Monitoring and Evaluation Update
Tom Griffiths Head of Analysis, Cities and Local Growth
Contact: [email protected]
LoGA 1
Why does M&E matter?
Contact: [email protected]
LoGA 2
• Confident management: data underpins local and national level financial and programme management
• Delivery is king: opportunity to build track record and
demonstrate progress both internally and externally (e.g. local stakeholders, HMG, NAO)
• Building the future: to improve future decision making and make the case for further devolution
Monitoring: progress to date
Contact: [email protected]
LoGA 3
Growth Deal Schemes: Unblocking Small
housing Sites (CUT)
1. Core Metrics Selected Metric
Start Quarter
End Quarter
Inputs
Expenditure X 2015 Q3 2018 Q4
Funding breakdown X 2015 Q3 2018 Q4
In-kind resources provided X 2015 Q3 2018 Q4
Outcomes
Jobs connected to the intervention D
Commercial floorspace constructed
D
Housing unit starts X 2015 Q3 2018 Q4
Housing units completed X 2015 Q3 2018 Q4
2. PROJECT SPECIFIC OUTPUTS AND OUTCOMES - to be collected where relevant to the intervention
Transport
Outputs
Total length of resurfaced roads
Total length of newly built roads
Total length of new cycle ways
• Metrics • Proportionate and harmonised menu • LEPs have selected metrics to cover all 15/16
projects
• LOGASnet • Web-based portal already used by local
partners for LG Finance, Troubled Families etc • System will also be used to capture MI for
Growth Hubs, City Deals & GPF
• Wide consultation • LEPs, DFT, BIS, SFA, ESIF, Defra, EA, DCLG.
Background – Local Growth MI System
4
What is it? • Forms part of Cities & Local Growth reporting System
provides LEPs with one method for inputting reporting and monitoring information/data to Government.
What Local Growth Programmes are being reporting on? • Local Growth Fund • City Deals • Growth Hubs • Growing Places Fund
5
LOGASnet • Online data capture
system used by DCLG, Local Government, Scottish Government & third sector to administer grant payments and report on project outputs
What’s the solution?
Benefits
6
What’s the benefits?
• Well established – All LAs use it
• All local growth programmes on one system - simple to use access through a single web portal
• Metrics streamlined – We have listened to you!
• Secure - no more need for multiple excel spreadsheets
• No development or ongoing costs involved as using an existing system and part of the government family
• We acknowledge that there maybe some issues with LOGASnet (e.g. ESIF) - In the pipeline for migration to new corporate ‘Datamart’ solution
Current state of play
7
Current situation – work to date
• Local Growth System has been designed and developed over the last few months
• We have carried out some ‘pre-testing’ with a LEP (C2C) to get their initial feedback
• We have arranged for a group of LEPs (Black Country, New Anglia, Manchester, Lancashire, C2C & Thames Valley Berkshire, Cheshire & Warrington, Buckinghamshire Thames Valley) to take part in a ‘Proof of concept’ phase of work. Testing started this week and we have already begun to receive feedback.
Key Milestones/next steps
8
Key milestones
27/07 Deadline for LEPs to provide user details
27/07 Proof of concept testing phase commenced
29/07 LEP Systems workshop – Demo of LG System
06/08 Proof of concept testing completed
07/08 - 31/08 Revisions to system made - system rolled out to LEPs
01/09 System live ready for LEPs to enter data
Reporting schedule (maybe subject to change)
9
Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Apr-Jun 15 data return
(Sept)
Jul-Sept 15 data return
(Dec)
Oct-Dec 15 data return
(Mar)
Jan-Mar 16 data return
(Jun)
2015 2016
Local Growth Programme
Frequency of reporting
Sept 2015 Dec 2015 Mar 2016 Mar 2016
Opens Closes Opens Closes Opens Closes Opens Closes
01/09 14/09 01/12 14/12 01/03 14/03 01/06 14/06
Local Growth Fund Quarterly Yes Yes Yes Yes
City Deals Quarterly Yes Yes Yes Yes
Growth Hubs 6 monthly Yes No Yes No
Growing Places Fund 6 monthly No Yes No Yes
Reporting Schedule (Sept 2015 – Jun 2016)*maybe subject to change
Support Available
10
Support
• There will be a dedicated helpline & email accounts:
[email protected] – data inputting queries
[email protected] 0303 444 2 444 - technical queries
• Full user guides will be available
• All Relationship Managers understand the basics of the system and the metrics so can also assist if needed
Longer term – Data Mart
11
Future – migration to DCLG Data Mart
• DCLG IT are implementing a new data mart solution utilising new technology pioneered by leading internet companies such as Google, facebook and amazon
• Intention is to retire LOGASnet in summer 2016 and rebuild functionality in DCLG Data Mart solution.
• Programmes currently supported by LOGASnet will in turn be migrated including the Local Growth Programmes next year.