MT WELLINGTON HWAY (S/B) N MT WELLINGTON HWAY (N/B) … · 10 20 30 40 50 70 60 80 90 100 150 do...

1
A JOIN LINE A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | A JOIN LINE A | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | ORIGINAL SIZE 0 10 20 30 40 50 70 60 80 90 100 150 DO NOT SCALE - IF IN DOUBT, ASK 200mm Drawing No. Stamp Date Status Stamp Rev. A1 A1 Scales A3 Scales AUCKLAND TRANSPORT B FOR CONSULTATION 10/09/2019 12506145-G100 1 : 250 1 : 500 MT WELLINGTON SOUTHBOUND ON-RAMP DESIGN N ON-RAMP TO SH1 MOTORWAY (S/B) ON-RAMP TO SH1 MOTORWAY (S/B) SH1 AUCKLAND MOTORWAY (S/B) SH1 AUCKLAND MOTORWAY (N/B) MT WELLINGTON HWAY (S/B) MT WELLINGTON HWAY (N/B) OFF-RAMP TO MT WELLINGTON HWAY (S/B) LEGEND PROPOSED ROAD MARKING EXISTING ROAD MARKING PROPOSED FOOTPATH PROPOSED DIRECTIONAL TACTILE PAVERS PROPOSED WARNING TACTILE PAVERS PROPOSED PAVEMENT EXISTING ROAD MARKING TO BE REMOVED EXISTING KERB TO BE REMOVED PROPOSED TRAFFIC ISLAND

Transcript of MT WELLINGTON HWAY (S/B) N MT WELLINGTON HWAY (N/B) … · 10 20 30 40 50 70 60 80 90 100 150 do...

Page 1: MT WELLINGTON HWAY (S/B) N MT WELLINGTON HWAY (N/B) … · 10 20 30 40 50 70 60 80 90 100 150 do not scale - if in doubt, ask 200mm drawing no. stamp date status stamp rev. a1 a1

AJO

INLI

NEA

|

||

||

||

||

||

| || |

| || |

| || |

|

|

||||

| | | | | | | | | | | |

||||

||

||

| |

|

|

||

| | | || |

| | | | | | | |

||||

| | | | |

||||||||

A

JOIN

LINE

A

||||||||||||||||||||||||||||||||||

||||||||||||

| | | | | || |

| | |

| | | |

ORIG

INAL

SIZ

E0

1020

3040

5070

6080

9010

015

0DO

NOT

SCA

LE -

IF IN

DOU

BT, A

SK20

0mm

Drawing No.

StampDate

StatusStamp

Rev.

A1

A1Scales

A3Scales

AUCKLAND TRANSPORT

B

FOR CONSULTATION10/09/2019

12506145-G100

1 : 250 1 : 500

MT WELLINGTON SOUTHBOUNDON-RAMP DESIGN

N

ON-RAMP TO SH1 MOTORWAY (S/B)

ON-RAMP TO SH1 MOTORWAY (S/B)

SH

1 A

UC

KL

AN

D M

OT

OR

W

AY

(S

/B)

SH

1 A

UC

KL

AN

D M

OT

OR

W

AY

(N

/B)

M

T

W

E

L

L

I

N

G

T

O

N

H

W

A

Y

(

S

/

B

)

M

T

W

E

L

L

I

N

G

T

O

N

H

W

A

Y

(

N

/

B

)

O

F

F

-R

A

M

P

T

O

M

T

W

E

L

L

IN

G

T

O

N

H

W

A

Y

(S

/B

)

LEGEND

PROPOSED ROAD MARKING

EXISTING ROAD MARKING

PROPOSED FOOTPATH

PROPOSED DIRECTIONALTACTILE PAVERSPROPOSED WARNINGTACTILE PAVERS

PROPOSED PAVEMENT

EXISTING ROAD MARKINGTO BE REMOVED

EXISTING KERBTO BE REMOVED

PROPOSED TRAFFICISLAND