MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05...

21
Cover sheet for preliminary/ initial samples and project system business (PSB) components Sender: Contact Person: Tel.: Fax: E-mail: Recipien t: MTU Friedrichshafen GmbH Wareneingangsprüfung D-88040 Friedrichshafen Enclosed / Inspected 01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 09 EMC test 10 Reliability tests 11 Design approval 12 Risk analysis, e.g. FEMA 13 Process flowchart 14 Production control 16 Measurement and test equipment list 17 Measurement and test equipment certificates 18 EU safety data sheet 19 Transport unit / packaging 20 Certificates Supplier / Production plant: Customer: MTU supplier number: Report No.: Report No.: Description: Item number: Drawing number: Status/ date: Description: Item number: Drawing number: Status/ date: Delivery note no. / date: Quantity supplied: Batch number: Sample weight: Supplier confirmation: We hereby confirm that qualification was carried out according to MTQ 5003. Name: Department: Telephone: Fax: E-mail: ___________________________________________________________________________________________ Comments: Customer decision: over- all Individual approvals: 01 02 0 3 04 0 5 06 0 7 0 8 09 1 0 11 1 2 1 3 14 1 5 16 1 7 18 1 9 2 0 21 2 2 23 24 Approved Approved with conditions, re-sampling required Rejected, re-sampling Deviation approval no.: Validity: Deadline for re-sampling: In case of return shipment, include Q-report No. / date: Name: Comments: © by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen Test report prototype Report on qualification to MTQ5003 Preliminary sample Initial Sample New PSB part Full PSB test Product change (specification change) Transfer of production Production process change Production suspended for longer than 36 months Tool change/ correction Outsourced parts change Change of sub-contractor Re-sampling/ re-testing Other

Transcript of MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05...

Page 1: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Cover sheet for preliminary/ initial samples and project system business (PSB) components

Sender:                          Contact Person:       Tel.:      Fax:      E-mail:      

Recipient: MTU Friedrichshafen GmbHWareneingangsprüfung     D-88040 Friedrichshafen          

Enclosed / Inspected 01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test

09 EMC test 10 Reliability tests 11 Design approval 12 Risk analysis, e.g. FEMA 13 Process flowchart 14 Production control plan 15 Proof of process capability

16 Measurement and test equipment list 17 Measurement and test equipment certificates 18 EU safety data sheet 19 Transport unit / packaging 20 Certificates 21 Process acceptance 22 Other

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:      Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Delivery note no. / date:      Quantity supplied:      Batch number:      Sample weight:      

Supplier confirmation:We hereby confirm that qualification was carried out according to MTQ 5003.Name:      Department:      Telephone:      Fax:      E-mail:      

            ___________________________________________________________________________________________

Date Signature

Comments:                                    

Customer decision: over-all

Individual approvals:01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

ApprovedApproved with conditions, re-sampling requiredRejected, re-sampling required

Deviation approval no.:       Validity:       Deadline for re-sampling:                       In case of return shipment, include Q-report No. / date:           

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Test report prototype Report on qualification to MTQ5003

Preliminary sample Initial Sample New PSB part Full PSB test Product change (specification change) Transfer of production Production process change Production suspended for longer than 36 months Tool change/ correction Outsourced parts change Change of sub-contractor

Re-sampling/ re-testing Other      

Page 2: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Name:      Department:      Telephone:      Fax:      E-mail:      

Comments:                                     Date Signature

Form-No.:      

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 3: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Contents of the PPA report

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:      Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Enclosure Status/date

Nature, extent and identification ofenclosures

01 Dimensional check             02 Function check             03 Material test / heat treatment certificate             04 Haptics test             05 Acoustics test             06 Odors test             07 Visual test             08 Surface test             09 EMC test             10 Reliability test             11 Design approval             12 Risk analysis, e.g. FEMA             13 Process flowchart             14 Production control plan             15 Proof of process capability             16 Measurement and test equipment list             17 Measurement and test equipment certificates             18 EU safety data sheet             19 Transport unit / packaging             20 Certificates             21 Process acceptance             22 Other            

Supplier’s comments:                                         

Name:      Department:      Telephone:      Fax:      E-mail:      

            ___________________________________________________________________________________________

Date Signature

Form-No.:      

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 4: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 5: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 6: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 7: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 8: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:           

Customer decision:ApprovedRejected, re-sampling required

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 9: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

                              

Comments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:      

Customer decision:Approved

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 10: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

                                   

Rejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:       Customer decision:

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 11: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Comments:                                         

ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 12: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 13: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 14: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:       Description:      

Supplier confirmation:      Comments:           

Customer decision:ApprovedRejected, re-sampling required

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 15: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

                              

Comments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:      Comments:      

Customer decision:Approved

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 16: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

                                   

Rejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

Supplier confirmation:       Customer decision:

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 17: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Comments:                                         

ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 18: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

Product-related test results Status:      / Date:      

Page     of    

01 Dimensional check 02 Function check 03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test

06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability test

Supplier / Production plant:           

Customer:           

MTU supplier number:       Report No.:       Report No.:     Description:      Item number:      Drawing number:      Status/ date:      

Description:      Item number:      Drawing number:      Status/ date:      

Ref-No.:

RequirementsSpecifications

Actual valuesSupplier

Specificationfulfilled Comments

Yes No

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen

Page 19: MTU Solutions€¦ · Web view03 Material test / heat treatment certificate 04 Haptics test 05 Acoustics test 06 Odors test 07 Visual test 08 Surface test 09 EMC test 10 Reliability

Supplier confirmation:      Comments:                                         

Customer decision:ApprovedRejected, re-sampling requiredComments:                               

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Name:      Department:      Telephone:      Fax:      E-mail:                 

___________________________________________________________________________________________

Date Signature

Form-No.:      

© by VDA-QMC and ( www.ringwald-sasbach.de ) V/ 02.05 // MTU Friedrichshafen GmbH / D-88040 Friedrichshafen