    Multi Sectoral Development Plan ::: Goalpara District

    1

    MULTI- SECTORAL

    DISTRICT DEVELOPMENT PLAN

    FOR MINORITY

    CONCENTRATION DISTRICT

    2008-2009 to 2011-2012

    DISTRICT : GOALPARA

    STATE ASSAM

    Tele # (03663)240030(O), (03663)240028(R), Fax #(03663)240314(O)

    Email: [email protected] Web: www.goalpara.nic.in

  • 5/22/2018 Multi Sector

    3/102

    Multi Sectoral Development Plan ::: Goalpara District

    2

    MULTI-SECTORAL DISTRICT DEVELOPMENT PLAN

    GOALPARA

    INDEX

    PARTICULARS PAGE NOChapter-1 Synopsis 4

    Chapter-2 Critical Gaps And Development Deficits (Baseline Survey) 5 - 9

    Chapter-3 Planning Process and plan 10

    Chapter-4 Interventions 11 - 22

    Chapter-5 Summary of plan allocation (under each category) proposed

    under MSDP(Table-I).

    Financial and physical phasing for next three years under

    MSDP( Table-II)

    26 - 27

    28 - 30

    Chapter-6 Beneficiary Selection and Asset Management 31

    Chapter-7 Monitoring and Evaluation 32

    Annexure-1 Unit cost of Home Solar lighting systems 33 - 34

    Annexure-2 Unit cost of IAY houses 35 - 36

    Annexures-

    3A, 3B, 3C

    Health Sector Development

    Unit cost for

    a) Design of Health sub-centres

    b) Design of 24 X 7 labour rooms

    c) Design of Female wards

    37 - 38

    39 - 41

    42 - 43

    Annexures-

    4A, 4B, 4C

    Safe drinking water

    i) Chemical analysis report

    ii) Piped water supply scheme (PWSS) at

    Nayapara, Goalpara.

    ii) Piped water supply scheme (PWSS) at Lakhipur.

    44

    45 - 47

    48 - 50

  • 5/22/2018 Multi Sector

    4/102

    Multi Sectoral Development Plan ::: Goalpara District

    3

    Annexures-

    5A, 5B

    Employment generating activities

    a) Handloom & Textiles sector

    Unit cost for

    i) Establishment of Common facility centres (CFC).ii) Skill up gradation training on weaving.

    iii) Skill up gradation training on dyeing.

    iv) Skill up gradation training on designing.

    5155

    56 - 57

    Annexures

    6A, 6B, 6C,

    6D, 6E, 6F,

    6G

    b) Animal Husbandary &Veterinary sector

    Unit cost for

    i) Broiler farming

    ii) Goatery farming

    iii) Dairy farming

    iv) Piggery farming

    v) Training

    vi) Pig breading farm.

    vii) Mini cattle breading farm ( Dairy farm)

    58 -61

    6264

    65 - 68

    6971

    72

    73-75

    76-78

    Annexures-7 & 8

    c) Organised marketing sector (forward linkagesestablishment)

    i) Establishment of 16 nos.rural SHG-Haats

    ii) Construction of market comprising 190 nos of

    room for vendors at Haseela-beel.

    7981

    82 - 83

    Annexure-9 d) Infrastructure Development of ITI building at

    Goalpara.

    i) Electrical trade.

    ii) Mechanical trade.

    84 - 89

    Annexure- 10 Education sector development.

    Unit cost for Construction of additional class rooms for

    high schools, high Madrassa and higher secondary school in

    minority concentrated areas.

    90 - 93

    Annexure- 11 Reply of Para wise clarification / information on MSDP as

    sought by Govt.of India.94- 95

    Annexure-12 A brief profile of Goalpara District 96-101

  • 5/22/2018 Multi Sector

    5/102

    Multi Sectoral Development Plan ::: Goalpara District

    4

    CHAPTER 1The Synopsis

    The DistrictGoalpara District is one of 90 Minority concentration districts in the country and classified in

    category A i.e. the district is having both Socio-Economic and Basic amenities parameters

    below national average.

    The SurveyBased on the guidelines of Ministry of Minority Affairs, Government of India, base line survey

    of the district was carried out by Omeo Kumar Das Institute of Social Changes, Guwahati,

    Assam. On the basis of the survey the Multi Sectoral Development Plan for Minorities has been

    drafted for the district.

    The Gaps & PrioritiesPlan schemes covering prioritized critical gaps and development indicators are proposed underthis programme. Priorities have been given on pucca housing, better infrastructure of schools,

    basic health, critical infrastructure linkages that are required for optimizing services, skill

    development, marketing facilities which are required for improving living conditions besides

    beneficiary oriented schemes for creating income generating activities especially for the female.

    Partners in the processWhile preparing the schemes, views of the members of the District Level Committee on PMs

    New 15 pt. programme have been obtained along with the PRIS.

    The Plan/Project has been approved by the District Level Committee. The MSDP, which will

    change the socio-economic scenario of the minority people of Goalpara District, may be

    implemented successfully only through joint effort and responsibility of the Govt. functionaries

    as well as PRIS.

    Evaluation & MonitoringProper evaluation and external monitoring will be carried out at the time of implementation.

    There is no doubt that inclusive growth, accelerated development and improvement in the quality

    of life of the people will be arrived at in the District of Goalpara with the help of all.

    Gaon Panchayats having more than 25% Minority Population in the District

    Baladmari Kumri Kalpani Chandamari Sidhabari Kalyanpur

    Agia Badahapur Damra Sri Surjyagiri Baguan Katholbari

    Takimai Haguripara Hashdoba N/Simlitola Gaurnagar

    Kalisabhita Guriadhap Simulbari Harimura Kalsabhanga

    Tarangapur Kathuri Monkola Karipara Rajmita

    Jaleswar Fofonga Tukura Baladmari Char Messelkhowa

    Krishnai Manikpur Molandubi Mornai Jeera

    Dhaigoan Dhamar Bapurvita Jurigoan Dhupdhara Faringapara

    Chunari Shaktola Aoulatoli Kahibari Rowkhowa

    Kalisabhita Khankhowa Kharmuza Ambari Ramharirchar

    Ambari Bashbari Baguan Tiplai Rowmari

    Nolonga Markula Matia Simllitola Buduchar

  • 5/22/2018 Multi Sector

    6/102

    Multi Sectoral Development Plan ::: Goalpara District

    5

    CHAPTER 2

    CRITICAL GAPS & DEVELOPMENT DEFICITS(THE BASELINE SURVEY)

    At the time of preparation of the plan following aspects have been

    considered:

    1. Goalpara district has been selected in Multi Sectoral Development Plan for the economic &

    educational upliftment of Minority Concentrated Districts and was classified in A category.

    Under A category, the district was found to be below national average in socio-economic &

    infrastructural parameters. As per the guidelines, the emphasis has been given to poverty

    alleviation, generation of employment, literacy & infrastructure.

    2. The plan size is as per the outlay of Rs. 57.60 crore prescribed for the district.

    3. The scheme predominantly focuses on rural areas.

    4. Socio-economic and infrastructural development of the district has been considered for

    improving the quality of life of the people and reducing the imbalances during the 11th five-year

    plan. While this has been the principal objective, it has been kept in mind that at the time of

    making interventions under the MSDP, the minority concentrated areas are given preference.

    Although no location specific details in few sectors have been indicated in the plan, at the time of

    implementation of the schemes, minority dominated areas will be chosen for the implementation

    of the scheme. In sectors where achieving 100% saturation will not be possible during this plan

    period, it is proposed to address intervention only in the areas with substantial minority

    population under MSDP.

    5. The baseline survey by Omeo Kumar Das Institute of Social Changes, Guwahati, Assam has

    identified priority areas for the multi-sectoral development for the district. The findings of the

    survey formed critical input for the formulation of MSDP.

  • 5/22/2018 Multi Sector

    7/102

    Multi Sectoral Development Plan ::: Goalpara District

    6

    Ranking of deficits in order of priority as per baseline survey

    Sl

    no

    Indicators Survey

    results

    India (NSS

    2004-05)

    Gap between

    all India and

    District

    Priority

    1 2 3=1-2 4

    I) Socio-economic indicators

    1 Rate of literacy 70.00 67.30 2.70 7

    2 Rate of female literacy 64.84 57.10 7.74 9

    3 Work participation rate 53.68 38.00 15.68 10

    4 Female work participation rate 14.52 21.50 -6.98 6

    II) Basic amenities indicators

    5 Percentage of pucca houses 21.89 59.40 -37.51 2

    6 Percentage of households with

    access to safe drinking water

    70.22 87.90 -17.68 5

    7 Percentage of households with

    sanitation facilities.

    16.33 39.20 -22.87 4

    8 Percentage of electrified

    households

    15.11 67.90 -52.79 1

    III)Health indicators

    9 Percentage of fully vaccinated

    children

    50.30 43.50 6.80 8

    10 Percentage of institutional

    delivery.

    15.02 38.70 -23.68 3

    Most important facilities lacking in the villages:

    In the Goalpara district the transport & communication, drinking water supply and health

    facilities are the most important facilities lacking in the villages. However, the households across

    all religious groups placed road communication and drinking water supply ahead of health

    facilities as shown in the household database.

    Other Findings of Survey:

    *The Assam Human Development (AHDR), 2003 states that Goalpara is one of the lowest

    ranked districts of Assam. The district ranks 18 in respect of HDI with an index value of 0.308

    which is below the state average of 0.407. In terms of income, education and health this district

    occupies 14th, 18thand 16thplaces respectively.

    *Taking cognizance of the development deficits pointed out above, the first priority of

    multisector development plan for rural Goalpara should be expansion of rural electrification. As

    the present survey has clearly pointed out, nearly one third of the villages in the district are yet to

    be provided with electricity connection. In addition, poverty is a factor to restrict a large section

    of the households from availingthe facility in the villages having electricity connection.

  • 5/22/2018 Multi Sector

    8/102

    Multi Sectoral Development Plan ::: Goalpara District

    7

    *Compared to the national scenario, the second priority area for an effective development

    intervention in the district should be rural housing, making provision for pucca houses for rural

    poor of the district under the existing centrally sponsored housing programme. As pointed out in

    the table above, the different between the existing scenario of the district and the national

    average is quite prominent.

    *The present sample survey has reflected that majority of the rural households have access to the

    Govt. health service providers, although the access is not always easy primarily because of poor

    road connectivity, the issue of child delivery deserves adequate attention on priority basis.This

    issue, besides access to the services, involves behavioral change , specially of the predominant

    religious minority community of the district. Therefore, multi sector development plan forr the

    district must address this sensitive dimension in a gradual process.

    * Safe drinking water is still one major problem in the Goalpara Municipal Board & Lakhipur

    Town, and therefore, the multisector development plan of the district may adequately emphasize

    on this one important issue.

    * Although the literacy rate in the district is found a little above the national average,the present

    baseline survey has reflected that the rural areas are highly deprived of required education

    infrastructureleading to a relatively poor rate of illiteracy . The requirements are better education

    infrastructure, scholarship etc.In addition to incentives, the religious minority along side the ST

    & SC population should be sensitized . While aiming at promotion of literacy in the district,

    special emphasis shoul be on girl in order to address the issue of female literacy.

    * The immunization status of the surveyed population shows that only about 50% of the children

    in the age group of 0-5 years have been fully immunized which needs to be addressed with

    serious concern. The quality service delivery and immunization of vaccinationis found poor. In

    most of the cases the parents are not aware of the secod and third doses of vaccines.

    Immunization therefore, should be adequate emphasized through existing programme of NRHM.

    * The survey indicates that more than 87% of the families are reported to be BPL butonly a little more than 55% of them have BPL ration card.

    * Preference for self- employment among the underemployed is more prevalent thansalaried jobs in the sample villages. This means that Govt. needs to create morefacilities for skill development training and make provisions of real services to keepthe enthusiasm level high for the people in self employment endeavour, which is

    grossly missing in most of the State departments in the State.

    a) percentage distribution of workforce by main industryMain industry Hindu Muslim Christian

    Male Female

    Total Male Female

    Total Male Female

    Total

    Cultivation 26.6 2.2 28.8 23.4 1.7 25.0 23.3 3.9 27.1

    Livestock 0.6 0.6 0.9 0.3 0.3 1.2 0.8

    Horticulture 1.1 1.1 .8 .8 1.6 .8 2.3

    Fishing 1.0 1.0

    Forestry 0.4 0.4

    Poultry 0.4 0.4 0.1 0.1 0.8 0.8Mining & quarrying 3.9 0.7 4.6 5.8 0.4 6.2 9.3 0.8 10.1

  • 5/22/2018 Multi Sector

    9/102

    Multi Sectoral Development Plan ::: Goalpara District

    8

    Agricultural basedmanufacturing

    1.3 0.7 2.0 0.3 0.3 0.5

    Non- agricultural

    based manufacturing

    3.7 2.8 6.5 1.8 0.3 2.1 6.2 1.6 7.8

    Electricity, gas &

    water supply

    0.2 0.2 0.4 0.4

    b) Percentage distribution of sample households by own land.

    Hindu Muslim Christian

    SC ST OBC General Total General Total ST Total

    Land less 0.3 0.3 1.5 1.5

    Marginal 20.9 24.3 14.9 17.1 77.1 87.2 87.2 87.7 87.7

    Small 2.0 8.9 2.3 3.7 16.9 6.7 6.7 12.3 12.3

    c) percentage distribution of sample households by own cultivated land.

    Hindu Muslim Christian

    SC ST OBC General Total General Total ST Total

    Land less 17.1 14.3 10.6 13.7 55.7 54.7 54.7 45.2 45.2

    Marginal 4.6 15.1 6.6 6.3 32.6 37.1 37.1 47.9 47.9

    Small 1.7 4.6 .9 1.1 8.3 6.1 6.1 6.8 6.8

    d) Distribution of households across religion and caste who own livestock.

    livestockHindu Muslim Christian All

    totalSC ST OBC General Total General Total ST Total

    Milch animal 7.46 16.45 7.97 10.03 41.90 52.70 52.70 5.40 5.40 100.00

    Graught animal 2.37 23.70 9.00 6.16 41.23 55.45 55.45 3.32 3.32 100.00

    Young cattle 7.92 19.06 5.28 10.26 42.52 53.67 53.67 3.81 3.81 100.00

    Goats 12.02 19.58 7.65 8.20 46.45 50.82 50.82 2.73 2.73 100.00

    Sheep 4.76 4.76 - - 9.52 90.48 90.48 - - 100.00

    Cock/Hen/Duck 5.62 17.71 5.62 5.40 34.34 57.88 57.88 7.78 7.78 100.00

    Pigs 7.69 56.04 9.89 1.10 74.73 1.10 1.10 24.18 24.18 100.00

    Others - - - - - 100.00 100.00 - - 100.00

    e) Percentage distribution of the sample population by level of literacy

    Educational Level Hindu Muslim Christian

    Male Female Total Male Female Total Male Female Total

    Illiterate 13.9 25.7 19.9 33.7 43.8 38.4 19.9 30.5 25.0

    Below primary 8.6 8.9 8.8 16.2 15.9 16.0 15.3 17.1 16.2

    Primary 16.8 14.5 15.6 18.1 13.1 15.7 18.2 17.7 17.9

    Middle 21.8 22.3 22.0 18.6 16.3 17.5 17.6 18.3 17.9

    Management / Com.

    School course(vocational)

    0.4 0.2 0.2 0.1 0.1

  • 5/22/2018 Multi Sector

    10/102

    Multi Sectoral Development Plan ::: Goalpara District

    9

    Metric / high school 27.3 20.8 24.0 7.7 8.1 7.9 23.9 15.9 20.0

    Higher secondary 8.6 6.5 7.5 3.5 1.9 2.8 4.0 .6 2.4

    Tech. Diploma belowdegree

    0.1 0.1

    Tech/professional degree 0.1 0.3 0.2 0.1 0.0

    Graduate degree (General) 2.0 0.7 1.3 1.9 0.5 1.2 0.6 0.3

    Post graduate (General) 0.1 0.3 0.2 0.1 0.0

    Others 0.1 0.1 0.1 0.1 0.3 0.2 0.6 0.3

    Total 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

    f) Distribution of households(%) by housing status

    Hindu Muslim Christian

    SC ST OBC General Total General Total ST TotalOwn 16.3 23.7 15.4 17.1 72.6 89.5 89.5 74.0 74.0

    Indira Awas /

    Govt. Provided

    7.1 12.3 3.4 4.3 27.1 9.6 9.6 26.0 26.0

    Rented 0.3 0.3 0.8 0.8

    Total 23.4 36.0 18.9 21.7 100.0 100.0 100.0 100.0 100.0

    g) Distribution of households with Electricity connection

    Religion CasteHouse electrified

    Yes No Total

    Hindu

    SC 5.1 18.3 23.4

    ST 8.6 27.4 36.0OBC 6.0 12.9 18.9

    General 7.7 14.0 21.7

    Total 27.4 72.6 100.0

    Muslim General 5.2 94.8 100.0

    Total 5.2 94.8 100.0

    ChristianST 20.5 79.5 100.0

    Total 20.5 79.5 100.0

    h) Distribution of nonelectrified households by source of light

    Religion Caste

    Source of light

    Oil lamp Lantern Lamp +others

    Oil lamp+ others

    Lantern+ others

    Total

    Hindu

    SC 18.5 6.7 25.2

    ST 26.8 .4 9.8 .4 .4 37.8

    OBC 11.0 5.9 .8 17.7

    General 14.2 5.1 19.3

    Total 70.5 .4 27.6 1.2 .4 100.0

    MuslimGeneral 61.3 .4 37.6 .7 100.0

    Total 61.3 .4 37.6 .7 100.0

    ChristianST 60.3 3.4 36.2 100.0

    Total 60.0 3.4 36.2 100.0

  • 5/22/2018 Multi Sector

    11/102

    Multi Sectoral Development Plan ::: Goalpara District

    10

    CHAPTER 3

    PLANNING PROCESS AND PLAN

    Based on the base line survey by the Omeo Kumar Das Institute of Social Changes andDevelopment the following points are verified at the time of preparation of proposalby the various departments and development deficits and critical gaps identifiedconcerned.

    They have not been sanctioned or proposed under any other scheme/programme.

    There is no duplication with other public funded schemes being implemented in thedistrict with similar objectives.

    That these do not involve any recurring cost and do not include maintenance liabilities.

    Guidelines and norms fixed by the Government of India and various central assistance

    schemes are being followed strictly with respect to the cost estimate, plan formulationand implementation strategies, etc

    Synergy and topping up of various existing programmes, etc followed strictly

    Guidelines & Norms followed

    Critical Gaps & Development Deficits.. Plan Guidelines & Norms followed..

    1. Electrified Households (Priority rank-1) Solar Energy System for rural household in remote areas as

    per Guidelines of Assam Energy Development Agency

    under MNES2. Houses with Pucca Walls (Priority rank-

    2)

    IAY Guidelines and Norms with BPL waitlist on the

    identified minority concentrated Gaon Panchayats based on

    base line survey

    3. Health & Immunization (Priority rank-

    3 & 8)

    NRHM guidelines & norms in the identified minority

    concentrated Gaon Panchayats based on base line survey

    4. Safe Drinking Water & Sanitaion

    (Priority rank-4 & 5)

    Norms on the basis of APWD(B) for 2004-05 and rates

    earmarked by the CPHE/ACE(LAZ).Safe drinking water

    is still one major problem in the Goalpara (Nayapara) &

    Lakhipur.

    5. Work Participation

    a. Animal Husbandary & Veterinery

    b. Handloom & Textile

    c. Organized & Market Development

    (Priority rank-6 & 10)

    a.Unit Cost rates on the basis of NABARD guidelines for

    more employment opportunity in rural areas through SHGs.

    b. Unit Cost rates on the basis of Ministry of textile,

    Govt.of India guidelines for more employment opportunity

    in rural areas through SHG.

    c.Norms on the basis of APWD(B) schedule rates for

    2004-05 for more employment opportunity in rural &

    urban areas.

    6. Literacy: (Priority rank 7 & 9) SSA guidelines and identified minority concentrated Gaon

    Panchayats based on base line survey.

  • 5/22/2018 Multi Sector

    12/102

    Multi Sectoral Development Plan ::: Goalpara District

    11

    CHAPTER- 4

    INTERVENTIONS

    * INTERVENTIONS AS PER FINDINGS OF THE BASE LINE (BL) SURVEY: As per the BLsurvey, the following have been identified as priority areas and each priority area as identified

    has been attempted to be addressed in the following manner:

    a) Electricity in houses (Priority rank-1):

    Under various rural electrification programmes, all the villages in the district are being electrified

    in a phased manner. The emphasis now is on giving connection to maximum number of

    households. No additional funds are needed, hence no allocation is proposed under MSDP.

    However, it is proposed to make provision for solar energy systems for rural households in

    remote areas like chars and along foothills of Meghalaya. The details and the unit cost of the

    scheme are enclosed at Annexure -1.

    b) Houses with Pucca walls (Priority rank-2):

    The district lags far behind the national average in terms of the number of people having houses

    with puccca walls by 37.51%. As per the requirement of houseless people who are to be provided

    with houses under IAY at the present rate of fund allocation by the rural development

    department, all the houseless people can not be provided with Pucca Houses under IAY before

    the completion of the 11th five year plan. Thus there will be substantial gap. Accordingly top

    priority has been accorded for fund allocation for housing by topping up the centrally sponsored

    scheme of Indira Awas Yojana (IAY).

    The statement showing priority wise IAY wait list with Bharat Nirman block wise & GP wise in

    Goalpara district.

    Rongjuli Development T.D Block:

    Sl

    no

    Name of GP Total nos of IAY

    wait list with

    Bharat Nuirman

    beneficiaries

    Total nos of minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Ambari 2012 nos 1421 nos 70.62%2 Tiplai 1698 nos 1185 nos 69.75%

    3 Simlitola 2108 nos 1066 nos 50.56%

    4 Dhupdhara 870 nos 385 nos 44.25%

    5 Khutabari 1485 nos 597 nos 40.20%

    6 Kothakuthi 800 nos 310 nos 38.75%

    7 Dhanubhanga 869 nos 322 nos 37.05%

    8 Kahibari 617 nos 214 nos 34.68%

    9 Rongjuli 982 nos 174 nos 17.82%

    Total 11441 nos 5656 nos 49.43%

  • 5/22/2018 Multi Sector

    13/102

    Multi Sectoral Development Plan ::: Goalpara District

    12

    Kushdhowa Development T.D. block:Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Baguan

    Kathalbari

    402 nos 252 nos 62.68%

    2 Damra 1547 nos 660 nos 42.66%

    3 Puranibhita 1376 nos 484 nos 35.17%

    4 Darranggirri 1376 nos 389 nos 17.05%

    5 Lela 981 nos 189 nos 19.26%

    6 Kushdhowa 632 nos 105 nos 16.61%

    7 Majjakhili 1011 nos 107 nos 10.58%

    8 Dudhnoi 1080 nos 19 nos 1.75%

    Total 8405 nos 2205 nos 26.04%

    Matia Development Block:

    Slno

    Name of GP Total nos of IAY wait listwith Bharat Nirman

    beneficiaries

    Total nos ofminority

    beneficiaries

    % minority IAYbeneficiaries

    1 N/Simlitola 2732 nos 2616 nos 95.75%

    2 Buduchar 2110 nos 1966 nos 93.17%

    3 Baladmari Char 2056 nos 1735 nos 84.38%

    4 Sidhabari 2441 nos 1969 nos 80.66%

    5 Surjyagiri 2544 nos 1993 nos 78.34%

    6 Karipara 834 nos 503 nos 60.31%

    7 Mornoi 1055 nos 580 nos 54.97%

    8 Harimura 1642 nos 713 nos 43.42%9 Matia 823 nos 319 nos 38.76%

    10 Dolgoma -

    Kadamtola

    683 nos 71 nos 10.39%

    11 Bakaitary 626 nos 53 nos 8.46%

    Total 17546 nos 12518 nos 71.34%

    Krishnai Development Block:Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Manikpur

    Bhelakhamar

    1363 nos 1246 nos 91.41%

    2 Molandibi 2415 nos 1976 nos 81.82%

    3 Krishnai 2202 nos 1657 nos 75.24%

    4 Fofonga 1458 nos 1055 nos 72.35%

    5 Tukura

    Bormohara

    1125 nos 719 nos 63.91%

    6 Meselkhowa 1236 nos 774 nos 62.62%

    7 Jira 1330 nos 665 nos 50%

    8 Dhaigoan 1110 nos 401 nos 36.12%

    9 Dirmajakhili

    Salpara

    1785 nos 92 nos 5.15%

    Total 14024 nos 8585 nos 61.21%

  • 5/22/2018 Multi Sector

    14/102

    Multi Sectoral Development Plan ::: Goalpara District

    13

    Lakhipur Development Block:Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Saktola 1376 nos 1351 nos 98.11%

    2 Kholsabhanga 750 nos 727 nos 96.93%3 Rowkhowa 887 nos 846 nos 95.37%

    4 Aolatoli 1039 nos 1133 nos 91.70%

    5 Foringapara 834 nos 759 nos 91%

    6 Bapurbhita

    Jurigoan

    1670 nos 1476 nos 88.38%

    7 Chunari 1163 nos 1022 nos 87.87%

    8 Dhamar 1641nos 577 nos 35.16%

    9 Dodan 689 nos 105 nos 15.23%

    10 Joyramkuchi 947 nos 129 nos 13.62%

    11 Pukhuripara 736 nos 73 nos 9.91%Total 11732 nos 8198 nos 69.87%

    Balijana Development Block:Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Kalpani

    Chandamari

    650 nos 580 nos 89.23%

    2 Kumri 38 nos 31 nos 81.54%

    3 Baladmari 794 nos 641 nos 80.73%

    4 Badahpur 165 nos 114 nos 69.09%

    5 Kalyanpur 1298 nos 741 nos 57.08%

    6 Agai 222 nos 97 nos 43.69%

    7 Bordamal 167 nos 68 nos 40.71%

    8 Balijana 237 nos 75 nos 31.64%

    9 Dwarka 108 nos 24 nos 22.22%

    10 Dariduri 683 nos 33 nos 4.83%

    Total 4362 nos 2404 nos 55.11%

    Kharmuza Development Block:Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Khankhowa 1129 nos 1129 nos 100%

    2 Ramharir Char 1107 nos 1107 nos 100%

    3 Ambari 2233 nos 2233 nos 100%

    4 Bashbari 1673 nos 1673 nos 100%

    5 Rowmari 2029 nos 2029 nos 100%

    6 Nolonga 2696 nos 2690 nos 99.77%

    7 Kharmuza 1984 nos 1978 nos 99.69%

    8 Markula 1887 nos 1835 nos 97.24%

    9 Baguan 1138 nos 712 nos 62.56%

    Total 15876 nos 15386 nos 96.91%

  • 5/22/2018 Multi Sector

    15/102

    Multi Sectoral Development Plan ::: Goalpara District

    14

    Jaleswar Development Block:

    Sl

    no

    Name of GP Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    1 Haguripara 1316 nos 1316 nos 100%

    2 Katarihara 1872 nos 1872 nos 100%

    3 Kathuri 1319 nos 1319 nos 100%

    4 Monkola

    Saildhara

    608 nos 608 nos 100%

    5 Rajmita 3031 nos 3020 nos 99.63%

    6 Simlabari 3124 nos 3100 nos 99.23%

    7 Tarangapur 2543 nos 2521 nos 99.13%

    8 Jaleswar 2092 nos 2070 nos 98.94%

    9 Gaurnagar 2171 nos 2140 nos 98.57%

    10 Gosaidubi 1523 nos 1500 nos 98.48%

    11 Takimari 1241 nos 1220 98.30%

    12 Guriadhap 976 nos 950 nos 97.33%

    13 Khalisavita 2419 nos 2315 nos 95.70%

    14 Hasdoba 1616 nos 1400 nos 86.63%

    Total 25,851 nos 25,351nos 98.06%

    Block wise total IAY wait list with increasing order and percentage:Sl

    no

    Name of block Total nos of IAY wait list

    with Bharat Nirman

    beneficiaries

    Total nos of

    minority

    beneficiaries

    % minority IAY

    beneficiaries

    with increasing

    order.

    1 Jaleswar 25,851 nos 25,351nos 98.06%

    2 Kharmuza 15,876 nos 15,386 nos 96.91%

    3 Matia 17,546 nos 12,518 nos 71.34%

    4 Lakhipur 11,732 nos 8198 nos 69.87%

    5 Krishnai 14,024 nos 8585 nos 61.21%

    6 Balijana 4362 nos 2404 nos 55.11%

    7 Rongjuli 11441 nos 5656 nos 49.43%

    8 Kushdhowa 8405 nos 2205 nos 26.04%

    Total 1,09,237 nos 80,303 nos 73.47%

  • 5/22/2018 Multi Sector

    16/102

    Multi Sectoral Development Plan ::: Goalpara District

    15

    The present source of fund allocation under this sector as indicated by the table below shows that

    under the existing fund sources only 24158 households out of the IAY waitlist with Bharat

    Nirman of 1,09,237 numbers will get IAY houses by the year 2011-2012.

    Total No. of houseless families

    requiring house as per Bharat Nirman

    beneficiaries.

    Financial year Year wise coverage of

    families under IAY.

    1,09,237

    2007-2008 4802

    2008-2009 4839

    2009-2010 4839

    2010-2011 4839

    2011-2012 4839

    Total 24158

    Thus remaining wait list will not be covered by the end of 11 th five year plan. Out of the gap,

    7500 households are proposed to be benefited from identified villages having substantial

    minority population wherein the minority beneficiaries shall be limited to around 60% and the

    remaining from other communities in minority concentrated Gaon Panchayats. Provision has

    been made at the unit cost Rs.38, 500.00 as approved by GOI under IAY (Annexure-2)

    c) Health Indicators: (Priority rank 3 and 8)

    One of the most important areas of concern as per the BL survey is institutional delivery and

    percentage of fully vaccinated children where the district lags behind the national average by

    23.68%. The actual situation in respect of the vaccination in the district is quite good and the

    district fares better than the State and national average.The single most important reason for the

    poor institutional delivery is lack of proper labour rooms, female wards and sub-centres to

    conduct deliveries.

  • 5/22/2018 Multi Sector

    17/102

    Multi Sectoral Development Plan ::: Goalpara District

    16

  • 5/22/2018 Multi Sector

    18/102

    Multi Sectoral Development Plan ::: Goalpara District

    17

    There are 69 numbers of Sub-Centres which are functioning in rented houses in Goalpara which

    are often inadequate in space and other facilites. Out of those Sub-Centres, 34 numbers of Sub-

    Centres are under construction under 12thFinance Commission Award and another 13 shall be

    started shortly. At the present rate of work, it will not be possible to achieve 100% saturation

    within 11thfive year plan period and therefore, it is proposed to construct buildings for 22 sub-

    centres which are buildingless, through MSDP fund. The construction is proposed at the designand unit cost of 7.5 lakhs approved by the State Govt. under NRHM. The design and the costing

    are as detailed in Annexure 3(A).The Sub-Centres which are proposed for construction of building are as follows:-

    Sl.No Name of Sub Centre Population Availability of land

    1 Khagrabari SC 7600 Available

    2 Titapara SC 5200 Available

    3 Bangaljhar SC 3700 Available

    4 Lempara SC 1549 Available

    5 Tiapara Char SC 5200 Available6 Chotipara SC 3660 Available

    7 Ketkibari SC 2735 Available

    8 Rokhapara SC 3254 Available

    9 Darighopa SC 4215 Available

    10 Bhetaipara SC 2968 Available

    11 Garuchatka SC 5026 Available

    12 Barpathar SC 4750 Available

    13 Checapani SC 2005 Available

    14 Salpara SC 4417 Available

    15 Kaliashastra SC 3875 Available16 Khamari SC 2008 Available

    17 Jaybhum SC 6856 Available

    18 Daikhowa SC 5672 Available

    19 Sonamoyee SC 5299 Available

    20 Polashkandi SC 2516 Available

    21 Meservita SC 4299 Available

    22 Pub-Kathuri SC 7897 AvailableIn Goalpara, there are 36 (Thirty Six) numbers of Health Institutions where the delivery should

    be performed. Out of these 36 institutions, 5 nos. are BPHC, 14 nos. are SD, 12 nos. are MPHC,

    2 nos. are SHC, 1 is FRU, 1 is M.C.H, 1 is Civil Hospital & 151 nos. of Sub-Centre. The data of

    total expected birth & actual institutional delivery is given below:

    Total Population : 9,69,363 (projected)

    Birth Rate (Assam) : 2.46%

    Total expected birth : 23,846

    Nos. of Institutional Delivery (2007-08) : 9,728

    The above-mentioned data indicates that less than 50% of total delivery occurs in health

    institutions. This problem may be eradicated by developing the infrastructure of health

    institutions by providing 35 number of wards to each of the 35 numbers of Health Institutions

    (excluding 200 Bedded Civil Hospital, Goalpara) and additional Labour Rooms in identified 15

    institutions. The institutions where addl. Labour room is required are:

  • 5/22/2018 Multi Sector

    19/102

    Multi Sectoral Development Plan ::: Goalpara District

    18

    Sl.

    No.

    Name of the Health

    Institution

    Average

    Delivery/MonthJustification

    1 Matia BPHC 15

    Poor infrastructure for

    conducting delivery

    2 Agia BPHC 40

    3 Mornai BPHC 25

    4 Maternal & Child HealthCentre,Goalpara

    16

    5 Lakhipur BPHC 140An additional Labour

    Room is required as

    delivery load is high

    6 Dudhnoi FRU 85

    7 Joleswar SHC 75

    8 Krishnai MPHC 60

    9 Khutabari MPHC 0

    Insufficient

    infrastructure for

    conducting delivery.

    10 Dohela Majjakhili SD 0

    11 Bardamol SD 0

    12 Daranggiri SD 3

    13 Kushdhowa SD 014 Badahpur SD 3

    15 Dhumerghat SD 0

    Further, List of 35 Health Institutions where addl. female ward is required for better ante-

    natal, natal and post-natal care is as follows:

    NAME OF HEALTH INSTITUTIONS

    Maternal & Child Health

    Centre , Goalpara

    Dilmajakhili SD Rongjuli BPHC

    Agia BPHC Dohela Majjakhili SD Dudhnoi FRUBadahpur SD Harimura SD Bikali SD

    Bardamal SD Lakhipur BPHC Ambari SD

    Baguan SD Baida SHC Damra MPHC

    Ambari Bazar SD Jaleswar SHC Khutabari MPHC

    Joypur MPHC Chaibari MPHC Simlitola MPHC

    Kharmuza MPHC Chunari SD Darrangiri MPHC

    Messelkhowa MPHC Dhumerghat SD Tiplai MPHC

    Mornoi BPHC Matia BPHC Thabalpara MPHC

    Krishnai MPHC Bahati MPHC Kushdhowa SD

    Khardang MPHC Dolgoma SD

    The construction of the labour room @ Rs 6.00 lakhs and the female ward @ Rs 7.00 lakhs is

    proposed at the design and unit cost approved by the State Govt. under NRHM. The design and

    the costing are as detailed in Annexure 3(B) and 3(C).

    d) Sanitation facilities: ( Priority rank-4)

    The district lags behind the national average by 22.87% as per BL survey, which means that a

    substantial number of households are without W/C toilets. However, the district is under total

  • 5/22/2018 Multi Sector

    20/102

    Multi Sectoral Development Plan ::: Goalpara District

    19

    sanitation campaign and there are adequate funds to cover all the left out families, hence no

    allocation is proposed under MSDP.

    e) Safe drinking water (Priority rank-5)

    The District lags behind the national average by 17.68 % as per baseline survey report. Thedistrict is being covered under RGDWM programme and all rural areas are likely to be covered

    with 2012 as per population norms for safe drinking water source.

    However, there are large areas adjoining and outside Goalpara and Lakhipur towns with

    substantial minority concentration and without any safe drinking water source.

    Further, due to heavy iron content in the water in these areas ( Chemical Analysis report at

    Annexure 4(A)) , it is proposed to provide two PWSS in these areas along with the Iron

    filteration plant; One at Nayapara ( Goalpara ) and other at Lakhipur, both areas with substantial

    minority population. The details of the schemes are given in Annexure 4(B)and 4(C).The

    schemes are very essential for providing safe drinking water source to the people in these areas.

    f) Work participation rate including female work participation rate (priority

    rank 6 & 10).

    The district lags behind the national average by 6.98% as per BL survey. The important

    recommendations of the survey report on this sector are as follows:

    * Enhancement of female work participation rate in the district is to be fourth priority of the

    multi-sector development plan for Goalpara. The present baseline survey provides sufficient

    insinghts for effective planning for greater female work participation in the district. For instance,

    besides highlighting the problems of self-employed people in the district, the baseline survey has

    clearly pointed out the kind of skill sought by the people.

    * Preference for selfemployment among the underemployed or unemployed is more prevalent

    than salaried jobs in the sample villages. This means that Govt. needs to create more facilites for

    skill development training and make provisions of real services to keep the enthusiasm level high

    for the people in self employment endeavour, which isgrassly missing in most of the State

    department in the State.

    The employment potential of land based activities is limited. With the increase in population and

    limited land resources, it is imperative to find alternative employment opportunities. In this

    context, the rural Non-Farm Sector (RNFS) assumes great significance. A substantial portion of

    surplus rural labour can be absorbed in this sector. This will also facilitate provision of effective

    source of income generation to women who constitute nearly 50% of the rural population and areunable to move to distant places for a job. The cottage and village industries are important

  • 5/22/2018 Multi Sector

    21/102

    Multi Sectoral Development Plan ::: Goalpara District

    20

    activities for village economy and provide gainful employment to unemployed population of

    rural areas. Keeping above observations in mind, the following interventions are proposed in the

    minority concentrated areas.

    It is proposed to create more opportunities of employment through the following interventions:

    i) HANDLOOM SECTOR DEVELOPMENT:

    The handloom weavers are active in 345 villages and 9 small towns. There are 9 (nine ) major

    pockets in the district, (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv)

    Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola. For the

    Development of the sector, a two pronged approached is proposed:-

    Development of common infrastructure:-The main problem of this sector is lack of adequate

    dyeing and allied facilities in the district. For the development of this sector, a provision forestablishing a Common Facility Centre and Handloom Dyeing Unitat each of the nine Pockets is

    made under MSDP as detailed in Annexure - 5 (A).

    Skill up Gradation Cum Construction of Workshed to the weavers:- Training and retraining

    are critical inputs for handloom weavers to produce diversified products with improve quality to

    meet changing market trends and requirements. The training is proposed in disciplines of

    weaving, dyeing and designing alongwith construction of workshed for each weavers as detailed

    in Annexure5 (B)The proposals for the development of Common Facility Centre and skill up gradation Cum

    Construction of Workshed are prepared as per the norms prescribed under the guidelines of

    Integrated HandloomDevelopment Scheme of Ministry of Textiles, Govt. of India.

    ii) ANIMAL HUSBANDARY SECTOR DEVELOPMENT:

    There are 220 numbers of SHGs in Goalpara district in A.H & Veterinary sector out of which

    200 nos of SHGs will be involved in MSDP. These groups mainly belong to minority community

    out of which Muslim prefer Poultry, Goatery and Dairy farming while Christians (Garos) prefer

    Dairy & Piggery farming. To increase meat, milk and egg production in the district and the

    income generating level of the SHGs, four types of Animal Husbandary activities are proposed

    for farming with skill upgradation (capacity building). Proposed activities are:

    a) Dairy farming

    b) Goatery farming

    c) Broiler farming and

    d) Piggery farming

  • 5/22/2018 Multi Sector

    22/102

    Multi Sectoral Development Plan ::: Goalpara District

    21

    In addition to the above activities two breading farms proposed to establish at Govt. Fodder farm

    Rakhyasini ( Matia ) and Kuchdhowa ( Govt. piggery farm campus) in Piggery sector and two

    mini dairy farms are proposed to establish at State Vety. Dispensary campus Ambari and State

    Vety. Dispensary Campus , Joyramkuchi ( Jaleswar ) in dairy sector, both these breading farms

    will be run by the SHGs of the respective locality and total numbers of SHG involve is

    4(four).The breading farms are as follows:

    a)Pig Breeding farm.

    b)Mini cattle Breeding farm ( Dairy Farm).

    For each of the above sub - sectors, a total of 50 SHGs comprising of 500 members are proposed

    to be benefited in the minority concentrated areas. The unit costs based on NABARD guidelines

    are enclosed at Annexure 6(A), 6(B), 6(C), 6(D), 6(F) &6(G).

    Further, the training is proposed for skill upgradation of these 200 SHGs. The details are at

    Annexure 6(E).

    iii) ORGANIZED MARKET SECTOR (FORWARD LINKAGE DEVELOPMENT:

    A) SHG HAATS:

    There are 5644 number of SHGs in the rural areas of our district. However, there is a difficulty in

    getting a remunerative price due to lack of organized markets and consequent bargaining power

    of SHGs. To overcome this and to increase rural incomes, it is proposed to construct SHG Haats

    at 16(sixteen) identified minority concentrated locations for providing organized markets to the

    SHGs and a large numbers of SHGs will be benefited directly on rotation basis. The SHG Haats

    are proposed at Chunari Bazaar, Nidanpur, Rangapani Bazaar, Krishnai, Bashbari Bazaar,

    Kaljani Bazzar, Makri Bazaar, Agia, Dudhnoi Bazaar, Darrangiri, Nabagata Simlitola, in front of

    Matia Block office, Milanpur, Borpathar, Gaurnagar Bazaar and Jaleswar. The details of the

    scheme are at Annexure-7. The unit cost for a 12outlet Haat is proposed @ Rs.12.50 lakhs

    based on APWD schedule.

    B) MARKET AT HASILA BEEL:

    Goalpara town is the Dist. Head Quarter of Goalpara District of Assam. The mighty river

    Brahmaputra following areas the north and west boundary blessed Goalpara to be a fertile

    agricultural land meeting the demand of its boundary district. But due to lack of proper Market

    Place, the venders are running their business in road side spaces of the town. About 250 retail

    venders of vegetable, Fish, Mutton & Chicken are running their business in the road side of the

    town and create traffic snarls, accidents, garbage problem etc, leading to closed drains

    unhygienic working conditions and open to exploitation by both police and Municipal tax

  • 5/22/2018 Multi Sector

    23/102

    Multi Sectoral Development Plan ::: Goalpara District

    22

    collectors .The venders have no permanent settlement to setup there shopping houses because

    they are mainly BPL people.

    So, the provision of proper market place outside the town area would help the venders of

    vegetable, chicken, Mutton etc. who are mainly from minority community and BPL families.

    This scheme would upgrade their skills and also settle their business to progress their livelihood.

    10 Bigha, 2 katha and 6 lessa land is available for market at Hasila beel.

    The people from all communities including minorities shall be benefited in the proposed Hasila

    Market. The minority population to be benefited is expected to be with in 60% to 70%.

    To provide organized hygenic market to these vendors, it is proposed to construct Hasila Beel

    Market with 190 outets and a lot of open space at a total cost of Rs 194.833 lakhs as per APWD

    schedule. Out of total cost of this, 95% is proposed from MSDP and 5% is proposed to be

    provided by beneficiaries. The details are at Annexure 8.

    v) Upgradation of ITI:

    A very large proportion of the population of minority communities is engaged in low level

    technical work and earns its livelihood as artisans and labourers. Provision of technical training

    to such people would upgrade their skills and earning capacity. The ITI situated in the district

    does not have sufficient building of its own and is being run with a lot of constraints. To provide

    better training and self employment generation skills to the minorities, it is proposed to establish

    two workshops at a cost of Rs. 101.13 lakhs only as per APWD schedule. Presently, the students

    have to go to ITI, Boangaigoan and to private Workshops for training. The details are at

    Annexure-9.

    g) Literacy (Priority 7 & 9)

    The lower primary (LP)/Elementary schools of the district are being covered for additional class

    room under SSA. So, no proposal is made for additional class room for Elementary schools.

    However, the high and the higher secondary schools are not covered and there is a high rate of

    dropout due to lack of classrooms at high and higher secondary school level. This has resulted in

    poor overall literacy level including female litracy.

    It is proposed to construct 258 additional class rooms keeping in view the 1:40 norms for

    classrooms for students. The size of the room is proposed to be 8m X 6.24 m as per SEBA

    (Secondary Education Board of Assam) norms. The unit cost has been worked out to be Rs.2.55

    lakhs based on SSA rates. The details of the estimate are enclosed at Annexure 10.

  • 5/22/2018 Multi Sector

    24/102

    Multi Sectoral Development Plan ::: Goalpara District

    23

    LIST OF SCHOOLS REQUIRING ADDL. CLASSROOM

    Sl.No. Name of SchoolTotal No. of

    Students

    Total No. ofMinorityStudents

    MinorityP/C

    No. ofExisting

    Classroom

    No. ofClassroomrequired as

    per rule

    No. of Addl.Class room,

    required

    1 2 3 4 5 6 7 8

    1 Dupdhara H.S. 835 139 16.65% 19 21 2

    2 Dupdhara Girls H.S. 530 225 45% 8 13 53 Dudhnoi Girls High School 740 22 2.97% 15 19 4

    4 Derek H.S. 400 400 100% 5 10 55 Bagun Girls H.S. 280 146 52% 3 7 4

    6 Bakaitari High School 285 25 9% 9 7 -

    7 Dhaundhanga H.S. 310 30 9.50% 5 8 38 Nehru Vidyapith H.S 279 15 5.37% 5 7 2

    9 Baladmari High School 815 371 45.52% 18 20 210 Amjonga High School 650 Nil Nil 14 16 2

    11 Maj-Jakhili H.S. 408 18 4.60% 12 10 -

    12 Ambari Bazar H.S. 453 453 100% 5 11 613 Indira High School 324 Nil Nil 4 8 4

    14 Gossaidubi High School 265 260 98.11% 3 7 4

    15 Foringapara H.S. 240 240 100% 3 6 316 Nishangram H.S. 380 350 97% 5 10 517 Simlitola High School 658 51 8% 12 16 4

    18 Bapuji H.S. 260 128 49.80% 4 7 319 Padupara Anchalik Mad. H.S 320 320 100% 7 8 120 Agia Balijana Girls H.S. 421 3 0.70% 7 10 3

    21 Fatengapara H.S. 282 282 100% 3 8 522 Batabari High School 195 195 100% 3 5 2

    23 Takimari H.S. 256 241 87% 4 6 224 Lower Chotipara H.S. 210 210 100% 3 5 2

    25 Dirmajakhili High School 250 Nil Nil 5 6 126 Bardamal High School 250 Nil Nil 7 6 -

  • 5/22/2018 Multi Sector

    25/102

    Multi Sectoral Development Plan ::: Goalpara District

    24

    27 Kushdhowa High School 352 42 12% 4 8 4

    28 Karipara High School. 321 205 60% 4 8 429 Don-Bosco High School 750 490 65% 16 19 330 Krishnai Habraghat H.S. 884 675 76% 12 22 1031 Tiplai H.S. 491 160 32.80% 9 12 3

    32 Bashbari H. S. 242 242 100% 4 6 233 Lakhipur Girls H.S. 310 184 87.60% 6 8 2

    34 Dubapara High School 361 224 62% 4 9 535 Bagdoba Besimari H.S 640 135 21% 12 16 4

    36 Bahati H.S. 183 92 52% 12 5 -37 Bapurbhita H.S. 195 150 77.00% 4 6 238 Central Girls H.S. 566 247 43.60% 12 14 2

    39 Rakhalkilla H. S. 260 260 100% 5 7 240 Puthimari H.S. 500 376 75% 12 13 1

    41 Dudhnoi H.S. 580 50 9% 12 15 3

    42 Dohikata Bhojmala H. School 280 125 44.64% 6 7 143 Tarangapur H.S. 280 256 98.50% 4 7 344 Dhumerghat H.S. 386 210 55% 5 10 5

    45 Goalpara Girls H.S. 113 108 96% 6 3 -46 Folimari High School 280 280 100% 3 7 4

    47 Jaleswar Girls H.S. 250 205 100% 3 6 348 Goalpara Vidyapith H.S. 512 212 41.40% 10 12 2

    49 Krishnai Girls H.S. 516 326 56% 9 13 4

    50 Simulbari High School 237 226 96% 5 6 151 Bagun High School 462 224 48.50% 8 12 452 S.B.P. Memo. H.S.School 756 340 45% 12 19 7

    53 Darrangiri H.S.School 510 Nil Nil 10 13 354 Khalisabhita H.S.School. 513 473 92% 5 13 8

    55 Lakhipur H.S. School 714 463 54.80% 11 18 7

    56 Jaleswar H.S. School 544 538 99% 7 14 757 Rangjuli H. S. School 970 Nil Nil 16 24 858 Krishnai Mad. H.S.School. 634 630 99% 8 16 8

  • 5/22/2018 Multi Sector

    26/102

    Multi Sectoral Development Plan ::: Goalpara District

    25

    59 Balbala High School. 353 122 35% 7 9 2

    60 Dalgoma H.S.School 810 346 42.72% 16 20 461 P.R.Govt. H.S. & M.P. School 836 543 65% 15 21 6

    62 J. N. Memo. H.S.School 1238 248 20% 21 31 1063 Chunari H.S. School 752 660 88% 12 19 7

    64 Kharmuza H.S. School 495 437 88% 7 12 5

    65 Rajmita High Madrassa 222 222 100% 4 6 2

    66 RakhaldubiHigh Madrassa 749 749 100% 11 18 7

    67 Katarihara Giris H/Mad 195 195 100% 3 5 2

    68 Pud-Kathuri H.Mad. 260 260 100% 3 6 369 Nayapara High Mad. 205 205 100% 3 5 2

    70 Aolatoli High Madrassa 250 250 100% 3 6 3

    71 Katarihara Title Madrassa 150 150 100% 2 4 2

    72 Katarihara Sr. Madrassa 525 525 100% 10 13 3

    73 Meserbhita Nasiria Arabic College. 560 560 100% 10 14 4G. Total 32439 17488 571 814 258

    In respect of above High schools , Higher Secondary schools and high Madrassa these are functioning under Govt . of Assam and the Principals ,

    Head Masters and Superientendents with staff of the schools are drawing salary from the Govt. of Assam.

  • 5/22/2018 Multi Sector

    27/102

    Multi Sectoral Development Plan ::: Goalpara District

    26

    TABLE-I

    MULTI- SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA

    ( Rs. In lakhs)

    Sl no Activity Output Quantity Unit cost Financialallocation

    (A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME

    1 Upgradation of existing ITI Creation additional class room of twotrades 1 101.13 101.13

    ( B) TOPPING UP OF CENTRALLY SPONSERED SCHEMES .

    2 IAY Construction of houses for families

    living below poverty line.

    7500 0.385 2887.50

    3 Accelerated water supply

    programme.

    a) Construction of new pipe water

    supply scheme at Nayapara

    1 135.00 135.00

    b) Construction of new pipe water

    supply scheme at Lakhipur

    1 66.90 66.90

    (C) BRIDGING CRITICAL INFRASTRUCTURE GAP

    4

    a) Construction of

    subcentres

    Construction of subcentres which are

    not having Govt. building.

    22 7.5 165.00

    b) labour room An additional labour room is required

    as delivery load is high.

    15 6.00 90.00

    c)Female wards forMPHC/S.H.C/S.D/BPHC/P

    HCs

    To provide Health care facilities to theareas where such facilities are still

    lacking.

    35 7.00 245.00

    5

    Assistance to handloom

    weavers

    Looms & Accessories, Construction of

    workshed & skill upgradation training

    in weaving, design development andin dying.

    looms 50 nos, Jacquard 50 nos

    ,Warping drum 5 nos , workshed

    180 nos with training.

    - 62.98

    Construction of common

    facilily centre for

    1) CFC , (i) Bausiatari, (ii) Gojapara,

    (iii) Godharbori (Muslim Para), (iv)

    CFC 9, Loom 90 nos, J. machine

    90 nos, W . drum 18 nos ,

    17.42 156.78

  • 5/22/2018 Multi Sector

    28/102

    Multi Sectoral Development Plan ::: Goalpara District

    27

    upliftment of handloom

    weavers at eight pokets.

    Shakumari, (v) Bhalukdubhi, (vi)

    Bagdoba , (vii) Rongsai (viii) Baguan

    & (ix) Simlitola Looms ,Jacquard

    machine, Warping drump , Dyeng

    equipments etc.

    Winding charkha 90 nos

    6 Dairy schemeGoatery schemeBroiler scheme and

    Piggery scheme for self

    employment.Pig breeding farm

    Mini cattle breeding farm

    (dairy farm)

    Assistance for setting of Dairy unit ,

    Goatery unit , Broiler unit and Piggery

    unit including training. .

    2) to gear up SHG.( Kuchdhowa andRakhyashini)

    3) to gear up SHG ( Ambari State

    Vety Dispensary, Joyramkuchi State

    Vety. Dispensary.

    1) Dairy 50 unit , 2) Goatery 50

    unit , 3) Boiler 50 unit and

    piggery 50 unit including training

    4) 2 units5) 2 units

    1) 3.70 lacs , 2)

    3.00 lacs , 3)

    2.97 lacs ,4) 3.10lacs 5) training

    Rs.1.00 lacs foreach scheme.

    6) 19.515 X 2

    7)19.515 X 2

    578.65

    39.03

    39.03

    7 Organized market

    Development

    a) Construction of Market at Hasila

    Beel

    1 185.10 185.10

    b) Construction of SHGs Haats in

    rural areas.16 12.50 200.00

    8 Upgradation & strengtheningof High and HigherSecondary schools

    Construction of additional class rooms 258 2.55 657.90

    9 Installation of solar lights Solar energy systems for rural householdsin remote areas like chars and along

    foothills of Meghalaya

    2400 1450.00 34.80

    10 Sub total 5644.80

    11 Contingency @2% 115.20

    12 Grand total 5760.00

  • 5/22/2018 Multi Sector

    29/102

    Multi Sectoral Development Plan ::: Goalpara District

    28

    TABLE-IIMULTI SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA

    ( Rs. In lakhs)

    Sl

    no

    Activity Output Quantity Unit cost Financial allocation

    Total 2008-09 2009-10 2010-11

    Phy Fin Phy Fin phy fin

    (A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME

    1 Upgradation of

    existing ITI

    Creation additional class room

    of two trades

    1 101.13 101.13 1

    50.565

    30.339

    20.226

    (B) TOPPING UP OF CENTRALLY SPONSORED SCHEMES.

    2 IAY Construction of houses for

    families living below poverty

    line.

    7500 0.385 2887.50

    4000

    1540

    2500

    962.50

    1000

    385

    (C) BRIDGING CRITICAL INFRASTRUCTURE GAP.

    3

    Accelerated Pipe

    water supply

    programme.

    a) Construction of new pipe

    water supply scheme at

    Nayapara , Goalpara .

    1 135.00 135.00

    67.5

    40.5

    27

    b) Construction of new pipe

    water supply scheme atLakhipur

    1 66.90 66.90

    33.4

    5

    20.0

    7

    13.3

    8

    4 a) Construction of

    subcentres

    Construction of subcentres

    which are not run in Govt.

    building .

    22 7.5 165.0011

    82.5 7

    52.5 4

    30

    b) labour room An additional labour room is

    required as delivery load is high.( institutional delivery)

    15 6.00 90.00 848 5

    30 2

    12

  • 5/22/2018 Multi Sector

    30/102

    Multi Sectoral Development Plan ::: Goalpara District

    29

    c)Female wards

    for

    MPHC/S.H.C/S.D

    /BPHC/PHCs

    To provide Health care facilities

    to the areas where such facilities

    are still lacking .( percentage of

    fully vaccinated children)

    35 7.00 245.0018

    126

    10

    70 7

    49

    5 Assistance tohandloom weavers

    Looms & Accessories,Construction of workshed &

    skill upgradation training in

    weaving, design developmentand in dying.

    looms 50 nos,Jacquard 50 nos

    ,Warping drum 5 nos ,

    workshed 180 noswith training.

    - 62.98

    31.49

    18.894

    12.596

    Construction ofcommon facilily

    centre for

    upliftment of

    handloom weavers

    at eight pokets.

    1) CFC , (i) Bausiatari, (ii)Gojapara, (iii) Godharbori

    (Muslim Para), (iv) Shakumari,

    (v) Bhalukdubhi, (vi) Bagdoba ,

    (vii) Rongsai (viii) Baguan &

    (ix) Simlitola, Looms ,Jacquard

    machine, Warping drump ,

    Dyeng equipments etc.

    CFC 9, Loom 90 nos,J. machine 90 nos, W

    . drump 18 nos ,

    Winding charkha 90

    nos

    17.42 156.78 5

    87.10 2

    34.84 2

    34.84

    6 Dairy schemeGoatery scheme

    Broiler scheme

    and

    Piggery scheme

    for self

    employment.

    Assistance for setting of Dairyunit , Goatery unit , Broiler unit

    and Piggery unit including

    training. .

    1) Dairy 50 unit , 2)Goatery 50 unit , 3)

    Boiler 50 unit and

    piggery 50 unit

    including training

    1) 3.70 lacs ,2) 3.00 lacs ,

    3) 2.97 lacs

    ,4) 3.10 lacs

    5) training

    Rs.1.00 lacs

    for each

    scheme.

    578.65

    290.00

    188.65

    100.00

    Pig breeding farm

    Mini cattle

    breeding farm (

    dairy farm

    2) to gear up SHG.( Kuchdhowa

    and Rakhyashini)

    3) to gear up SHG ( Ambari

    State Vety Dispensary,

    Joyramkuchi State Vety.

    Dispensary.

    4) 2 units

    5) 2 units

    6) 19.515 X 2

    7) 19.515 X 2

    39.03

    39.03

    1

    119.515

    19.515

    1

    111.709

    11.709

    7.806

    7.806

  • 5/22/2018 Multi Sector

    31/102

    Multi Sectoral Development Plan ::: Goalpara District

    30

    7 Organized market

    Development.

    a) Construction of Market at

    Hasila Beel1 185.10 185.10

    92.55

    50.55

    42.00

    b) Construction of SHGs Haats

    in rural areas.

    16 12.50 200.00 8100

    450 4

    50

    8 Upgradation &

    strengthening of

    High and Higher

    Secondary schools

    Construction of additional class

    rooms258 2.55 657.90

    129

    328.95

    77

    197.37

    52

    131.58

    9 Installation of

    solar lights

    Solar energy systems for rural

    households in remote areas like

    chars and along foothills of

    Meghalaya

    2400 1450.00 34.80

    1200

    17.40

    720

    10.44

    480

    6.96

    10 Sub total 5644.80

    2934.535

    1780.071

    930.194

    11 Contingency @2% 115.20

    57.6

    34.6

    23.0

    12 Grand Total 5760.00

    2992.135

    1814.671

    953.194

  • 5/22/2018 Multi Sector

    32/102

    Multi Sectoral Development Plan ::: Goalpara District

    31

    CHAPTER-6BENEFICIARIES SELECTION & ASSETS MANAGEMENT

    Selection and creation of assets:

    Any kind of assets/infrastructure to be developed or created under the MSDP will be

    constructed as per the laid out Government norms and procedures wherein the PRI

    like ZP, AP and Gaon Panchayat will be involved for the selection of individual

    beneficiaries, distribution and monitoring, etc as per GoI norms and procedures.

    For IAY, the allotment shall be strictly based on BPL waitlist in identified

    minority concentrated Gaon Panchayats. The PRI institutions will monitor andsupervise the construction, etc.

    Major benefit to women SHGs in minority concentrated areas.

    Line departments like Fishery, Animal Husbandry, Agriculture, Handloom etc

    will be associated.

    Financial institutions like the banks and NABARD shall be involved.

    Training is to be provided by reputed Govt training institutes or approved

    NGOs. All existing rules, specifications and regulation by GoI and the Govt of Assam

    shall be followed.

    Assets maintenance

    All the assets/building/infrastructure etc will be at the disposal of individual or

    department concerned as the case may be. All these assets will be registered and

    handed over to the concerned individual beneficiary or department for proper up

    keeping and further maintenance. Assets register will be maintained centrally from

    the office of the Deputy Commissioner and by the department concerned. The PRIs,

    line departments, SHGs, NGOs etc shall be taken into confidence while handing over

    the assets.

  • 5/22/2018 Multi Sector

    33/102

    Multi Sectoral Development Plan ::: Goalpara District

    32

    CHAPTER-7

    MONITORING & EVALUATION

    There is a committee to oversee the implementation of MSDP in the district with

    Deputy Commissioner as the Chairman as District Level Committee for implementation

    of the Prime Ministers New 15 Point Programme for the Welfare of Minorities as

    constituted by the State as per direction of Ministry of Minority Affairs.

    There is a District Vigilance & Monitoring Committee to review the progress of the

    scheme.

    District Vigilance Council headed by the Commissioner of the Division to take care ofthe progress.

    Moreover, following external agencies will be involved for the monitoring and

    evaluation of the same:-

    1. Directorate of Monitoring & Evaluation, Government of Assam

    2. National Institute of Rural Development, Guwahati

    3. State Institute of Rural Development, Guwahati

    4. Assam Agricultural University, Jorhat

    5. Indian Institute of Entrepreneurship, Guwahati

    6. Weavers Service & Training Center, Guwahati

    7. Krishi Vigyan Kendra, Dudhnoi

    Transparency and Publicity

    IT enabled monitoring cell with direct NIC network.

    Transparency and publicity of information and extensive use of ICT enabled uses.

  • 5/22/2018 Multi Sector

    34/102

    Multi Sectoral Development Plan ::: Goalpara District

    33

    ANNEXURE -1

    INSTALLATION OF SOLAR LIGHT BY AEDA UNDER MNES

    i) Proposed for Solar photovoitaic systems to be executed by AEDA (Assam Energy

    Development Agency) under MNES. After a very detailed and in depth deliberation with local

    community and local authorities , it has emerged that the Solar Home lighting Systems with two

    lights is the most effective and efficient systems to address the particular need of lighting

    problems in the villages in the char areas and foothill areas of Goalpara .

    It was decided to install individual Solar Home lighting Systems at 2400 nos of households. It

    was concluded that Solar Home lighting Systems with 9W CFL luminary will be the most

    suitable for each household.

    ii) Brief description of two point solar home systems: Sunlight is directly converted into DC

    electricity by the SPV module mounted on the metal support structure . The generated electricity

    charges a better through an electronic charge controller in the day time and two of burning the

    CFL daily is 4-5 hours and the system will be designed to have three days autonomy. The light

    output of a 9W CFL is equivalent to that of a 60W incandescent lamp.

    System Specifications:

    Sl no Item Qnty. Specification.

    1 SPV Module ( with support

    structure)

    1 12V, 37Wp

    2 Storage Battery 1 12V,40AH Low maintenance Tubular

    Plate Batteries

    3 Charge Controller ( Battery

    over charge and deep

    discharge controller)

    1 10 amps

    4 Luminaries 2 9W DC CFL

    5 Cables and accessories 1 set

    System Cost:

    1 Item Price(Rs.)

    1 12V,37Wp Solar Module 12V,40AH Tubular

    Plate Battery 2 nos of 9W CFL Luminaries 1 No

    of charge Controller Cables and Accessories

    with 2 years Warranty

    Rs.12,500.00

  • 5/22/2018 Multi Sector

    35/102

    Multi Sectoral Development Plan ::: Goalpara District

    34

    Project Cost:

    Sl no Item Amount (Rs.)

    1 Project cost for 2400 nos of SPV Home Lighting

    systems including supply , installation andcommissioning at site @ Rs.12,500.00 per

    system

    Rs.3,00,00,000.00

    2 Service charge to AEDA @Rs.200.00 per

    system for 2400 systems

    Rs.4,80,000.00

    Total project cost Rs.3,04,80,000.00

    Project funding : MNES= 90%, MSDP= 10% plus service charge

    Sl no Item Contribution per

    system (Rs.)

    Total contribution for 274 nos

    of systems(Rs.)

    1 MNES share

    a)System cost

    Rs.11,250.00 Rs.2,70,00,000.00

    Total MNES share Rs.2,70,00,000.00

    2 (A)MSDP sharei) system costii) Administrative

    charge to AEDA

    Rs.1,250.00

    Rs.200.00

    Rs.30,00,000.00

    Rs.4,80,000.00

    3 Total MSDP share (B) Rs.34,80,000.00

    4 Total project cost (A+ B) Rs.3,04,80,000.00

    Fund requirement from MSDP= Rs.34,80,000.00

  • 5/22/2018 Multi Sector

    36/102

    Multi Sectoral Development Plan ::: Goalpara District

    35

    ANNEXURE -2

    UNIT COST OF IAY HOUSE

  • 5/22/2018 Multi Sector

    37/102

    Multi Sectoral Development Plan ::: Goalpara District

    36

  • 5/22/2018 Multi Sector

    38/102

    Multi Sectoral Development Plan ::: Goalpara District

    37

    ANNEXURE -3(A)

    UNIT COST OF SUB-CENTRE

  • 5/22/2018 Multi Sector

    39/102

    Multi Sectoral Development Plan ::: Goalpara District

    38

    DESIGN OF SUB-CENTRE

  • 5/22/2018 Multi Sector

    40/102

    Multi Sectoral Development Plan ::: Goalpara District

    39

    ANNEXURE -3(B)

    UNIT COST OF LABOUR ROOM

  • 5/22/2018 Multi Sector

    41/102

    Multi Sectoral Development Plan ::: Goalpara District

    40

    DESIGN OF LABOUR ROOM

  • 5/22/2018 Multi Sector

    42/102

    Multi Sectoral Development Plan ::: Goalpara District

    41

  • 5/22/2018 Multi Sector

    43/102

    Multi Sectoral Development Plan ::: Goalpara District

    42

    ANNEXURE -3(C)

    UNIT COST OF FEMALE WARD

  • 5/22/2018 Multi Sector

    44/102

    Multi Sectoral Development Plan ::: Goalpara District

    43

    DESIGN OF FEMALE WARD

  • 5/22/2018 Multi Sector

    45/102

    Multi Sectoral Development Plan ::: Goalpara District

    44

    ANNEXURE -4(A)

    CHEMICAL ANALYSIS REPORT

  • 5/22/2018 Multi Sector

    46/102

    Multi Sectoral Development Plan ::: Goalpara District

    45

    ANNEXURE -4(B)

    NAYAPARA PWSSREPORT

    Name of proposed PWSS : Nayapara PWSSProposed Cost : Rs. 135.00 Lakh

    Programme : Mul ti -Sectoral Development

    Programme for M inori ty Concentrated

    District.INTRODUCTION:

    Nayapara & adjoining area outside the Goalpara Town which are not included in

    Rajib Gandhi National Rural Drinking Water Mission is a water scared one & even in some

    cases ordinary HTW does not work. The area is a thickly populated one and does not have anyorganised water supply scheme for the people. There is a long standing demand of the people for

    good quality drinking.

    Source Proposed :

    Considering the plain topography of the area, there is no likelihood to met with

    rocky , hence boring of a deep tube well with ordinary rig may be feasible.

    Quality of Ground Water :

    The ground water contains excess iron, hence this ground water can be used as

    source of the scheme after proper treatment by filtration process.

    Land & Electricity :

    A land plot measuring 4 Katha is available to set up various components of the

    scheme. So, land will not be a problem for the proposed scheme. Moreover, power required to

    run the scheme can be obtained from nearby power line running nearby the proposed scheme.

    The proposal for an amount of Rs.135.00 Lakh (Rupees One Crore, Thirty Five

    Lakh) Only for Nayapara PWSS under Multi Sectoral Development Programme for Minority

    Concreted District, is submitted for according necessary Administrative Approval.

    Executive Engineer(PHE),

    Goalpara Division, Goalpara

  • 5/22/2018 Multi Sector

    47/102

    Multi Sectoral Development Plan ::: Goalpara District

    46

    PROFORMA

    1. Name of Scheme : : Nayapara PWSS

  • 5/22/2018 Multi Sector

    48/102

    Multi Sectoral Development Plan ::: Goalpara District

    47

    CALCULATION OF COST DETAILS OF NAYAPARA PWSS

    (Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE

    (PHE Approved Rates. )

    Sl.No.

    Item of Work Amount ( Rs.)

    1 Deep Tube Well (By DTH /Rotary Rotary Rig) Size 200 mm x

    200 mm750,000.00

    2 Raw Water Pumping Main- 150 mm dia GI 78,675.00

    3Raw Water Pump Set: ( Submersible Pump Set) HP- 15.00 HP 200,000.00

    4Raw cum Clear water Pump House. Size: 25.00 Sqm. 150,000.00

    5 Installation of Clear water Pump set -40 H.P. Centrifugal Pump

    Set. - 250,000.00

    6 Rapid Sand Filter - Size : 20.00sqm 800,000.00

    7Clear Water Reservoir- Size : 5,00,000 Litre. 3,250,000.00

    8 Clear Water Pumping Main- LS 100,000.00

    9Distribution System. Total Length : 12.00 KM 4,200,000.00

    10Overhead RCC Reservoir. 2,00,000 litres 3,400,000.00

    11Internal Electrification. - Raw Cum ClearWaterPump House 10,000.00

    12 T & P Materials 20,000.00

    13 Detail Survey 5,000.00

    14 Trial Run of the scheme. 10,000.00

    15 Chemical Dosing arrangement 30,000.00

    Total = Rs. 13,253,675.00

    Add 2% Contingency = Rs. 265,073.50

    Grand Total = Rs. 13,518,748.50

    Say, = Rs. 13,500,000.00

    ( Rupees One crore & Thir ty F ive Lakh ) Only(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE

    (PHE Approved Rates. )

    Executive Engineer(PHE),Goalpara Division, Goalpara

  • 5/22/2018 Multi Sector

    49/102

    Multi Sectoral Development Plan ::: Goalpara District

    48

    ANNEXURE -4(C)

    LAKHIPUR PWSSREPORT

    Name of proposed PWSS : Lakhipur PWSS.

    Name of Dev. of Block : Lakhipur

    Proposed Cost : Rs. 66.90 Lakh

    Programme : Mul ti -Sectoral Development

    Programme for M inori ty Concentrated

    District.Location:

    Proposed Lakhipur PWSS is situated in Lakhipur Development Block under 38

    Goalpara West L.A.C. The proposed scheme is about 50 Km away towards West direction fromGoalpara District Head Quarter. Ward No.1(One) complete and Ward No.2(Two) in Partly is

    considered in the proposal to cover with the scheme.

    Need of the project:

    The area isadjoining and outside Lakhipur Town and is not come in purview to

    cover the population with Drinking water Facility under Rajib Gandhi National Drinking Water

    Mission. Drinking water facility is the main problem of the locality as there is no organised

    water supply arrangement in the area. The two wards of the proposed PWSS are contiguous

    in nature and can easily be covered with piped water supply scheme.

    Source Proposed :Considering the plain topography of the area, there is no likelihood to met with

    rocky , hence boring of a deep tube well with ordinary rig may be feasible.

    Quality of Ground Water :

    The ground water contains excess iron, hence this ground water can be used as

    source of the scheme after proper treatment by filtration process.

    Land & Electricity :

    A land plot measuring 2 Katha 10 Lessa is available to set up various components

    of the scheme. So, land will not be a problem for the proposed scheme. Moreover, power

    required to run the scheme can be obtained from nearby power line running nearby the

    proposed scheme.

    The proposal for an amount of Rs.66.90 Lakh (Rupees Sixty Six Lakh & Ninety

    Thousand) Only for Lakhipur PWSS under Multi Sectoral Development Programme for

    Minority Concreted District, is submitted for according necessary Administrative Approval..

    Executive Engineer(PHE),Goalpara Division, Goalpara

  • 5/22/2018 Multi Sector

    50/102

    Multi Sectoral Development Plan ::: Goalpara District

    49

  • 5/22/2018 Multi Sector

    51/102

    Multi Sectoral Development Plan ::: Goalpara District

    50

    ABSTRACT OF COST- DETAILS OF LAKHIPUR PWSS

    (Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE

    (PHE Approved Rates. )

    Item of Work Amount ( Rs.)

    1. Source : Installation of DTW- (By Rotary /DTH Rig) : Rs. 6,25,000.00

    2. Raw Water cum Clear water Pump House- : Rs. 1,00,000.00

    3. Raw water pumping Main : : Rs. 44,741.00

    4. Raw water Pump Set ( 1 No. 8 HP S/Pump Set )- : Rs. 1,50,000.00

    5. Treatment Plant- 6.00 Sqm : Rs. 4,50,000.00

    6. Under Ground Reservoir- Size- 200,000 litres : Rs. 12,00,000.00

    7. Distribution System. Total Length = 8.00Km : Rs. 28,00,000.00

    8. Clear Water Pumping Main- : Rs 1,55,884.0

    9. Clear water pump Set.( 10 HP Centrifugal Pump) : Rs. 1,70,000.00

    10. Accomodation cum storage. : Rs. 1,00,000.0011. External Power connection. : Rs. 3,15,000.00

    12. Internal Electrification. : Rs. 1,00,000.00

    13. Site Development . (Low Site) : Rs. 88,000.00

    14. Compound Fencing : Rs. 1,50,000.00

    15. Approach Road (Depressed Approach) : Rs. 50,000.00

    16. Detail Survey : Rs. 10,000.00

    17. Materials for Tools and Plants : Rs. 20,000.00

    18. Trial Run of the scheme : Rs. 10,000.00

    19. Construction of RCC Sign Board : Rs 10,000.00

    20. Chemical Dosing Arrangement : Rs 10,000.00

    -------------------------------------------------Total : Rs. 65,58,625.00

    Add 2% for Contingencies : Rs. 1,31,172.50

    -----------------------------------------------

    Grand Total = Rs. 66,89,797.50

    Say, : Rs. 66,90,000.00

    (Rupees Six ty Six Lakh Ninety Thousand ) only

    (Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE(PHE

    Approved Rates. )

    Executive Engineer(PHE),Goalpara Division, Goalpara

  • 5/22/2018 Multi Sector

    52/102

    Multi Sectoral Development Plan ::: Goalpara District

    51

    ANNEXURE - 5 (A)

    COMMON FACILITY CENTRE FOR MINORITY HANDLOOM

    WEAVERS UNDER MULTISECTORAL DEVELOPMENTPROJECT

    Handloom weaving is a traditional cottage industry in Assam. In spite of mill made products the

    handloom product have their own special attraction. To work together common facilitiy centres

    are proposed for the minority weavers. In the common facility centre the weavers can do the

    works of weaving preparatory, weaving, dyeing and finishing. There will be 9 (nine) nos. of

    common facility centres in the Goalpara district in the villages (i) Bausiatari, (ii) Gojapara, (iii)

    Godharbori (Muslim Para), (iv) Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii)

    Baguan & (ix) Simlitola respectively. The common facility centre will be maintained by a

    consortium formed on the pattern of Integrated Handloom Development Scheme. It is proposed

    to provide the facilities to all weavers on user charges basis.

    Sl.

    no.

    Components Space

    Reqd.

    Name of equipments &

    others

    Qnty Rate in

    Rs.

    Total

    Amount

    1. Weaving

    workshop

    90 sq. mtr Fly Shuttle framelooms

    a) Accessories like

    bobbin, pirn, heald frame,

    healdwires, and reed of

    different count.

    b) Jacquards of different

    capacity with harness,

    card, card punching

    machin etc.

    c) Charkha

    d) Warping drum with

    creel stand & accessories.

    e) Misc. Expenses

    including documentation

    10 nos

    10 sets

    10 nos

    10 nos

    02 nos

    8000/-

    2000/-

    7000/-

    2000/-

    16000/-

    80,000/-

    20,000/-

    70,000/-

    20,000/-

    32,000/-

    50,000/-

  • 5/22/2018 Multi Sector

    53/102

    Multi Sectoral Development Plan ::: Goalpara District

    52

    2. Dyeing shed 21.90

    Sq. mtr

    Dyeing tubs, stirring rod,

    gas cylinder and burner,

    bucket, mug, measuring

    cylinder, measuring

    beaker, watch glass,

    Dyestuff and chemical etc.

    1,00,000/- 1,00,000/

    -

    3. Office room 9.36

    sq.mtr

    Furniture, showcase,

    product display stand etc.

    1,00,000/- 1,00,000/

    -

    4. Working

    capital

    Yarn (cotton, silk, acrylic

    etc.)

    1,00,000/- 1,00,000/

    -

    5. Training for

    10 nos of

    weavers for 2

    months

    Stipend, honorarium to

    master trainer, raw

    material etc.

    1,20,000/- 1,20,000/

    -

    Total cost for construction of building Rs. 10.50 lacs

    Total cost for equipments and others (sl. no 1 to 5) Rs 6.92 lacs

    Total cost for 1 Common Facility Centre of Rs. 17.42 lacs

    Total cost for 9 nos. of Common Facility Centre is 9 x Rs.17.42 lacs = Rs, 156.78 lacs

    N.B:

    1.Unit cost as per guideli ne of I ntegrated Handloom Development Scheme of

    M ini stry of Textil e, Govt. of I ndia.

    2. The cost of Bu il ding mater ials as per APWD schedule of rate for 2004-05.

    SPECIFICATION

    1. Plinth foundation : - 75 mm thick c.c. prop. 1:4:8 over 1st class brick flat.

    2. Plinth wall : - 250 mm thick 1st class brick/stone masonry/c.c. works.

    a) Outer wall : - Works in cement mortar prop. 1:5 and 12 mm cement plaster 1:5

    and by exposed faces over plate as per first direction of the Deptt.

    b) Inner wall : -125 mm thick 1st class brick work/stone masonry work/ c.c work

    as per marginal sketch in cement mortar in prop.1:5.

    3. Post : - 130 mm x 130 mm R.C. post with 4 nos. 12 mm main Rods and 6

    mm stirrup @ 15cm c/c prop. 1:2:4 complete with all necessary

    shuttering, curing.

    4. Lintel/ Beam : - 130 mm x 130 mm R.C. lintel with 4 nos. 10 mm main Rods and

    6 mm stirrup @ 15 cm c/c prop.l:2:4 complete with all necessary

  • 5/22/2018 Multi Sector

    54/102

    Multi Sectoral Development Plan ::: Goalpara District

    53

    shuttering, curing etc. foundation tie 800 mm x 150 mm size with 4

    nos. 12 mm M.S. rod.

    5. Floor : - 65 mm thick c.c. floor in prop. 1:3:6 with stone aggregates Up to

    32 mm size over one 1st class brick flat soling and 12 mm thick

    cement plastering in prop. 1:2 on top including trawl finishing with

    neat cement watering, curing etc. complete as per direction.

    6. Wall : - 125 mm thick 1st class brick nogged wall in cement mortar Prop.

    1:5 from plinth up to post plate with cement plaster 12 mm thick on

    both faces in prop. 1:5 including colour/white washing with or more

    coats complete as directed.

    OR

    100 mm thick c.c. wall in cement mortar in prop. 1:3 with 13 mm thick

    cement plaster on both faces in prop. 1:5 up to window grill and rest white

    wall and cement plaster in prop. 1:8 complete as directed.

    7. Doors and Windows : 38 mm thick 1st. class local wood doors and windows as per

    design and drawing with Iron Gratings in the windows.

    8. Roofing : - 0.63 mm lst thickness (in mm}C.I/A.C sheet roofing over out of

    MS black iron tubes of ISI approved make.

    9. Ceiling : - 4 mm A.C. building board with painting! Hessian cloth Ceiling

    with two coats approved paints.

    10. Miscellaneous : - C. C. apron and drain, cupboard socket doors and windows

    leaves to be painted with one coat of primer two coats of enamel

    paints of approved shed

    11. Height of plinth : - 600mm

    12. Height of building : - 3650 mm from the plinth up to top post plate

  • 5/22/2018 Multi Sector

    55/102

    Multi Sectoral Development Plan ::: Goalpara District

    54

    Preliminary Estimate of Common Facility Centre

    General Abstract of Cost as per APWD scheduleSL

    NO.

    ITEM OF WORKS AMOUNT

    Rs. P.

    1. TOTAL PLINTH AREA OF THE BUILDING : 156.24 SQ.M.

    RATE AS PER APWD (B) SCHEDULE FOR 2004-05

    @ RS 5990.00/SQ.M.

    9,35,878 00

    2. NORMAL PREPARATION OF SITE @ 1% OF CIVIL WORK NIL

    3. SANITARY INSTALLATION @ 5% OF CIVIL WORK 46,794 00

    4. WATER SUPPLY @ 2% OF CIVIL WORK 18,718 00

    5. INTERNAL ELECTRIFICATION @ 5% OF CIVIL WORK 46,794 00

    6. FOR EXTERNAL ELECTRIFICATION @ 2% OF CIVIL WORK 18,718 00

    GRAND TOTAL : RS. 10,66,902 . 00

    Or Say .. RS. 10,50,000 . 00

    (Rupees ten L akhs fi fty thousand) Only

  • 5/22/2018 Multi Sector

    56/102

    Multi Sectoral Development Plan ::: Goalpara District

    55

  • 5/22/2018 Multi Sector

    57/102

    Multi Sectoral Development Plan ::: Goalpara District

    56

    ANNEXTURE 5(B)

    SKILL UP GRADATION CUM CONSTRUCTION OF WORKSHED TO MINORITY

    WEAVERS UNDER MULTI SECTORAL DEVELOPMENT PROJECT

    The minority weavers will be provided training for up gradating their skill in weaving, design

    development and dyeing so as to enable them to produce a diversified range of products as per

    latest market demands .Training will be given batch wise in groups of 20 for a period of 2

    months in weaving, 15 days in design development and 15 days in dyeing. It is proposed to

    provide work shed to all weavers in order to protect the weavers and loom from rain and sunlight

    so that the weavers can engage themselves in weaving all seasons. So that the average running

    time of loom may increase resulting the increase of quality of production. Average cost of work

    shed for 20 sq. mt shed will be Rs 25,000.

    a) TRAINING IN WEAVINGCUM CONSTRUCTION OF WORKSHED``

    Batch size for each programme : 20 traineesDuration of training : 2 months

    Sl. No Component Provision of fund (in Rupees)

    1. Stipend for 20 weavers 90,000 @ Rs. 75/- as per day

    for 60 days

    2. Honorarium to Master Trainer for 2 months 9,000/- @ Rs 45,00/- per

    month for 2 months

    3. Stipend of Master Trainer for refresher course 2,250 @ Rs. 150/- per day

    for 15 days

    4. Cost of warping drum 16,000/-

    5. Cost of looms & attachment (Dobby/ Jacquard/

    accessories) @ Rs. 8,000+4,000for 10 looms for 20

    trainees

    1,20,000/-

    6. Raw material 24,000 (for cotton)

    7. Loom setting charges, subject to maximum of 10

    looms provided under basic inputs

    2,000/-

    8. Documentation and sample 3,000/-

    Total 2,66,250/-

    9. Admn. & Misc. expenditure 5% of the total cost 13,000/-

    Total

    Tool Kit

    2,79,250/-

    Plus 21,000/-3,00,250/-

    10. Construction of Work shed (area 20 sqm. Per unit) 20 x Rs. 25,000 =5,00,000/-

    Total Amount = 8, 00,250/-

    Say Rs. 8, 00,000/- per batch

  • 5/22/2018 Multi Sector

    58/102

    Multi Sectoral Development Plan ::: Goalpara District

    57

    b) TRAINING IN DESIGN DEVELOPMENT CUM CONSTRUCTION OF WORKSHED

    Batch size for each programme : 20 trainees

    Duration of Training : 15 days

    Sl. no Component Provision of funds ( in Rupees)

    1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days)

    2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days)

    3. Raw material Rs. 18,000/- (@ Rs. 4500/per 5 trainees for 20

    trainees)

    4. Documentation of Design Rs. 3000/-

    5. Hiring sheds electricity and water charges Rs. 2000/-

    6. Administrative and Misc expenditure (5% of

    the total cost.)

    Rs.2388/-

    7. Construction of Work shed

    (area 20 sqm. Per unit)

    20 x Rs. 25,000 =5,00,000/-

    Total Rs. 5,50,138/-

    Say Total Rs. 5,50,000/- per batch

    C) TRAINING I N DYEING CUM CONSTRUCTION OF WORKSHED

    Batch size for each programme: 20 trainees

    Duration of training: 15 days

    Sl

    no

    Component Provision of funds

    (in Rupees)

    1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days)

    2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days)

    3. Stipend of master trainer for refresher course Rs. 750/- (@ Rs 150/- per day for 15 days)

    4. Raw material Rs. 64,000/- (@ Rs. 3200/-for 20 trainees)5. Documentation of dyeing Rs. 3000/-

    6. Hiring sheds, Electricity, Water charges Rs. 2000/-

    7. Administrative and misc expenditure

    ( 5% of the total cost)

    Rs. 4725/-

    8. Construction of Work shed

    (area 20 sqm. Per unit)

    20 x Rs. 25,000 =5,00,000/-

    Total Rs. 5,99,225/-

    Say Total Rs. 5, 99,000/- per batch

    Sl.

    No

    Type of Training No of

    beneficiaries

    No of

    batch

    Unit cost per batch

    in lacs

    Total amount in

    lacs

    1. Training in Weaving 100 5 Rs 8.00 Rs. 40.00

    2. Training in Design

    Development

    40 2 Rs. 5.50 Rs.11.00

    3. Training in Dyeing 40 2 Rs. 5.99 Rs. 11.98

    Total Rs. 62.98

    TOTAL PROJECT COST RS. 62.98 Lacs(Rupees Sixty Two Lacs Ninety Eight Thousand Only)

    N.B: Unit cost as per guideline of Integrated Handloom Development Scheme of Ministry of Textile,Govt. of India.

  • 5/22/2018 Multi Sector

    59/102

    Multi Sectoral Development Plan ::: Goalpara District

    58

    ANNEXURE 6(A)

    Multi Sectoral Development Project

    Sector :- A.H& Veterinary Deptt., Goalpara.

    Scheme :- Broiler Farming

    Prepared allocation

    ( Rs. In Lakh )

    Unit cost Total No. of

    unit

    Total Cost Beneficiar

    y share

    (10%)

    Govt.

    Share

    (90%)

    (A)

    Addl. Cost

    of Training

    (B)

    Total Govt.

    Share

    Including

    Training

    (A+B)

    2.97 50 148.50 14.85 133.65 1.00 134.65

    FEASIBILITY :- Agro-climatic condition favours poultry farming specially Broiler Farming

    in the district. As electrification is presently covering the rural areas of the district which became

    new era for rural unemployed youth for establishing broiler farm in the same. Popularity of

    broiler meat increasing day by day in the District. Market demand is tremendous in the District

    particularly for neighboring state. Transportation facilities touches every corner of the district

    which helps in transportation of poultry and poultry product.

    So, the commercial broiler farming may be considered as technically feasible and economically

    viable in normal condition.

    JUSTIFICATION :- Top most priority of the broiler farming is to solve unenployement

    problem as it is clean farm practice in comparison to other livestock farming. Through this

    farming transfer of new technology from expert to rural people. It is the way of motivation of

    rural people towards commercial poultry farming. Succesful inplementation of the project will

    incraese the district economy.

  • 5/22/2018 Multi Sector

    60/102

    Multi Sectoral Development Plan ::: Goalpara District

    59

    UNIT COST ( BROILER FARMING)Scheme)

    Scheme for setting up of a Broiler farm under deeep litter system of

    rearing in SGSY group finance (in ten individual sheds of the Swarojgaries)

    Introduction : Farming of hybrid bird under deep litter system of rearing is found

    to be a very profitable bussiness if managed under proper technical guidance. If broiler farm is

    started with efficiency mangemental practices with proper veterina