7/29/2019 MPD cbm http://slidepdf.com/reader/full/mpd-cbm 1/19 SIEM WIS AS Siem WIS Background, Challenges, Technology and Solutions

Transcript of MPD cbm

Page 1: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 1/19

SIEM WIS AS

Siem WISBackground, Challenges, Technology and

Solutions

Page 2: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 2/19

SIEM WIS AS

Backgroundz Well Intervention Solutions AS (Siem WIS), was established in February

2005 and is located at Sotra, outside Bergen Norway

z Siem WIS has extensive experience from the oil service industry throughits employees, respectively from Transocean, AGR Ability Group,Schlumberger, KCA Deutag, FMC Technologies, Baker Hughes Inteq andPGS.

- Core experiences:

Technology development

Engineering

Project management

Operations

Riserless Intervention

Riserless Drilling

Well Intervention and drilling services

Page 3: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 3/19

SIEM WIS AS

z The industry has major possibilities to increase oil recovery, by

development and utilization of new technologyz The Siem WIS technology represents;

-  Add-on solutions to existing operational challenges

- Safer and more efficient operations

z The Siem WIS solutions will represent minimum implications toexisting systems

z By identifying challenges, and applying innovation andexpertise, simple and reliable solutions are provided

Background

Page 4: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 4/19

SIEM WIS AS

z  Variation of dynamic behavior in the mud column during drillingoperations, caused by reduction or stoppage of mud pumping, when

making or breaking drillpipe

z Due to rapid depletion of many reservoirs globally after production start,drilling of new wells will be a challenge

z

The demand to achieve a more constant well pressure during drilling andtripping operations is increasing as a function of the depletion of thereservoir. The narrow pressure window between the pore- and fracturepressure is challenging in all depleted reservoirs.

z Requirement for stable Equivalent Circulation Density (ECD)

Challenges - drilling depleted reservoiror drilling through coal

Page 5: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 5/19

SIEM WIS AS Variation in ECD “ballooning effect” 

narrow pore pressure/fracturegradient window

Pumps on and off 

during connections

Margin +/- 2 bar 

Continuous circulation

Margin +/- 12 bar 

Page 6: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 6/19

SIEM WIS AS

Normal drilling MPD set-up

Page 7: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 7/19

SIEM WIS ASCirculation device drilling

set-up

Page 8: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 8/19

SIEM WIS AS|

Page 9: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 9/19

SIEM WIS ASSiem WIS CircSubTM -

advantages/disadvantagesDrilled Length/Well

Extension

Equipment Lifetime

Time: Connections

Time: Test ing

Time: Handling

Connection Influx

Eliminate a casing

Hole stability

Hole cleaning

Continuous Logging

Managed Pressure

Drilling

CircSubTM Footprint

Page 10: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 10/19

SIEM WIS ASSeal test setup.

Page 11: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 11/19

SIEM WIS AS

z How to seal around drillpipe to control well pressure

Challenge –Establish a closed mud loop for ManagedPressure Drilling application

Page 12: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 12/19

SIEM WIS AS

Retrievable seal solution

The set-up shows the SiemWIS seal as apart of the riser configuration. Thissolution will eliminate the need for highpressure equipment above the seal.The retrievable sealing elements are runpiggy back through the riser.

Page 13: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 13/19

SIEM WIS AS

Siem WIS solutionz By combining existing MPD configuration with Siem WIS

CircSub and Siem WIS Seal, a complete and efficient servicecan be established

Page 14: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 14/19

SIEM WIS ASManaged pressure drilling

set-up

MUD PUMPS

PITS

Continous

Circulation

Device

WIS

SEAL

MPD Choke Manifold

Kill Line

Choke Line

Return Line Annular 

Shakers

K i  l  l   /  M e

 g

Return / Choke

Drain Line

Separator 

Gas flare

TopDrive

MUD PUMPS

Drillfloor 

Topside

Page 15: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 15/19

SIEM WIS AS “The Vision” 

Page 16: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 16/19

SIEM WIS AS

z How to enable economic, complete, riserless subsea wellintervention services to be performed from vessels

Riserless Subsea Well

Intervention!

Page 17: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 17/19

SIEM WIS ASSiem WIS

solution

WISSEAL

 Annular 

SEA BED

6" Flexible composite riser system

2" Megline / Kill line

3" Fluid return line / Choke line

Power 3kv & Signals

2500 mtr 

Kill / Choke

Mud return

Remote controlintervention

valve

PITS

Continous Circulation

Device RIG Choke Manifold /Secure drilling manifold

Shakers

Drain

Line

Separator 

Gas flare

TopDrive

Top Side

MudPumps

Drill Floor 

Subsea pump /

Control module

Page 18: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 18/19

SIEM WIS AS Vessel potential with Siem WIS technology

Vessel solution Siem WIS solution

Page 19: MPD cbm

7/29/2019 MPD cbm

http://slidepdf.com/reader/full/mpd-cbm 19/19

SIEM WIS ASRiserless managed pressure

drilling set-up