Multi Annual Infrastructure Planning

35
23 maart 2006 Multi Annual Infrastructure Planning Twinning project, Tuesday 28 March 2006, Ljubljana By Henk Schutte, Ministry of Transport, The Netherlands

description

Multi Annual Infrastructure Planning. Twinning project, Tuesday 28 March 2006, Ljubljana By Henk Schutte, Ministry of Transport, The Netherlands. Minister. State Secretary. Secretary-General. Deputy Secretary-General. Central Services. Inspectorate of V&W. DG Public Works. - PowerPoint PPT Presentation

Transcript of Multi Annual Infrastructure Planning

Page 1: Multi Annual Infrastructure Planning

23 maart 2006

Multi Annual Infrastructure Planning

Twinning project, Tuesday 28 March 2006, Ljubljana

By Henk Schutte, Ministry of Transport, The Netherlands

Page 2: Multi Annual Infrastructure Planning

23 maart 2006

2

Ministry organogram

Central Services

Inspectorate of V&W

DG Public Works

& Water Management

DG Freight Transport

and Aviation

DG Passenger Transport

DG Water

Secretary-General

Deputy Secretary-General

Minister

State Secretary

1000supervision implementati

on

8000

Policy

150 200 100

Page 3: Multi Annual Infrastructure Planning

23 maart 2006

3

DG Passenger Transport

DG Passenger Transport

Railway Directorate

Road Directorate

Water Directorate

Pol I cy

Rail infra manager ProRail

Rijkswaterstaat (Road Agency)

Execution

Page 4: Multi Annual Infrastructure Planning

23 maart 2006

4

Content of Presentation

• Institutional setting• Facts and figures• Actual Policy• Policy process (priorities)• Maintenance (more details)• Managing performance• Multi-annual planning

Page 5: Multi Annual Infrastructure Planning

23 maart 2006

5

Relationship State-ProRail

• ProRail is rail infra structure manager• ProRail: Private company• State is only shareholder• Legislative framework: Act on Railways• Management Concession ProRail

Page 6: Multi Annual Infrastructure Planning

23 maart 2006

6

Institutional triangle

• State• ProRail (Maintenance, capacitymanagement,

Traffic Control)• Railway Operators (passenger and freight)• EC-directives

MoT

NSProRailFreight Operators

Page 7: Multi Annual Infrastructure Planning

23 maart 2006

7

Funding of ProRail

• Annual subsidy for maintenance• Subsidies for new infrastructure (projects)• Infrastructure charge• Third party revenues

Page 8: Multi Annual Infrastructure Planning

23 maart 2006

8

Dutch railway infra structure: Facts and figures (1)

• 6500 km rail (2004)• 2800 length of network• 4500 km of catenary• 4500 bridges and tunnels• 3000 secured cross overs• 9000 switches• 9800 signalling poles• 386 stations

Page 9: Multi Annual Infrastructure Planning

23 maart 2006

9

National Rail Network

526527

539

Ah

LwHlg

Stv

Swd

Rd

Dz

GnZb

Vdm

Emn

CoSb

Mp

Mrb

Aml

ZlKpn

WdnHgl

EsDv

ZpApd

WwDr

Em

Ed

AhgZv

Nm

VrkKtr

Amf

Pon

Dld

TlGdm

Ut

Hvs

Gd

Wd

Nws

Shl

Apn

Asd

Zd

Hlm

Bv

Zvt

Ledn

Utg

Amr

Hwd Hn Ekz

Hdr

Lls

Gv

Hld

Mvt Rtd

KfhDdr Ddri

Otw

Zlw

Bd Tb

Mdk

Rsd

Esn

Vs

Ha

Sloe

Tnz

Fsz

Ht

VegBtl

Ehv BrVl

Kn

DhBdlg

Wt

Rm

Bon

Std

HrlHz

Mt

Wsm

Ck

Vdg

007

On

Asn

002

011

654

012

653

006

200

016

021

024025

026

033

034

038041

042

043

049

060

062

063

064

070

076

Sptn556

085 087

112

118

124

125

203

204

205

213

226

437

502

Ddn

503

506

Va 507

513

065

530

531

536

543

546

548

551

553

561

564

603

606

608 609

610

613

621

623

924950

605

023

Lar

098

020

084

211

009

107

526526527527

539539

Ah

LwHlg

Stv

Swd

Rd

Dz

GnZb

Vdm

Emn

CoSb

Mp

Mrb

Aml

ZlKpn

WdnHgl

EsDv

ZpApd

WwDr

Em

Ed

AhgZv

Nm

VrkKtr

Amf

Pon

Dld

TlGdm

Ut

Hvs

Gd

Wd

Nws

Shl

Apn

Asd

Zd

Hlm

Bv

Zvt

Ledn

Utg

Amr

Hwd Hn Ekz

Hdr

Lls

Gv

Hld

Mvt Rtd

KfhDdr Ddri

Otw

Zlw

Bd Tb

Mdk

Rsd

Esn

Vs

Ha

Sloe

Tnz

Fsz

Ht

VegBtl

Ehv BrVl

Kn

DhBdlg

Wt

Rm

Bon

Std

HrlHz

Mt

Wsm

Ck

Vdg

007007

On

Asn

002002

011011

654654

012012

653653

006006

200200

016016

021021

024024025025

026026

033033

034034

038038041041

042042

043043

049049

060060

062062

063063

064064

070070

076076

Sptn556556

085085 087087

112112

118118

124124

125125

203203

204204

205205

213213

226226

437437

502502

Ddn

503503

506506

Va 507507

513513

065065

530530

531531

536536

543543

546546

548548

551551

553553

561561

564564

603603

606606

608608 609609

610610

613613

621621

623623

924924950950

605605

023023

Lar

098098

020020

084084

211211

009009

107107

Page 10: Multi Annual Infrastructure Planning

23 maart 2006

10

Dutch railway transportation: Facts and figures (2)

• 128 mln train kilometers (per year) • 5000 passenger trains (per day)• 230 freight trains (per day)• 1 mln passengers (per day)• 80.000 tonne freight (per day)

Page 11: Multi Annual Infrastructure Planning

23 maart 2006

11

MoT: Setting the policy priorities

• Prioritisation of railway infrastructure investment projects according to MIT-rules

• Prioritisation of railway infrastructure maintenance according to output results

• Multi-annual budget for funding ProRail

Page 12: Multi Annual Infrastructure Planning

23 maart 2006

12

MoT: Actual Policy

• National mobility plan• Decreasing budgets for new infrastructure• Increasing budgets for maintenance• “Railinfrastructure Recovery plan”

!

Page 13: Multi Annual Infrastructure Planning

23 maart 2006

13

Consequences of former policy - ‘Lessons learned’

• Too much focus on new infra structure• Absorption budgets by mega projects• Limited budgets for maintenance• Backlog in maintenance • RAMS problems• Unsatisfied railway operators and

passengers

Page 14: Multi Annual Infrastructure Planning

23 maart 2006

14

Railway infra structure: Available budget

• New infrastructure 2006-2010 € 4,5 (billion)

• New infrastructure 2011-2014 € 1,9• New infrastructure 2015-2020 € 0,1• Total new infrastructure € 6,5• Maintenance 2006-2010 € 6,9• Maintenance 2011-2014 € 4,4• Maintenance 2015-2020 € 9,0• Total Maintenance € 20

Page 15: Multi Annual Infrastructure Planning

23 maart 2006

15

ProRail: Facts and figures financial

• Total Costs Maintenance * € 1200 mln

• Infra Structure Charge € 200 mln

• Annual MoT subsidy € 1000 mln

* Management, Current & capital maintenance, renewal, interest, depreciations, overhead, other.

Page 16: Multi Annual Infrastructure Planning

23 maart 2006

16

MIT- model: Phases and decision moments

Exploration of problem

Planning of infrastructure

Realisationphase

1. Intakedecision

2. Yes/no planning phase

3. Project decision

4. Implementing order

5. Completion

Page 17: Multi Annual Infrastructure Planning

23 maart 2006

17

Decision making process (Stakeholders)

• Realization policy goals• Political influence• Economical Costs and benefits• Regional policy (Provinces and local

authorities)• Wish list railway operators• Wish list rail infra manager ProRail• Interests of societal organisations• Interests of citizens

Page 18: Multi Annual Infrastructure Planning

23 maart 2006

18

Decision making processes on railway infrastructure: the policy arena

MIT

ProRail

Provincesparliament

Railway operators

Munici palities Citizens

Societal organisations

MoT: Railway Directorate

Page 19: Multi Annual Infrastructure Planning

23 maart 2006

19

Prioritising Railway Maintenance

• Long term budget based on agreed upon results (KPI’s)

• ProRail responsibly for selecting means (activities) to obtain the results

• State influence on rail infra management operation limited to ‘political sensitive dossiers’(for example accessibility)

• Maintenance agreements between the MoT and ProRail contain renewals as well

• Planning & control includes audits/benchmarks.

Page 20: Multi Annual Infrastructure Planning

23 maart 2006

20

Measuring the results: Key Performance Indicators (KPI’s)

• Reliability (Disruptions, Irregularities, Function restore time)

• Availability (train free periods, the avoidance of speed restrictions!)

• Quality (Renewal, Life Cycle Management)• Safety (percentage of travellers, which

feel safe at day / night ,the amount of train collisions and the death toll)

• Properness (the amount of travellers that judges stations to be sufficient clean)

Page 21: Multi Annual Infrastructure Planning

23 maart 2006

21Working with the MIT in the Railway Sector – lessons learned

• Long term planning important for efficient operation (LCM) and increasing reliability and utilisation (performance)

• Overview of long term effects and performance necessary for securing long term budget

• Golden rule: less budget = less performance (exception: efficiency).

• Transparant decision making based on integrated approach.

Page 22: Multi Annual Infrastructure Planning

23 maart 2006

22

Content Afternoon presentation

• Setting policy priorities in more detail (the National Mobility Plan)

• From performance to budget• Relationship Multi Annual budget and

annual management plan• Multi Annual budget and changes in

policy• Conclusions

Page 23: Multi Annual Infrastructure Planning

23 maart 2006

23

Setting policy priorities

• The National Mobility Plan (2011-2020)

- Retain current rail maintenance level within few years (renewal plan)- Improving quality and preparing for future local growth- Punctuality from 83% in 2003 to 89-91% in 2020.- Limited expanding of the network

Page 24: Multi Annual Infrastructure Planning

23 maart 2006

24

From Performance tot budget

• Performance targets as agreed upon in the National Mobility Plan

• Decision making process based on performance-cost scenario’s

• Multi-annual budget (MIT) is based on the costs of the national mobility plan

• Efficiency improvement is part of the budget

Page 25: Multi Annual Infrastructure Planning

23 maart 2006

25

Railway infra structure: Available budget

• New infrastructure 2006-2010 € 4,5 (billion)

• New infrastructure 2011-2014 € 1,9• New infrastructure 2015-2020 € 0,1• Total new infrastructure € 6,5• Maintenance 2006-2010 € 6,9• Maintenance 2011-2014 € 4,4• Maintenance 2015-2020 € 9,0• Total Maintenance € 20

Page 26: Multi Annual Infrastructure Planning

23 maart 2006

26

Multi Anual Overview

• Handout

Page 27: Multi Annual Infrastructure Planning

23 maart 2006

27

Multi Annual Budget and Annual Management Plan

• Multi Annual Budget (MIT) based on National Mobility Plan

• Annual Subsidy based on annual management plan

• Annual management plan includes renewal.

Page 28: Multi Annual Infrastructure Planning

23 maart 2006

28

Annual Management Plan (1)

• ProRail responsible for annual management & maintenance plan

• The plan has to be in line with performance agreed upon in MIT and national mobility plan

• ProRail responsible for selecting means tot obtain goals( Performance)

• MoT has to approve the management plan

Page 29: Multi Annual Infrastructure Planning

23 maart 2006

29

Annual Management Plan (2)

• The annual management & maintenance policy must be in line with the Multi-Annual budget

• Annual MoT subsidy based on annual Management Plan

• Deviations from the plan have to be agreed upon and can change the annual subsidy

• Differences between subsidy and realised costs have to be explained by ProRail

• Differences will be part of the result or balance sheet of ProRail

Page 30: Multi Annual Infrastructure Planning

23 maart 2006

30

Mutli Annual Budget and changes in policy (1)

• Right to approve the (multi annual) budget by the parliament

• New government can always change priorities and budget

• A change in policy starts with the discussion about the goals

Budget follows performance !

Page 31: Multi Annual Infrastructure Planning

23 maart 2006

31

Mutli Annual Budget and changes in policy (2)

• Consequences for Life Cycle costs and efficiency

• Changes in policy difficult on short term (2006-2010), possible on mid term (2011-2014) and likely on long term (2015-2020)

Page 32: Multi Annual Infrastructure Planning

23 maart 2006

32

Case: What if there’s less budget available

• Step 1: Define policy priorities (MoT)• Step 2: Change maintenance Plan in line

with these priorities (ProRail)• Step 3: Overview of effects (ProRail)• Step 4: Scenario’s for decision-making in

terms of costs & budget) and benefits & performance (MoT).

Page 33: Multi Annual Infrastructure Planning

23 maart 2006

33

Conclusions (1)

• Multi Annual Budget provides stability for ProRail: relative secure budget.

• Multi Annual budget provides stability for MoT: less claims, less surprises, stability in performance.

• Multi Annual Performance and Multi Annual Budget are two sides of same coin!

Page 34: Multi Annual Infrastructure Planning

23 maart 2006

34

Conclusions (2)

• Multi annual planning provides opportunity for optimizing life cycle costs

• Performance planning demands knowledge of and transparancy in relationship between performance, activities and costs

• Multi Annual Performance Policy necessary for securing Multi Annual budget

Page 35: Multi Annual Infrastructure Planning

23 maart 2006

35

Any questions?