Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term...
Transcript of Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term...
![Page 1: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/1.jpg)
Monitoring of Long Term Agreements in the Netherlands
Teun Bolder
Brussels
November 16, 2016
Contact: Christiaan Abeelen RVO.NL [email protected] 0031-6-23091568
![Page 2: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/2.jpg)
Content
• Introduction
• 3 generations of LTA’s
• Monitoring process
• Comparison of methods
• Results
2
![Page 3: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/3.jpg)
3
Industrial energy saving policy in the Netherlands
Negotiated
agreements
industry
Negotiated
Agreement
energy sector
Subsidies
for renewable
production
(SDE)
Subsidies for
energy saving
techniques (EIA)
Green Deals Top sectors
policy
financial prescriptive
ETS Environmental
Management Act
![Page 4: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/4.jpg)
The long history of the long term agreements
1991 2000 2008 2009
Energ
y u
se (
PJ)
1000
800
600
400
200
Benchmarking Convenant
(650)
LTA1 (ca. 730 PJ)
LTA2
(160) LTA3
(220)
LEE (626)
2016
![Page 5: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/5.jpg)
Decomposition
![Page 6: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/6.jpg)
Most firms are SME
0
100
200
300
400
500
600
0-99 100-199 200-299 300-399 400-499 500-599 600-699 700-799 800-899 900-999 >1000
#
energy use (TJ)
energy use of participating companies
Average
energy
use
Median
6
![Page 7: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/7.jpg)
Yearly monitoring process
Time Action
December Companies receive information
January-march Companies fill in data
1 April Deadline
March / April Check by consultants
April Aggregation
May Sector / company reports
June / July Results brochure
August- December Evaluation / preparation
![Page 8: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/8.jpg)
Monitoring organisation
Internet/excel
Monitoring advisors RVO.nl
External consultants (± € 500 000 / year)
ICT (± € 100 000 / year)
Reports:
• company reports (1000)
• sector reports (40)
• overall results brochure
• other (internal) reports
![Page 9: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/9.jpg)
Monitoring information, input
Energy use
Production data
Energy saving projects
Energy management
Other factors
![Page 10: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/10.jpg)
10
3 Generations of LTA’s & Monitoring principles
LTA 1:
•EEI measures development in energy-intensity:
energy per unit of useful output
•The EEI normalizes for volume-effect, and many other factors
LTA 2:
• Three indices: - Energy Efficiency (energy intensity)
- Supply chain efficiency
- Renewable energy
•One index based on energy-intensity
•Two indices based on implemented projects
LTA 3:
•All indices are based on implemented projects
![Page 11: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/11.jpg)
Comparison old and new method
0
2
4
6
8
10
12
14
16
18
20
1998 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
savin
gs (
% o
f en
erg
y u
se)
LTA2: intensity inprovement LTA3: cumaltive savings by projects
![Page 12: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/12.jpg)
12
Results: Energy
![Page 13: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/13.jpg)
13
Conclusions
Participating companies implement many energy saving projects
These projects lead to savings of 1.3 (LEE) to 1.9% per year (LTA)
Monitoring of projects is time consuming and expensive
Results give a good representation of efforts
![Page 14: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/14.jpg)
More information:
www.rvo.nl/lta (Dutch): information on LTA
www.bess-project.info/ (multiple languages): information of benchmarking project for SME
www.ltauptake.eu/ (multiple languages): toolkit for implementation of voluntary agreements
Publications:
“Energy Efficiency Measures: The Next Generation”. ECEEE Summer Study Paper 1-065-12. 11-14 September 2012, Arnhem.
“From top-down to bottom-up: two ways to monitor energy-efficiency in Dutch voluntary agreements”. ECEEE Summer Study Paper 7-070-13. 3–8 June 2013. Toulon/Hyères, France
“Implementation of energy efficiency projects by Dutch industry”. Energy Policy 63 (2013) 408–418.”
Contact: Christiaan Abeelen 0031-6-23091568
[email protected] www.RVO.nl
![Page 15: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/15.jpg)
Spare sheets
15
![Page 16: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/16.jpg)
Monitoring methods
LTA 1 & 2:
Energy efficiency = Energy intensity
formula: Energy / Product [J/ton]
LTA3/LEE:
Energy efficiency= Energy saving by Projects
formula = Energy saved / Energy used [%]
![Page 17: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/17.jpg)
0
100
200
300
400
500
600
0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-20 >20
Nu
mb
er o
f p
roje
cts
Payback period (year)
Certain
Conditional
Uncertain
Results: Economy
![Page 18: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/18.jpg)
Relation between production and energy intensity
![Page 19: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/19.jpg)
Decomposition of factors
![Page 20: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/20.jpg)
Skewed distribution of energy use
0%
20%
40%
60%
80%
100%
0 100 200 300 400 500 600 700 800 900 1000
sh
are
of
tota
l en
erg
y u
se
number of companies
10 firms use 50% of energy 800 firms use 10% of energy Average: 823 TJ Median: 92 TJ =1400 households 20
![Page 21: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/21.jpg)
Make an energy efficiency plan (EEP) every 4 years:
•Energy balance
•Energy management
•Energy saving projects (certain/conditional/uncertain)
Yearly monitoring report:
•Energy use
•Production
•Implemented energy saving projects
21
Planning and implementation
![Page 22: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/22.jpg)
Implementation of projects (process efficiency LTA3)
Number of projects Savings (TJ)
Certainty level Planned Implemented % Planned Implemented %
Certain 5.022 4.020 80% 10.801 7.891 73%
Conditional 3.129 1.164 37% 6.307 1.825 29%
Uncertain 2.048 528 26% 4.931 537 11%
Additional to EEP 0 1.783 - 0 3.685 -
Delayed* 0 334 - 0 196
Total 10.199 7.829 77% 22.039 14.135 64%
22
![Page 23: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/23.jpg)
75
77
79
81
83
85
87
89
91
93
95
2005 2006 2007 2008 2009 2010 2011 2012 2013
En
erg
y u
se (
PJ)
energy use reference energy use
Fig. 3 Development of energy and reference energy use 2006-2013 for industrial LTA-companies (n=559).
Energy use versus production
![Page 24: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/24.jpg)
Results
![Page 25: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/25.jpg)
Relation production and efficiency
0 1 2 3 4 5
En
erg
y u
se
(J)
efficiency gain during production increase
Energy use Production index
efficiency gain
0 1 2 3 4 5
En
erg
y u
se
(J)
efficiency loss during production decrease
Energy use Production index
efficiency loss
![Page 26: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/26.jpg)
26
Energy saving projects Category Subcategory
Process efficiency Energy management and good housekeeping
Adjustment in processes
Utilities and buildings
Strategic measures
Chain efficiency Production chain (distribution, saving on
materials)
Product chain (savings during product use)
Renewable energy Own production
Purchase of renewable energy
![Page 27: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/27.jpg)
27
Relation between the instruments
SE
CT
OR
S Roadmap
Green deals Four-year sectoral plans
Realised projects
Energy Efficiency Plans
CO
MP
AN
IES
Innovation contracts
COVENANTS OTHER POLICY
Subsidies
![Page 28: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/28.jpg)
28
![Page 29: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/29.jpg)
29
![Page 30: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/30.jpg)
30
![Page 31: Monitoring of Long Term Agreements in the Netherlands · 2017. 9. 28. · Monitoring of Long Term Agreements in the Netherlands Teun Bolder Brussels November 16, 2016 Contact: Christiaan](https://reader033.fdocuments.us/reader033/viewer/2022060921/60ad37d7d331a857b3736ab8/html5/thumbnails/31.jpg)
31