    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 1 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    AUTHORIZATIONANDRECORD

    R!. Ds"ri#tio$%r#&r' ()

    *Co$tr&"tor+

    R!i,' ()

    *Co$st&$t+

    A##ro!' ()

    */%+D&t

    1.1S"on/on#

    2.0S"on/on#

    I#ort&$t

    ' "n*o%a!"on on!a"n '%"n " !' %o%"!a%$ %o%!$ o* G%an#P%ana Sn. B'. ! 'all no! %%o&, o", %+al, &l"', o%"!%"&! "n 'ol o% a%!l$ "!'o&! a&!'o%"5a!"on.

    TA1LEOFCONTENTS

    Rf Ds"ri#tio$ %& No.

    1.0 NRDCN............................................................................................................

    2.0 SCPE / RS.......................................................................................................

    3.0 R SE:ENCE /;............................................................................................

    4.0

  • 7/23/2019 MSR Format.doc

    2/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 2 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    1.0 Introduction

    The purpose of this method statement is to describe and define the process

    flow for the installation of lifts.To ensure that the work is carried out in a

    controlled and systematic manner conforming to the specific requirements.

    2.0 Scope Of Work

    The works covers supply,install and commissioning of the lifts.All materials

    and works shall comply with the tender specifications,approved drawings and

    samples.

    !.0 Work Se"uence F#o$

    Kindly refer to A%%&'I (1)

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    3/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 3 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    *.0 Met+od St,teent

    ,ndin/ Oer of ift S+,ft() And ift M,c+ine Roo()

    Requirement for handing over the lift shaft(s for commencement of lift

    installation are as follows !"

    a #tages of floors to be handed over for lift installation shall be

    scheduled in accordance with T$#%&s programme and builder master

    work programme approved by 'am att #dn.%hd.

    b #caffolding to be erected in the lift shaft(s.

    c #eparator beams shall be installed if required.

    d )rotections shall be provided to prevent seepage of water into the lift

    shaft(s.

    e To remove all formworks, timbers, or steel bars sticking out along the

    internal shaft wall.

    f To clear all debris, water and unwanted material in the lift pit(s.

    g Kerbs shall be provided at every lift entrance to prevent water from

    flowing into the lift shaft(s.

    h Temporary power supply for lightings, power hand tools and light

    power machinery shall be provided.

    i *ift door opening, lift well entrance and trap door hole shall be

    protected at all time during construction.

    + A covered storage area at site will be allocated to lift equipment upon

    the delivery of equipment. All items shall be stacked up properly andin safest possible way during storage to keep away from rain and

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    4/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 4 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    ground dirt and electronic parts shall be protected from rain, dust and

    dirt before installation.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    5/29

  • 7/23/2019 MSR Format.doc

    6/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 6 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    *.0 Appro,# of %#uin/ Reu#t - Se"uence !

    The plumbing result of the lift shaft(s shall be submitted to $ain ontractor

    for approval before works can further proceed. $ain ontractor shall

    undertake to carry out shaft wall rectification works if any, after the approval

    of plumbing result.

    3.0 F,ric,tion of 4uide R,i# Br,cket - Se"uence *

    3uide rail brackets shall be custom made to meet the lift shaft(s conditions

    with the plumbing result approved by $ain ontractor.

    5.0 Int,## ,ndin/ oor Fr,e - Se"uence 3

    The landing door frame will be installed at position described in the plumbing

    result approved by $ain ontractor. %efore commencement of door frame

    installation, the $ain ontractor will provide inished loor *evel marked at

    the lift lobby area as well as the position for mounting of the landing board

    and indicator bo-es if required.

    6.0 Int,## S+,ft Wirin/ - Se"uence 5

    4lectrical trunkings and wirings will be installed along the shaft wall and on

    the lift motor"room floor. $aterial sample will be submitted for consultant

    approval. )ower cables will run in trunkings separate from that of control

    cables.

    7.0 Int,## M,c+ine Roo &"uipent - Se"uence 6

    )rovision of access must be made available for heavy lift equipment moving

    into the lift machine room. 5oisting of the lift machine and the controllers

    from the ground to the building roof is by means of tower crane. The hoisting

    machine weighs about 6788 kg and has to be lifted onto concrete plinths.

    5oisting hooks or beams shall be provided in the lift machine room as per

    T$#% drawings to facilitate the hoisting process.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    7/29

  • 7/23/2019 MSR Format.doc

    8/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 8 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11

    $ain ontractor will continue with his work to the lift lobby wall until the

    door frames. All gaps between frames and wall and between wall and

    indicatorbutton bo-es has to be sealed or cement filled by the $ain

    ontractor. All these are to be completed in shortest possible time to avoid

    interrupting of lift installation schedule.

    1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12

    T$#% will proceed with the installation of landing door panels after the

    completion of door frame in"fill by $ain ontractor.

    1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And

    &tc. - Se"uence 1!

    Assembly of lift car(s will be carried out at the lowest possible level such as

    the main level. $ain ontractor has to construct the buffer plinths in the lift

    pit(s prior to the assembly of car(s. ounter"weight frames and blocks will

    be assembled at the highest possible level of lift shaft(s. $achine room

    wiring will commence as soon as the equipment in the lift machine room is

    installed in position.

    13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*

    >nstallation of hoisting ropes shall commence as soon as the assembly of car

    and counter"weight are completed.

    15.0 ift Interior Fini+e - Se"uence 13

    At this time, the scaffolding in the hoist"way(s should be dismantled. The lift

    car(s should then be suspended via hoisting ropes and is able to move

    manually by means of winding the hoisting motor in the lift machine room.

    The interior finishes in the lift car shall commence before the testing andcommissioning of the lift(s.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    9/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 9 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11

    $ain ontractor will continue with his work to the lift lobby wall until the

    door frames. All gaps between frames and wall and between wall and

    indicatorbutton bo-es has to be sealed or cement filled by the $ain

    ontractor. All these are to be completed in shortest possible time to avoid

    interrupting of lift installation schedule.

    1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12

    T$#% will proceed with the installation of landing door panels after the

    completion of door frame in"fill by $ain ontractor.

    1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And

    &tc. - Se"uence 1!

    Assembly of lift car(s will be carried out at the lowest possible level such as

    the main level. $ain ontractor has to construct the buffer plinths in the lift

    pit(s prior to the assembly of car(s. ounter"weight frames and blocks will

    be assembled at the highest possible level of lift shaft(s. $achine room

    wiring will commence as soon as the equipment in the lift machine room is

    installed in position.

    13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*

    >nstallation of hoisting ropes shall commence as soon as the assembly of car

    and counter"weight are completed.

    15.0 ift Interior Fini+e - Se"uence 13

    At this time, the scaffolding in the hoist"way(s should be dismantled. The lift

    car(s should then be suspended via hoisting ropes and is able to move

    manually by means of winding the hoisting motor in the lift machine room.The interior finishes in the lift car shall commence before the testing and

    commissioning of the lift(s.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    10/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 10 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11

    $ain ontractor will continue with his work to the lift lobby wall until the

    door frames. All gaps between frames and wall and between wall and

    indicatorbutton bo-es has to be sealed or cement filled by the $ain

    ontractor. All these are to be completed in shortest possible time to avoid

    interrupting of lift installation schedule.

    1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12

    T$#% will proceed with the installation of landing door panels after thecompletion of door frame in"fill by $ain ontractor.

    1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And

    &tc. - Se"uence 1!

    Assembly of lift car(s will be carried out at the lowest possible level such as

    the main level. $ain ontractor has to construct the buffer plinths in the lift

    pit(s prior to the assembly of car(s. ounter"weight frames and blocks will

    be assembled at the highest possible level of lift shaft(s. $achine room

    wiring will commence as soon as the equipment in the lift machine room is

    installed in position.

    13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*

    >nstallation of hoisting ropes shall commence as soon as the assembly of car

    and counter"weight are completed.

    15.0 ift Interior Fini+e - Se"uence 13

    At this time, the scaffolding in the hoist"way(s should be dismantled. The lift

    car(s should then be suspended via hoisting ropes and is able to movemanually by means of winding the hoisting motor in the lift machine room.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    11/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 11 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    The interior finishes in the lift car shall commence before the testing and

    commissioning of the lift(s.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    12/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 12 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    3.0 M,teri,#

    *ift ar, *ift #haft, 3uide Rail %rackets, *anding ?oor rames, *anding ?oor

    )anels, onduits, Trunking, #haft :iring, %uffers, :hisperfle-,

    *anding %oard, *anding >ndicator,

  • 7/23/2019 MSR Format.doc

    13/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 13 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    7.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,

    and to protect from foreseeable ha@ards the )ublic insofar as they come into

    contact with the ompany and its products. All persons in a supervisory position

    are directly responsible for safe methods of conditions of working in their areaof responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    14/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 14 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    8.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,

    and to protect from foreseeable ha@ards the )ublic insofar as they come intocontact with the ompany and its products. All persons in a supervisory position

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    15/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 1> o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    are directly responsible for safe methods of conditions of working in their area

    of responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    16/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 16 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    10.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,

    and to protect from foreseeable ha@ards the )ublic insofar as they come into

    contact with the ompany and its products. All persons in a supervisory position

    are directly responsible for safe methods of conditions of working in their areaof responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    17/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 17 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    11.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,

    and to protect from foreseeable ha@ards the )ublic insofar as they come intocontact with the ompany and its products. All persons in a supervisory position

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    18/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 18 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    are directly responsible for safe methods of conditions of working in their area

    of responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    19/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 19 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    12.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,

    and to protect from foreseeable ha@ards the )ublic insofar as they come into

    contact with the ompany and its products. All persons in a supervisory position

    are directly responsible for safe methods of conditions of working in their areaof responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    20/29

  • 7/23/2019 MSR Format.doc

    21/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 21 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    are directly responsible for safe methods of conditions of working in their area

    of responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    22/29

  • 7/23/2019 MSR Format.doc

    23/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 23 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    13.0 S,fet: < &nironent

    Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached

    ompany #afety )olicy document.

    These are set out under the following headings

    a %,rt I " The general policy of the company towards safety.

    b %,rt II" The general safety regulations enforced by the company.

    c %,rt III" The organi@ation and method of implementation of the policy.

    COM%A'> SAF&T> %OIC>

    %,rt I

    4ener,# St,teent

    6 The board of ?irectors of this company and > regards the promotion, of 5ealth

    and #afety at work as an essential ob+ective for $anagement and 4mployees at

    all levels.

    / The ompany is ultimately accountable for implementing #afety and 5ealth

    legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this

    respect, it will abide by any odes of practice approved and issued by the #afety

    and 5ealth Authority. The ompany will do all that is practicable to ensure safe

    methods of working and safer conditions of working throughout the company,and to protect from foreseeable ha@ards the )ublic insofar as they come into

    contact with the ompany and its products. All persons in a supervisory position

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    24/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 24 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    are directly responsible for safe methods of conditions of working in their area

    of responsibility.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    25/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 2> o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    :orks $aintenance 4ngineer

    The :orks $aintenance 4ngineer is responsible for the regular e-amination of

    ladders, cranes, power presses, lifting tackle, machine safety devices and

    guards, electrical apparatus, plant and building repair and maintenance. Any

    defective equipment, plant or machine will be withdrawn from use until

    rectified.

    #afety Representative

    )urpose

    >n accordance with ompanies #afety = 5ealth )olicy, safety representative

    will be elected. 4ach representative will be consulted with a view to making and

    maintaining arrangements, which will enable him and employees represented, to

    co"operate effectively in prompting and developing measures to ensure the

    safety and health at work of all employees and checking the effectiveness of

    such measures.

    The appointed #afety Representative will spend as much time as is necessary

    with the agreement of management dealing with matters relating to 5ealth and

    #afety of employees at work in hisher area. This will include dealing with

    matters referred to himher by the employees.

    The person will also be involved in!

    (a A progressive identification of all ha@ards involving in+ury andor damage

    potential in con+unction with a member of $anagement.

    (b The compilation and implementation of odes of #afe :orking )ractices

    and onduct, based on identifiable ha@ards.

    (c )romoting safe working practices among employees.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    26/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 26 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    (d The investigation of accidents, whenever necessary and in con+unction

    with $anagement.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    27/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 27 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    :orks $aintenance 4ngineer

    The :orks $aintenance 4ngineer is responsible for the regular e-amination of

    ladders, cranes, power presses, lifting tackle, machine safety devices and

    guards, electrical apparatus, plant and building repair and maintenance. Any

    defective equipment, plant or machine will be withdrawn from use until

    rectified.

    #afety Representative

    )urpose

    >n accordance with ompanies #afety = 5ealth )olicy, safety representativewill be elected. 4ach representative will be consulted with a view to making and

    maintaining arrangements, which will enable him and employees represented, to

    co"operate effectively in prompting and developing measures to ensure the

    safety and health at work of all employees and checking the effectiveness of

    such measures.

    The appointed #afety Representative will spend as much time as is necessary

    with the agreement of management dealing with matters relating to 5ealth and

    #afety of employees at work in hisher area. This will include dealing with

    matters referred to himher by the employees.

    The person will also be involved in!

    (a A progressive identification of all ha@ards involving in+ury andor damage

    potential in con+unction with a member of $anagement.

    (b The compilation and implementation of odes of #afe :orking )ractices

    and onduct, based on identifiable ha@ards.

    (c )romoting safe working practices among employees.

    (d The investigation of accidents, whenever necessary and in con+unction

    with $anagement.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    28/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 28 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    :orks $aintenance 4ngineer

    The :orks $aintenance 4ngineer is responsible for the regular e-amination of

    ladders, cranes, power presses, lifting tackle, machine safety devices and

    guards, electrical apparatus, plant and building repair and maintenance. Any

    defective equipment, plant or machine will be withdrawn from use until

    rectified.

    #afety Representative

    )urpose

    >n accordance with ompanies #afety = 5ealth )olicy, safety representative

    will be elected. 4ach representative will be consulted with a view to making and

    maintaining arrangements, which will enable him and employees represented, to

    co"operate effectively in prompting and developing measures to ensure the

    safety and health at work of all employees and checking the effectiveness of

    such measures.

    The appointed #afety Representative will spend as much time as is necessary

    with the agreement of management dealing with matters relating to 5ealth and

    #afety of employees at work in hisher area. This will include dealing with

    matters referred to himher by the employees.

    The person will also be involved in!

    (a A progressive identification of all ha@ards involving in+ury andor damage

    potential in con+unction with a member of $anagement.

    (b The compilation and implementation of odes of #afe :orking )ractices

    and onduct, based on identifiable ha@ards.

    (c )romoting safe working practices among employees.

    MSR FORMAT CM-MSR-01 (B)

  • 7/23/2019 MSR Format.doc

    29/29

    METHOD STATEMENT

    GERBANG PERDANA S B(RoC No. 469478-X)

    No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an

    For Lift Works

    Pa# No. 29 o* 21

    R+""on No. 2.0

    & 7.6.04

    MSR-CIQ02-M-032-R2.0

    (d The investigation of accidents, whenever necessary and in con+unction

    with $anagement.