Mouth Hylebos/Blair Slip 1 Approximate size: 50 Acres Volume: 300,000 cy disposed in Slip 1 Contaminants: PCBs, Pb, Hg, Ni, Cu Parties performed work: Port of Tacoma and Occidental Confirmation sampling demonstrates success Further worked planned

description

Mouth Hylebos/Blair Slip 1. Approximate size : 50 Acres Volume : 300,000 cy disposed in Slip 1 Contaminants : PCBs, Pb, Hg, Ni, Cu Parties performed work : Port of Tacoma and Occidental Confirmation sampling demonstrates success Further worked planned. Head of Hylebos. - PowerPoint PPT Presentation

Transcript of Mouth Hylebos/Blair Slip 1

Page 1: Mouth Hylebos/Blair Slip 1

Mouth Hylebos/Blair Slip 1

Approximate size: 50 Acres

Volume: 300,000 cy disposed in Slip 1

Contaminants: PCBs, Pb, Hg, Ni, Cu

Parties performed work: Port of Tacoma and Occidental

Confirmation sampling demonstrates success

Further worked planned

Page 2: Mouth Hylebos/Blair Slip 1

Head of Hylebos Volume/area: excavation/capping of 5.5 acres of bank/intertidal (40,000 cy) and habitat improvements Contaminants: Primarily PCBs, PAHs Work performed by: General Metals and Atofina Relocation of Hylebos Marina Complexity of “source control”

e.g., Atofina groundwater seeps

Page 3: Mouth Hylebos/Blair Slip 1

Photos 7/1/03 Dalton Olmsted Fugelvand

Completed Wayconn Intertidal Excavation

Dunlap Excavation in progress

General Metals Peninsula Habitat Improvement & Adjacent Excavation

Page 4: Mouth Hylebos/Blair Slip 1

Cleanup Work Planned for 2004Lockheed Shipyard

Todd Shipyard

Commencement Bay

- Mouth of Thea Foss Waterway

- Head of Hylebos Waterway

- Mouth of Hylebos Waterway/Blair Slip 1

- Head of Middle Waterway

Page 5: Mouth Hylebos/Blair Slip 1

Todd Shipyard

Area: 40 acres Volume – est. 200,000 cy dredged Contaminants: As, Cu, Pb, Zn, Hg, TBT,

Zn, PCBs, PAH Major source control upgrades with

cleanup Pier replacement Create additional habitat

Page 6: Mouth Hylebos/Blair Slip 1

Cleanup Work Planned for 2004

Thea Foss

hydraulically dredge 525,000 cy of sediments

cap 21 acres

remove and replace 5 marinas

construct a new marina in front of Glass Museum

mitigation projects in the Middle Waterway, St. Paul Waterway, Puyallup River Side Channel

bank stabilization and creation of pocket beaches throughout the waterway

Page 7: Mouth Hylebos/Blair Slip 1

Head of Hylebos

General Metals & Atofina Chemicals “Precision” dredging 45 acres – 370,000 cy Contaminants: PCBs, PAHs, metals

July 15, 2004 - February 15, 2005

By rail to Roosevelt Regional Landfill

Page 8: Mouth Hylebos/Blair Slip 1

Head of Middle Waterway

Cleanup of subsurface sediments to be conducted by DNR in summer 2004

Page 9: Mouth Hylebos/Blair Slip 1

Status of Sites in RI/FS

Lower Duwamish Waterway

Portland Harbor

Page 10: Mouth Hylebos/Blair Slip 1

Lower DuwamishWaterway Site

Source Control

Remedial Investigation

Feasibility Study

Early Cleanup Actions

Page 11: Mouth Hylebos/Blair Slip 1

Portland Harbor Site

Portland HarborSampling Area

River Miles2 -11

RM 2

RM 11

Page 12: Mouth Hylebos/Blair Slip 1

Lori Cohen

Office of Environmental Cleanup

EPA/Region 10

206-553-6523