS PER APWD (B) SCHEDULE FOR 2004-05
@ RS 5990.00/SQ.M.
9,35,878 00
2. NORMAL PREPARATION OF SITE @ 1% OF CIVIL WORK NIL
3. SANITARY INSTALLATION @ 5% OF CIVIL WORK 46,794 00
4. WATER SUPPLY @ 2% OF CIVIL WORK 18,718 00
5. INTERNAL ELECTRIFICATION @ 5% OF CIVIL WORK 46,794 00
6. FOR EXTERNAL ELECTRIFICATION @ 2% OF CIVIL WORK 18,718 00
GRAND TOTAL : RS. 10,66,902 . 00
Or Say .. RS. 10,50,000 . 00
(Rupees ten L akhs fi fty thousand) Only
-
5/22/2018 Multi Sector
56/102
Multi Sectoral Development Plan ::: Goalpara District
55
-
5/22/2018 Multi Sector
57/102
Multi Sectoral Development Plan ::: Goalpara District
56
ANNEXTURE 5(B)
SKILL UP GRADATION CUM CONSTRUCTION OF WORKSHED TO MINORITY
WEAVERS UNDER MULTI SECTORAL DEVELOPMENT PROJECT
The minority weavers will be provided training for up gradating their skill in weaving, design
development and dyeing so as to enable them to produce a diversified range of products as per
latest market demands .Training will be given batch wise in groups of 20 for a period of 2
months in weaving, 15 days in design development and 15 days in dyeing. It is proposed to
provide work shed to all weavers in order to protect the weavers and loom from rain and sunlight
so that the weavers can engage themselves in weaving all seasons. So that the average running
time of loom may increase resulting the increase of quality of production. Average cost of work
shed for 20 sq. mt shed will be Rs 25,000.
a) TRAINING IN WEAVINGCUM CONSTRUCTION OF WORKSHED``
Batch size for each programme : 20 traineesDuration of training : 2 months
Sl. No Component Provision of fund (in Rupees)
1. Stipend for 20 weavers 90,000 @ Rs. 75/- as per day
for 60 days
2. Honorarium to Master Trainer for 2 months 9,000/- @ Rs 45,00/- per
month for 2 months
3. Stipend of Master Trainer for refresher course 2,250 @ Rs. 150/- per day
for 15 days
4. Cost of warping drum 16,000/-
5. Cost of looms & attachment (Dobby/ Jacquard/
accessories) @ Rs. 8,000+4,000for 10 looms for 20
trainees
1,20,000/-
6. Raw material 24,000 (for cotton)
7. Loom setting charges, subject to maximum of 10
looms provided under basic inputs
2,000/-
8. Documentation and sample 3,000/-
Total 2,66,250/-
9. Admn. & Misc. expenditure 5% of the total cost 13,000/-
Total
Tool Kit
2,79,250/-
Plus 21,000/-3,00,250/-
10. Construction of Work shed (area 20 sqm. Per unit) 20 x Rs. 25,000 =5,00,000/-
Total Amount = 8, 00,250/-
Say Rs. 8, 00,000/- per batch
-
5/22/2018 Multi Sector
58/102
Multi Sectoral Development Plan ::: Goalpara District
57
b) TRAINING IN DESIGN DEVELOPMENT CUM CONSTRUCTION OF WORKSHED
Batch size for each programme : 20 trainees
Duration of Training : 15 days
Sl. no Component Provision of funds ( in Rupees)
1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days)
2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days)
3. Raw material Rs. 18,000/- (@ Rs. 4500/per 5 trainees for 20
trainees)
4. Documentation of Design Rs. 3000/-
5. Hiring sheds electricity and water charges Rs. 2000/-
6. Administrative and Misc expenditure (5% of
the total cost.)
Rs.2388/-
7. Construction of Work shed
(area 20 sqm. Per unit)
20 x Rs. 25,000 =5,00,000/-
Total Rs. 5,50,138/-
Say Total Rs. 5,50,000/- per batch
C) TRAINING I N DYEING CUM CONSTRUCTION OF WORKSHED
Batch size for each programme: 20 trainees
Duration of training: 15 days
Sl
no
Component Provision of funds
(in Rupees)
1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days)
2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days)
3. Stipend of master trainer for refresher course Rs. 750/- (@ Rs 150/- per day for 15 days)
4. Raw material Rs. 64,000/- (@ Rs. 3200/-for 20 trainees)5. Documentation of dyeing Rs. 3000/-
6. Hiring sheds, Electricity, Water charges Rs. 2000/-
7. Administrative and misc expenditure
( 5% of the total cost)
Rs. 4725/-
8. Construction of Work shed
(area 20 sqm. Per unit)
20 x Rs. 25,000 =5,00,000/-
Total Rs. 5,99,225/-
Say Total Rs. 5, 99,000/- per batch
Sl.
No
Type of Training No of
beneficiaries
No of
batch
Unit cost per batch
in lacs
Total amount in
lacs
1. Training in Weaving 100 5 Rs 8.00 Rs. 40.00
2. Training in Design
Development
40 2 Rs. 5.50 Rs.11.00
3. Training in Dyeing 40 2 Rs. 5.99 Rs. 11.98
Total Rs. 62.98
TOTAL PROJECT COST RS. 62.98 Lacs(Rupees Sixty Two Lacs Ninety Eight Thousand Only)
N.B: Unit cost as per guideline of Integrated Handloom Development Scheme of Ministry of Textile,Govt. of India.
-
5/22/2018 Multi Sector
59/102
Multi Sectoral Development Plan ::: Goalpara District
58
ANNEXURE 6(A)
Multi Sectoral Development Project
Sector :- A.H& Veterinary Deptt., Goalpara.
Scheme :- Broiler Farming
Prepared allocation
( Rs. In Lakh )
Unit cost Total No. of
unit
Total Cost Beneficiar
y share
(10%)
Govt.
Share
(90%)
(A)
Addl. Cost
of Training
(B)
Total Govt.
Share
Including
Training
(A+B)
2.97 50 148.50 14.85 133.65 1.00 134.65
FEASIBILITY :- Agro-climatic condition favours poultry farming specially Broiler Farming
in the district. As electrification is presently covering the rural areas of the district which became
new era for rural unemployed youth for establishing broiler farm in the same. Popularity of
broiler meat increasing day by day in the District. Market demand is tremendous in the District
particularly for neighboring state. Transportation facilities touches every corner of the district
which helps in transportation of poultry and poultry product.
So, the commercial broiler farming may be considered as technically feasible and economically
viable in normal condition.
JUSTIFICATION :- Top most priority of the broiler farming is to solve unenployement
problem as it is clean farm practice in comparison to other livestock farming. Through this
farming transfer of new technology from expert to rural people. It is the way of motivation of
rural people towards commercial poultry farming. Succesful inplementation of the project will
incraese the district economy.
-
5/22/2018 Multi Sector
60/102
Multi Sectoral Development Plan ::: Goalpara District
59
UNIT COST ( BROILER FARMING)Scheme)
Scheme for setting up of a Broiler farm under deeep litter system of
rearing in SGSY group finance (in ten individual sheds of the Swarojgaries)
Introduction : Farming of hybrid bird under deep litter system of rearing is found
to be a very profitable bussiness if managed under proper technical guidance. If broiler farm is
started with efficiency mangemental practices with proper veterina