Wind – a renewable energy resource. Wind Energy transformations in wind turbines.
MSZET Hungarian Wind Energy Association UTILISATION OF WIND ENERGY IN HUNGARY IN 2009
description
Transcript of MSZET Hungarian Wind Energy Association UTILISATION OF WIND ENERGY IN HUNGARY IN 2009
MSZET Hungarian Wind Energy AssociationMSZET Hungarian Wind Energy Association
UTILISATION OF WIND ENERGY UTILISATION OF WIND ENERGY IN HUNGARY IN 2009IN HUNGARY IN 2009
Author and Presenter: Gábor CsákányMSZET West Transdanubian regional manager
NRG Systems Ltd (Vestas Cental Europe – Sales Hungary) managing director
Co-authors:Tamás Tóth – Hungarian Energy Office
Péter Tóth – President MSZET
2
Utilisation of wind energy in Hungary in 2009
Actual data of the Hungarian power system (Source: MAVIR Zrt.)
3
Utilisation of wind energy in Hungary in 2009
Main data of the electricity system, 2007
•Production: 40 000 GWh•Import: 14 278 GWh•Plant self-consumption,grid loss: 6 838 GWh•Inland consumption: 37 149 GWh•Export: 10 291 GWh
Source: KSH (Central Statistical Agency, Hungary)
3987 GWh
40000 GWh
Production
Import-export
6838 GWh
Inlandconsumption
Plant selfconsumption,grid loss
37149 GWh
4
Utilisation of wind energy in Hungary in 2009
Share of the domestic electricity production, 2007
38 % natural gas37 % nuclear energy13 % lignite6 % coal5 % renewable energy- thereof 0,3 % wind energy1 % oilSource: MAVIR Zrt.
38%
37%
13%
6% 5% 1%
natural gas
nuclear energy
lignite
coal
renewable
oil
5
Utilisation of wind energy in Hungary in 2009
Governmental policy
New EU target for Hungary: 13 % share
of renewable energy sources by 2020 The three elements of the Hungarian energy
policy 2008-2020:
security of supply, competitiveness, sustainability Green electricity target by 2020:7557-9470 GWh
6
Utilisation of wind energy in Hungary in 2009
Disposal of electrical energy in the frames of compulsory taking-over
Compulsory taking over (KÁT) system:
The KÁT system has the objective to support the
rising share of cogeneration heat and power and
energy production based on renewable sources
and on waste within the total energy production.
The KÁT system has been in operation since
01.01.2008, the liberalization of the Hungarian
electricity system.
7
Utilisation of wind energy in Hungary in 2009
Disposal of electrical energy in the frames of compulsory taking-over
• Responsible: MAVIR Zrt. the Hungarian Transmission System Operator
• Fix feed-in price guaranteed:
- for a certain period of time;
- raised every year by the inflation rate.
8
Utilisation of wind energy in Hungary in 2009
Feed-in price
• Current feed-in price for wind turbines within the 330 MW barrier: 0,095 c€/kWh
(MNB Hungarian National Bank exchange rate of 02-03-2009: 1 EUR = 296 HUF)
9
Utilisation of wind energy in Hungary in 2009
Subvention
The KÁT subvention is distributed as follows (1st half of 2008):(MNB Hungarian National Bank exchange rate of 02-03-2009: 1 EUR = 296 HUF)
73%
25%
1%0%
CHP (24,2 millard HUF)renewable energy (8,3 mil-liard HUF)mixed fired thermo power plants (0,4 milliard HUF)energy from waste firing plants (0,1 milliard HUF)
10
Utilisation of wind energy in Hungary in 2009
Subvention proportions within renewable energy (alltogether 25 %)
biomass (21%)wind energy (3 %)hydro power plant (1 %)
11
Utilisation of wind energy in Hungary in 2009
Disproportions of the subvention
Within renewable energy biomass is supported
disproportionally much:• mostly old-technology mixed fired (lignite
and wood) thermo power plants• bad efficiency• using mainly whole trees behalf of wood
chips
12
Utilisation of wind energy in Hungary in 2009
Disproportions of the subvention
– Gas turbines supported also disproportionally much
– These need to be changed in order
to meet renewable target in 2020
13
Utilisation of wind energy in Hungary in 2009
Current situation in the wind energy market
• 75 units of wind turbines
• alltogether 139,325 MW (end of February 2009)
of installed wind power capacity
14
Utilisation of wind energy in Hungary in 2009
Installed wind power capacity 2000-2008
15
Utilisation of wind energy in Hungary in 2009
Market situation – wind turbine manufacturers
• Vestas is market leader with 57,875 MW
and with 41,54% market share
• Gamesa, RePower and Enercon on 2nd,3rd, 4th place
Vestas (41,54 %)Gamesa (25,84 %)RePower (17,23 %)Enercon (13,63 %)Others (1,67 %)
16
Utilisation of wind energy in Hungary in 2009
Positive law environment before 11th November 2005
• Three-step authorization process:
environmental permit
building permit
grid connection contract
• More than 3000 MW windfarms under development, possessing environmental permit
17
Utilisation of wind energy in Hungary in 2009
Negative changes in law environment
• Government edict Nr. 246/2005 (XI.10.):
Four-step authorization process
Additionally: MEH (Hungarian Energy Office) license
• Introducing the barrier of 330 MW
pleading electrical system regulation problems
18
Utilisation of wind energy in Hungary in 2009
Penalty system: Edict 389/2007. (valid: 01.01.08 - 30.11.08)
• Production plan for every 15 minute interval
• Monday to Friday forecasting
(sometimes 3-4 days in forward)
• Deviation range +/- 30 % regarding 15 minute intervals
• If 30% exceeded penalty after every kWh
deviation within the 15 min interval
• Penalty from beginning of the operation
19
Utilisation of wind energy in Hungary in 2009
Penalty system: Edict 389/2007. (valid: 01.01.08 - 30.11.08)
No service company able to provide such
precise meteorological / production data
Consequence:
Average penalty between 1c€ - 2,5c€ / kWh
20
Utilisation of wind energy in Hungary in 2009
Penalty system: Edict 389/2007. (valid: 01.01.08 - 30.11.08)
• MSZET, the Hungarian Wind Energy Association appealed to the Hungarian Constitutional Court to abolish the penalty system.
Law suit is in progress.
21
Utilisation of wind energy in Hungary in 2009
Penalty system: Modification: Edict 287/2008. (valid from 30.11.08)
• Production plan for every 15 minute interval
• Monday to Monday forecasting (only 1 day in forward)
• Deviation range +/- 50 % regarding 1 day intervals
• If 50% exceeded penalty after every kWh deviation over the 50% deviation within the 1 day interval
• Penalty after 6 months after beginning of the operation (6 months grace period)
• Regulation stays in effect till 02.01.2011
22
Utilisation of wind energy in Hungary in 2009
Modification of the penalty systemConsequences
• Relief for the wind farm operators
• However main goal remains to abolish
the penalty system
• Average penalty decreases
• Appropriate data on penalty after 6 months
after the new edict came into effect
23
Utilisation of wind energy in Hungary in 2009
Future potential for wind energy
• New quotas needed: 330 MW barrier should be lifted (legislation works on this issue)
Greenpeace urges 1000 MW capacity
• Permission process should be simplified
• If gas power plants were used for regulation
in stead of base load power stations, more wind
turbines could be brought into the network.
24
Thank you for your Thank you for your kind attention!kind attention!