MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION
Presented by:
Dustin G. Wasley, PE, Principal – CES
MT Mine Design, Operation & Closure Conference
May 9, 2013
![Page 2: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/2.jpg)
Outline of Topics
History of the Monte Cristo Mining District
Overview of Mines/Facilities
Nature and Extent of Contamination
Removal Action Summary
Removal Action Update/Timeline
Environmental Group Involvement/Interest
![Page 3: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/3.jpg)
Overview of the MCMA Located in NW Washington, near/in HMJ Wilderness
![Page 4: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/4.jpg)
Overview of the MCMA Located in NW Washington, near/in HMJ Wilderness
~60 Mines/Prospects, plus several mills - mainly waste rock, tailings, concentrates, and impacted soil
Complex Land Ownership, USFS/private, platted Townsite
2,000 – 6,000 feet amsl (Monte Cristo Lake to Headwaters)
Heavy Recreational Use (3,500+ annual visitors)
ASARCO Settlement - $5.5M each to Forest Service and Ecology
![Page 5: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/5.jpg)
HMJ WILDERNESS
BOUNDARY
MONTE CRISTO
TOWNSITE
![Page 6: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/6.jpg)
Stakeholders
Region 6 – Forest Service
Washington Department of Ecology
Monte Cristo Preservation Association
U.S. Fish and Wildlife
Washington Department of Fish and Game
Private Landowners/Seasonal Residents
Recreational Users - Hikers, Campers, etc.
Sauk-Suiattle Tribe
![Page 7: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/7.jpg)
Early History of Mining District
1889 – First discovery and early claims.
1891 – Rockefeller buys majority interest.
1892/1893 – Wagon Road/Railway completed to Monte Cristo.
1894 – United Concentration Company completes Mill.
1894 to 1906 – Period of Most Significant Mining, Ore Production ~300,000 tons.
1903 – ASARCO purchases Everett Smelter/Monte Cristo interests.
1907 – Main Production ends at Monte Cristo.
![Page 8: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/8.jpg)
![Page 9: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/9.jpg)
![Page 10: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/10.jpg)
![Page 11: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/11.jpg)
![Page 12: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/12.jpg)
![Page 13: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/13.jpg)
CERCLA Investigations 2002 – Preliminary Assessment - Concentrator/Mystery (FS)
2004 – Site Inspection – Phase I/II Initiated (FS/CES)
2006 – Preliminary Assessments – 4 Additional Sites (FS)
2007 – Site Inspection – Phase III/IV Initiated (FS/CES)
2008 – Site Inspection Finalized (FS/CES)
2008 – EE/CA Initiated (FS/CES)
2009 – EE/CA Public Presentation (FS/CES)
2010 – EE/CA Published, Public Comment (FS/CES)
2012 – Signed Removal Action Memorandum (FS)
![Page 14: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/14.jpg)
Project Challenges Wilderness Area
Limited Access – No Viable Road
Archeological / Cultural Issues (Road and Townsite)
Inventoried Roadless Area
Limited Communications
High Gradient Streams
Multiple Stakeholders
And…………………………………
![Page 15: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/15.jpg)
![Page 16: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/16.jpg)
Mines/Facilities Investigated Pride of the Mountains Mine
Pride of the Woods Mine
New Discovery Mine
Mystery Mine
Golden Cord Mine
Justice Mine
Rainy Mine
Lincoln Mine
Liberty Prospect
Sheridan Mine
Sidney Mine
Boston-American Mine
• Ore Collector
• Comet Terminal
• Concentrator/Mill
• Assay Shack
• Haulage Ways
![Page 17: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/17.jpg)
HMJ WILDERNESS
BOUNDARY
MONTE CRISTO
TOWNSITE
![Page 18: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/18.jpg)
![Page 19: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/19.jpg)
Upper Glacier Basin/Creek Area
Pride of the Mountains Mine
New Discovery Mine
Pride of the Woods Mine
HMJ Wilderness
![Page 20: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/20.jpg)
Pride of the Woods Mine
1 Adit
Located on Glacier Basin Trail
~1000 cy of Waste Rock As = 16,640 ppm (Avg)
Toe of Waste Rock in Glacier Creek
Seep at Toe of Waste Rock Up to 1,100 ppb (As)
![Page 21: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/21.jpg)
Pride of the Woods Mine
Portal Area
WR Toe in Glacier Creek
![Page 22: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/22.jpg)
Mystery Ridge/Basin Area
Mystery Mine
Golden Cord Mine
Justice Mine HMJ Wilderness
![Page 23: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/23.jpg)
Mystery Mine
3 Adits and Glory Hole ~32,000 cy of Waste Rock
As = 12,657 ppm (Avg)
Adit Seep <40 gpm / 3,300 ppb (As)
Seep Below Waste Rock <4.5 gpm / 1,100 ppb (As)
![Page 24: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/24.jpg)
Mystery Mine
Main Portal Area Adit Seep
![Page 25: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/25.jpg)
Justice Mine
2 Adits ~14,000 cy of Waste Rock
As = 11,719 ppm (Avg)
Adit Seep 90 gpm & 235 ppb (As)
Seep Below Waste Rock 1.35 gpm & 264 ppb (As)
![Page 26: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/26.jpg)
Main Portal Seep and WR Dump
Justice Mine
![Page 27: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/27.jpg)
Lower Glacier Creek/Townsite Area
Rainy Mine Ore Collector Concentrator Assay Shack Haulage Ways Comet Terminal Boston-American Mine
HMJ
Wilderness
![Page 28: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/28.jpg)
Rainy Mine
1 Adit and 2 Shafts ~5,000 cy of Waste Rock
As = 40,455 ppm (Avg)
Glacier Creek Eroding Waste Rock Dump
Adit Seep 0.05 gpm & 14 ppb (As)
![Page 29: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/29.jpg)
Rainy Mine
Dump and Glacier Creek
![Page 30: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/30.jpg)
Ore Collector Ruins Present (stone,
brick, and wood)
~2,500 cy of Ore Fine and Coarse
As = 29,551 ppm (Avg)
![Page 31: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/31.jpg)
Comet Terminal
Ruins/spillage piles
Located on Glacier Basin Trail
11 ore stockpiles/spillage piles (As up to 10%)
~ 1,000 cy of piles and soil (scattered)
![Page 32: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/32.jpg)
Concentrator/ Mill
Mill Ruins Present
~10,000 cy of Tailings As = 21,400 ppm (Avg)
100 cy of Dangerous Waste
Near Glacier Creek
![Page 33: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/33.jpg)
![Page 34: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/34.jpg)
Assay Shack / Haulage Ways
Ruins Present at Assay Shack
~200 cy of Soil @ Assay As = 36,400 ppm (Avg)
~200 cy of Soil @ Haulage As = 7,150 ppm (Avg)
![Page 35: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/35.jpg)
Seventy-Six Gulch/Creek Area
Sidney Mine
Sheridan Mine
Liberty Prospect
![Page 36: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/36.jpg)
Sampling Overview
10 Background Soil Samples
115+ Waste Rock/Tailings/Soil Samples (plus many hundreds of XRF readings)
79 Adit Discharge Water Samples
164 Surface Water Samples – Aquatic Stations
169 Sediment Samples – Aquatic Stations
16 Pore Water Samples – Aquatic Stations
![Page 37: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/37.jpg)
Nature and Extent of Contamination
Soil (Complete Pathway) - Arsenic is the primary COC. ~80,000 cy of waste rock, tailings, cons, and impacted soil present.
Air (Complete Pathway) – Contaminants are concentrated at the surface where receptors could be exposed (Accounted for in Soil Pathway)
Groundwater (Incomplete Pathway) – No known wells near MCMA. Adit discharges/seeps are included in the Surface Water Pathway.
Surface Water (Complete Pathway) – General increase in contaminant concentrations in surface water/sediment downstream.
Cleanup Levels - 236 mg/kg (Near) / 660 mg/kg (Remote)
![Page 38: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/38.jpg)
Seventy-Six Creek
Glacier Creek
Monte Cristo Lake
Monte Cristo Townsite
(4-38 cfs)
(1-65 cfs)
South Fork Sauk River
(40-340 cfs)
Aquatic Stations
![Page 39: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/39.jpg)
0
50
100
150
200
250
300
0.00 0.44 0.54 0.66 0.91 1.63 1.88 2.39 3.23 4.00 5.22 5.98 6.84 7.42 8.79 9.32 9.59
As
(ug/
L)
Distance in Miles
Arsenic Concentrations in Surface Water Glacier Creek & South Fork Sauk River
Spring 2010 Fall 2010
Spring 2011 Fall 2011
Spring 2012 Fall 2012
POM
New Discovery
POW Mystery
Justice Rainy
Ore Collector/ Mill
76 Gulch
Weden Creek
Barlow Pass
Monte Cristo Lake
![Page 40: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/40.jpg)
0
500
1,000
1,500
2,000
2,500
0.00 0.44 0.54 0.66 0.91 1.63 1.88 2.39 3.23 4.00 5.22 5.98 6.84 7.42 8.79 9.32 9.59
As
(ug/
L)
Distance in Miles
Arsenic Concentrations in Stream Sediment Glacier Creek & South Fork Sauk River
Spring 2010 Fall 2010
Spring 2011 Fall 2011
Spring 2012 Fall 2012
POM
New Discovery
POW
Mystery
Justice
Rainy
Ore Collector/ Mill
76 Gulch
Weden Creek
Barlow Pass
Monte Cristo Lake
![Page 41: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/41.jpg)
RA Recommendations Common Items
o Adit / Shaft Closures (Easily Accessible only)
o Preservation of Historically Significant Areas (Process Facilities)
o Construct New CERCLA Access Route on North Side of SFSR
o Wilderness Area Signage
o Adit Discharge Water Treatment (Future Task)
• Onsite Fully Lined Repository
o Pride of the Woods Mine
o Rainy Mine
o Sidney Mine
o Collector/Concentrator
o Assay Shack/ Haulage Ways
o Comet Terminal
• Institutional Controls – Remaining Sites o Due to Remoteness, Access, Wilderness Proximity, Distance from SW
• Total Cost ~ $4-5M
![Page 42: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/42.jpg)
![Page 43: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/43.jpg)
CERCLA Removal Action Timeline 2013
o Winter – Finalize Access Route / Bridge Designs / Work Plan
o Spring – Aquatic Sampling Event
o Summer – Access Route / Bridge Construction
o Summer – Data Gap Investigations
o Fall – Aquatic Sampling Event
2014 o Winter – Repository Design Plans/Specs/Work Plan
o Spring – Aquatic Sampling Event
o Spring/Summer – Removal Action Implementation
o Fall – Aquatic Sampling Event
![Page 44: MONTE CRISTO MINING AREA CERCLA REMOVAL …...MONTE CRISTO MINING AREA CERCLA REMOVAL ACTION Presented by: Dustin G. Wasley, PE, Principal – CES MT Mine Design, Operation & Closure](https://reader030.fdocuments.us/reader030/viewer/2022040901/5e71140e7711622684032eb1/html5/thumbnails/44.jpg)
Environmental Group Involvement
Washington Environmental Council (WEC) Lawsuit Claimed CWA violations into waters of US
No NPDES permit on 7 discharges
Lawsuit eventually dismissed because of ongoing CERCLA project
Sierra Club
Basically wants Forest Service to do nothing
Major concerns with Endangered Species
Requested onsite observer during construction
Requested USF&W to re-initiate BO process..