    Howells Glazing Systems Ltd

    FIXING INSTRUCTIONS

    Page 1

    ALIVER Thermal Break Roof

    Tooling Requirements

    1. Electric Drill

    2. Battery Drill3. Spirit Level4. Tape Measure5. Hand Tools (Hammer, Rubber Mallet, Large Square, Pozi Screwdriver, Glazing

    Knife, Hacksaw)6. Allen Keys 3mm & 6mm7. Drill Bits 4mm & 6.5mm8. 8mm & 10mm Taps (For Tie Bars)

    9. Mastic Gun10. 13mm Spanner11. Scaffold Tower.

  • 8/3/2019 Mono Pitch Installation Guide Type B

    2/14

    Page 2

    Step 1

    Before the assembly of the conservatory roof,ensure the following dimensions have beenchecked (A & B) to provide a square base.Windows must be vertical and cill must be level.

    Step 2

    All conservatory roof packs are labelled.

    Check that the total of packs match the delivery note.

    Open the Accessory Pack first. Then open the Ring-Beam and Main Rafters.

    This will avoid any confusion and avoid any sections oraccessories being lost or damaged on site.

    Underside of wall plate

    Step 3

    Locate the wall/plate and fix to the back wall at the

    height as shown on the roof plan

  • 8/3/2019 Mono Pitch Installation Guide Type B

    3/14

    Page 3

    Step 5

    Place the Ring/Beam/Gutter onto

    your windows and secure through

    the windows up into the ring beam.

    TIP

    Before going too far it may be

    advisable to try and lift a rafter into

    place at this point to see how close

    the fit is. You may have to adjustthe wall/plate height or ring beam

    position..

    Step 6

    Once you are happy with the fit of the

    rafters, secure each rafter into place

    through the holes under the hinge plates atboth the wall/plate and ring beam.

    Screw fix under

    here into the rafter

    at the top & bottom

    Step 7

    Clip the white plastic T shape isolator

    VR514 into the rafter.

    VR 514

    Important Note

    When joining Ring Beam to Ring

    Beam (Shaped Roof) it is important

    that a silicone seal is applied to ALL

    edges prior to assembly.

  • 8/3/2019 Mono Pitch Installation Guide Type B

    4/14

    Page 4

  • 8/3/2019 Mono Pitch Installation Guide Type B

    5/14

    Page 5Step 8

    Using the plastic spacers set out the top wall

    plate cover and bolt to the wall

    VR 2426Wall Plate

    Plastic Spacers(Provided)

    Step 9

    Place the end caps and glass stops into position on the

    Ring Beam. Screw the end caps onto the end of the

    white pvc T section. A packer will be required between

    the aluminium glass end stop and the glass.

  • 8/3/2019 Mono Pitch Installation Guide Type B

    6/14

    Page 6

    Step 12

    Step 10

    Seal with the adhesive strip (flash band)

    ACMX09811) between the wall plate and glassas shown.

    Step 11

    Locate the glass end closer into the correctchannel and bed onto a silicone joint.

  • 8/3/2019 Mono Pitch Installation Guide Type B

    7/14

    Page 7

    Step 13

    Clip into place the large flipper gasket (ACVR202)

    into the wall plate. This will need to be notched

    around each rafter capping.

    Step 14

    Clip in the finishing sections (SR014) to cover

    the screws fixing the rafters to the ring beam

    and wall plate.

  • 8/3/2019 Mono Pitch Installation Guide Type B

    8/14

    2

  • 8/3/2019 Mono Pitch Installation Guide Type B

    9/14

  • 8/3/2019 Mono Pitch Installation Guide Type B

    10/14

    150mm 125mm 105mm 73mm

  • 8/3/2019 Mono Pitch Installation Guide Type B

    11/14

  • 8/3/2019 Mono Pitch Installation Guide Type B

    12/14

  • 8/3/2019 Mono Pitch Installation Guide Type B

    13/14

  • 8/3/2019 Mono Pitch Installation Guide Type B

    14/14