PERFORMANCE MEASURES
In December 2015, the Federal Surface Transportation Authorization known as Fixing America’s
Surface Transportation (FAST) Act passed into law. The FAST Act “largely maintains current
structures and funding shares between highways and transit” and “makes changes and reforms
to many Federal transportation programs, including streamlining the approval processes for new
transportation projects, providing new safety tools, and establishing new programs to advance
critical freight projects” (source: U. S. DOT website). The FAST Act retains most of the planning
requirements of prior federal regulations, i.e. Moving Ahead for Progress in the 21st Century
(MAP-21) and the Safe Accountable Flexible, Efficient Transportation Equity Act: A Legacy for
Users (SAFETEA-LU).
The FAST Act added two additional factors to the eight planning factors for both metro and
statewide planning identified in MAP-21:
• Support the economic vitality of the metropolitan area, especially by enabling global
competitiveness, productivity and efficiency;
• Increase the safety of the transportation system for all motorized and non-motorized
users;
• Increase the ability of the transportation system to support homeland security and to
safeguard the personal security of motorized and non-motorized users;
• Increase accessibility and mobility of people and freight;
• Protect and enhance the environment, promote energy conservation, improve the quality
of life and promote consistency between transportation improvements and State and
local planned growth and economic development patterns;
• Enhance the integration and connectivity of the transportation system, across and
between modes, for people and freight;
• Promote efficient system management and operation;
• Emphasize the preservation of the existing transportation system;
• Improve the resiliency and reliability of the transportation system and reduce or mitigate
stormwater impacts of surface transportation; and
• Enhance travel and tourism.
Montachusett MPO 3-2 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
A key feature of the FAST Act legislation that is maintained from prior legislation “is the
establishment of a performance- and outcome-based program. The objective…is for States to
invest resources in projects that collectively will make progress toward the achievement of the
national goals.” National performance goals have been established in seven areas:
• Safety - To achieve a significant reduction in traffic fatalities and serious injuries on all
public roads.
• Infrastructure condition - To maintain the highway infrastructure asset system in a state
of good repair.
• Congestion reduction - To achieve a significant reduction in congestion on the National
Highway System.
• System reliability - To improve the efficiency of the surface transportation system.
• Freight movement and economic vitality - To improve the national freight network,
strengthen the ability of rural communities to access national and international trade
markets, and support regional economic development.
• Environmental sustainability - To enhance the performance of the transportation system
while protecting and enhancing the natural environment.
• Reduced project delivery delays - To reduce project costs, promote jobs and the economy,
and expedite the movement of people and goods by accelerating project completion
through eliminating delays in the project development and delivery process, including
reducing regulatory burdens and improving agencies’ work practices.
Performance measures and targets are required to be established by FHWA, state DOTs, MPOs
and other stakeholders in consultation with each other over the upcoming years. The
Montachusett MPO is committed to working with MassDOT, FHWA and other partners to
develop and track the performance of elements of the regional transportation system and to
utilize these performance measures as a tool or guide in the transportation planning process.
Regional Transportation Plan – Performance Measures
MRPC staff has continued to review available data, information, state and federal goals and
requirements in order to develop and expand regional local performance measures. A series of
performance measures were identified during the development of the 2016 Regional
Transportation Plan (RTP). These performance measures form the basis for system monitoring
Montachusett MPO 3-3 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
in the Montachusett Region only. Additionally, the regional performance measures are
incorporated into the decision-making process for the TIP and where applicable are linked to
transportation investment decisions, i.e. the Transportation Evaluation Criteria (TEC). As these
measures are further defined and reviewed by the MPO, it is expected that the TEC will also be
revised and/or updated to reflect them. Data for the regional performance measures are derived
from a combination of agency data collection efforts, studies and statewide databases made
available to the MRPC.
The following tables outline the RTP defined Goals, Objectives and Performance Measures (PM)
that address the seven National performance goals.
Regional Transportation Plan Goals, Objectives and Performance Measures Summary
Goal 1 – Improve and Maintain Safety and Security
Objectives Performance Measures
• Seek to reduce the number and severity of vehicular crashes within the region across all modes.
1. Reduce the Regional EPDO and percentage of fatal and injury crashes among vehicles, bicycles and pedestrians by 10% over a 10-year period.
• Promote projects that are designed to address high crash locations and prioritize their implementation.
2. Reduce the fatality rate by 10% and the serious injury rate by 10% from current levels in 10 years.
• Promote and encourage education outreach programs to drivers, pedestrians and bicyclists regarding rules and responsibilities.
3. Identify and/or implement 4 to 5 corrective projects at identified top 10 high incident locations over a 10-year period.
• Expand community involvement with federal and state programs and education initiatives such as Safe Routes to School.
4. Conduct 1 to 2 Road Safety Audits at identified high crash locations every 2 years.
• Seek to improve user awareness along all transportation networks through better identification, pavement markings and signage with an emphasis on bicycle and pedestrian routes.
5. Increase the number of communities involved in the Safe Routes to School program.
Goal 1 – Improve and Maintain Safety and Security (cont.)
Objectives Performance Measures
• Seek to expand the number and use of variable message signs along major roads such as Route 2 and I-190 to inform drivers of potential unsafe conditions and important alerts.
6. Maintain involvement with the Central MA Regional Homeland Security Council and evacuation planning efforts.
• Promote projects that address key identified emergency and evacuation routes in order to maintain effectiveness.
7. Maintain the average number of preventable fixed route crashes under 2+ per month and demand responsive crashes under 5+ per month.
Montachusett MPO 3-4 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Goal 2 – Reduce Congestion and Improve Mobility
Objectives Performance Measures
• Monitor locations and promote projects that address congested roadways within the region.
1. Conduct Travel Time data collection along 3 to 5 major roadways throughout region on an annual basis.
• Support programs that quickly and efficiently address bridge deficiencies across all modes with an emphasis on freight and rail locations.
2. Identify 1 bottleneck location and conduct a study every 2 years in order to develop and/or implement corrective measures.
• Encourage communities to address local mobility issues in order to promote mode shift options in congested areas.
3. Increase the number of Complete Street certified communities within the region. Seek to have a majority of communities formally certified within 10 years.
• Seek to increase travel options within the region through the promotion of trails, Complete Streets, transit, land use and their interactions.
Goal 3 – Promote and Seek Equitable Transportation for All
Objectives Performance Measures
• Seek to increase access to transit options through improved dissemination of available service information.
1. Increase formal membership and public outreach within Montachusett Joint Transportation Committee (MJTC) of Title VI and Environmental Justice groups.
• Improve outreach and partnerships between RTA’s and social service agencies, schools, health centers, neighborhood organizations, etc.
2. Conduct benefits/burdens review of federal aid projects identified through the TIP process on an annual basis.
• Seek to expand and increase transit service operations to improve job access and commercial services for all users.
3. Continue to work with the Montachusett Regional Transit Authority (MART) to expand outreach to and usage by Title VI and Environmental Justice communities through promotions and training methods on how to utilize the system.
• Promote the development of improvements and options across all modes for areas that serve Title VI and Environmental Justice populations.
• Monitor fee options in order to maintain equitability for all users.
• Actively seek and identify organizations and agencies of Title VI and Environmental Justice populations and conduct direct outreach to encourage involvement and participation in the planning process.
Goal 4 – Improve System Preservation and Maintenance of All Modes
Objectives Performance Measures
• Seek to encourage and prioritize preservation projects within communities in order to maintain a state of good repair for all modes.
1. Continue pavement management data collection and analysis efforts on an annual basis through a rotating 3-year schedule of federal aid eligible roadways.
Montachusett MPO 3-5 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Goal 4 – Improve System Preservation and Maintenance of All Modes (cont.)
Objectives Performance Measures
• Continue to monitor, and revise as needed, the Transportation Evaluation Criteria (TEC) to encourage those projects that help to maintain a state of good repair.
2. Increase the percentage of categorized “Good” to “Excellent” federal aid eligible roadway miles within the region over a 10-year period.
• Continue the promotion and prioritization of bridge projects throughout the region.
3. Decrease the number of identified “Structurally Deficient” bridges within the Region.
• Encourage communities to maintain and monitor trials that provide transportation options throughout the year.
4. Review and revise the Transportation Evaluation Criteria (TEC) every 2 to 5 years to maintain a viable prioritization process.
• Seek to encourage additional funds for maintenance as well as the development of a potential federal/state funded preservation program.
5. Maintain the number of road service calls due to mechanical failures on the fixed route and demand responsive systems under 10 per month.
• Encourage and support continued operation, maintenance, state of good repair and expansion of the transit system.
6. Maintain a percentage of operated scheduled trips per month at 90% or better.
• Encourage communities with viable preservation projects to seek funding and implementation through and in collaboration with the Transportation Improvement Program (TIP) process.
7. Achieve an average on time ranking on the fixed route system of 95% by 2040.
• Encourage state and local officials to evaluate the benefits of a joint procurement process for equipment, materials and services to help reduce costs.
Goal 5 – Improve Economic Vitality and Freight Movement
Objectives Performance Measures
• Seek to promote economic advantages of the regional trail network and recreational destinations.
1. Revise, update and distribute a Regional Trail map, in coordination with the Montachusett Regional Trail Coalition (MRTC), by 2020.
• Seek to establish and prioritize major trail connections throughout the region.
2. Review and analyze 1 to 2 freight corridors through development of a Unified Planning Work Program (UPWP) task every 5 years.
• Seek to promote and expand commuter transit and rail options beyond the urban centers.
• Prioritize and improve railroad and other restricted bridges in order to enhance freight mobility.
• Seek to improve freight and general vehicle access and connection to Route 2 throughout the region.
Montachusett MPO 3-6 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Goal 6 – Improve Transportation Options and Promote Heathy Modes
Objectives Performance Measures
• Seek to expand travel options and modes across the region through improved connections and services.
1. Increase the number of bicycle facilities, ex. Bicycle racks and
lockers and on-board bus racks, at transit centers within 12
years.
• Promote additional bicycle facilities for transit centers and vehicles.
2. Conduct 3 to 4 walk audits over a 12-year period in interested
communities.
• Promote an improved local review process that addresses issues related to Complete Streets, trail development, sidewalk implementation and mobility improvement as well as mode shift options within their community.
3. Establish a top 5 list of prioritized trail connections, within and
across communities, in 4 years with updates every 4 years.
Goal 6 – Improve Transportation Options and Promote Heathy Modes (cont.)
Objectives Performance Measures
• Seek to increase and encourage a shift from single occupant vehicles to transit, bicycle and pedestrian modes through improved transit, van/car pool and trail options.
• Improve infrastructure, i.e. sidewalks, benches, shelters, shared lanes, etc., along competing modes to encourage increased usage.
Goal 7 – Reduce Green House Gas and Promote Environmental Practices and Sustainability
Objectives Performance Measures
• Seek to reduce Greenhouse Gas emissions through support and implementation of Congestion Mitigation Air Quality (CMAQ) and Transportation Alternative Program (TAP) projects as well as state mode shift goals.
1. Increase percentage of alternative fuel vehicles within the overall transit fleet by 2020.
• Prioritize vehicle replacement in the transit fleet with applicable and cost-effective alternative fuel vehicles.
2. Program and implement 100% of Congestion Mitigation Air Quality (CMAQ) projects within the regional Transportation Improvement Program (TIP).
• Encourage communities to promote and support Green Streets through Low Impact (LID) and Transit Oriented (TOD) Development projects as well as stormwater drainage improvement.
• Encourage and promote transit options to new residential and smart growth developments.
• Encourage and support the use of alternative fuel vehicles by the public with infrastructure support services and by transit systems through vehicle replacement programs.
As previously stated, these performance measures are to be utilized on a regional level to assist
in monitoring RTP goals. They are not intended to replace any state performance measure
adopted by the MPO.
Montachusett MPO 3-7 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
In the four years since the development of the 2016 RTP, MRPC has monitored progress of toward
meeting these PM. Many of the measures are expected to be monitored over a period of 10 years
or more, however, they are still being monitored to determine if they are on track. The following
is a Performance Measure “Dashboard” which summarizes the progress of the PM in the
Montachusett region.
Montachusett MPO 3-8 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Goal Performance MeasureTime
PeriodStatus
Action
Needed
Action
YearNotes
*Reduce the Regional EPDO and percentage of fatal and injury crashes among
vehicles, bicycles and pedestrians by 10% over a 10 year period.10 Years Benchmark set, monitoring ongoing Monitor/ Report 2025 Pending further analysis
*Reduce the fatality rate by 10% and the serious injury rate by 10% from current
levels in 10 years.10 Years Benchmark set, monitoring ongoing Monitor/ Report 2025 Pending further analysis
*Identify and/or implement 4 to 5 corrective projects at identified top 10 high
incident locations over a 10 year period.10 Years Benchmark set, monitoring ongoing
Identification/
Implementation 2025 Pending further analysis
*Conduct 1 to 2 Road Safety Audits at identified high crash locations every 2
years.2 Years Achieved Road Safety Audits Ongoing 4 road safety audits completed in 2 years
*Increase the number of communities involved in the Safe Routes to School
program.General Benchmark set, monitoring ongoing
Report of number
of communities
involved
OngoingIncreased from 14 out of 22 (63%) communities
in 2016 to 16 (73%) communities in 2019
*Maintain involvement with the Central MA Regional Homeland Security
Council and evacuation planning efforts.General Achieved Participation Ongoing
Evacuation route mapping project completed in
2016.
*Maintain the average number of preventable fixed route crashes under 2+ per
month and demand responsive crashes under 5+ per month.General Monitoring ongoing, achieved Meet benchmarks Ongoing Only missed goal in 1 month out of 12.
*Conduct Travel Time data collection along 3 to 5 major roadways throughout
region on an annual basis.Annual Amended to as needed basis Travel Time Data Yearly
Previously utilized TravTime software is now
obsolete. Monitoring now occurs on project
need basis using multiple platforms.
*Identify 1 bottleneck location and conduct a study every 2 years in order to
develop and/or implement corrective measures.
Every 2
YearsAchieved Bottleneck Study
2017,
2019
Merriam Ave/South St. cooridor study
completed in 2018, Main St. cooridor of Ayer
planned for 2020
*Increase the number of Complete Street certified communities within the
region. Seek to have a majority of communities formally certified within 10
years.
10 Years Achieved Monitor/ Report 2025Increased from 9 of 22 (41%) communities in
2015 to 17 of 22 (77%) communities in 2019
*Increase formal membership and public outreach within Montachusett Joint
Transportation Committee (MJTC) of Title VI and Environmental Justice groups.General Ongoing effort, achieved Outreach Ongoing Increased membership
*Conduct benefits/burdens review of federal aid projects identified through
the TIP process on an annual basis. Annual Achieved Conduct Review Annually
Completed an equity analysis in every TIP and
UPWP since 2016
*Continue to work with the Montachusett Regional Transit Authority (MART) to
expand outreach to and usage by Title VI and Environmental Justice
communities through promotions and training methods on how to utilize the
system.
General Ongoing effort, achieved Outreach Ongoing
MART has created a series of videos on how to
use MART's fixed route buses in English and
Spanish
*Continue pavement management data collection and analysis efforts on an
annual basis through a rotating 3 year schedule of federal aid eligible roadways.General On-track
Data Collection/
AnalysisOngoing
Amended to four year basis to coincide with
MassDOT collection program and development
of the RTP.
*Increase the percentage of categorized “Good” to “Excellent” federal aid
eligible roadway miles within the region over a 10 year period.10 Years Benchmark set, monitoring ongoing Monitor/ Report 2025 In danger of not achieving 10 year measure.
*Decrease the number of identified “Structurally Deficient” bridges within the
Region.General Monitoring ongoing, achieved Monitor/ Report Ongoing
Has been achieved in most recent years, in
danger of not being achieved in future years.
*Review and revise the Transportation Evaluation Criteria (TEC) every 2 to 5
years to maintain a viable prioritization process.2 - 5 Years Achieved Review/ Revise
Before
2020Most recently achieved in 2018
*Maintain the number of road service calls due to mechanical failures on the
fixed route and demand responsive systems under 10 per month.General Monitoring monthly Monitor/ Report Ongoing Fell above in 4 out of 12 months. Bus fleet older.
*Maintain a percentage of operated scheduled trips per month at 90% or better. General Monitoring ongoing, achieved Monitor/ Report Ongoing
*Achieve an average on time ranking on the fixed route system of 95% by 2040. General Monitoring ongoing, achieved Monitor/ Report Ongoing
*Revise, update and distribute a Regional Trail map, in coordination with the
Montachusett Regional Trail Coalition (MRTC), by 2020.2020 Achieved Update Maps
Before
2020
Updated regional guide & individual community
maps (2018)
*Review and analyze 1 to 2 freight corridors through development of a Unified
Planning Work Program (UPWP) task every 5 years.
Every 5
YearsOngoing Review/ Analysis
Before
2020Future UPWP projects planned
*Increase the number of bicycle facilities, ex. Bicycle racks and lockers and on
board bus racks, at transit centers within 12 years.
Within 12
YearsOn-track Review
Before
2027Expanding # of vehicles with racks in FFY20
*Conduct 3 to 4 walk audits over a 12 year period in interested communities.Within 12
YearsOn track
Outreach,
organize, conduct
walk audits
Before
2027Conducted one walk audit in Lunenburg (2019)
*Establish a top 5 list of prioritized trail connections, within and across
communities, in 4 years with updates every 4 years.
Every 4
YearsOn track Prioritization 2019
MRPC has been working closely with the
Montachusett Regional Trails Coalition on this
list. It continues to be updated yearly.
*Increase percentage of alternative fuel vehicles within the overall transit fleet
by 2020.2020
Feasibility study on electric vehicles
needs to take place firstReview 2020
This will not be achieved until later years
Pending further analysis
*Program and implement 100% of Congestion Mitigation Air Quality (CMAQ)
projects within the regional Transportation Improvement Program (TIP).General
No longer relavent/ change in
allocation requirements has occurredImplementation Ongoing
CMAQ no longer is dispersed as targets,
although CMAQ is still actively assigned to
projects in the region.
Improve Transportation
Options and Promote
Heathy Modes
Reduce Green House Gas
and Promote
Environmental Practices
and Sustainability
Performance Measure Dashboard
Improve and Maintain
Safety and Security
Reduce Congestion and
Improve Mobility
Promote and Seek
Equitable Transportation
for All
Improve System
Preservation and
Maintenance of All
Modes
Improve Economic
Vitality and Freight
Movement
Montachusett MPO 3-9 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Statewide and Regional Transportation Performance Management
FHWA defines Transportation Performance Management as a strategic approach that uses
system information to make investment and policy decisions to achieve national performance
goals. In short, Transportation Performance Management:
• Is systematically applied, a regular ongoing process
• Provides key information to help decision makers allowing them to understand the
consequences of investment decisions across transportation assets or modes
• Improving communications between decision makers, stakeholders and the traveling
public.
• Ensuring targets and measures are developed in cooperative partnerships and based on
data and objective information
Effective on April 14, 2016 FHWA established a final rule on the first of its Performance Measures,
Safety Measures (PM 1). Targets related to PM 1 were then set by MassDOT and adopted by the
Montachusett MPO for CY 2019 on February 20, 2019. Subsequently, FHWA established two
additional performance measures that state Departments of Transportation and MPOs needed
to adopt and track. The National Highway System Bridge and Pavement Condition Performance
Measure (PM 2) and the Systems Performance Measures, Congestion, Reliability and Emissions
(PM 3) were required to be established by the end of 2018. MassDOT then provided statewide
target information for PM 2 and PM 3 to the Montachusett MPO for their review and either their
adoption by the MPO or the establishment of their own regional PM 2 and PM 3. After review
and discussion, the Montachusett formally adopted the statewide PM 2 targets on October 17,
2018 and PM 3 targets on September 19, 2018.
Safety Performance Measures (PM1)
Montachusett MPO has chosen to adopt the statewide safety performance measure targets set
by MassDOT for Calendar Year (CY) 2019. In setting these targets, MassDOT has followed FHWA
guidelines by using statewide crash data and Highway Performance Monitoring System (HPMS)
Montachusett MPO 3-10 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
data for vehicle miles traveled (VMT) in order to calculate 5 year, rolling average trend lines for
all FHWA-defined safety measures. For CY 2019 targets, four of the five safety measures—total
number of fatalities, rate of fatalities per 100 million vehicle miles traveled, total number of
incapacitating injuries, and rate of incapacitating injuries per 100 million VMT—were established
by extending their trend lines into the 2015-2019 period. All four of these measures reflect a
modest decrease in statewide trends. The fifth safety measure, the total number of combined
incapacitating injuries and fatalities for non-motorized modes, is the only safety measure for
which the statewide trend line depicts an increase. MassDOT’s effort to increase non-motorized
mode share throughout the Commonwealth has posed a challenge to simultaneously reducing
non-motorized injuries and fatalities. Rather than adopt a target that depicts an increase in the
trend line, MassDOT has elected to establish a target of non-motorized fatalities and injuries and
for CY 2019 that remains constant from the rolling average for 2012–2016. In recent years,
MassDOT and the Montachusett MPO have invested in “complete streets,” bicycle and
pedestrian infrastructure, intersection and safety improvements in both the Capital Investment
Plan (CIP) and Statewide Transportation Improvement Program (STIP) to address increasing
mode share and to incorporate safety mitigation elements into projects. Moving forward,
Montachusett MPO, alongside MassDOT, is actively seeking to improve data collection and
methodology for bicycle and pedestrian VMT counts and to continue analyzing crash clusters and
crash counts that include both motorized and non-motorized modes in order to address safety
issues at these locations.
In all safety categories, MassDOT has established a long-term target of “Toward Zero Deaths”
through MassDOT’s Performance Measures Tracker1 and will be establishing safety targets for
the MPO to consider for adoption each calendar year. While the MPO is not required by FHWA
to report on annual safety performance targets, FHWA guidelines require MPOs to adopt
MassDOT’s annual targets or to establish their own each year.
1 https://www.mass.gov/lists/tracker-annual-performance-management-reports
Montachusett MPO 3-11 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
The safety measures MassDOT has established for CY 2019, and that Montachusett MPO has
adopted, are as follows:
1) Fatalities: The target number of fatalities for years CY 2019 is 353, down from an average of
364 fatalities for the years 2012–2016. [See Figure 3-1 for Montachusett MPO vs. statewide
comparison of the trend for this performance measure]
2) Rate of Fatalities per 100 million VMT: The target fatality rate for years CY 2019 is 0.58, down
from a 0.61 average for years 2012–2016. [See Figure 3-1 for Montachusett MPO vs.
statewide comparison of the trend for this performance measure]
3) Serious Injuries: The target number of incapacitating injuries for CY2019 is 2801, down from
the average of 3146 for years 2012–2016. [See Figure 3-2 for Montachusett MPO vs.
statewide comparison of the trend for this performance measure]
4) Rate of Incapacitating Injuries per 100 million VMT: The incapacitating injury rate target for
CY2019 is 4.37 per year, down from the 5.24 average rate for years 2012–2016. [See Figure
3-2 for Montachusett MPO vs. statewide comparison of the trend for this performance
measure]
5) Total Number of Combined Incapacitating Injuries and Fatalities for Non-Motorized
Modes: The CY2019 target number of fatalities and incapacitating injuries for non-motorists
is 541 per year, the same as the average for years 2012–2016. [See Figure 3-3 for
Montachusett MPO vs. statewide comparison of the trend for this performance measure]
Montachusett MPO 3-12 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Figure 3 - 1. Total Fatalities Per Year Montachusett vs. Statewide
Figure 3 - 2. Total Serious Injuries Per Year Montachusett MPO vs. Statewide
Montachusett MPO 3-13 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Figure 3 - 3. Total Combined Serious Injuries & Fatalities for Non-Motorized Modes
Source of Data: MassDOT, Office of Transportation Planning
Bridge & Pavement Performance Measures (PM2)
Montachusett MPO has chosen to adopt the 2-year (2020) and 4-year (2022) statewide bridge
and pavement performance measure targets set by MassDOT. MassDOT was required to adopt
a statewide target by May 20th, 2018, with MPOs either adopting the statewide target or
establishing their own by November 2018. In setting these targets, MassDOT has followed FHWA
guidelines by measuring bridges and pavement condition using the 9-point National Bridge
Inventory Standards (NBIS); the International Roughness Index (IRI); the presence of pavement
rutting; and the presence of pavement cracking. 2-year and 4-year targets were set for six
individual performance measures: percent of bridges in good condition; percent of bridges in
poor condition; percent of Interstate pavement in good condition; percent of Interstate
pavement in poor condition; percent of non-Interstate pavement in good condition; and percent
of non-Interstate pavement in poor condition. All of the above performance measures are
tracked in greater detail in MassDOT’s Transportation Asset Management Plan (TAMP), which is
due to be finalized in July 2019.
Montachusett MPO 3-14 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Targets for bridge-related performance measures were determined by identifying which bridge
projects are programmed and projecting at what rate bridge conditions deteriorate. The bridge-
related performance measures measure the percentage of deck area, rather than the total
number of bridges.
Performance targets for pavement-related performance measures were based on a single year
of data collection, and thus were set to remain steady under the guidance of FHWA. These
measures are to be revisited at the 2-year mark (2020), once three years of data are available,
for more informed target setting.
MassDOT continues to measure pavement quality and to set statewide short-term and long-term
targets in the MassDOT Performance Management Tracker using the Pavement Serviceability
Index (PSI), which differs from IRI. These measures and targets are used in conjunction with
federal measures to inform program sizing and project selection.
Table 3 - 1. Statewide Performance Measures (PM 2)
Performance Measure Current (2017) 2-year target (2020) 4-year target (2022)
Bridges in good condition 15.22% 15% 16%
Bridges in poor condition 12.37% 13% 12%
Interstate Pavement in good
condition
74.2% 70% 70%
Interstate Pavement in poor
condition
0.1% 4% 4%
Non-Interstate Pavement in good
condition
32.9% 30% 30%
Non-Interstate Pavement in poor
condition
31.4% 30% 30%
Reliability, Congestion, & Emissions Performance Measures (PM3)
Montachusett MPO has chosen to adopt the 2-year (2020) and 4-year (2022) statewide reliability,
congestion, and emissions performance measure targets set by MassDOT. MassDOT was
Montachusett MPO 3-15 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
required to adopt a statewide target by May 20th, 2018, with MPOs either adopting the statewide
target or establishing their own by November 2018.
MassDOT followed FHWA regulation in measuring Level of Travel Time Reliability (LOTTR) on both
the Interstate and non-Interstate NHS as well as Truck Travel Time Reliability (TTTR) on the
Interstate system using the National Performance Management Research Dataset (NPMRDS)
provided by FHWA. These performance measures aim to identify the predictability of travel times
on the roadway network by comparing the average travel time along a given segment against
longer travel times. For LOTTR, the performance of all segments of the Interstate and of the non-
Interstate NHS are defined as either reliable or unreliable based on a comparison between the
50th percentile travel time and the 80th percentile travel time, and the proportion of reliable
segments is reported. For TTTR, the ratio between the 50th percentile travel time and the 90th
percentile travel time for trucks only along the Interstate system is reported as a statewide
measure. As this data set has but one year of consistent data, FHWA guidance has been to set
conservative targets and to adjust future targets once more data becomes available. To that end,
MassDOT’s reliability performance targets are set to remain the same.
Montachusett MPO — an agency whose planning area includes communities in the Boston
Urbanized Area (UZA), and as a signatory to the 2018 Boston UZA Memorandum of
Understanding (Boston UZA MOU)—has also adopted 2-year (2020) and 4-year (2022) Boston
UZA-wide congestion performance measure targets. These performance measures are the
percentage of non-single occupancy vehicle (SOV) travel and the Peak Hour Excessive Delay
(PHED). Targets were developed in coordination with state Departments of Transportation and
neighboring MPOs with planning responsibility for portions of the Boston UZA.
The percentage of non-SOV travel is approximated using the U.S. Census Bureau’s American
Community Survey (ACS) Journey-to-Work data. In the Boston UZA, the proportion of non-SOV
travel has been steadily increasing and is projected to continue increasing at a rate of 0.32%
annually.
Montachusett MPO 3-16 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
PHED is measured by totaling the number of hours spent in excessive delay (defined as travel
time at 20 miles per hour or at 60% of the posted speed limit, whichever is greater) in peak hours
(between 6:00am and 10:00, and between 3:00pm and 7:00pm) divided by the total UZA
population. As of target-setting, there was only one year of data available. As such, the
performance targets have been set flat until further data is available.
Emissions reduction targets are measured as the sum total of all emissions reductions anticipated
through CMAQ-funded projects in non-attainment or air quality maintenance areas (currently
the cities of Lowell, Springfield, Waltham, and Worcester, and the town of Oak Bluffs) identified
in the Statewide Transportation Improvement Program (STIP). This anticipated emissions
reduction is calculated using the existing CMAQ processes.
Table 3 - 2. Statewide Performance Measures (PM 3)
Measure Current (2017) 2-year (2020) 4-year (2022)
Non-Interstate LOTTR 80% 80% 80%
Interstate LOTTR 68% 68% 68%
TTTR 1.85 1.85 1.85
PHED (Boston UZA) 18.31 18.31 18.31
% non-SOV (Boston UZA) 33.6% (2016) 34.82% 35.46%
Emissions Reductions Baseline (FFY 14–17) 1,622 CO
497.9 Ozone
TBD CO (Springfield)
1.1 Ozone
Transit Asset Management
In 2012, the Moving Ahead for Progress in the 21st Century Act (MAP-21) mandated, and in 2015
the Fixing America’s Surface Transportation Act (FAST) reauthorized, FTA to develop a rule to
establish a strategic and systematic process of operating, maintaining and improving public
transportation capital assets effectively through their entire life cycle. FTA's national Transit
Asset Management System Rule:
• Defines "state of good repair"
• Requires grantees to develop a TAM plan
• Establishes performance measures
Montachusett MPO 3-17 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
• Establishes annual reporting requirements to the National Transit Database
• Requires FTA to provide technical assistance
In July 2016, FTA published a Final Rule for Transit Asset Management. The rule requires FTA
grantees to develop asset management plans for their public transportation assets, including
vehicles, facilities, equipment, and other infrastructure.
TAM requirements in this final rule are part of a larger performance management context. MAP-
21 created a performance-based and multimodal program to strengthen the U.S. transportation
system, which is comprised of a series of nine rules overseen by FTA and the Federal Highway
Administration (FHWA). FTA is tasked with developing other rules, including the National Public
Transit Safety Plan and the Public Transportation Agency Safety Plan, and has worked jointly with
FHWA on a rule to manage Statewide and Metropolitan Planning.
The Montachusett Regional Transit Authority (MART) completed a TAM plan in September of
2018 and presented it to the Montachusett MPO. The Montachusett MPO has adopted targets
in the following categories in the spring of 2019
• Rolling Stock
• Equipment
• Facilities
As dictated by the Final Rule, a Tier I TAM Plan must include the following nine elements:
1) Inventory of Capital Assets – An inventory of the number and type of capital assets. The inventory must include all capital assets that a provider owns, except equipment with an acquisition value under $50,000 that is not a service vehicle.
2) Condition Assessment – A condition assessment of those inventoried assets for which a provider owns or has direct capital responsibility.
3) Identification of Decision Support Tool or Processes – A description of analytical processes or
Montachusett MPO 3-18 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
decision‐support tools that a provider uses to estimate capital investment needs over time and develop its investment prioritization.
4) Investment Prioritization – A project‐based prioritization of investments.
5) TAM and SGR policy – A TAM policy is the executive‐level direction regarding expectations for transit asset management; a TAM strategy consists of the actions that support the implementation of the TAM policy.
6) Implementation strategy – The operational actions that a transit provider decides to conduct, in order to achieve its TAM goals and policies.
7) List of key annual activities – The actions needed to implement a TAM plan for each year of the plan's horizon.
8) Identification of resources – A summary or list of the resources, including personnel, that a provider needs to develop and carry out the TAM plan.
9) Evaluation plan – An outline of how a provider will monitor, update, and evaluate, as needed, its TAM plan and related business practices to ensure the continuous improvement.
Montachusett MPO 3-19 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019
Included in the table below are MART’s determined performance targets for its assets by
category and FTA defined performance measures.
Montachusett MPO 3-20 Working Towards the Future
2020 Regional Transportation Plan MPO Endorsed: July 17, 2019