MOT-GMRRT South PID 103249 The Miami Conservancy District (MCD) proposes to resurface the Great Miami River Recreation Trail from the Montgomery/Warren County Line to Linden Avenue, in the City of Miamisburg and Miami Township, Montgomery County. The project involves milling the top one inch of existing asphalt surface from approximately 4.3 miles of existing paved trail. The existing trail ranges from eight feet to ten feet wide. A tack coat and overlay of one inch of new asphalt will be applied to the entire length of the project. The project is necessary to restore a smooth and safe trail surface. Due to the age and wearing, the existing surface has cracking and asphalt deterioration. The project will begin at the Montgomery-Warren county line, the southernmost boundary of ODOT District 7. The project will follow the continuous trail to Linden Avenue in Miamisburg, the northern terminus point. The section of GMRRT north of Linden Avenue in Miamisburg immediately past the project limit was milled and resurfaced in 2014 (MOT-Great Miami River Recreation Trail Resurfacing, PID 95932) and is in good condition. The project will occur within the existing public right-of-way of the trail and no new right-of- way acquisition will be required. The project will not affect any existing utilities and will not require any temporary or permanent utility relocation. The project will not require any ditch work or pipe work. The project will not require any tree removals. Portions of the project are located within the designated special flood hazard area and designated floodway associated with the Great Miami River. The Engineer of Record has documented that the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains Run, MIA-GMRRT-1.57 across Shephards Run, and MSB-GMRRT-2.42 across M&E Canal Ditch. The Montgomery County Engineer’s office inspected all three bridges in November 2014. The safety railing at all three bridges has been replaced in recent years. The milling and resurfacing project does not include any bridge or railing work. The project includes milling and resurfacing the trail where it passes through two public parks Crains Run Nature Park (Miami Township) and Rice Field (City of Miamisburg). MCD maintains the GMRRT in both parks. The trail connection in both parks will be maintained during and after the project. MCD will work with the Township and City to utilize existing park roads and trails as part of the construction detours. The trail, Rice Field, and Crains Run Nature are recognized Section 4(f) resources; the proposed resurfacing activity is not considered a “use” of these resources. In July, 2016, the City of Miamisburg replaced the ADA curb ramps at the north terminus of the project at Linden Avenue and directly across Linden Avenue where the GMRRT continues northward. The trail does not connect to any other public street within the project limits.

Transcript of MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail...

Page 1: MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

MOT-GMRRT South PID 103249

The Miami Conservancy District (MCD) proposes to resurface the Great Miami River

Recreation Trail from the Montgomery/Warren County Line to Linden Avenue, in the City of

Miamisburg and Miami Township, Montgomery County.

The project involves milling the top one inch of existing asphalt surface from approximately 4.3

miles of existing paved trail. The existing trail ranges from eight feet to ten feet wide. A tack

coat and overlay of one inch of new asphalt will be applied to the entire length of the project.

The project is necessary to restore a smooth and safe trail surface. Due to the age and wearing,

the existing surface has cracking and asphalt deterioration.

The project will begin at the Montgomery-Warren county line, the southernmost boundary of

ODOT District 7. The project will follow the continuous trail to Linden Avenue in Miamisburg,

the northern terminus point. The section of GMRRT north of Linden Avenue in Miamisburg

immediately past the project limit was milled and resurfaced in 2014 (MOT-Great Miami River

Recreation Trail Resurfacing, PID 95932) and is in good condition.

The project will occur within the existing public right-of-way of the trail and no new right-of-

way acquisition will be required. The project will not affect any existing utilities and will not

require any temporary or permanent utility relocation. The project will not require any ditch

work or pipe work. The project will not require any tree removals.

Portions of the project are located within the designated special flood hazard area and designated

floodway associated with the Great Miami River. The Engineer of Record has documented that

the project will result in “no rise” of the base flood elevation.

The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

Run, MIA-GMRRT-1.57 across Shephards Run, and MSB-GMRRT-2.42 across M&E Canal

Ditch. The Montgomery County Engineer’s office inspected all three bridges in November 2014.

The safety railing at all three bridges has been replaced in recent years. The milling and

resurfacing project does not include any bridge or railing work.

The project includes milling and resurfacing the trail where it passes through two public parks –

Crains Run Nature Park (Miami Township) and Rice Field (City of Miamisburg). MCD

maintains the GMRRT in both parks. The trail connection in both parks will be maintained

during and after the project. MCD will work with the Township and City to utilize existing park

roads and trails as part of the construction detours. The trail, Rice Field, and Crains Run Nature

are recognized Section 4(f) resources; the proposed resurfacing activity is not considered a “use”

of these resources.

In July, 2016, the City of Miamisburg replaced the ADA curb ramps at the north terminus of the

project at Linden Avenue and directly across Linden Avenue where the GMRRT continues

northward. The trail does not connect to any other public street within the project limits.

Page 2: MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

During resurfacing, the affected segments of the GMRRT will be detoured. MCD will provide

signed detours on public roadways or paved public access roads. MCD will communicate these

detours through www.miamivalleytrails.org, www.mcdwater.org, the MCD Twitter account and

other appropriate social media.

Based on US Census data, within the project area, minorities represent 10% of the population

and individuals in poverty represent 11% of the population.

The project will be constructed with federal (Transportation Enhancement) and local funding.

Currently, the project is expected to award in March 2017.

Page 3: MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

s

ss

0 0

s

s

.s

. s

s

s

0

.

s

s

s

.

s

s

.

0

.

0

.

s

s

s

.

0

s

..

0

.

s

s

.

s

s

0

ss

s

0

s

0

s

s

.

s

s

r

rr

/ /

r

r

-r

- r

r

r

/

-

r

r

r

-

r

r

-

/

-

/

-

r

r

r

-

/

r

--

/

-

r

r

-

r

r

/

rr

r

/

r

/

r

r

-

r

r

725

4

123

35 35

4

725

T-13

9

75

741

675

725

4

35

49

75

741

48

48

75

4

48D35

75

40

70

40

70

49

49

70

48

40

48

75

70

40

75

48

725

675

48

835

201

202

4

35

444

40

202

201

70

4

235

,

,

,

,

,

,

,,

,,

,

,

,

,

,

,

,

,

,

,,

,,

,

,

,

,

,

,

,

,

,

,,

,,

,

,

,

725

4

123

35 35

4

725

T-13

9

75

741

675

725

4

35

49

75

741

48

48

75

4

48D35

75

40

70

40

70

49

49

70

48

40

48

75

70

40

75

48

725

675

48

835

201

202

4

35

444

40

202

201

70

4

235

MONTGOMERY COUNTYUnincorporated Places

Airports

Mile Markers 2 mile

Interstate Routes

Proposed Interstate Routes

U S Routes

Proposed U S Routes

State Routes

Proposed State Routes

Ramps

County Roads

County Sub Division Streets

Proposed County Roads

County Roads (Right of Way only)

Township Roads

Township Sub Division Streets

Township Roads (Right of Way only)

Proposed Township Roads

Municipal Streets

Railroads

County Boundary

City Boundary

Township Boundary

1

2

3

4

0 1 2 3 4 5

Miles

Revised: April - 2015

tbishop
PolyLine
tbishop
Arrow
tbishop
Text Box
MOT-GMRRT South PID 103249
tbishop
PolyLine
Page 4: MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

´ 0 1,000 2,000 3,000 4,000 5,000Feet

MOT-GMRRT SouthPID 103249

Miamisburg/Franklin, Ohio Quadrangle

Page 5: MOT-GMRRT South · the project will result in “no rise” of the base flood elevation. The trail crosses three trail bridges within the project limits: MIA-GMRRT-1.32 across Crains

JAMA

ICA

RD

S UNI

ON R

D

BENNER RD

MEDLAR RDFARMINGTON RD

GAY R

D

CRAINS RUN RD

S MAI

N ST

MAUE RD

UPPER MIAMISBURG RD

BELVO RD

SHEPHARD RD

LEIS RD

E PEARL ST

KERCHER ST

LOWER MIAMISBURG RDDAYTON CINCINNATI PIKE

ROSINA DR

S LINDEN AVE

S GEB

HART

CHU

RCH

RD

N MAIN ST

S HEIN

CKE

RD

N 11

TH S

T

CHAU

TAUQ

UA R

D

N 12

TH S

T

W LINDEN AVE

MOUND RD

N HE

INCK

E RD

OLD M

AIN ST

CINC

INNA

TI PI

KE

S RIVE

RVIEW

AVE

KATHY LN

S 6TH

STS 5

TH ST

S 3RD

STZECK RD

N 4T

H ST

RICHARD ST

E CENTRAL AVE

LAWR

ENCE

AVE

JANE

T AVE

SUNS

ET AV

E

S 9TH

ST

SUE AVE

YALE AVE

COLE

MAN

RD

MEARS DR

NORTH DR

MYNA LN

MARSHA DR

EVAN

S AVE

S UNI

ON R

D

S 9TH

ST

±

0 1,800 3,600 5,400 7,200900Feet

MOT-GMRRT South, PID 103249

EXPLANATIONbikeways

The Miami Conservancy District makes no warranty or guaranteeas to the content, accuracy, timeliness, or completeness of any ofthe data provided, and assumes no legal responsibility for theinformation contained. Use of these materials constitutesacceptance of this disclaimer of liability.

End ProjectLinden Avenue

GMRRT

Begin ProjectMontgomery-WarrenCounty line