Monitoring of Cooling Water
1- Parameters of Make up Water & Cooling Water
SPECIFICATION OF MAKE UP WATER
Parameter Unit ETP Make-up Fresh Make-up
Ph 6.5-8.0 7.0-8.0
Turbidity NTU 10-50 <1.0
Talk Mg/Ltr 110-170 30-90
T Hardness Mg/Ltr 100-150 130-180
Ca Hardness Mg/Ltr 70-110 50-100
Mg Hardness Mg/Ltr 30-45 26-36
TDS Mg/Ltr 600-900 100-160
Fe Mg/Ltr 1.5-3.0 <0.1
Inorganic PO4 Mg/Ltr 0 0
Organic PO4 Mg/Ltr 0 0
TPO4 Mg/Ltr 0.2 0
Chloride Mg/Ltr 90-150 10-20
Silica Mg/Ltr 10-15 05-10
Oil Mg/Ltr <10 Nil
Zinc Mg/Ltr 0 0
FRC Mg/Ltr 0.1-0.2 0.1-0.2
TBC Counts/ml <100000 <100
SRB C/100ml <1000 NIL
SPECIFICATION OF COOLING WATER
Parameter Unit PCT TPS
Ph 7.0-7.5 7.0-7.5
Turbidity NTU <30 <15
Talk Mg/Ltr 30-90 30-90
T Hardness Mg/Ltr 150-400 200-500
Ca Hardness Mg/Ltr 100-300 150-400
Mg Hardness Mg/Ltr 50-100 50-100
TDS Mg/Ltr <1000 <1000
Fe Mg/Ltr <1.0 <1.0
Inorganic PO4 Mg/Ltr 5.0-7.0 5.0-7.0
Organic PO4 Mg/Ltr 8.0-10 8.0-10
TPO4 Mg/Ltr 13-17 13-17
Chloride Mg/Ltr <300 <300
Silica Mg/Ltr 10-100 10-100
Oil Mg/Ltr <10.0 <10.0
Zinc Mg/Ltr 1.0-2.0 1.0-1.5
FRC Mg/Ltr 0.2-0.5 0.2-0.5
TBC Counts/ml <100000 <100000
SRB C/100ml <100 <100
ORP mV 300-500 300-500
COC 2 3
2- Monitoring With Monitors
MONITORING EQUIPMENT OBSERVATION/PERFORMANCE
Bio fouling Monitor:- This equipment has been commissioned at return line for Inspection of bio fouling. Differential Pressure across biofouling monitor should not exceed more than 20% of the initial value through out the contact period.
Deposit Monitor: - This equipment has been commissioned at return line for Inspection of deposition in cooling water systems. Deposition on heater of deposit monitor should be loose in nature and deposition should be < 15mg/dm2/year. 3-CORROSION MONITORING OF COOLING WATER SYSTEM-
Corrosion coupons are installed for monitoring of corrosion in Cooling Water system. Corrosion Rate -3 mpy max. For M.S, 0.5 mpy max for Brass.
4- TEST COOLER:- This equipment has been commissioned at return line for Inspection of overall performance of circulating water.
5- PLANT SURVEY: - Plant survey carried out to know about the performance of critical Exchanger of the plant.