Muhammad Musa Khan CV

download Muhammad Musa Khan CV

of 7

Transcript of Muhammad Musa Khan CV

  • 7/24/2019 Muhammad Musa Khan CV

    1/7

    Muhammad Musa Khan

    31/3-C Sarwar Road Lahore Cantt,

    Lahore, Pakistan

    Contact: +92 3344271769

    [email protected]

    Personal Information

    Fathers Name : Ishtiaq Muhammad Khan

    NIC# : 35201-4145222-9

    Gender : Male

    Religion : Islam

    Nationality : Pakistan

    Date of BIRTH : 7th

    November 1989

    Marital Status : Single

    Career Objective

    To pursue a career in an esteemed organization, where I can utilize my abilities and harmonize my

    skills according to the organizations vision. Organized, highly motivated, and detail directed problem

    solver. Communicate effectively to identify and resolve problems. I am a goal-oriented individual withstrong leadership capabilities. Ability to direct complex projects from concept to fully operational status.

    I am Skilled at learning new concepts quickly, working well under pressure, and communicating ideas

    clearly and effectively.

    mailto:[email protected]:[email protected]:[email protected]
  • 7/24/2019 Muhammad Musa Khan CV

    2/7

    Key skills and qualities

    Programming: Programming in C++ Language, Assembly, C, Java, MATLAB, Verilog

    Operating Systems: Windows 98/2000/Xp/7/8

    Software: MS Office (Word, Excel, Power Point), Eagle, CAD

    Education and training

    University Of Lahore

    Lahore, Pakistan

    Degree:

    Bachelors of Science in Electronics and Communication

    Projects:

    Mini projects:

    Home Automation by hyper link using Microcontroller.

    Designing database of a 3 story parking lot using C++.

    Hardware Designing of Fm modulator.

    Final Project:

    Transformer-less & Efficient uninterrupted power supply with

    Battery Analyzer

    Explanation:

    The main purpose of the project was to provide an economical

    and mobile power inverting device.

    The key features of the project are the modified sinusoidal output

    and the ferrite core transformer.

    DC voltage from the battery is converted into pulsating AC using a

    converter , which is then stepped UP using ferrite core

    transformer. This stepped up voltage is then rectified to give

    stepped up DC voltage. The PWM (pulse width modulation) technique has been used to

    achieve a modified sinusoidal output

    Using MOSFETs and their driving circuitry. Low pass filter is further

    used to filter the harmonics and to get the desired output.

    The analyzer circuit connected to the battery analyzes the rate of

    decay of voltage of the battery.

    The battery analyzer output is displayed using an LCD.

  • 7/24/2019 Muhammad Musa Khan CV

    3/7

    Major Power Courses

    Power System Power System Analysis Power System operation &control

    Power Plants High Voltage Engineering

    Major Telecom Courses

    Introduction to telecom systems Telecom switching

    Work Experience

    SHAQURRI INTERNATIONAL Pvt. Ltd (ISO Certified)

    Assistant Manager Operations Central-I

    1

    st

    May 2014 to Date

    Operations and Maintenance Engineer

    8th

    June 2013 to 1st

    May 2014

    Job Profile:

    Providing Sales, Services, Rental, Installations of Switchgears

    and Power Generators (10 KVA ~ 1250 KVA), weekly and

    monthly Preventive, Corrective Maintenance and Overhauling

    Projects. Providing Maintenance and Services as a Vendor in all over

    Pakistan to Mobile Operators i.e. Telenor, U-Fone, Mobilink,

    Zong, Askari and Allied Banks.

    Looking after the Real Estate and Core project of Telenor in

    Central Region.

    Partially Looking after the Admin and Core project of Zong in

    Central region.

    Projects

    Power Generation Projects:

    Providing Sales, Rental, Services, Installations and weekly and monthly Preventing & Corrective

    Maintenance and overhauling of all the power projects.

    Installations in all Pakistan Mobile operators i.e. Ufone, Mobilink, Zong, Telenor

    Other major customers are:

  • 7/24/2019 Muhammad Musa Khan CV

    4/7

    Netherland Embassy & Residences, Belgium Embassy & Residences, German Embassy &

    Residences, United Nation, Red Cross, Unicef, Equant Pakistan, Premier Oil, Care International,

    CRS, IPDF, Trocare, Sheikh Zaid School, Rohde & Schwarz, Mitsubishi Corporation, BTC Network

    Solution, Gerry FedEx, Haggler Baillie, Federal Board Islamabad, ENI Guest House, European

    Commission, CDM, Sharp Office, Islamabad Stock Exchange, MOL Pakistan, Mocca Coffee Shop,

    Earth Factor, Terralight and Ace Energy.

    Reporting:

    Complete knowledge about all types of official reporting. Daily, weekly and monthly reporting of

    all the above projects.

    Escalation of invoices, queries and FSRs (Field Service Report).

    Key Roles:

    To Co-ordinate with senior managers.

    To Co-ordinate with all the operators' staff.

    To manage all operators staff duty on daily basis at their sites.

    Preplanning of Services & Maintenance of all the sites.

    PM (Preventing Maintenance) of all DG's on daily, weekly and monthly basis.

    CM (Corrective Maintenance) of all DG's on emergency call or complaints.

    Co-ordinate with services & maintenance team.

    To collaborate with consultants and clients for the approval of profile.

    To provide the quotation of power GENSET system to the clients.

    Prepare BOQ, Hard Ware, Calculations and Escalation of Invoices.

    Progress Invoices, Security Invoices etc.

    To Prepare the quotations from the queries of clients.

    Calculations of designing the Power Genset system (Load, Voltage and Current etc).

    Knowledge about all POWER GENERATORS, Engines & their Alternators.

    Complete Knowledge of all equipment of Power D.G system.

    Complete Knowledge of all Panels and Cards.

    Have a Good Knowledge of LV and MV Switchgear Projects.

    Including (LDB, PDB, PFI Panel, MCC Panels, ACB, VCB Panels, ATS, AMF, AVR, MOR and Change

    over Switches, LT Panels.

    Knowledge of both Project Management with Value Engineering and Design Drawings and LV

    Schematics, Load Calculation, Selection of Cables, Voltage drop calculations.

    Knowledge about designing of Power Genset system.

    To find the Base Load of the Genset.

  • 7/24/2019 Muhammad Musa Khan CV

    5/7

    Knowledge of all panels and D.B's Commissioning & Testing.

    Knowledge of Circuit Breaker selection, contactor selection and Cable/Wire selection.

    Knowledge about all the Gensets MODULES and their Cards.

    Knowledge about ATS, AMF, AVR and their Commissioning.

    Complete Knowledge about all the Mathematical calculations for the designing of system.

    To work on Single Line Drawings and complete drawings of projects.

    Have a good Knowledge about all types of DRAWINGS (Electrical, Mechanical & Civil).

    To make all types of DRAWINGS (Electrical, Mechanical & Civil) on AUTOCAD.

    To make all types of 2D & 3D DRAWINGS on AUTOCAD.

    Complete Knowledge of Drawings Making and Reading.

    Reporting:Complete knowledge about all types of Official Reporting. Daily, Weekly and Monthly

    Reporting of all the above Projects to Clients.Escalation of Quotes, Invoices, Queries,Fueling and FSRs (Field Service Report).

    NEXTON GROUP

    Project Engineer

    (1st

    May, 2012 to 8th

    June, 2013)

    Job Profile:

    Complete engineering projects by organizing and controlling project elements. Develop project

    objectives by reviewing project proposals and plans, conferring with management. Control project costs

    by approving expenditures; administering contractor contracts. Maintain project schedule by monitoringproject progress; coordinating activities; resolving problems. Contribute to team effort by accomplishing

    related results as needed.

    Projects:

    Power Transmission Line Projects:

    Muzeferabad Hattian Transmission Line Project:

    Supply, Erection, Stringing, Testing & Commissioning of (LOT II) 132 KV.

    HESCO (Govt Project) 11 KV capacitor control panels, INCOMING/OUTGOING panels of

    HV, consumer panels, bulk metering panels wapda approved, and L.T section of the total

    building including MCC,S ,PFI,MAIN, L.T, PLC , and SYNC panel GEPCO: transportation , erection and installation of PC poles and stringing of 11KV line at

    Gujrat site

    REWAT-SOWAN in & out Transmission Line Project:

    Tower Foundation, Erection, Stringing testing & commissioning of 132 KV.

    Solar Energy Projects:

  • 7/24/2019 Muhammad Musa Khan CV

    6/7

    K-2 Base Camp 1000 watt Solar Powered System.

    Al Noor NGO School Solar Powered Lights at Kala Bagh (Paki shah Mardan).

    Devent International NGO Solar projects at F-7 Islamabad.

    Domestic projects at I-8 Islamabad.

    Commercial shops lightening through Solar in Wah Cantt.

    Society Solar Powered Grid at DHA Islamabad.

    Domestic projects of Solar Geysers in Islamabad and Gujranwala.

    Have provided various readymade DC solar products in the market as well.

    Key Roles:

    ToCo-ordinate with Project Manager.

    To Estimate the Project cost and collaboration with teams.

    To collaborate with consultants and clients for the approval of profile.

    Knowledge of Stringing, Commissioning & Erection of Transmission Line.

    Knowledge about (132, 220, 500) KV Power Transmission Line.

    To Prepare BOQ, Hardware Calculations and Escalation of Invoices.

    To make all type of daily, weekly and monthly official reports.

    Progress Invoices, Security Invoices and Crop Compensation.

    Complete knowledge about all the Solar Energy System.

    Have a good knowledge about all the Solar Equipment.

    To design the Queries of Solar Energy System.

    Complete knowledge of designing the Solar Energy Projects.

    Complete knowledge of Installation and Trouble Shooting of Solar Energy Projects.

    Managing construction of L.T/H.T 11kv Lines, RCC structures, PC poles/spun poles distributionSystem for WAPDA end.

    Installation of T/Formers and regular site visits to check quality and order of works

    Executing work orders according to the MAPS provided by WAPDA

    Attending technical meetings and giving complete guidance to clients regarding technical

    discussions.

    Extensive experience in Bidding of Tenders and Attending the opening of tenders on due dates.

    Experience of major overhauling and complete testing of 22.5MVA generator (TDPS Make).

    Knowledge of operation and maintenance of Brushless Excitation System (both Static and PMG

    System).

    Responsible for Erection and successful Commissioning of 18MW WHRB.

    Experience of operation and complete maintenance of Battery charger.

    Knowledge of Power system protection and fault level study for proper relay co-ordination.

    Implement AGC scheme for Generator, PMS, load shedding, relay communication

    Looking after 20/25 MVA Transformer Procurement, Erection and commissioning along with

    132kv complete bay.

    Making plans and other strategies which are beneficial for the company and our team

  • 7/24/2019 Muhammad Musa Khan CV

    7/7

    Certifications & Achievements

    MS PRIMA VERA PITAC Engineering Pakistan

    August 2014 to September 2014 (PAKISTAN INDUSTRIAL TECHNICAL ASSISTANCE CENTRE)

    Interests and hobbies

    Learning new Applications.

    Playing chess.

    Adventurous activities.

    Self Fitness.

    Reference

    Will be furnished upon request