Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights...

9
Moscow 2011 Presentation Construction Company

Transcript of Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights...

Page 1: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Moscow 2011

Presentation

Construction Company

Page 2: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page2

About Us

Sunbury Heights Construction Management division has been

working in the Russian market for over 5 years.

We are a diversified construction organization, offering a wide range of design, construction, reconstruction, repair and fit-out works of commercial, sports, retail and residential premises.

Our experts have extensive experience of running construction works for major international companies and corporations.

Page 3: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page3

Services provided by Sunbury Heights Construction

Preparatory and Design Works:

Technical Inspection and evaluation of the building, collection and analysis of its technical specifications. Assistance in preparation of technical request for design works; assistance in preparation of technical addendum to lease.

Elaboration of all parts of the design documentation that includes the lay-out, floors and ceiling, electricity, water and sewage systems plans, fire evacuation

and smoke removal scheme provided along with three-dimensional visualization;

Development of all parts of design documentation are made to conform with the LL requirements, sanitary regulations and building characteristics;

Full coordination and complete control over all stages and aspects of work during project in order to avoid overlaps or errors and ensure proper operation of the future office;

Designer supervision over the construction works to be done in accordance with the developed plan and operating standards;

Page 4: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page4

Services provided by Sunbury Heights Construction

Obtaining Approvals

Obtainment of approvals by the landlord of the building and its local facility management company;

Approving all changes made in the building with the Bureau of Technical Inventory (BTI) and the Inter-Agency Commission (IAC);

Getting approvals by State Emergency Ministry and Rospotrebnadzor confirmed through the corresponding letter and approval certificate;

Page 5: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page5

Services provided by Sunbury Heights Construction

General Construction Works:

 Erection of walls, glass partitions, metal welding, stairs raising, facade works;

Mounting of the raised floors and podiums, laying of carpets with welded seams, laminate, linoleum, wood flooring, parquets, granite tiles and works with natural stone;

Installation of modular Armstrong ceilings, Grilliato lattice, suspended ceilings Barisol and other types of ceilings;

Plastering and finish works of all kinds.

We use only modern certified and approved materials.

Page 6: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page6

Services provided by Sunbury Heights Construction

Installation of Engineering Systems

Heating, ventilation and air conditioning systems installation based on chiller-fan coil units, split systems, precision air conditioners;

Water supply and sanitation of any complexity, including the installation of accumulators, pumps, grinders, tanks, and instrumentation;

Installation of electrical systems and lighting, conducting the necessary testing and tuning works allowed by the landlord;

Installation of automatic, manual and gas fire suppressing system, fire alarm sounding system and fire alarm and smoke extraction systems;

Low-power and telephone systems installation, including structured cabling networks, access control systems, alarm and video surveillance.

Page 7: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Basic principles of our work:

1. Our primary task is to meet the deadlines of the project within the limited budget, but with highest quality and project standards

2. We understand the importance of saving client’s budget while offering high quality materials

3. We ensure an individual approach to each client, developing a clear understanding their needs and requirements.

4. We remain responsible for the end result and provide post-warranty services.

Apr 10, 2023

page7

Page 8: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Our clients:

Apr 10, 2023

page8

Johnson & Johnson 2007 185 m2 Fit-out works at the new office

Seldico LLC 2007 230 m2 Fit-out works at the new office

Amway 2008 680 m2 Design and build of the new office

EDF (Electricite de France) 2008 1 150 m2 Design and build of the new office

Sawatzky 2008 650 m2 Fit-out works at the entrance area at the Baltchug Business Center

Geberit 2009 336 m2 Design and build of the new office

Canon 2009 1 950 m2 Design and build of the new office

Alstom 2009 780 m2 Office repair fit-out works

Qatar Airways 2009 287,5 m2 Design and build of the new office

Church of Jesus Christ 2009-2010 240 m2 Design and build of new Church. Gaining approvals with city authorities

PPD 2010 850 m2 Design and build of the new office

Pfizer 2010 700 m2 Design and changing lay-out of the office

Etihad Airways 2010 500 m2 Design

FujiFilm 2010 1700 m2 Design and build of the new office

Bank of Tokyo 2010 250 m2 Design and changing lay-out of the office

Trust bank 2009-2010 23 500 m2 Fit-out works and adjacent territory infrastructure development

AmigoSport 2011 360 m2 Design works

Page 9: Moscow 201 1 Presentation Construction Company. 5-Jun-14 pag e 2 About Us Sunbury Heights Construction Management division has been working in the Russian.

Apr 10, 2023

page9

Contact Information

For more information, please

contact our Moscow office

Tel: +7 495 710 7065

Our website:

www.sunburyheights.com