Monthly reprot

2
30Apr15 Project Data Sheet Client: Nakheel Consultant: Al Gurg Consultants Contractor: Parkway International Contracting LLC Project Scope Civil, MEP & Infrastructure works for Exp A, B & C Built up Area 31,509 Sq. M Contractual Data Commencement Date: 26Nov13 Completion Date: 18Jul15 Contract Duration: 600 Calendar Days Time Elapsed: 520 Calendar Days % Time Elapsed 86.7% Time Remaining: 80 Calendar Days % Time Rem. 13.3% EOT Claims by PIC 248 Calendar Days Approved EOT 79 Calendar Days Revised Completion Date 05Oct15 Contract Value: 92,155,809 AED Approved Cost Variation 514,732 AED Revised Contract Value 92,670,541 AED Cum. Value of Work Done 28,837,375 AED Contract outstanding Balance 63,833,166 AED Forecasted Data (Updated Program) Overall Delays (BL Program) 251 Calender days % Dur. Delays 41.83% Revised Working Program Date: 31Dec15 % Time Elapsed 68.0% Progress (As per Baseline) Upto Last Month / Period This Month / Period Cumulative Progress % Planned ( Baseline) 83.34% 5.33% 88.67% Planned ( Revised WP) 42.67% 2.47% 45.14% Actual 40.09% 0.00% 40.09% Variance (Baseline) 43.25% 5.33% 48.58% Variance (RWP) 2.58% 2.47% 5.05% After Mobilization in Month of Dec'14, PIC was unable to proceed for construction activities due to unavailabilty of IFC drawings, Desgin NOC's and Building Permits Now Progress is monitered at site using revised working program as approved by Al Gurg. New completion date for the project is 31Dec2015 Still PIC is awainting for Authority approvals of ExpC2 which affecting the Progress of Project Remarks Current Progress ( %) EXECUTIVE SUMMARY Date Date Job No : 131 Ibn Battuta Shopping Mall Expansion Expansion A, B & C Monthly Report No. 16

description

monthlyu report

Transcript of Monthly reprot

  • 30Apr15

    ProjectDataSheetClient: Nakheel

    Consultant: AlGurgConsultants

    Contractor: ParkwayInternationalContractingLLC

    ProjectScope Civil,MEP&InfrastructureworksforExpA,B&C

    BuiltupArea 31,509Sq.M

    ContractualDataCommencementDate: 26Nov13CompletionDate: 18Jul15ContractDuration: 600 CalendarDaysTimeElapsed: 520 CalendarDays %TimeElapsed 86.7%TimeRemaining: 80 CalendarDays %TimeRem. 13.3%EOTClaimsbyPIC 248 CalendarDaysApprovedEOT 79 CalendarDaysRevisedCompletionDate 05Oct15ContractValue: 92,155,809 AEDApprovedCostVariation 514,732 AEDRevisedContractValue 92,670,541 AEDCum.ValueofWorkDone 28,837,375 AEDContractoutstandingBalance 63,833,166 AED

    ForecastedData(UpdatedProgram)OverallDelays(BLProgram) 251 Calenderdays %Dur.Delays 41.83%RevisedWorkingProgramDate: 31Dec15 %TimeElapsed 68.0%

    Progress(AsperBaseline)

    UptoLastMonth/Period ThisMonth/Period

    CumulativeProgress%

    Planned(Baseline) 83.34% 5.33% 88.67%

    Planned(RevisedWP) 42.67% 2.47% 45.14%

    Actual 40.09% 0.00% 40.09%

    Variance(Baseline) 43.25% 5.33% 48.58%

    Variance(RWP) 2.58% 2.47% 5.05%

    AfterMobilizationinMonthofDec'14,PICwasunabletoproceedforconstructionactivitiesduetounavailabiltyofIFCdrawings,DesginNOC'sandBuildingPermitsNowProgressismoniteredatsiteusingrevisedworkingprogramasapprovedbyAlGurg.Newcompletiondatefortheprojectis31Dec2015StillPICisawaintingforAuthorityapprovalsofExpC2whichaffectingtheProgressofProject

    RemarksCurrentProgress(%)

    EXECUTIVESUMMARYDateDate

    JobNo:131 IbnBattutaShoppingMallExpansionExpansionA,B&C MonthlyReportNo.16

  • JobNo:131 IbnBattutaShoppingMallExpansionExpansionA,B&C MonthlyReportNo.16

    Progress(AsperRevisedWorkingProgram

    UptoLastMonth/Period ThisMonth/Period Cumulative

    Planned(Baseline) 71,204,232 8,463,093 79,667,325

    Planned(RevisedWP) 31,016,792 5,628,305 36,645,097

    Actual 24,350,594 24,350,594

    Variance(Baseline) (46,853,638) (8,463,093) (55,316,731)

    Variance(RWP) (6,666,198) (5,628,305) (12,294,503)

    ManDays

    Remarks

    UptoLastMonth/Period ThisMonth/Period

    CumulativeMandays LastMonth/Period

    ThisMonth/Period

    Planned(Baseline)127598 11424 139022 441 372

    Planned(RevisedWP)56805 13181 69986 558 481

    Actual 65263 16406 81669 702 631

    Variance(Baseline) (62,335) 4,982 (57,353)261 259

    Variance(RWP) 8,458 3,225 11,683 144 151

    ActualManpowerincreasefrommonthofMarchbecause2ndFixMEPandFinsihingworkarestartedand

    inprogress

    PreparationofInvoiceforthemonthofMay15isinProgress.

    Monthly Daily(Avg)

    ValueofWorkDone(AED) Remarks