MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD

10
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group

description

AMMW2013. MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD. APS. ESRF. SPRING 8. I. LECONTE – P. ROUSSELY – OPERATION Group. AMMW2013. HOW X-RAYs ARE PRODUCED ?. 0.5 MeV. 200 MeV. BOOSTER ( 300m ). 200 MeV  6GeV. LINAC. 200 MeV. 6GeV. STORAGE RING ( 844 m ). - PowerPoint PPT Presentation

Transcript of MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD

Slide: 1

MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD

APS

SPRING 8

ESRF

AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 2

AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group

Particles Electrons

Energy 6 GeV

Intensity 200 mA

Hours/year 5600

0.5 MeV

200 MeV

LINAC200 MeV 6GeV

BOOSTER ( 300m )

STORAGE RING ( 844 m )

200 MeV

HOW X-RAYs ARE PRODUCED ?

6GeV

Slide: 3

USM : 231 days - Shutdowns : 80 days - - MDT : 54 days

Planning 2013 :AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 4

620 employees, 18% work for the Machine

Annual budget : 100 M€

Number of assets : 20 000

Annual maintenance budget : 13 M€

Management responsible : For asset & maintenance each group is responsible in close collaboration with the Operation group

AMMW2013

ORGANIZATION :OPERATIONAlignment

Control

Diagnostics

DrawingsFront end

Infrastructure

Power supplies

Radio Frequency

SafetyTheory

Vacuum

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 5

3D trailer

AMMW2013

Fast data loggers for quick events

Tools for operation tracking:

1 hour buffer

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 6

AMMW2013

Historical data base, recalls in the past months and /or years

Tools for operation tracking:

Jlogbook ( selections by date/events/equipment … ) used daily by the Operator on crew in the Control Room

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 7

AMMW2013

AMM entreprise strategy :

No dedicated tools for the accelerators up to now, but we plan to develop our Jlogbook in this way( Infrastructure group and RF group use CARL master software )

Our goals are :

Machine availability Mean Time Between Failures

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 8

2008 2009 2010 2011 2012 201395%

100%

98.30% 99.04% 98.78% 98.91% 98.58% 98.69%

1.70% 0.96% 1.22% 1.09% 1.42% 1.31%

Years

Perc

enta

ge o

f ava

ilabi

lity

ESRF record

In progress

ACCELERATOR'S AVAILABILITY FROM 2008 TO 2013

AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 9

2008 2009 2010 2011 2012 20130

20

40

60

80

100

64.5

75.8

67.5

107.8

60.0

69.4

1.1 0.7 0.8 1.2 0.9 0.9

Hour

s

Mean time per failure

ESRF re-cord

4 days

MEAN TIME BETWEEN FAILURES FROM 2008 TO 2013

AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group

Slide: 10

THANK YOU FOR YOUR ATTENTION

AMMW2013

I. LECONTE – P. ROUSSELY – OPERATION Group