MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD
description
Transcript of MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD
Slide: 1
MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD
APS
SPRING 8
ESRF
AMMW2013
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 2
AMMW2013
I. LECONTE – P. ROUSSELY – OPERATION Group
Particles Electrons
Energy 6 GeV
Intensity 200 mA
Hours/year 5600
0.5 MeV
200 MeV
LINAC200 MeV 6GeV
BOOSTER ( 300m )
STORAGE RING ( 844 m )
200 MeV
HOW X-RAYs ARE PRODUCED ?
6GeV
Slide: 3
USM : 231 days - Shutdowns : 80 days - - MDT : 54 days
Planning 2013 :AMMW2013
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 4
620 employees, 18% work for the Machine
Annual budget : 100 M€
Number of assets : 20 000
Annual maintenance budget : 13 M€
Management responsible : For asset & maintenance each group is responsible in close collaboration with the Operation group
AMMW2013
ORGANIZATION :OPERATIONAlignment
Control
Diagnostics
DrawingsFront end
Infrastructure
Power supplies
Radio Frequency
SafetyTheory
Vacuum
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 5
3D trailer
AMMW2013
Fast data loggers for quick events
Tools for operation tracking:
1 hour buffer
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 6
AMMW2013
Historical data base, recalls in the past months and /or years
Tools for operation tracking:
Jlogbook ( selections by date/events/equipment … ) used daily by the Operator on crew in the Control Room
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 7
AMMW2013
AMM entreprise strategy :
No dedicated tools for the accelerators up to now, but we plan to develop our Jlogbook in this way( Infrastructure group and RF group use CARL master software )
Our goals are :
Machine availability Mean Time Between Failures
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 8
2008 2009 2010 2011 2012 201395%
100%
98.30% 99.04% 98.78% 98.91% 98.58% 98.69%
1.70% 0.96% 1.22% 1.09% 1.42% 1.31%
Years
Perc
enta
ge o
f ava
ilabi
lity
ESRF record
In progress
ACCELERATOR'S AVAILABILITY FROM 2008 TO 2013
AMMW2013
I. LECONTE – P. ROUSSELY – OPERATION Group
Slide: 9
2008 2009 2010 2011 2012 20130
20
40
60
80
100
64.5
75.8
67.5
107.8
60.0
69.4
1.1 0.7 0.8 1.2 0.9 0.9
Hour
s
Mean time per failure
ESRF re-cord
4 days
MEAN TIME BETWEEN FAILURES FROM 2008 TO 2013
AMMW2013
I. LECONTE – P. ROUSSELY – OPERATION Group