    University of

    Karachi

    CONCEPT PAPER

    Online ExaminationSystem

  • 7/29/2019 MS swami

    2/11

    INTRODCUTION

    At University of Karachi (Department of Computer Science) out team wants to

    organize online examination test. The purpose of on-line test simulator is to take

    online test in an efficient manner and no time wasting for checking the paper. The

    main objective of on-line test simulator is to efficiently evaluate the candidate

    thoroughly through a fully automated system that not only saves lot of time but also

    gives fast results. For students they give papers according to their convenience and

    time and there is no need of using extra thing like paper, pen etc. The project

    proposed here is designed to expand the efforts in a more coordinated manner. The

    hope is that we can develop a campus-wide, secure, web-based system that will make

    the process of examination more efficient and secure.

    PURPOSE

    This Web Application provides facility to conduct online

    examination world-wide.

    It saves time as it allows number of students to give the exam at a

    time and displays the results as the test gets over, so no need to

    wait for the result. It is automatically generated by the server. Administrator has a privilege to create, modify and delete the test

    papers and its particular questions.

    User can register, login and give the test with his specific id, and

    can see the results as well.

    SCOPEScope of this project is very broad in terms of other manually taking exams.

    Few of them are:-

    This can be used in educational institutions as well as in corporate

    world.

    Can be used anywhere any time as it is a web based application.

    User Location doesnt matter).

    No restriction that examiner has to be present when the candidate takes the

    test.

    FEATURES Secure Easy to use

  • 7/29/2019 MS swami

    3/11

    Reliable and accurate

    No need of examiner

    Technologies usedThis project is a web application that is developed in ASP.NET

    having DB2 as back end.

    1. Database Design (SQL server)

    2. Input Design (ASP.NET)

    3. Coding (C #)

    Feasibility StudyWhat are the users demonstrable needs?

    User needs a web-based system, which will remove all the above-mentioned

    Problems that, the user is facing. The user wants a web-based system, which

    will reduce the bulk of paperwork, provide ease of work, flexibility, fast

    record finding, modifying, adding, removing and generating the reports.

    How can the problem be redefined?

    We proposed our perception of the system, in accordance with the problems

    of existing system by making a full layout of the system on paper. We talliedthe problems and needs by existing system and requirements. We were further

    updating in the layout in the basis of redefined the problems. In feasibility

    study phase we had undergone through various steps, which are described as

    under:

    How feasible is the system proposed? This was analyzed by comparing the

    following

    factors with both the existing system and proposed system.

    CostThe cost required in the proposed system is comparatively less to the existing

    system.

    EffortCompared to the existing system the proposed system will provide a better

    working environment in which their will be ease of work and the effort

    required will be comparatively less than the existing system

  • 7/29/2019 MS swami

    4/11

    Time

    Also the time required generating a report or for doing any other work will be

    comparatively very less than in the existing system. Record finding and

    updating will take less time than the existing system.

    Labor

    In the existing system the number of staff required for completing the work is

    more while the new system will require quite less number of staff.

    Specification Report

    System Interface

    Application would be a self-contained system. It will not

    access data of any

    other application nor will other application have access to its

    data.

    User Interface

    Application will be accessed through a Browser Interface. The interface

    Would be viewed best using 1024 x 768 and 800 x 600 pixels resolution

    Setting. The software would be fully compatible with Microsoft Internet

    Explorer 9 and Chrome, Safari etc. No user would be able to access any part

    of the application without logging on to the system.

  • 7/29/2019 MS swami

    5/11

  • 7/29/2019 MS swami

    6/11

    Time Line

    We will maintain the projects every talk in milestones. There are the following

    phases which would be documented as they are being completed.

    In the first step we acquire both functional and non-functional requirements

    from user and system developers.

    After completing the requirement model analyzing of the project would be

    started. In this phase the technology, the team, environment would be selected.

    Development would be started then.

    Testing period, and at last the deliverable of the project would be submitted to

    client.

    Every team member would work parallel, and provide each of their milestone to

    make update the project.

    Anticipated Outcomes

    These are the following anticipated outcomes

    This MIS will help to manage information more accurately.

    It will increase maintainability of information.

    It will provide user to attend his own exam seperatly. Teacher would have facility to check these papers, through computer.

    Application would facilitate students, teachers both.

    The use of invigilator wouldnt require.

    COST

    The cost of the project would be dependent on futures rates in industry. The

    application would be given a cost after suggesting the cost of developers and other

    staff members.

    CONTACT INFO:

    ABC technologiesKarachi.Pakistan.www.ABC.com.

  • 7/29/2019 MS swami

    7/11

    University of

    Karachi

    Project Plan

  • 7/29/2019 MS swami

    8/11

    Online Examination

    SystemProject Information

    Project name : Online Examination SystemTimeline: 15/3/2012 to 30/6/2012

    Summary:

    The Online Examination System allows institutes to get exams through the web andcandidates need not to appear physically. Candidates are required to visit the online

    examination system throw website of the institute.

    PROJECT METHODOLGIES

    Project Management Approach

    The project shall be managed according to five principles of productivitymanagement, as follows:

    The project components are modularized.

    Each task is defined in detail.

    Correct resources, including personnel, are identified and committed.

    Time needed for each task and the whole project is estimated.

    A procedure is set up for changes to the project plan.

    There is a general agreement on evaluation criteria.

    PROJECT TEAMDevelopment team

    The development team will consist of.

    o Project Managers.

    o Team lead.

    o Developers.

    o Designers.

    o Technical assistant. (University).

  • 7/29/2019 MS swami

    9/11

    Change Control Board (CCB) The change control board consist of following stakeholders of the project:

    o Project Managers.

    o Team lead.

    o Designer.o Technical assistant (university).

    o Management Head (university).

    Work Breakdown Structure

    Evaluationandrecommendat

    ion1.1.1

    Online

    ExaminationSystem

    Final1.5

    Control1.4

    Execution1.3

    Planning1.2

    Initiation1.1

    DevelopProjectproposal1.1.2

    Reviewproposal1.1.4

    Submitproposal1.1.3

    Designsystem1.3.3

    CreateScopestmt1.2.1

    DetermineProjectteam1.2.2

    Projectmeeting

    1.2.3

    Develop plan1.2.4

    PlanApproved1.2.6

    Submitplan1.2.5

    Startoffmeetin

    g1.3.1

    Verify andValidate1.3.2

    Procurehardwareandsoftware1.3.4

    Installsystem1.3.5

    Testing1.3.6

    ProjectMgmt

    1.4.1

    ProjectStatusmeetings1.4.2

    Riskmgmt1.4.3

    UpdateProj- -ectMgt plan1.4.4

    AuditDocument1.5.1

    Install livesystem1.3.7

    Approveproposal1.1.5

    User training1.3.8

    Go live1.3.9

    DocumentLessonsLearned1.5.2

    UpdateFile/Records

    1.5.3

    GoingformalAcceptance1.5.4

    Archivefiles/document1.5.5

  • 7/29/2019 MS swami

    10/11

    DELIVERABLES

    Risk factors

    Organizational constraints.o The people working at examination department dont want this system

    because of their job security.

    o Risk status: Amber

    Budget:

    This may be the problem if administration changed and they reduce the

    budget during the project

    Risk Status: Red.

    Natural disaster occurs during the project.

    Risk Status: Green.

    Deliverable Name Description Deliverable Date

    Online Examinationsystem

    Website up gradation to

    handle online admission

    request from users

    15-5-2012

    Customize guide A technical guide for non-

    technical and end-users 25-5-2012

    Online help Setup of online help for

    new users 5-6-2012

    Configuration tool and

    report generator

    Tool for report generation

    and configuration 20-6-2012

    Administration plan A plan for administration

    and

    Maintenance

    25-6-2012

  • 7/29/2019 MS swami

    11/11

    How we avoid or mitigate this risk factors

    Organizational constraint

    It can be removed if the management is powerful who is giving the order for

    the project and have the power to implement the without taking care what the

    employees think about the project as compare to what is better for the

    organization.

    Budget:

    It most likely come in government organization because they normally

    reversed the projects of their predecessors one so to avoid it a signed

    undertaken by all stakeholders that the project funding never stops what so

    ever.

    Natural Disaster:

    The chances of this are very rare but it is quite impossible to avoid instead of

    creating a backup project plan and choosing the place for the project which is

    less susceptible to natural disaster