David H Moloney
Nov 2016
Motorway Construction, Project Execution PlanDetails of how a Motorway is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
Brief Description
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct a Motorway.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how aproject will be executed, monitored and controlled.
High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
![Page 2: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/2.jpg)
Contents
ⓒ David H Moloney
![Page 3: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/3.jpg)
EarthworksE
art
hw
ork
s
IncludesExcavations, filling, compaction, disposal and landscaping.
Cut through hills
Fill in low areas
Strip Vegetation &Topsoil
![Page 4: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/4.jpg)
Mass Haul DiagramE
art
hw
ork
s
The mass haul diagram shows the fill and excavation volumes plotted against chainage along a road. It is used to provide an indication of the haul distances and to ensure that haul distances are minimised.
![Page 5: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/5.jpg)
Outputs - Excavate & Load, Cart, Tip & Return
Brief Description
Cycle Time for 7km haulage distance using an Excavator 45 tonne weight and Dumper with a 40 tonne capacity, the cycle time is 34 minutes
Ea
rth
wo
rks
7 minutes
14 minutes
3 minutes
14 minutes 7 km
7 km
![Page 6: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/6.jpg)
Outputs for Excavate & Load, Cart, Tip & Return E
art
hw
ork
s
![Page 7: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/7.jpg)
Rock - Excavability
The excavability of rock depends mainly on the rock strength and the layer thickness. This diagram shows excavation methods for rock of various strengths and thicknesses, with a free face.
ⓒ David H Moloney
![Page 8: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/8.jpg)
Outputs for Rock breaking E
art
hw
ork
s
![Page 9: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/9.jpg)
Rock Cut E
art
hw
ork
s
![Page 10: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/10.jpg)
Trench - Safety Measures H
ealth,
Safe
ty &
Envir
onm
ent
![Page 11: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/11.jpg)
Existing Underground Utilities
ⓒ David H Moloney
Brief Description
Before digging establish the
location and route of
underground utilities.
Locator to find Utilities
Spray Paint to mark pavement
Health,
Safe
ty &
Envir
onm
ent
![Page 12: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/12.jpg)
Roads & PavingsR
oads &
Pavin
gs
IncludesSub-base, base and surfacing, kerbs, footpaths, traffic signs and markings.
Signs & Markings
Asphalt pavement
Median Barrier
Basecourse
![Page 13: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/13.jpg)
CABC ( Crushed aggregate base course )R
oa
ds
![Page 14: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/14.jpg)
CABC ( Crushed aggregate base course )E
art
hw
ork
s
Mixing Plant
Testing Compaction
Site Trial
![Page 15: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/15.jpg)
Crushed Aggregate Basecourse
ⓒ David H Moloney
Pa
vin
g
![Page 16: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/16.jpg)
Asphalt Paving
ⓒ David H Moloney
Pa
vin
g
![Page 17: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/17.jpg)
Asphalt Paving
ⓒ David H Moloney
Pa
vin
g
![Page 18: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/18.jpg)
Insitu Concrete Barrier
ⓒ David H Moloney
Pa
vin
g Slipform central median barrier, the moving formwork allow for the simultaneous extrusion and finishing of the concrete. Powerful vibrators compact the semi-dry concrete.
![Page 19: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/19.jpg)
Steel Traffic Safety Barrier
ⓒ David H Moloney
Pa
vin
g
The barriers are designed to keep vehicles within their roadway and prevent vehicles from colliding with dangerous obstacles such as bridges, buildings, walls or large storm drains.
![Page 20: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/20.jpg)
Pavement MarkingP
avin
g
Road surface markings are used on paved roadways to provide guidance and information to drivers and pedestrians. They can be used to delineate traffic lanes.
![Page 21: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/21.jpg)
Road Signs
ⓒ David H Moloney
Pa
vin
g
Road signs are signs erected at the side of or above roads to give instructions or provide information to road users.
![Page 22: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/22.jpg)
BridgesB
rid
ge
s
![Page 23: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/23.jpg)
Bridge Construction
ⓒ David H Moloney
Co
ncre
te
![Page 24: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/24.jpg)
Bridge Construction
ⓒ David H Moloney
Co
ncre
te
![Page 25: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/25.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Co
ncre
te
Brief Description
The sequence to construct a reinforced concrete wall is as
follows:
Tie the reinforcement.
Erect stop-ends and the wall shutters.
Pour and vibrate the concrete mix.
Remove the shutters after the concrete has hardened.
.
Cycle Time Pour per Day
![Page 26: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/26.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Co
ncre
te
![Page 27: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/27.jpg)
Concrete MixG
en
era
l It
em
s
A concrete mix contains 5 major
elements: cement, water, coarse
aggregates, fine aggregates (sand) and
air in different proportion. Additional
elements such as pozzolanic materials (fly
ash, silica fumes or slag) and chemical
admixtures can also be incorporated to
the mix to increase its properties.
![Page 28: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/28.jpg)
Vibrating Concrete
ⓒ David H Moloney
Co
ncre
te
![Page 29: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/29.jpg)
Culvert Construction
ⓒ David H Moloney
Co
ncre
te
![Page 30: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/30.jpg)
Piling Insitu Concrete
![Page 31: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/31.jpg)
Piling Construction - Vertical PilesP
ilin
g
![Page 32: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/32.jpg)
Piling Construction - Raking PilesP
ilin
g
![Page 33: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/33.jpg)
Su
rve
yin
g &
se
ttin
g O
ut
Survey & Setting Out
![Page 34: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/34.jpg)
Setting out & Surveying
![Page 35: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/35.jpg)
Setting out & Surveying
![Page 36: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/36.jpg)
Site Facilities & Temporary WorksS
ite
Fa
cili
tie
s &
te
mp
ora
ry W
ork
s
![Page 37: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/37.jpg)
Site Facilities S
ite
Fa
cili
tie
s &
te
mp
ora
ry W
ork
s
![Page 38: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/38.jpg)
Welfare Facilities
ⓒ David H Moloney
Ge
ne
ral It
em
s
Toilets – Washing
Canteen, Drying Room, Toilet & Generator
![Page 39: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/39.jpg)
Site Hoarding examples
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 40: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/40.jpg)
Wheel Wash Drive-through
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 41: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/41.jpg)
Temporary Electricity Supply & Tower Lights
Generators
Ge
ne
ral It
em
s
Used so construction work can continue effectively and safely in periods of insufficient natural light.
![Page 42: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/42.jpg)
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Construction dewatering is the removal or drainage of
groundwater and or surface / rain water usually by
pumping to keep the works dry.
![Page 43: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/43.jpg)
Concrete Batching Plant David H Moloney
ⓒ David H Moloney
Concrete batching plant comprises - concrete mixer, control cabin, silos for cement and fly ash, aggregate bins and conveyor belt system to feed the mixer. Also aggregate storage bays and water storage tanks. The mixing is computer controlled and has a dynamic screen display, showing the process. Material storage capacity to match two days concrete production
![Page 44: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/44.jpg)
Concrete Batching Plant Yard G
en
era
l It
em
s
![Page 45: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/45.jpg)
Quarry & Aggregate Production
3D image to show Sequence, Method & Plant.
ⓒ David H Moloney
![Page 46: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/46.jpg)
Quarry Operations
![Page 47: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/47.jpg)
Reinforcement Cutting & Bending Yard David H Moloney
ⓒ David H Moloney
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
![Page 48: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/48.jpg)
Asphalt Batching Plant
The plant is used for the manufacture of asphalt. Aggregates, sand and a filler (such as stone dust), in the correct proportions, are heated, and coated by mixing with a binder, bitumen based. The temperature of the finished asphalt mix must be sufficient to be workable after transport to the final destination.
![Page 49: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/49.jpg)
Health, Safety & EnvironmentalH
ea
lth
, sa
fety
& e
nvir
on
me
nta
l
![Page 50: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/50.jpg)
Emergency Phone Numbers & Response
![Page 51: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/51.jpg)
HSE Monitoring & Reporting - Dashboard Dashboard is a single page, graphical representation of
current HSE Issues and historical trends
![Page 52: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/52.jpg)
Safety Training Matrix M
isce
llan
eo
us
The purpose of safety training is to provide the knowledge necessary to
perform a job safely
![Page 53: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/53.jpg)
Personal Protective Equipment (PPE)H
ealth,
Safe
ty &
Envir
onm
ent
Personal protective equipment (PPE) is protective clothing, helmets, goggles, or other garments or equipment designed to protect the wearer from injury or infection
![Page 54: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/54.jpg)
Safety Precautions
![Page 55: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/55.jpg)
Site Safety Posters examples
![Page 56: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/56.jpg)
Environmentally Friendly Site Air, Noise, Water & Soil Pollution
![Page 57: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/57.jpg)
Hazardous Substances Symbols H
ealth,
Safe
ty &
Envir
onm
ent
COSHH stands for the Control of Substances Hazardous to Health
Shown are the new hazard symbols
![Page 58: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/58.jpg)
Water Pollution PreventionG
en
era
l It
em
s
![Page 59: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/59.jpg)
Segregation of Waste H
ealth,
Safe
ty &
Envir
onm
ent
Segregation of waste for proper disposal and recycling. Less waste goes to landfill and hazardous waste is treated to make it safe.
Colour Code for Skips & Bins
![Page 60: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/60.jpg)
Putting Waste Concrete to use
ⓒ David H Moloney
Health,
Safe
ty &
Envir
onm
ent
Precast bases for signs and hoarding, Precast blocks for walls.
![Page 61: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/61.jpg)
Quality AssuranceQ
ua
lity A
ssu
ran
ce
![Page 62: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/62.jpg)
Quality Assurance Dashboard Dashboard is a single page, graphical representation of
current statistics and historical trends
![Page 63: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/63.jpg)
Laboratory
ⓒ David H Moloney
Asp
ha
lt P
avin
g
![Page 64: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/64.jpg)
AdministrationA
dm
inis
tra
tion
![Page 65: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/65.jpg)
Organogram
Brief Description
Shown are the line and
lateral relationships
between the various team
members and their relative
position in the site
organisation.
![Page 66: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/66.jpg)
Staff Responsibility Matrix
![Page 67: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/67.jpg)
Staff Directory
Brief Description
List of staff and their
contact details
![Page 68: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/68.jpg)
Daily Work Record
Brief Description
Daily Work Records showing the
allocation of resources, materials and
work activities carried out daily.
![Page 69: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/69.jpg)
Quotations Comparison Sheet
![Page 70: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/70.jpg)
Filing System
![Page 71: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/71.jpg)
Programme & Progress MonitoringP
rog
ram
me
& P
rog
ress M
on
ito
rin
g
![Page 72: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/72.jpg)
Progress Monitoring & Reporting - Dashboard
ⓒ David H Moloney
Dashboard is a single page, graphical representation of current progress and historical trends
![Page 73: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/73.jpg)
Histogram Charts for Resources & Outputs
Manpower per Discipline Concrete per Location
Numbers for each month of the Project Quantity for each month of the Project
ⓒ David H Moloney
![Page 74: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/74.jpg)
Plant & Equipment List & Worker’s Job Titles
ⓒ David H Moloney
![Page 75: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/75.jpg)
Time Chainage Diagram
Brief Description
The chart has two axis: one for time and the other for location
A legend explains meaning of the colours, symbols and line types
Legend
![Page 76: Motorway Construction, Project Execution Plan](https://reader034.fdocuments.us/reader034/viewer/2022050706/58705a051a28aba2118b6407/html5/thumbnails/76.jpg)
End