Multi Annual Infrastructure Planning
description
Transcript of Multi Annual Infrastructure Planning
23 maart 2006
Multi Annual Infrastructure Planning
Twinning project, Tuesday 28 March 2006, Ljubljana
By Henk Schutte, Ministry of Transport, The Netherlands
23 maart 2006
2
Ministry organogram
Central Services
Inspectorate of V&W
DG Public Works
& Water Management
DG Freight Transport
and Aviation
DG Passenger Transport
DG Water
Secretary-General
Deputy Secretary-General
Minister
State Secretary
1000supervision implementati
on
8000
Policy
150 200 100
23 maart 2006
3
DG Passenger Transport
DG Passenger Transport
Railway Directorate
Road Directorate
Water Directorate
Pol I cy
Rail infra manager ProRail
Rijkswaterstaat (Road Agency)
Execution
23 maart 2006
4
Content of Presentation
• Institutional setting• Facts and figures• Actual Policy• Policy process (priorities)• Maintenance (more details)• Managing performance• Multi-annual planning
23 maart 2006
5
Relationship State-ProRail
• ProRail is rail infra structure manager• ProRail: Private company• State is only shareholder• Legislative framework: Act on Railways• Management Concession ProRail
23 maart 2006
6
Institutional triangle
• State• ProRail (Maintenance, capacitymanagement,
Traffic Control)• Railway Operators (passenger and freight)• EC-directives
MoT
NSProRailFreight Operators
23 maart 2006
7
Funding of ProRail
• Annual subsidy for maintenance• Subsidies for new infrastructure (projects)• Infrastructure charge• Third party revenues
23 maart 2006
8
Dutch railway infra structure: Facts and figures (1)
• 6500 km rail (2004)• 2800 length of network• 4500 km of catenary• 4500 bridges and tunnels• 3000 secured cross overs• 9000 switches• 9800 signalling poles• 386 stations
23 maart 2006
9
National Rail Network
526527
539
Ah
LwHlg
Stv
Swd
Rd
Dz
GnZb
Vdm
Emn
CoSb
Mp
Mrb
Aml
ZlKpn
WdnHgl
EsDv
ZpApd
WwDr
Em
Ed
AhgZv
Nm
VrkKtr
Amf
Pon
Dld
TlGdm
Ut
Hvs
Gd
Wd
Nws
Shl
Apn
Asd
Zd
Hlm
Bv
Zvt
Ledn
Utg
Amr
Hwd Hn Ekz
Hdr
Lls
Gv
Hld
Mvt Rtd
KfhDdr Ddri
Otw
Zlw
Bd Tb
Mdk
Rsd
Esn
Vs
Ha
Sloe
Tnz
Fsz
Ht
VegBtl
Ehv BrVl
Kn
DhBdlg
Wt
Rm
Bon
Std
HrlHz
Mt
Wsm
Ck
Vdg
007
On
Asn
002
011
654
012
653
006
200
016
021
024025
026
033
034
038041
042
043
049
060
062
063
064
070
076
Sptn556
085 087
112
118
124
125
203
204
205
213
226
437
502
Ddn
503
506
Va 507
513
065
530
531
536
543
546
548
551
553
561
564
603
606
608 609
610
613
621
623
924950
605
023
Lar
098
020
084
211
009
107
526526527527
539539
Ah
LwHlg
Stv
Swd
Rd
Dz
GnZb
Vdm
Emn
CoSb
Mp
Mrb
Aml
ZlKpn
WdnHgl
EsDv
ZpApd
WwDr
Em
Ed
AhgZv
Nm
VrkKtr
Amf
Pon
Dld
TlGdm
Ut
Hvs
Gd
Wd
Nws
Shl
Apn
Asd
Zd
Hlm
Bv
Zvt
Ledn
Utg
Amr
Hwd Hn Ekz
Hdr
Lls
Gv
Hld
Mvt Rtd
KfhDdr Ddri
Otw
Zlw
Bd Tb
Mdk
Rsd
Esn
Vs
Ha
Sloe
Tnz
Fsz
Ht
VegBtl
Ehv BrVl
Kn
DhBdlg
Wt
Rm
Bon
Std
HrlHz
Mt
Wsm
Ck
Vdg
007007
On
Asn
002002
011011
654654
012012
653653
006006
200200
016016
021021
024024025025
026026
033033
034034
038038041041
042042
043043
049049
060060
062062
063063
064064
070070
076076
Sptn556556
085085 087087
112112
118118
124124
125125
203203
204204
205205
213213
226226
437437
502502
Ddn
503503
506506
Va 507507
513513
065065
530530
531531
536536
543543
546546
548548
551551
553553
561561
564564
603603
606606
608608 609609
610610
613613
621621
623623
924924950950
605605
023023
Lar
098098
020020
084084
211211
009009
107107
23 maart 2006
10
Dutch railway transportation: Facts and figures (2)
• 128 mln train kilometers (per year) • 5000 passenger trains (per day)• 230 freight trains (per day)• 1 mln passengers (per day)• 80.000 tonne freight (per day)
23 maart 2006
11
MoT: Setting the policy priorities
• Prioritisation of railway infrastructure investment projects according to MIT-rules
• Prioritisation of railway infrastructure maintenance according to output results
• Multi-annual budget for funding ProRail
23 maart 2006
12
MoT: Actual Policy
• National mobility plan• Decreasing budgets for new infrastructure• Increasing budgets for maintenance• “Railinfrastructure Recovery plan”
!
23 maart 2006
13
Consequences of former policy - ‘Lessons learned’
• Too much focus on new infra structure• Absorption budgets by mega projects• Limited budgets for maintenance• Backlog in maintenance • RAMS problems• Unsatisfied railway operators and
passengers
23 maart 2006
14
Railway infra structure: Available budget
• New infrastructure 2006-2010 € 4,5 (billion)
• New infrastructure 2011-2014 € 1,9• New infrastructure 2015-2020 € 0,1• Total new infrastructure € 6,5• Maintenance 2006-2010 € 6,9• Maintenance 2011-2014 € 4,4• Maintenance 2015-2020 € 9,0• Total Maintenance € 20
23 maart 2006
15
ProRail: Facts and figures financial
• Total Costs Maintenance * € 1200 mln
• Infra Structure Charge € 200 mln
• Annual MoT subsidy € 1000 mln
* Management, Current & capital maintenance, renewal, interest, depreciations, overhead, other.
23 maart 2006
16
MIT- model: Phases and decision moments
Exploration of problem
Planning of infrastructure
Realisationphase
1. Intakedecision
2. Yes/no planning phase
3. Project decision
4. Implementing order
5. Completion
23 maart 2006
17
Decision making process (Stakeholders)
• Realization policy goals• Political influence• Economical Costs and benefits• Regional policy (Provinces and local
authorities)• Wish list railway operators• Wish list rail infra manager ProRail• Interests of societal organisations• Interests of citizens
23 maart 2006
18
Decision making processes on railway infrastructure: the policy arena
MIT
ProRail
Provincesparliament
Railway operators
Munici palities Citizens
Societal organisations
MoT: Railway Directorate
23 maart 2006
19
Prioritising Railway Maintenance
• Long term budget based on agreed upon results (KPI’s)
• ProRail responsibly for selecting means (activities) to obtain the results
• State influence on rail infra management operation limited to ‘political sensitive dossiers’(for example accessibility)
• Maintenance agreements between the MoT and ProRail contain renewals as well
• Planning & control includes audits/benchmarks.
23 maart 2006
20
Measuring the results: Key Performance Indicators (KPI’s)
• Reliability (Disruptions, Irregularities, Function restore time)
• Availability (train free periods, the avoidance of speed restrictions!)
• Quality (Renewal, Life Cycle Management)• Safety (percentage of travellers, which
feel safe at day / night ,the amount of train collisions and the death toll)
• Properness (the amount of travellers that judges stations to be sufficient clean)
23 maart 2006
21Working with the MIT in the Railway Sector – lessons learned
• Long term planning important for efficient operation (LCM) and increasing reliability and utilisation (performance)
• Overview of long term effects and performance necessary for securing long term budget
• Golden rule: less budget = less performance (exception: efficiency).
• Transparant decision making based on integrated approach.
23 maart 2006
22
Content Afternoon presentation
• Setting policy priorities in more detail (the National Mobility Plan)
• From performance to budget• Relationship Multi Annual budget and
annual management plan• Multi Annual budget and changes in
policy• Conclusions
23 maart 2006
23
Setting policy priorities
• The National Mobility Plan (2011-2020)
- Retain current rail maintenance level within few years (renewal plan)- Improving quality and preparing for future local growth- Punctuality from 83% in 2003 to 89-91% in 2020.- Limited expanding of the network
23 maart 2006
24
From Performance tot budget
• Performance targets as agreed upon in the National Mobility Plan
• Decision making process based on performance-cost scenario’s
• Multi-annual budget (MIT) is based on the costs of the national mobility plan
• Efficiency improvement is part of the budget
23 maart 2006
25
Railway infra structure: Available budget
• New infrastructure 2006-2010 € 4,5 (billion)
• New infrastructure 2011-2014 € 1,9• New infrastructure 2015-2020 € 0,1• Total new infrastructure € 6,5• Maintenance 2006-2010 € 6,9• Maintenance 2011-2014 € 4,4• Maintenance 2015-2020 € 9,0• Total Maintenance € 20
23 maart 2006
26
Multi Anual Overview
• Handout
23 maart 2006
27
Multi Annual Budget and Annual Management Plan
• Multi Annual Budget (MIT) based on National Mobility Plan
• Annual Subsidy based on annual management plan
• Annual management plan includes renewal.
23 maart 2006
28
Annual Management Plan (1)
• ProRail responsible for annual management & maintenance plan
• The plan has to be in line with performance agreed upon in MIT and national mobility plan
• ProRail responsible for selecting means tot obtain goals( Performance)
• MoT has to approve the management plan
23 maart 2006
29
Annual Management Plan (2)
• The annual management & maintenance policy must be in line with the Multi-Annual budget
• Annual MoT subsidy based on annual Management Plan
• Deviations from the plan have to be agreed upon and can change the annual subsidy
• Differences between subsidy and realised costs have to be explained by ProRail
• Differences will be part of the result or balance sheet of ProRail
23 maart 2006
30
Mutli Annual Budget and changes in policy (1)
• Right to approve the (multi annual) budget by the parliament
• New government can always change priorities and budget
• A change in policy starts with the discussion about the goals
Budget follows performance !
23 maart 2006
31
Mutli Annual Budget and changes in policy (2)
• Consequences for Life Cycle costs and efficiency
• Changes in policy difficult on short term (2006-2010), possible on mid term (2011-2014) and likely on long term (2015-2020)
23 maart 2006
32
Case: What if there’s less budget available
• Step 1: Define policy priorities (MoT)• Step 2: Change maintenance Plan in line
with these priorities (ProRail)• Step 3: Overview of effects (ProRail)• Step 4: Scenario’s for decision-making in
terms of costs & budget) and benefits & performance (MoT).
23 maart 2006
33
Conclusions (1)
• Multi Annual Budget provides stability for ProRail: relative secure budget.
• Multi Annual budget provides stability for MoT: less claims, less surprises, stability in performance.
• Multi Annual Performance and Multi Annual Budget are two sides of same coin!
23 maart 2006
34
Conclusions (2)
• Multi annual planning provides opportunity for optimizing life cycle costs
• Performance planning demands knowledge of and transparancy in relationship between performance, activities and costs
• Multi Annual Performance Policy necessary for securing Multi Annual budget
23 maart 2006
35