MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

37
MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli

Transcript of MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

Page 1: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

MST REPORT AND IMPLEMENTATION

PLAN

NCF Meeting 22 August 2013Mr HM Mweli

Page 2: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

“...science and mathematics should be revitalised through the increased number of school leavers who are eligible to study science and mathematics-based subjects at university. The number of people embarking on careers in science and technology should be at least three times the current levels.”

National Planning Commission: National Development Plan, Nov 2011

2

INTRODUCTION

Page 3: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

RECOMMENDATIONS – MST MINISTERIAL

TASK TEAM

3

Page 4: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Ineffective Teacher Training programme

DBE to work with DHET and HEIs to strengthen the implementation of initial Teacher Development programmes

DBE (Branch T), DHET, HEIs

October 2013

Ineffective support programmes

Identify effective modalities for professional development and support .

DBE (Branch T)

July 2013

Page 5: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Unfavorable ratio of subject advisors to Educators

Implement norms and standards for staff provisioning to ensure adequate provision per phase.

DBE (Branch T0, PEDs

2014/15

Subject Advisors not qualified for the subjects for which they are responsible

Replace subject advisors with appropriately qualified ones.

PED 2014/15

Page 6: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Subject Advisors are not allowed to monitor teaching and learning in the classroom

Review existing protocols to allow Subject Advisors to monitor and support teaching and learning in the classroom.

DBE (Branch T)

November 2013

Small multigrade schools which make it difficult for effective teaching and learning to take place

Consolidation of Multigrade schools to use options such as boarding facilities, transport etc.

PEDs December 2013

Page 7: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Ineffective post provisioning norms (PPN) for multigrade schools

Review the PPN to bring about effective teaching and learning in multigrade schools.

DBE (Branch T) PDEs

August 2013

Ineffective Teacher Development programmes for teachers teaching in multigrade schools

Redesign Teacher Development programmes to meet the needs of teachers teaching in Multigrade schools

DBE (Branch T), DHET, HEIs

October 2013

Page 8: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Inadequate co ordination with other state departments, agencies, NGOs and corporate

Strengthen partnerships with other state departments, agencies, NGOs and corporate

DBE, PEDs October 2013

Ineffective Resource allocation and utilisation for MST implementation

Co ordinate resource allocation and utilisation for effective MST implementation

DBE, PEDs July 2013

Page 9: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION

RESPONS IBILITY

TIME FRAME

Inadequate uitilisation of ICT to support MST

Explore various modalities to strengthen ICT utilisation for MST implementation

DBE (Branch C), PEDs

July 2013

Serious implications of the combination of Natural Science and Technology for teacher demand, supply and utilisation

Investigate implications for the combinations of NST for teacher demand, supply and utilisation and deal with the ramifications

DBE (Branch C and T)

October 2013

Page 10: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Strengthen the capacity of the sector to effectively implement the MST strategy

Establishment of a dedicated MST strategy office

DBE (Branch C)

July 2013

Inadequate and uncoordinated internal capacity to effectively implement the MST strategy in the sector

Consolidate MST expertise to strengthen internal capacity to implement MST activities

DBE, PEDs August 2013

Page 11: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FINDINGS RECOMMENDATION RESPONS IBILITY

TIME FRAME

Poor language proficiency and utility impacting negatively on MST

Implementation of Language across the Curriculum

DBE (Branch C), PEDs

January 2014

Lack of coherence between strategy thrust and the implementation plan

Ensure alignment between the strategy and the Implementation Plan

DBE July 2013

Page 12: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

QUICK WINS

12

Page 13: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

QUICK WINS

13

DELIVERABLES RESPONS IBILITY TIME FRAME

1. Establishment of the MST Office.

DBE (Branch C) July 2013

2. Aligning the MST plan to the strategy

DBE July 2013

3. Aligning Provincial Plans to the MST Strategy and implementation plan.

PEDs July 2013

Page 14: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

14

DELIVERABLES RESPONS IBILITY TIME FRAME

4. Strengthening and consolidating MST internal capacity.

DBE & PEDs Dec 2013

5. Matching subjects advisors and teacher competencies to the profile of the post.

PDEs, Districts & Schools

Dec 2013

6. Providing Maths & Science Siyavula textbooks and workbooks

DBE July 2013

Page 15: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

15

DELIVERABLES RESPONS IBILITY TIME FRAME

7.Developing Norms and Standards for MST, LTSM (equipment and consumables)

DBE September 2013

8. Provision of Science kits and Technology tool kits through Dinaledi and Technical High School conditional grants.

PDEs August 2013

9. Scripting lessons plans experience for MST

DBE & PDEs August 2013

10. Scripting monitoring and support by subject advisors and SMTs.

DBE & PDEs August 2013

Page 16: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

16

DELIVERABLES RESPONS IBILITY TIME FRAME

11. Monitoring the coverage and utilization of the 2012 NSC diagnostic report and remedial plans.

PDEs & Districts July 2013

12. Monitoring the quality and impact of MST interventions and support and programmes

DBE & PDEs

13. Using ICT to create virtual classroom to deal with shortages of suitably qualified teachers as well as revision and enrichment programme.

PDEs July 2013

Page 17: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

MST PROVINCIAL

REPORTS

17

Page 18: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

EASTERN CAPEFINDINGS WEAKNESSES STRENGTHS

Many vacant posts throughout the system – at school, district and provincial level.

•Teacher migration from rural to urban areas results in loss of subject expertise.•The delay in the renewal of contracts of temporary teachers.•Multi-grade teaching is prevalent in rural areas.

All learners are accommodated in schools.

Whilst an MST directorate is in place, it operates as a unique entity with no constructive engagement with the curriculum directorate or districts.

•Although the provincial MSTE Strategy and plan have been developed, schools indicated little knowledge of such.• The GET, FET and MST are working in silos.

•Despite the lack of knowledge, there is a buy-in of the implementation of MST in schools by the MST teachers.

Page 19: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

EASTERN CAPE...FINDINGS WEAKNESSES STRENGTHS

The province reports poor teacher development for both in-service and pre-service teachers.

•Teachers raised concerns about the competency of curriculum advisors which results in teacher workshops being of below standard. •Subject Advisors claim that they do not have the necessary resources to support the teachers.

•There is collaboration with partnerships like NMMU, SAICA , and other national Departments to support teachers.

Serious budgetary constraints impacting on physical resources.

•There is a lack of proper facilities e.g. laboratories and consumables.

•Some schools received computers (although in some cases they do not know how to use them).

ICT integration into teaching and learning is non-existent in the majority of schools.

The majority of schools that received computers cannot use them.

Schools received computers.

Page 20: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

EASTERN CAPE... FINDINGS WEAKNESSES STRENGTHS

The Dinaledi schools have not been very successful in serving as hubs of support and mentoring in mathematics and science for other schools.

In the rural schools, some Dinaledi schools have temporary teachers, and contracts are not renewed timeously.

•In urban areas, Dinaledi schools do play a mentoring role to their neighbouring schools in the implementation of MST.•To expand the support, the province further identified its own Dinaledi like schools.•There are Girls’ camps in the province.

Page 21: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FREE STATEFINDINGS WEAKNESSES STRENGTHS

Teachers are not competent to teach Mathematics and Physical Sciences

• Shortage of qualified teachers in Mathematics and Science subjects and most especially Technology.• Poor attendance of

teacher training sessions.

• Subject Advisors generally conduct the teacher development programmes, but the programmes are infrequent and short.• Private sector and the

University of Free State’s willingness to support education.

Unfavourable ratio of subject advisors to educators

• The Grade 8 and 9 teachers that are in High schools are ignored by Subject Advisors during the school visits

Subject advisors are provided with ICT resources to assist in curriculum delivery and they visit schools

Page 22: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

FREE STATE...FINDINGS WEAKNESSES STRENGTHS

No MST unit Lack of coordination of MST programmes

Teaching of Mathematics, Science and Technology subjects is not given proper attention

• Learners are encouraged to offer Mathematical Literacy with Physical Sciences• Insufficient time allocated

for Mathematics and Science subjects as per allocation in the CAPS• Education Resource

Centres not effectively utilised.

The schools draw good practices from each other through Cluster groups for information sharing and skills transfer.

Resources centres are used

Page 23: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

GAUTENGFINDINGS WEAKNESSES STRENGTHS

The MST strategy has not been widely communicated to all stakeholders.

Communication between provincial, district and school officials is problematic due to challenges in access to emails.

Schools are easily accessible due to the small geographic area of Gauteng.

Lack of availability of suitably qualified MST teachers , and teachers qualified in other disciplines are teaching MST subjects.

• Unions are preventing teachers from attending teacher training programmes in the afternoons and during school holidays.•Curriculum advisors only do book checks and in most instances are prevented from entering teachers classroom so quality of support is compromised.

Gauteng Online has provided good technology in the province but lack of teacher training results in non integration into the curriculum.

Page 24: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

GAUTENG...FINDINGS WEAKNESSES STRENGTHS

Sci-bono has responsibility for in-service teacher training, strategy and planning in the province.

•Curriculum Advisors lack technological equipment like laptops to adequately carry out their supportive and monitoring roles.•No dedicated unit that is driving MST in the department.•Some resentment amongst district officials towards Sci-Bono.

•Provisions have been made for curriculum advisors to have state subsidised cars to effectively support schools.•Overall best NSC results in 2012.

CAT , IT and Engineering subjects are offered only in a very few schools and it is not seen as part of the MST strategy.

•There are no textbooks for JAVA.•Many schools still lack laboratory equipment and other vital teaching resources.

In most instances schools have reasonable access to physical resources.

Page 25: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

KWA-ZULU NATALFINDINGS WEAKNESSES STRENGTHSCompeting priorities leads to officials ignoring the implementation of MST strategy.

•Role of Subject advisors need to be clarified. •Silos exist in the system.

•MST coordinators have a clear understanding of the MST Strategy and its requirements.•Subject Advisors have demonstrated strong commitment to achieving MST goals of the department.

Progress on MST implementation not known.

•Competency level of MST teachers are poor•Poor communication between Head Office and Districts regarding resources affects the utilization negatively.

Page 26: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

KWA-ZULU NATAL...FINDINGS WEAKNESSES STRENGTHS

Districts are not conversant with the MST strategy

•CAPS need to be supported at a school level with teacher development programmes.

•Principals and teachers are positive about the implementation of CAPS.•Teachers are reasonably satisfied with the workbooks, but they need to be reviewed.

There is lack of communication between provincial head office and districts

•Practical work in some schools is non-existent.•Switching of languages from Home language to English in Grade 4 impacts on the performance of Mathematics and Science.•Concentration on Dinaledi schools causes resentment in the fraternity because subject advisors should support all schools evenly.

•FET subjects advisors well qualified and skilled to successfully implement MST programmes.

•Subject Advisors are supporting schools

Page 27: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

LIMPOPOFINDINGS WEAKNESSES STRENGTHS

The number of learners taking mathematics and physical sciences has declined over the past three years.

Camps for girl learnersand talented learners advantage only a few.

Principals and teachers still discourage learners to take these subjects.

Many learners offer Mathematical Literacy rather than Mathematics.

Camps for girl learners and talented learners have been established.

Ineffective teaching takes place in schools

Some teachers do not stick to Pacesetters and subject advisors do not monitor optimal utilisation of pacesetters.

Pacesetters have beenprovided to teachers.

Page 28: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

LIMPOPOFINDINGS WEAKNESSES STRENGTHS

A shortage of primary school teachers qualified to teach mathematics, science and technology results

The shortage of qualified primary teachers

to teach MST results in a poor foundation being laid for Maths and Physical Sciences.

Time Table Charts were distributed to all primary schools.

No support to novice teachers.

No specific support is available to teachers entering the system for the first time.

Inadequately qualified teachers to teach Mathematics and Physical Sciences.

Little or no provision is available for teachers to improve their Qualifications.

Few teachers did ACEcourses (the last group completed ACE in Mathematical Literacy to address the shortage of qualified teachers for this subject)

Page 29: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

LIMPOPO......

FINDINGS WEAKNESSES STRENGTHS

Train teachers and subject advisors on pedagogical content knowledge.

A severe shortage of suitably qualified Mathematics and Physical Sciences teachers exists.

Lack of support to nonDinaledi schools owing to human resource and funding limitations.

Poor instructional leadership skills of school management teams. (SMT’s)

Support was providedTo the SMTs of Dinaledi schools, using conditional grant funding.

Provide resources to schools and facilitate the use of resource centres.

Science laboratories are often not available.

Teachers and curriculum advisors complain about the quality of the Siyavula textbooks.

• Resources such as DVDs for MST subjects and scientific calculators were made available to Dinaledi schools and Technical High Schools through a conditional grant.

Page 30: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

MPUMALANGAFINDINGS WEAKNESSES STRENGTHS

Insufficient capacity to manage a multitude of programmes reflected in their revised strategy.

Lack of competent subject advisors for both Maths and Physical Sciences. Lack of a coherent strategy to develop educators particularly in mathematics and science.

Subject advisory servicevisits schools periodically.

Poor ICT integration into teaching and learning.

Computers are not connected to networking nor to internet and not integrated to teaching.

A significant number of schools have computers.

A number of initiatives to improve performance in mathematics and science.

An extremely large percentage of time, energy and resources were spent on logistic.

Camps for girls were established to demystify MST subjects where 100 learners have been identified per district.

Page 31: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

MPUMALANGA...FINDINGS WEAKNESSES STRENGTHS

Shortage of competent and skilled mathematics and science educators.

• Lack of competent subject advisors for both Maths and Physical Sciences.• A delay in the renewal of

contracts for temporary teachers.• Teachers migration

impacts negatively.• lack of a coherent strategy

to develop educators particularly in mathematics and science.

• Content workshops are organised by the subject advisory once per term to workshop difficult topics.

Page 32: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

NORTHERN CAPE

32

FINDINGS WEAKNESSES STRENGTHS

•Teaching of mathematics, science and technology are not given proper attention.

• There are not enough technical teachers for the new CAPS curriculum.

• There is wide support for the expansion of support for technical subjects.

•Non alignment of the MST strategies.

•The provincial strategy does not align closely to the national strategy

• Few officials are aware of MST strategies.

•Lack of teacher competence.

•Teacher training by HEIs is seen as inadequate and sometimes not relevant to the needs of the schooling sector.

• There is wide support for the continuation of Technology as a GET subject.

•Poor ICT competence •Poor digital consciousness and attitudes in schools

• There has been great success in using digital content via laptops and data projectors in mathematics and science

Page 33: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

NORTH WESTFINDINGS WEAKNESSES STRENGTHSPoor communication regarding the MST strategy and support provided by the provincial officials

•There is a disconnect between schools and the District officials and Provincial officials. •Dinaledi schools not sharing information, knowledge or resources with neighbouring schools.

• Communication Technology are available to address problems especially related to collecting and disseminating information to teachers and schools.•Information and resources are available at Dinaledi schools

Shortage of qualified Mathematics, Science and Technology teachers

•Post Provisioning Model (PPM) allocations results in overload of teaching especially in small, rural and farm schools resulting in multi-grade and multi-subject teaching in a class which is far from ideal.•Temporary posts are left vacant until April due to delays at Provincial level.

•Private sector willingness to support education in the area.

Insufficient subject content and pedagogical support to teachers

Insufficient and ineffective support from subject and curriculum advisors.

Some support is provided to schools

Page 34: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

NORTH WEST…FINDINGS WEAKNESSES STRENGTHS

Shortage of physical resources

•Teacher Resource Centres (EDSC) are generally just physical buildings that may have ‘some computers’ but no viable programmes, software or resources. •Inadequate supply of Mathematics, Science and Technology resources in schools.

•Physical infrastructure to use as resources centres are available. •All schools to be provided with the approved Science kits.

Poor emphasis on Technology subjects

•A limited number of schools offering Technology subjects in the FET phase.•Lack of a MST Provincial Strategy and implementation plan to provide clear guidelines and targets to the District, Schools and teachers. •Lack of IT related hard and software resources and connectivity is a major challenge.

•Schools are offering Technology subjects

Page 35: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

WESTERN CAPEFINDINGS WEAKNESSES STRENGTHS

HODs and Subject Advisors are not competent in the subjects they are responsible for.

Lack of accountability in the system means no one is ever held responsible for poor results, poor staff performance or inadequate service delivery.

•There is a strong groundswell of positive attitudes to improving MST that is waiting for stronger leadership

District offices and schools are applying a ‘common sense’ approach to MSTE delivery and find CAPS sufficient for this purpose.

Teachers don’t know how to integrate ICT into the curriculum.

• The end of the Khanya project left schools with no resource, support or capacity to maintain ICT in schools.

• Teacher resource centres are not fully utilised.

• Dinaledi schools are well equipped.• The Khanya ICT project was a good start

and helped promote ICT use.• The Technical Recap programme is very

successful and useful.

Page 36: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

WESTERN CAPE...FINDINGS WEAKNESSES STRENGTHS

Rigorous support is needed in get

• The national and provincial strategies are not impacting on delivery and are not a reference point for curriculum delivery.• Language transition in

Grade 4 creates a problem.

HEIs are not preparing teachers for Technical Subjects

• Teacher training by HEIs is seen as inadequate and sometimes not relevant to the needs of the schooling sector.

There is wide support for the expansion of support for technical subjects

Page 37: MST REPORT AND IMPLEMENTATION PLAN NCF Meeting 22 August 2013 Mr HM Mweli.

THANK YOU

37