Muhammad Yaseen CV-Updated

download Muhammad Yaseen CV-Updated

of 3

Transcript of Muhammad Yaseen CV-Updated

  • 8/2/2019 Muhammad Yaseen CV-Updated

    1/3

    MUHAMMAD YASEENPERSONAL INFORMATIONMobile +923433340008EMAIL [email protected] NAME Muhammad Nawaz Shar

    CNIC NO 41303-9494150-7DATE OF BIRTH 20TH JANUARY 1983Address: H, No 955 Baban Shah Colony Behind Hotel Indus HyderabadSindh.

    ObjectiveCivil and power engineering is the business of working creatively and co-operativelywith the natural world to deliver a sustainable constructed environment to enhancethe quality of life for present & future generations. Solve Electrical issues, G.SetIssuesAll power related issues requires practical rigors based on an appropriate use ofscience & practical experience with clear values to deliver quality for all of the

    stakeholders including the natural environment.A qualified engineer with an exceptional track record in large maintenance

    infrastructures systems for diverse construction setups, as well as hands on technicalexpertise in the same, seeking a senior techno-managerial position with a dynamicorganization to apply accrued skills in contributing towards the achievement oftangible and intangible organizational objectives.

    PROFFESSIONAL EXPERINCE

    Research and Development Foundation

    Public Health Engineer 30August2011 To Upto date

    Project: Wash Flood Emergency Response In District Tando Allah YaarSupported By: OXFAM GB & UNICEFProject Objectives. Support through Hygiene Sessions and Hygiene Kits Safe andClean Water through Tankering and Hand Pumps and emergency Communal Latrinesand Hand Washing Facility.

    Public Health Engineer 4th July 2011 to 30th August2011

    Project: Building Capacities of affected Communities to endure flood disaster in disstJAMSHOROSupported By: OXFAM GBWorking for Capacity Building of Affected Community through a proper standard

    working cycle as per project Requirement. (Construction of Communal Latrines,Shelters and NFIs and Capacity Building of Community Affected By Flood Disaster)

    Water Management Officer 18th May 2011 to 3rd July 2011Project: Livelihood Restoration of flood affected people.Supported By: TROCAIRE

  • 8/2/2019 Muhammad Yaseen CV-Updated

    2/3

    Implemented the project according to its main objectives and main Indicators throughWhich Many farmers Supported through Agriculture Support, Most Vulnerable Womenthrough Kitchen GardeningAnd skilled Labour through Cash for work.

    Field Engineer 18th January 2011 to 17th May 2011Project: Early Recovery Of flood affected Peoples through Semi Permanent ShelterSupported By: US AID, CONCERN world wideShelter project In Thattas Union Council Tando Hafiz Shah.Working for Flood Affected to Endure Post Disaster through Shelter with the Help ofConcern World Wide and USAID in District ThattaS Union Council Tando Hafiz Shah.Successfully Completed the targeted 870 Shelters Construction.

    NASCOM CONSTRUCTIONS (1st October 2010 to 10th January 2011)Site Acquisition Supervisor

    Worked On Telenor Rent Negotiation Project in BALOUCHISTAN AND SINDH

    Eltek Valere (As Pakistan) Site Engineer (16thMarch2009 to 17th

    September 2009)Performed the job Scope on P T C L, ZONG & U FONE Projects. Operation andMaintenance Of power and civil works.Performing & assisting in site acquisition.Preparing & controlling documentation regarding design, calculations& reports.Conduct regular meetings with subcontractors to keep the quality of work in pacewith the roll out schedule.Construction Works managementConstruction Works Scheduling and monitoring

    Preparing & controlling documentation regarding design, calculations& reports

    Power tech Engineering Solution, Site Engineer (2nd June2008 to February2009)

    WORKING, Erecting On the Multipurpose of Sites on Coastal Highway Baluchistan,On Warid Project.Executing & planning the civil works in accordance with the scope of work (incl.Modelsite design, civil work specifications& guide lines)Monitoring of the acceptance of construction works by the customer &acts as anescalation pointPrepare the Sites from the start point to final Acceptance.Looking After All problem having on Related with Owner, other PeoplesDaily meeting with Contractor On the site Based WorkIKAN Engineering Site Engineer (1st May2006 2nd June2008)

    Construction, Erecting and end allied facilities of TELENOR, WARIDTELECOM, C M PAK&P T C L towers.Designate & organize sub-contractors & monitor their activities at the site.

  • 8/2/2019 Muhammad Yaseen CV-Updated

    3/3

    Conduct regular meetings with the sub- contractors to keep the quality of work inpace with the rollout schedule.Monitoring the sites through constructions Engineers & SupervisorsQuality assurance of sites from customers point of viewScheduling provisional acceptance of the sites by the customer

    Troubleshooting all the operational matters relevant the civil works

    Leading the sites for final acceptance from the customerControl of all contractor services that they are under compliance with agreed terms &sites are handed over according to scheduleWare house requisition for material inflow & issue of the same to sitesLiaison with the government official day to day local political & commercial issuesSuccessfully lead to complete & achieve final acceptance for Phase 2 and Phase 3from the customers.Designate the subcontractor site construction work& supervise through construction/site engineers to implement quality assurance & target achievement according torollout planPlanning & executing the civil works in accordance with the scope of work (incl.Modelsite design, civil work specifications& guide lines)

    K H L (Extreme Engineering Solution) Site Engineer (3rd December2005 to 1st May 2006)Construction, Fabrication, Galvanization and Erecting of telecommunication towers &

    allied facilities of TELENOR, MOBILINK, and WARID TELECOM &PTCL towersConstruction, Supervision Quality assuranceMaintenance, Operation& Implementation of cell sitesDesign of towers and its foundationCheck the galvanization, and electrical earthling according to the specificationRemedial design if required according to the site requirementsWell know knowledge of G-Sets

    Troubleshooting of Electrical works

    UNIVERSAL ENGINEERING SERVICES Site supervisor (1st JULY2005 to 3rd DECEMBER 2005)

    The scope of work includes the following and supposes to be executed in accordancewith the agreed specification.Construction Works managementConstruction Works Scheduling and monitoringDetailed quality engineering and manage system implementationPreparing and controlling documentation regarding Design, Calculations and reportsConstruction Supervision and Quality Assurance

    Academic QualificationD A E PASSED TECHNICAL BOARD SINDH (Civil Engineering)B.COM Part 1 Continuous Govt SINDH COMMERCE COLLEGE HYDERABADComputer knowledgeMicrosoft Windows, Microsoft Office and MS DOS.