MIDDLE SCHOOL RENOVATION
WEEKLY PROGRESSJULY 12 - 16
7/12/10
ADAPTIVE GYM ENTRANCE GYM WALL IN PROGRESS
7/12/10GYM WALL IN PROGRESS
7/12/10D-POD DRYWALL
7/12/10LIBRARY 2ND FLOOR WALL STUDS
FOR NEW CLASSROOMS
7/14/10GYM WALL IN PROGRESS
7/14/10A-POD 1ST FLOOR WALL
PAINTING STARTED
7/14/10D-POD 2ND FLOOR SPACKLING OF
DRYWALL AND DOOR FRAMES INSTALLED
7/14/10E-POD 2ND FLOOR MORE
INSULATION DONE
7/14/10E-POD 2ND FLOOR
7/14/10LARGE GROUP ROOM WALL
STUDS FOR NEW CLASSROOMS
7/16/10CAFÉ PAINTED
7/16/10ENTRANCE TO NEW SUPPLY ROOM
7/16/10
D-POD DRYWALL SPACKLED
F-POD DRYWALL SPACKLED
7/16/10E-POD DRYWALL IN PROGRESS
7/16/10
ENTRANCE TO ADAPTIVE GYM
ENTRANCES TO GYM AND ADAPTIVE GYM
7/16/10GYM WALL COMPLETED
7/16/10OFFICE PAINTING IN PROGRESS