MPF(F) Mobile Landing Platform (6-4)

1
10/31/22 Platform Program Status Description Issues Program of Record is for 3 ships Key Sea Basing Enabler Use of Float On Float Off (FLO/FLO) Commercial technology TEU handling Capability added Will Require additional C4I upgrades to support MEB CE and Air Space Management task if “Big Decks” are omitted Vehicle Transfer System (VTS) is new technology CDD Increment 1 JCB 13 Feb 2008 Approved JROC Approval March 2008 DAB Jun 2008 (Pending ADM signature) Acquisition strategy approved – Supports RFP Jul 2008 Systems Design Award 15 Sep 2008 Milestone B FY10 Procurements 1 (FY10) Delivery (FY15) 2 (FY12); Delivery (FY16) 3 (FY13); Delivery (FY17) Ship 2 & 3 funding addressed during POM-10 Mobile Landing Platform (MLP) 3 MLP New Design and Build 6-4 Speed 20 kts Transit Waterline (Loaded) 25.2 ft Crew 55 (MSC), 11 (LCAC Det) Embarked Landing Force 856 (128 Navy; 728 USMC) Medical Capability 1,281 ft2; 4 Ward Beds Potable Water 200,242 gal Surface Interface Point 2 Well Deck Capacity 6-LCAC Flight Deck (Level/Class) 1 Land/Launch Spot (I/2); VERTREP lift Spot (I/4) UAS Adjacent Space 1000 ft2 Ramp 1 Self-depl LMSR/MLP Veh; 1 Portable Veh access Vehicle Square (Ro/Ro) 51,560 ft2 (Stowage for50 ISO 1CC Containers) Lifting Capability (lbs)1 52.9K single boom container crane,130’ lift radius 2 22K extended boom stores crane (port/stbd) 2 11K bridge cranes (LCAC lanes) (port/stbd) Cargo Fuel (JP-5) 1 mil gal Motor Gasoline (MOGAS) 550 gal (jettisonable drums) MPF(F) MLP VS(1) Requirements Validation Study February 6, 2008 Placemat

Transcript of MPF(F) Mobile Landing Platform (6-4)

Page 1: MPF(F) Mobile Landing Platform (6-4)

04/08/23

Platform

Program Status

Description

Issues• Program of Record is for 3 ships• Key Sea Basing Enabler• Use of Float On Float Off (FLO/FLO) Commercial

technology• TEU handling Capability added• Will Require additional C4I upgrades to support MEB

CE and Air Space Management task if “Big Decks” are omitted

• Vehicle Transfer System (VTS) is new technology

• CDD Increment 1• JCB 13 Feb 2008 Approved• JROC Approval March 2008• DAB Jun 2008 (Pending ADM signature)• Acquisition strategy approved – Supports RFP Jul 2008• Systems Design Award 15 Sep 2008• Milestone B FY10• Procurements

– 1 (FY10) Delivery (FY15) – 2 (FY12); Delivery (FY16)– 3 (FY13); Delivery (FY17)

Ship 2 & 3 funding addressed during POM-10

Mobile Landing Platform (MLP)

3 MLP New Design and Build

6-4

Speed 20 ktsTransit Waterline (Loaded) 25.2 ftCrew 55 (MSC), 11 (LCAC Det)Embarked Landing Force 856 (128 Navy; 728 USMC) Medical Capability 1,281 ft2; 4 Ward BedsPotable Water 200,242 galSurface Interface Point 2Well Deck Capacity 6-LCAC Flight Deck (Level/Class) 1 Land/Launch Spot (I/2); VERTREP lift Spot (I/4)UAS Adjacent Space 1000 ft2Ramp 1 Self-depl LMSR/MLP Veh; 1 Portable Veh accessVehicle Square (Ro/Ro) 51,560 ft2 (Stowage for50 ISO 1CC Containers)Lifting Capability (lbs) 1 52.9K single boom container crane,130’ lift

radius2 22K extended boom stores crane (port/stbd)2 11K bridge cranes (LCAC lanes) (port/stbd)

Cargo Fuel (JP-5) 1 mil galMotor Gasoline (MOGAS) 550 gal (jettisonable drums)

MPF(F) MLP VS(1) Requirements Validation Study February 6, 2008 Placemat