Transcript of MS Projects Day 3 Final
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 1/126
Click to edit Master subtitle style
Computer based Project ManagementUsing MS Project 2010
Training program on
Day 3
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 2/126
Click to edit Master subtitle style
Tasks Dependencies
A task dependency is the relationship between two tasks, in which the start or finish date of one task depends on the start or finish date of another. The task
whose start or finish date depends on another task is called the successor. Thetask that the successor is dependent upon is the predecessor. The mostcommon task dependency is a finish-to-start dependency. In this type of dependency, the second task in the relationship starts when the first task isfinished.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 4/126
Click to edit Master subtitle style
Lead and lag time
Overlapping linked tasks means that you want the successor task to begin beforethe predecessor task ends. Therefore, you give the successor task lead time. Leadtime can be entered as a duration. When you are entering lead time for a task,make sure it is a negative (-) value.
Working with lag time is like working with lead time, except that lag time is apositive value. It can be entered as a duration.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 5/126
Click to edit Master subtitle style
WBS Coding
WBS codes provide a way to number tasks in a project; the structure of the WBScode helps the reader identify the phase of the project in which the task occurs.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 6/126
Click to edit Master subtitle style
Task Constraints
Every task you enter into Project has some type of constraint applied to it. Aconstraint controls the start or finish date of a task and the degree to which that
task can be rescheduled. There are three categories of constraints:
Flexible constraints
Inflexible constraints Semi-flexible constraints
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 7/126
Click to edit Master subtitle style
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 9/126
Click to edit Master subtitle style
Adjusting Working Time for Individual Tasks
By default, your tasks are scheduled according to your Project Calendar. Butif a certain task needs to be done using a different calendar schedule, youcan assign a different calendar to the task.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 10/126
Options
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 11/126
Help
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 12/126
Click to edit Master subtitle style
Views
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 13/126
Click to edit Master subtitle style
Using Split Views
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 14/126
Click to edit Master subtitle style
Sorting Project Details
Tasks and resources appear in ID-number order in Project by default. However,you can change this by sorting them; sorting lets you rearrange the order in which
tasks and resources appear.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 15/126
Click to edit Master subtitle style
Grouping Project Details
Now we will concentrate on grouping. Grouping is a handy organizational tool,allowing you to focus on a variety of project angles. You can group tasks and
resources the same way.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 16/126
Click to edit Master subtitle style
Filtering Project Details
By filtering a list, you display only the records that meet your criteria, and hidethe records that do not. There are several ways to filter your lists.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 17/126
Viewing Details
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 18/126
Using Zoom
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 19/126
Using View Bar
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 20/126
Building the Network
• AOA Network
• AON Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 21/126
A Sample Set of Project Activitiesand Precedences
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 22/126
Stage 1 of a Sample AONnetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 23/126
Stage 2 of a Sample AONNetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 24/126
A Completed Sample AONNetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 25/126
Stage 1 of a Sample AOA
Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 26/126
Stage 2 of a Sample AOANetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 27/126
A Completed Sample AOANetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 28/126
A Completed Sample AOA NetworkShowing the Use of a Dummy Task
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 29/126
A Sample Problem for Finding theCritical Path and Critical Time
Activity Predecessor Duration
a -- 5 days
b -- 4
c a 3
d a 4
e a 6
f b, c 4
g d 5
h d, e 6
i f 6
j g, h 4
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 30/126
Stage 1 of a Sample Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 31/126
A Complete Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 32/126
Information Contents in an
AON Node
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 33/126
Forward Pass
Begin at starting event and work forward
Earliest Start Time Rule:
þ
If an activity has only a single immediate predecessor, itsES equals the EF of the predecessor þ If an activity has multiple immediate predecessors, its ES is
the maximum of all the EF values of its predecessors
ES = Max {EF of all immediate predecessors}
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 34/126
Forward Pass
Begin at starting event and work forward
Earliest Finish Time Rule:
þ
The earliest finish time (EF) of an activity is the sum of itsearliest start time (ES) and its activity time
EF = ES + Activity time
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 35/126
Backward Pass
Begin with the last event and work backwards
Latest Finish Time Rule:
þ
If an activity is an immediate predecessor for just a singleactivity, its LF equals the LS of the activity that immediatelyfollows it
þ If an activity is an immediate predecessor to more than oneactivity, its LF is the minimum of all LS values of all activitiesthat immediately follow it
LF = Min {LS of all immediate following activities}
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 36/126
Backward Pass
Begin with the last event and work backwards
Latest Start Time Rule:
þ
The latest start time (LS) of an activity is the difference of itslatest finish time (LF) and its activity time
LS = LF – Activity time
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 37/126
The Critical Path and Time for
Sample Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 38/126
Calculating Activity Slack
• Slack or FloatLST - EST = LFT - EFT = Slack
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 39/126
An MSP Version of
PERT/CPM Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 40/126
A Modified Version of MSPNetwork
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 41/126
Click to edit Master subtitle style
Resources
Wh t i R ?
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 42/126
What is a Resource?
Costs in a Project are associated with resources.If you want to account for costs in your project, you have to create resourcesand assign them to the tasks.When you do, you can see the resulting costs in the Total Cost column of theGantt Chart spreadsheet.
You can create resources with no associated costs. You might do that so
you can track only that resource’s time. Some people use Project strictly asa scheduling tool, so watching the time people are spending on tasks is their only interest, not what the time is costing. If you don’t assign costs toresources, you get no cost or budget information back from Project.
Fixed costs aren’t assigned through resources because they don’t accumulatecosts by time of work or units used. A fixed cost is a set cost applied directly toindividual tasks.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 43/126
Types of Resources
Project works with three types of resources:Work, Material, and Cost resources
Work resources are typically (but not always) people. They can’t bedepleted but can be reassigned. Their costs are associated with theamount of work time they put in, usually at an hourly rate or a cost per use.Work resources are assigned to tasks based on a Working Time calendar,where you specify their working and nonworking hours.
Material resources can have an hourly rate or a unit cost, and they alsohave an unlimited working time. This type of resource has no calendar, noovertime, and you make no settings for working and nonworking time.
Cost resources have a set cost associated with them. Calendars andunits of work or unit costs have nothing to do with the amount suchresources deduct from the bottom line of your project.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 44/126
Click to edit Master subtitle style
Setting Up People Resources
Once you have created a task list for your project, the next step is to create aresource list.
Work resources are the people and equipment that do the work of the project.
The easiest way to enter resources in a project is to use the Resource Sheet.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 45/126
Resource Name: Type the name of the resource. For a person, you can type the
person’s name or you can type a job description, such as Product Analyst 1 or
Product Analyst 2.
Type: Use this column to specify whether you’re defining a human, material, or cost
resource. Project refers to human resources as Work.
Material Label: For material resources, specify the unit of measure. You can set up
any label that you want. For example, you can use minutes for long distance, feet
for lumber, or miles for gasoline.
Initials: Type initials for the resource, or accept the default that Project provides,
which is the first letter of the resource name. This designation appears on any view
to which you add the Initials field. Typically, a resource’s name appears, but you
can customize the view to display initials if you prefer.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 46/126
Group: Assign resources to groups if they share some common characteristic,
such as job function. Then you can use this field as a filtering or sorting
mechanism and display information about the group (a particular job function) as
opposed to a specific resource. Just type a name to create a group.
Max. Units: Project expresses the amount of the work resource that you have
available for assignment as a percentage. For example, 100 percent equals one
unit, or the equivalent of one full-time resource; 50 percent equals one-half of a
unit, or one-half of a fulltime resource’s time; and 200 percent equals two full-timeresources.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 47/126
Std. Rate: The standard rate is the rate that you charge for regular work for a
resource. Project calculates the default rate in hours. However, you can charge a
resource’s work in other time increments. (For work resources, you can use minutes,days, weeks, months, or years. For material resources, think of the charge as per
unit based on the Material Label.) To specify a time increment other than hours, type
a forward slash and then the first letter of the word representing the time increment.
For example, to charge a resource’s use in days, type /d after the rate that you
specify.Ovt. Rate: The overtime rate is the rate that you charge for overtime work for a work
resource. Again, Project calculates the default rate in hours, but you can change the
default unit the same way that you changed it for the standard rate.
Cost/Use: In the Cost/Use column supply a rate for costs that are charged for
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 48/126
Cost/Use: In the Cost/Use column, supply a rate for costs that are charged for
each use of the resource. Resource costs may be based on the Standard rate
(which is calculated by multiplying the number of hours times the cost per hour),
the Cost/Use rate (a fixed fee for use of the resource), or a combination of the
two. Project uses a combination of the Cost/Use field and the Std. Rate field when
calculating the cost of a task. If you rented a piece of equipment that costs youRs.250/hour plus a setup charge of Rs10,000, you would assign a Std. Rate of
Rs.250/hour and a Cost/Use of Rs.10,000.
Accrue At: This field specifies how and when Microsoft Project charges resource
costs to a task at the standard or overtime rates. The default option is Prorated,
but you also can select Start or End. The three are described as follows:
If you select Start and assign that resource to a task, Project calculates the
cost for a task as soon as the task begins.
If you select End and assign that resource to a task, Project calculates the
cost for the task when the task is completed.
If you select Prorated and assign that resource to a task, Project accrues
the cost of the task as you complete scheduled work.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 49/126
Base Calendar : Base calendar identifies the calendar that Project should use
when scheduling the resource. The calendar identifies working and nonworking
time. Project assumes that each resource uses the Standard calendar, but as youread later in this chapter, you can create calendars for resource groups (perhaps
to handle shift work) or you can modify an individual resource’s calendar to reflect
vacation or other unavailable time (such as jury duty).
Code: You can use this field as a catchall field to assign any information that you
want to a resource, using an abbreviation of some sort. For example, suppose
that your company uses cost-center codes. You may want to supply the cost-
center code for the resource in the Code field. You can sort and filter information
by the abbreviations that you supply in the Code field.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 50/126
Click to edit Master subtitle style
Setting Up Equipment Resources
Equipment resources are also work resources, but they are different frompeople resources in the way they are used and scheduled. People generally
have a set number of working hours that they will contribute to a task eachday. But pieces of equipment don't really have a schedule: they can workaround the clock if it's needed.You don't have to track every piece of equipment that is used in the project,but you should keep track of equipment that accumulates cost or that isshared.
S tti U M t i l R
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 51/126
Click to edit Master subtitle style
Setting Up Material Resources
Material resources are the goods needed by work resources to complete tasks.Tracking the use of material resources helps track the rate at which theresources are used, as well as their costs. This is especially applicable in
building and construction projects that use a lot of materials, such as cement,steel etc.
Setting Up Cost Resources
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 52/126
Click to edit Master subtitle style
Setting Up Cost Resources
You can use a cost resource to represent a financial cost associated with atask in a project. Common types of cost resources might include categories of
expenses you’d want to track on a project for accounting purposes such astravel, entertainment, or training. Like material resources, cost resources do nowork and have no effect on the scheduling of a task. However, after you assigna cost resource to a task and specify the cost amount per task, you can thensee the cumulative costs for that type of cost resource, such as total travelcosts in a project.
R I f ti di l
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 53/126
Resource Information dialogbox
This section discusses the fields in the dialog box that
didn’t appear by default on the Entry table of theResource Sheet.
Adjusting Working Time for Individual Resources
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 54/126
Click to edit Master subtitle style
Adjusting Working Time for Individual Resources
A resource calendar controls the working and nonworking times of a resource.Project uses resource calendars to determine when work for a specificresource can be scheduled. Resource calendars apply only to work resources
(people and equipment) and not to material or cost resources.
Setting Up Resource Availability to Apply at Different Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 55/126
Click to edit Master subtitle style
Setting Up Resource Availability to Apply at Different Times
One of the values that Project stores for each work resource is the resource’s Max.Units value. This is the maximum capacity of a resource to accomplish tasks. Aresource’s working time settings (recorded in the individual resource calendars)
determine when work assigned to a resource can be scheduled. However, theresource’s capacity to work (measured in units and limited by the resource’s Max.Units value) determines the extent to which the resource can work within thosehours without becoming over allocated.
You can specify that different Max. Unitsvalues be applied at different time periods for any resource. Setting a resource’s availabilityover time enables you to control exactly whata resource’s Max. Units value is at any time.
You set resource availability over time in theResource Availability grid on the General tabof the Resource Information dialog box.
Booking
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 56/126
BookingtypeYou can specify a booking type for a resource assignment. Booking types are
most useful in the Enterprise environment, where you are utilizing theEnterprise Resource Pool.The Booking Type field offers you two choices: Committed and Proposed.When you commit a resource, you are officially assigning the resource to theproject. When you propose to use a resource, you are indicating that theresource is not yet officially assigned to the project, which essentially leaves theresource’s calendar untouched by the proposed assignment to your project. Another project manager could commit the resource to a different project for the same time frame, and Microsoft Project will not identify the resource asbeing overallocated. Project does not consider proposed bookings whencalculating resource allocation.The Booking type that you choose for a resource applies to all tasks inyour project to which you assign the resource.
G i
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 57/126
GenericResourceGeneric Resources — resources (as defined by you) that aren’t specificpeople, equipment, or materials, but rather descriptions of the skills that youneed for a task when you don’t know what specific resources are available.
To mark a resource as generic, place a check mark in the Generic box on theGeneral tab of the Resource Information dialog box. Your company may haveset up custom fields in Project that apply to your generic resource. To assignthe appropriate custom fields, click the Custom Fields tab and assign any
appropriate values to your genericresource.
Budget
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 58/126
BudgetResourceBudget resources give you the opportunity to specify how work or costs will beallocated during the project. Suppose, for example, that you want to budget for
the cost of a storage unit required during the life of your project. You wouldcreate a resource for the storage unit, setting its type as Cost, and then checkthe Budget check box on the General tab of the Resource Information dialogbox to make it a budget resource.
Project doesn’t allow you to enter any cost information for a budget resource onthe Resource Sheet. To assign a value to the budget resource, you first assignit to the project summary task—and Project won’t let you assign a value as youassign the budget resource. Then, you supply a value by adding the BudgetCost field to the table in the Task Usage view or the Resource Usage view.
Budget
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 59/126
You also can set up a work budget resource that you can use to budget for thenumber of hours of work you intend to perform for the entire project. You then
assign the work budget resource to the project summary task. To record thenumber of hours of work you want to budget for the entire project, add theBudget Work field to the Task Usage view or the Resource Usage view andenter your budget value. As you track the work for your project’s tasks, youcan compare the work performed with the budgeted work.
…… BudgetResource
Resources that work in groups
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 60/126
Resources that work in groups
Although you can't assign a group of resources to a single task, it is helpful toorganize resources into logical groups for organizational purposes. Grouping
allows you to view how resources are related, similar to outlining the task list.
Assigning Resources to Tasks
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 61/126
Click to edit Master subtitle style
Assigning Resources to Tasks
Matching up tasks and resources to do work is called an assignment. Assignments enable your project to move forward and make progress.Technically, you could complete a project without any resources, but resource
assignments help you find out valuable information:
Assigning Equipment Resources to a Task
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 62/126
Click to edit Master subtitle style
Assigning Equipment Resources to a Task
Assigning Material Resources to Tasks
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 63/126
Click to edit Master subtitle style
Assigning Material Resources to Tasks
Assigning Cost Resources to Tasks
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 64/126
Click to edit Master subtitle style
Assigning Cost Resources to Tasks
Assigning a fixed cost to a task
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 65/126
Click to edit Master subtitle style
Assigning a fixed cost to a task
Some tasks are fixed-cost tasks, that is, you know that the cost of a particular taskstays the same regardless of the duration of the task or the work performed by
any resources on the task.To assign a fixed cost to a task, use the Gantt Chart view and apply the Costtable. Follow these steps:1. Use the View bar or the View menu to switch to the Gantt Chart view.2. Choose View Table: Entry Cost to switch to the Cost table view of the Gantt
Chart,
3. Select the task to which you want to assign a fixed cost.4. Type the cost for that task in the Fixed Cost column and press Enter.
You can control the way that Project accrues the fixed cost for a task from theFixed Cost Accrual column. Your choices are Start, Prorated, and End. You can assign more than one fixed cost as well as variable costs to a task.
Assigning a fixed resource cost to a task
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 66/126
Assigning a fixed resource cost to a task
Set up the resource in the Resource Sheet view. If the resource has somesort of “per unit” cost (an hourly or daily rate), assign that rate in the Std.Rate field. Otherwise, assign a standard rate of Rs.0.
Supply the fixed-cost amount in the Cost/Use field.
Assigning a budget resource
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 67/126
Assigning a budget resource
To assign a budget resource to your project, you must first display the projectsummary task. Choose Tools Options and click the View tab. Place a check
in the Show Project Summary Task check box. When you click OK, the firsttask in your project bears the filename of the project.Click the project summary task and then choose Tools Assign Resources to
open the Assign Resources dialog box. Click the budget resource and click Assign. Project places a check in the leftmost column beside the resource toindicate that the resource is assigned to the selected task. You cannot assignany value to the budget resource at this point, so click Close.
To assign a value to a budget resource, switch to the Task Usage or theResource Usage view; in, I’m using the Task Usage view. To add the budgetresource value on a specific day, add the Budget Cost or Budget Work fieldsto the Details section of the view and enter the budget value. To add thebudget resource value to the project, regardless of the timeframe, add theBudget Cost and Budget Work fields to the table portion of the view and enter
the budget value.
Getting help while selecting resources to assign
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 68/126
g p g g
You may have noticed a plus sign (+) next to Resource
List options at the top. If you click the plus sign, the boxexpands, to provide you with ways to make selectingresources easier.
Removing or replacing a resource assignment
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 69/126
Removing or replacing a resource assignment
To remove a resource assignment, select the task from which you want to
remove the resource assignment using the Gantt Chart view. Then click the Assign Resources button or choose
Tools Assign Resources
to display the Assign Resources dialog box. Highlight the resourcethat you want to remove from the task. You should see a check mark next tothe resource in the leftmost columnof the dialog box. Click Remove.
Effort Driven Scheduling
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 70/126
Click to edit Master subtitle style
Effort Driven Scheduling
The Scheduling Formula
Work = Duration xUnits
40 hours task duration x 100% resource units = 40 hours of work
20 hours task duration x 200% resource units = 40 hours of work
You can turn off effort-driven scheduling for every new task that you create. SelectTools >> Options from the menu, click the Schedule tab, and uncheck the Newtasks are effort driven checkbox.
Wh D i T k Ti i
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 71/126
What Drives Task Timing
The timing of tasks is at the heart of all projects.
When you perform a task, the time it takes to complete it might be a settime, or the task might not finish until all the work is done.
Task types
Task types define the relationship that balances a task’s duration, the workrequired to complete the task, and resource availability.
Fixed UnitsFixed Duration
Fixed Work
Fixed Units: This is the default task type With this task type when you assign
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 72/126
Fixed Units: This is the default task type. With this task type, when you assignresources to a task with a certain number of units (hours of work expressed as apercentage of the working day), the resources’ assignments don’t change even if you change the duration of the task and the work amount.
Fixed Duration: This task type takes a set amount of time to complete,no matter how many resources you add to the mix.
Fixed Work: The number of resource hours assigned to the task determinesits length. If you set the duration of a Fixed Work task at 40 hours, for example, and you assign two resources to work 20 hours each(simultaneously) at units of 100 percent, the task will be completed in 20
hours. If you take away one of those resources, the single resource must putin 40 hours at units of 100 percent to complete the task.
Task Types
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 73/126
Click to edit Master subtitle style
Assigning Additional Resources to a Task
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 74/126
Click to edit Master subtitle style
There are two ways to assign multiple resources to a task:
Assign multiple resources when the assignment is created.
Assign additional resources after the assignment is created.
Changing Task Types
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 75/126
Click to edit Master subtitle style
Defining task types changes how tasks are scheduled. For any task,setting the task type determines which part of the scheduling equationMicrosoft Project uses to schedule a task. Once a resource assignment is
created, tasks are scheduled using this formula:
Duration = Work / Units
Work = Duration x Units "Effort driven" checkbox
This option tells MicrosoftProject to keep the totaltask work at its currentvalue. The duration of atask shortens or lengthensas resources are added or
removed from a task, whilethe amount of effortnecessary to complete atask remains unchanged.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 76/126
Click to edit Master subtitle style
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 77/126
Click to edit Master subtitle style
Advance Resource Schedule
Entering Multiple Pay Rates for a Resource
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 78/126
Click to edit Master subtitle style
Some work resources might perform different tasks withdifferent pay rates.
Setting Up Pay Rates to Apply at Different Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 79/126
Click to edit Master subtitle style
Resources can have both standard and overtime pay rates. By default, Projectuses these rates for the duration of the project. However, you can change aresource’s pay rates to be effective as of the date you choose.
Delaying the Start of Assignments
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 80/126
Click to edit Master subtitle style
If more than one resource is assigned to a task, you might not want all of theresources to start working on the task at the same time. You can delay the startof work for one or more resources assigned to a task.
Applying Contours to Assignments
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 81/126
Click to edit Master subtitle style
In the Resource Usage and Task Usage views, you can see exactly how long eachresource is scheduled to work on each task. In addition to viewing assignmentdetails, you can change the amount of time a resource works on a task in anygiven time period. There are two ways to do this:
• Apply a predefined work contour to an assignment.• Edit the assignment details directly.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 82/126
Applying Different Cost Rates to Assignments
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 83/126
Click to edit Master subtitle style
You can set as many as five pay rates per resource, which allows you to applydifferent pay rates to different assignments for a resource. Project initially usesrate table A by default, but you can specify that another rate table should be
used.
Entering Material Resource Consumption Rates
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 84/126
Click to edit Master subtitle style
Material Resource Consumption
• fixed consumption rate•
variable consumption rate
A fixed consumption rate means that, regardless of the duration of the task towhich the material resource is assigned, an absolute quantity of the resource willbe used. For example, pouring concrete for a house foundation requires a fixed
amount of concrete no matter how long it takes to pour it.
A variable consumption rate means that the quantity of the material resourceconsumed depends on the duration of the task. When shooting film, for example,you can shoot more film in four hours than in two, and you can determine an hourlyrate at which you shoot (or consume) film. After you enter a variable consumptionrate for a material resource’s assignment, Project calculates the total quantity of thematerial resource consumed based on the task’s duration. The advantage of usinga variable rate of consumption is that the rate is tied to the task’s duration. If theduration changes, the calculated quantity and cost of the material resource willchange as well.
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 86/126
PROJECT UNCERTAINTY AND RISK MANAGEMENT
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 87/126
The Statistical Distribution of all
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 88/126
The Statistical Distribution of allPossible Times for an Activity
Activity Expected Time and
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 89/126
Activity Expected Time andVariance
2
2
E
6
)(Var
6
)(
6
)4(T
−
==
−=
++=
ab
ab
bma
σ
σ
95 Percent Level
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 90/126
95 Percent Level
• Task will be a or lower 5 percent of thetime
• Task will be b or greater 5 percent of
the time
3.3
)( ab −
=σ
90 Percent Level
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 91/126
90 Percent Level
• Task will be a or lower 10 percent of thetime
• Task will be b or greater 10 percent of
the time
6.2
)( ab −
=σ
95 Percent Level (Alternative
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 92/126
95 Percent Level (AlternativeInterpretation)
• Task will be between a and b 95
percent of the time
90 Percent Level (Alternative
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 93/126
90 Percent Level (AlternativeInterpretation)
• Task will be between a and b 90percent of the time
29.3
)( ab −=σ
An AON Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 94/126
An AON Network
An MSP Version of a Sample
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 95/126
An MSP Version of a SampleProblem Network
A Pert/CPM Network for the
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 96/126
A Pert/CPM Network for theDay Care Project
An MSP Calendar for the Day Care
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 97/126
yProject, 4/16/00 to 5/27/00
The Probability of Completing
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 98/126
The Probability of Completingthe Project on Time
2
)(
µ σ
µ −=
D
Z
=NORMDIST(D, , ,TRUE)
The Statistical Distribution of Completion
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 99/126
The Statistical Distribution of CompletionTimes of the Path a-b-d-g-h
Selecting Risk and Finding D
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 100/126
Selecting Risk and Finding D
2
µ σ µ Z D +=
NORMINV(probability, , ,TRU
E)
AON Example
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 101/126
p
Activity DescriptionImmediate
Predecessors A Build internal components —
B Modify roof and floor —C Construct collection stack A
D Pour concrete and install frame A, B
E Build high-temperature burner C
F Install pollution control system C
G Install air pollution device D, E
H Inspect and test F, G
Project Schedule
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 102/126
Activity Description Time (weeks)
A Build internal components 2
B Modify roof and floor 3
C Construct collection stack 2D Pour concrete and install frame 4
E Build high-temperature burner 4
F Install pollution control system 3
G Install air pollution device 5
H Inspect and test 2Total Time (weeks) 25
Project Schedule
AON Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 103/126
AON Network
G
E
F
H
CA
Start
DB
AOA Network
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 104/126
H
(Inspect/ Test)7
AOA Network
6
F ( I n s t a l l
C o n t r o l s )
E
( B u i l d
B u r
n e r )
G ( I n s t a l l
P o l l u
t i o n
D e v i c
e )
5D
(Pour Concrete/Install Frame)
4C
(ConstructStack)
1
3
2
B ( M o d i f y
R o o f / F l o o r )
A
( B u i l d
I n t e r n a l
C o m p o
n e n t s )
Determining the Project Schedule
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 105/126
Determining the Project Schedule
Perform a Critical Path Analysis
A
Activity Nameor Symbol
EarliestStart
ESEarliestFinishEF
LatestStart
LS LatestFinish
LF
Activity Duration
2
LS/LF and ES/EF Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 106/126
LS/LF and ES/EF Times
E
4
F
3
G
5
H
2
4 8 13 15
4
8 13
7
13 15
10 13
8 13
4 8
D
4
3 7
C
2
2 4
B
3
0 3
Start
0
0
0
A
2
20
42
84
20
41
00
Computing Slack Time
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 107/126
Computing Slack Time
Earliest Earliest Latest Latest OnStart Finish Start Finish Slack Critical
Activity ES EF LS LF LS – ES Path
A 0 2 0 2 0 YesB 0 3 1 4 1 NoC 2 4 2 4 0 YesD 3 7 4 8 1 NoE 4 8 4 8 0 YesF 4 7 10 13 6 No
G 8 13 8 13 0 YesH 13 15 13 15 0 Yes
Critical Path
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 108/126
Critical Path
E
4
F
3
G
5
H
2
4 8 13 15
4
8 13
7
13 15
10 13
8 13
4 8
D
4
3 7
C
2
2 4
B
3
0 3
Start
0
0
0
A
2
20
42
84
20
41
00
ES – EF Gantt Chart
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 109/126
ES EF Gantt Chart
A Build internalcomponents
B Modify roof andfloor
C Construct collectionstack
D Pour concrete andinstall frame
E Build high-temperature burner
F Install pollutioncontrol system
G Install air pollutiondevice
H Inspect and test
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LS – LF Gantt Chart
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 110/126
LS LF Gantt Chart
A Build internalcomponents
B Modify roof andfloor
C Construct collectionstack
D Pour concrete andinstall frame
E Build high-temperature burner
F Install pollution
control system
G Install air pollutiondevice
H Inspect and test
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Variability in Activity Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 111/126
þ CPM assumes we know a fixed timeestimate for each activity and there is
no variability in activity timesþ PERT uses a probability distribution for activity times to allow for variability
Variability in Activity Times
Variability in Activity Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 112/126
þ Three time estimates are requiredþ Optimistic time (a) – if everything goes
according to plan
þ Pessimistic time (b) – assuming veryunfavorable conditions
þ Most likely time (m) – most realistic
estimate
Variability in Activity Times
Variability in Activity Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 113/126
Estimate follows beta distribution
Variability in Activity Times
Expected time:
Variance of times:t = (a + 4m + b)/6
v = [(b – a)/6]2
Variability in Activity Times
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 114/126
Estimate follows beta distribution
Variability in Activity Times
Expected time:
Variance of times:t = (a + 4m + b)/6
v = [(b − a)/6]2Probability of 1in 100 of > boccurring
Probability of 1in 100 of < a occurring
P r o b a b i l i t y
OptimisticTime (a)
Most LikelyTime (m)
Pessimistic Time(b)
ActivityTime
Figure 3.12
Computing Variance
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 115/126
Computing Variance
Most ExpectedOptimistic Likely Pessimistic Time Variance
Activity a m b t = (a + 4m + b)/6 [(b – a)/6]2
A 1 2 3 2 .11B 2 3 4 3 .11C 1 2 3 2 .11D 2 4 6 4 .44E 1 4 7 4 1.00F 1 2 9 3 1.78
G 3 4 11 5 1.78H 1 2 3 2 .11
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 116/126
y jCompletion
Project variance is computed bysumming the variances of criticalactivities
σ2 = Προϕεχτ ϖαριανχε
= ∑(ϖαριανχεσ οφαχτιϖιτιεσ
ον χριτιχαλ πατη)
p
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 117/126
y jCompletion
Project variance is computed bysumming the variances of criticalactivitiesProject variance
σ2 = .11 + .11 + 1.00 + 1.78 + .11 = 3.11
Προϕεχτ στανδαρδ δεϖιατιον
σπ = Προϕεχτ ϖαριανχε= 3.11 = 1.76 ωεεκσ
p
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 118/126
y jCompletion
PERT makes two more assumptions:
þ Total project completion times follow anormal probability distributionþ Activity times are statistically independent
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 119/126
Completion
Standard deviation = 1.76 weeks
15 Weeks
(Expected Completion Time)
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 120/126
Completion
What is the probability this project can becompleted on or before the 16 weekdeadline?
Z = –
/σπ
= (16 ωκσ 15 ωκσ)/1.76
= 0.57
due expected datedate of completion
Where Z is the number of standarddeviations the due date or target date lies
from the mean or expected date
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 121/126
y jCompletion
What is the probability this project can becompleted on or before the 16 weekdeadline?
Z = −
/σπ
= (16 ωκσ 15 ωκσ)/1.76
= 0.57
due expected datedate of completion
Where Z is the number of standarddeviations the due date or target date lies
from the mean or expected date
.00 .01 .07 .08
.1 .50000 .50399 .52790 .53188
.2 .53983 .54380 .56749 .57142
.5 .69146 .69497 .71566 .71904
.6 .72575 .72907 .74857 .75175
From Appendix I
Probability of Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 122/126
Completion
Time
Probability(T ≤ 16 weeks)
is 71.57%
0.57 Standard deviations
15 16Weeks Weeks
Determining Project
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 123/126
g jCompletion Time
Probability of 0.01
Z
Figure 3.15
From Appendix I
Probability of 0.99
2.33 Standarddeviations
0 2.33
Variability of Completion Time
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 124/126
Variability of Completion Time
for Noncritical Pathsþ Variability of times for activities on
noncritical paths must be considered
when finding the probability of finishing in a specified timeþ Variation in noncritical activity may
cause change in critical path
What Project Management
7/29/2019 MS Projects Day 3 Final
http://slidepdf.com/reader/full/ms-projects-day-3-final 125/126
Has Provided So Far
þ The project’s expected completion time is15 weeks
þ There is a 71.57% chance the equipment
will be in place by the 16 week deadlineþ Five activities (A, C, E, G, and H) are on thecritical path
þ Three activities (B, D, F) are not on thecritical path and have slack time
þ A detailed schedule is available