Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the...

32
Darwin Plus DPLUS083 Soil map and online database as climate change mitigation tools (Soil Mapping).

Transcript of Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the...

Page 1: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Darwin Plus DPLUS083

Soil map and online database as climate change mitigation tools (Soil Mapping).

Page 2: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Monitoring & Evaluation PlanName Document checkedMatt AitkenheadAnne JungblutChris EvansJames BryanGordon LennieSergio RadicJim McAdam

Version Control Table

BUILD STATUS:

Version Date Author Reason/Comments

Draft 1 08/10/18Steffi Carter

Initial draft

Draft 2 09/10/18Tara

PelembeInitial review

DISTRIBUTION:

Page 3: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Copy Version Issue Date Issued To

Electronic Draft 1 08/10/18 Issued to Tara Pelembe

Electronic Draft 2 09/10/18 Issued to PMG on google drive project folder

Page 4: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Contents

1 Introduction.................................................................................................................1

1.1 Purpose of this plan..............................................................................................1

1.2 Project summary....................................................................................................1

2 Logical Framework....................................................................................................2

3 Monitoring and evaluation plan.........................................................................10

4 Roles & Responsibilities........................................................................................19

5 Data Management....................................................................................................20

i

Page 5: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

1 Introduction

1.1 Purpose of this planThis monitoring and evaluation (M&E) plan has been prepared by the DPLU083 Project Manager (PM), is approved by the Project Management Group (PMG) and forms an integral part of the project reporting progress. Oversight of the delivery of the M&E plan will be the responsibility of the PM whilst signing off on the implementation of the M&E plan will be the responsibility of the PMG.

1.2 Project summary

Title Soil map and online database as climate change mitigation tools

Start/End date 1st April 2018 / 31st July 2020

Duration 2 years and 4 months

Territories Falkland Islands

Lead Partner South Atlantic Environmental Research Institute

Other partner institutions

James Hutton Institute (JHI), Natural History Museum (NHM), Falkland Island Government (FIG), UK Falkland Island Trust (UK FIT), Universidad de Magallanes (UMAG), Centre for Ecology and Hydrology (CEH)

Grant Value £265,612

Project leader name

Tara Pelembe

Project goal To create a baseline survey of soils, soil health and soil erosion to be presented in an online data system.

Project Outcome

The baseline survey of soils will inform policy makers, conservation officers and landowners to decide which actions are needed for long-term mitigation measures against climate change effects.

1

Page 6: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

2 Logical Framework

Project summary Measurable Indicators Means of verification Important AssumptionsImpact: Science-based evidence on soils, peatlands and erosion extent/risk will allow policy makers, conservationists and land managers/owners to implement priority actions mentioned in the national climate change mitigation action plan.

Outcome: Improved evidence-base for mitigating climate change through new decision support tools: online maps and database of soil types, peatlands and erosion extent/risk integrated with physical, chemical and microbiological analyses of soils.

0.1 A distribution map of soils, peatlands and erosion extent for the Falkland Islands to fill a knowledge gap and provide information on a fundamental natural resource which needs sustainable management.

0.2 An online tool for interpreting the chemical and microbiological aspects of the soils to help habitat restorationand land managers to more effectively mitigate against erosion, soil degradation and carbon loss.

0.1. A tailored WebGIS portal for accessing the distribution map and all project data will be designed and published online. The metadata catalogue (Falkland Islands IMS-GIS data centre) will host the metadata ofthe data gathered throughout the project.

0.2 The tool for interpreting the national soils, their characteristics and the erosion risk will be published on FIG Department of Agriculture (DoA) webpage.

0.1 SAERI continue to retain relevant skilled staff and the Falkland Islands IMS-GIS data centre will be sustained by the government in the future years

0.2 The tool for monitoring erosion risk will be simple enough to be maintained in the long term by the stakeholders

Outputs: 1. Project Management structure, monitoring, evaluation and communications tools established

1.1 A Memorandum of Understanding (MoU) agreed and signed by all partners by May 20181.2 Project Manager recruited byAugust 20181.3 A Project Management

1.1 MoU signed by all parties1.2 Project Manager employment contract signed1.3 PMG meeting notes available online1.4 PSG meeting notes available online.1.5 Project webpage available

1.1 Project partners agree to sign theMoU1.2 PM with the relevant skills is able to be recruited.1.3 and 1.4 PMG and PSG can meet without delays1.5 PM will be trained on how

2

Page 7: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important AssumptionsGroup (PMG) meeting held every 3 months starting May 20181.4 A Project Stakeholders group (PSG) meeting held every 6 months starting May 20181.5 At least 1 project webpage created by April 2018, and at least 1 update to the page made every 3 months.1.6 Monitoring and evaluation plan created by October 20181.7 Final project report produced byJuly 2020

for viewing online1.6 Monitoring and evaluation plan available online1.7 Final project report available online.

to use and update the project webpage on SAERI website1.6 The monitoring and evaluation plan has been written and implemented 1.7 PM to be on time with his/her tasks and able to write the final report

2. WP1: National Soil Map, peatland distribution and soil erosion extent/risk (scale 1:250,000)

2.1 Meeting in the UK (Cambridge –British Antarctic Survey - BAS) amongst overseas partners (UMAG via Skype) to define the strategy forthe soil survey by May 20182.2 Desk study for assessing Satellite imagery availability and identification of digital soil mappingmethods by June 20182.3 Remote Sensing analyses and first soil map by October 2018 to be used by surveyors2.4 Iteration of Remote Sensing analyses using data from soil campaign to originate new soil, peatlands and soil erosion

2.1 Meeting notes and survey strategy design available online. Data Management Plan initialised2.2 Desk study report available online2.3 Processed satellite imagery available online through the project specific webGIS service and by November 2018. Soil map given to the surveyors for ground truthing.2.4 First validated soil, peatlands anderosion extent/risk maps available to other project participants and stakeholders by April 2019. Remote sensing interpretation methods

2.1 All overseas project partners available for the meeting and BAS agreeing to provide a meeting room2.2 Availability of cloud-free Sentinel 2 imagery across multiple years (from 2015) and for more than one season. If Sentinel 2 is not available, then Landsat will be the substitute for analyses2.3 Images will have been processed and the model shown to be successful2.4 Soil surveyors were able to provide ground truthing points and soil descriptions for remote sensing analyses. Digital Soil model is proving good.

3

Page 8: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptions(extent/risk) maps by April 20192.5 Soil survey methodology ready by October 20182.6 Soil surveyor is identified and will participate to the meeting in Cambridge (2.1) to plan the soil campaign methodology2.7 Soil Campaign to be conducted in November 2018, February and November 2019.2.8 Desk-based analysis of soil data collected in the Falklands following each soil sampling campaign2.9 Remote sensing analyses consisting in iterations of soil/peatlands and erosion risk maps on the basis of the data coming from soil campaigns and laboratory analyses (completion the first quarter of year 3)

documented and shared amongst project partners to allow evaluation of derived maps2.5 Publication online of the soil survey methodology2.6 Soil surveyor contract of employment2.7 Brief soil survey reports generated at the end of each soil campaign2.8 Soil type descriptions available as GIS layer and tables (excel or comma delimited files) at the beginning of each new campaign2.9 Maps of soil, peatlands and erosion extent/risk published online through the webGIS service and stored on the Falkland Islands data centre repository. All datasets will have been documented with standard metadata form and metadata logged in IMS-GIS data centre metadata catalogue online by July2020

2.5 There is good collaboration between project partners and the PM is already in post2.6 Experienced soil surveyor is available to take the job2.7. Good weather to allow fieldworkduring the various soil campaigns inorder to provide ground truthing points for remote sensing analyses. It is assumed that there will not be problems with the logistics (e.g. flight disruptions and lack of accommodations in rural locations) All soil surveyors will be fit and healthy enough to carry out fieldwork for the planned periods2.8 At the end of each soil campaign the majority of the data are already in digital form to allow time for soil descriptions between consecutive campaigns2.9 Soil survey campaigns feed the model used by the remote sensing analyses with useful data. No assumption on the data centre as it exists already and provides the type of services needed to publishing data.

4

Page 9: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptions3. WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological properties

3.1 Chemical analyses of soil sampled during the fieldwork (November 2018, February and November 2019)3.2 DNA sequencing of soil samplescollected at locations chosen by stakeholders and agricultural advisors3.3 Map the results against other data collected or used by the project to identify patterns in the soil physical, chemical and biological properties across the islands 3.4 Identify a sustainable and long term manageable monitoring programme for assessing soil health by the end of July 2020

3.1 Report on methods, types and results from the chemical properties are analysed and published on a pdf and csv file.3.2 Report on methods, and results from DNA sequencing analyses will be available as pdf file and on a csv file3.3 Interpretation of the results (physical, chemical and biological) for each sampled location and Extrapolation to the entire islands. Data to be added to the interactive soil properties and erosion risk tool and scientific evaluation published inopen access international journal.3.4 Documentation of approaches used for sample analysis, for comparison/standardisation and to facilitate project reporting and publication development

3.1 Soil samples are collected according to standards and received by the laboratory technician in a well preserved way.3.2 No delays in shipping equipment for laboratory analyses3.3 The laboratory tests were successful and the interactive tool is ready3.4 The results obtained from the laboratory analyses will be availablefor publication

4. WP3: Development of soil spatial database and interactive tool for interpreting and describing soils properties and health, displaying soilerosion risk on selected farms. The tool supports stakeholders’ actions for mitigating with climate change effects

4.1 Meeting with stakeholders to present examples of designs of the online data system tool and obtain feedback on which format works better. Updates on the development of the tool will be provided at each PSG meeting.4.2 Data sharing procedures to

4.1 Summary document from meeting with stakeholders to decide how the interactive tool should look and what it should contain in order to be useful and usable. To be updated after every meeting (at least every 6 months) by reporting on interactions with stakeholders

4.1 All stakeholders are available for the meeting and show interest in helping in outlining and testing the interactive tool 4.2 and 4.3 no assumption as the data manager has been working for the last 4 years at SAERI using the server and creating

5

Page 10: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptionsallow access to the data for all project participants. By June 20184.3 SAERI server to be set up in orderto store database in PostgreSQL and datasets collected throughout the project by June 20184.4 Online interactive soil database on soil properties and erosion risk by July 20204.5 Database of the national soils, peatlands and eroded areas and erosion risk in PostgreSQL (open source database engine) accessible byStakeholders and project partners. Continuous work from November 2018 until July 20204.6 Preparation and publication of webGIS services to make results available to the wider public by July2020

throughout online tool development,to provide evidence of feedback andtool design adjustments4.2 Report on data sharing agreementPublished online4.3 Ensure that the server in SAERI has prepared for the new database.4.4 Delivery of the tool and publication online. Additionally, a step by step guide on how the interactive tool works and instruction on its long term maintenance will be provided.4.5 Data on national soils/peatland distribution, carbon storage, soil erosion extent and risk layers which populate the database are made available to the stakeholders and project partners4.6 Publication of the maps throughProject specific webGIS service

databases.4.4 Free or low charge internet connection for the interactive soil properties and erosion risk tool (to benegotiated with SURE, the local telecommunication provider)4.5 the server used for storing the database is accessible to authorised users (stakeholders and project partners)4.6 the webGIS service will be ready by the last quarter of year 2

5. WP4: Knowledge transfer workshops and training courses

5.1 At maximum of 8 workshops (split into 4 in West and 4 in East Falkland) will be run on farms and inStanley to landowners and to the public to describe and explain in simple words the use

5.1 Workshop reports will be available online and the workshop will be followed up by articles in the local newspaper5.2 Stakeholder feedback forms completed.

5.1, 5.2, 5.3, 5.4 Interest from stakeholders, above all landowners 5.1 Venues for hosting the workshops in rural areas will be available and people can travel to them without disruptions

6

Page 11: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptionsof the tools employed throughout the project and to ensure the people are informed and can appreciate their practical applications to land management. The workshops will be running in the last quarter of year 25.2 At least two local stakeholders trained in fieldwork to learn what the soil survey is about and how a better knowledge of the soils and their properties helps in managing this natural resource in relation to farm business and conservation plans. Monthly fieldwork campaigns will occur 3 times in spring and summer 2018/2019 and in spring 20195.3 A training course to be delivered by microbiology specialists to local scientists, interested stakeholders and to the DoA laboratory technician. The training course will take place indicatively in the last quarter of year 2

5.3: Training course material available online; training participant feedback forms completed.

5.2 Local stakeholders’ available time and scheduled fieldwork coincide5.3 Overseas project partners can reach the Falklands without travel disruptions and local participants are on the islands and available for training

Activities (each activity is numbered according to the output that it will contribute towards, for example 1.1, 1.2 and 1.3 are contributing to Output 1)

Output 1 - Project Management Structure1.1 Write the MoU, circulate it among the project partners and have it signed1.2 Prepare the contract for the PM role, advertise the job, recruit and have the contract signed by August 2018

7

Page 12: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptions1.3 Arrange quarterly PMG meetings1.4 Arrange PSG meetings every six months1.5 Set up the project webpage at the main SAERI website and keep it updated once every three months1.6 Write the monitoring and evaluation plan by October 20181.7 Write and submit the final project report by July 2020 and prepare scientific papers by July 2020

Output 2 - W P 1 : National Soil Map, peatland distribution and soil erosion extent/risk 2.1 Recruit the soil surveyor and define the date and meet in Cambridge to draw an action plan for the desk-based data analyses, the soil campaign and laboratory works (in London and Falklands)2.2 Acquire necessary field equipment and ship it to the Falklands if not bought on the islands2.3 Plan soil campaign in the Falkland Islands and liaise with SAERI logistics officer for the preparation of the fieldwork on farms and in Stanley2.4 Identify suitable satellite imagery (Sentinel 2) across years and seasons and source other datasets and data sources (Google Earth) which can contribute to the identification of soils, peatlands and areas affected by erosion. Investigate and decide which Digital Soil Mapping methods are the most appropriate for the Falkland Islands. Prepare a report2.5 Carry out the pre-processing and processing of the identified satellite imagery and incorporate the other ancillary data. Issue the first soil map by the end of October 2018as it will be used by surveyors in the soil campaign2.6 Prepare new versions of the maps (soil/peatlands/erosion) on the basis of the ground-truthed points collected by the soil surveyors. Make the maps available to the stakeholders by end of April 20192.7 Write the soil survey methodology to be followed during the soil campaign and make it available online2.8 Carry out the soil campaign in the Falkland Islands and write a short fieldwork report at the end of each campaign2.9 Process and analyse the data collected during the soil campaign and make them available to the other project partners. The activity will take place between each campaign.2.10 Combine ancillary data (elevation, habitat and weather) and soil physical properties to estimate erosion risk and generate a map2.11 Remote sensing analyses continue to be updated and iterated in order to include data coming from then soil campaign. The final maps of soil, peatlands, erosion extent and risk are delivered to the stakeholders by June 2020

Output 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological properties3.1 Check which equipment is needed to carry out laboratory analyses in the Falklands and subsequently buy and ship what is missing3.2 Identify with stakeholders, soil surveyors and agricultural advisors how many soil samples should be collected for DNA sequencing and from which areas3.3 Adopt current accepted metrics and standards to measure soil health and DNA sequencing. Write a report and make it available online3.4 Define with the soil surveyors and the laboratory technician the standard methods of soil collection and storage. If necessary run a training course3.5 Assess the sustainability of soil management practices by sequencing analysis for soil microorganisms carried out at the Life Sciences Department, NHM, London

8

Page 13: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Project summary Measurable Indicators Means of verification Important Assumptions3.6 Provide interpretation of the results from analyses so that they can be explained in a way that is accessible to local stakeholders and all users of the interpretative soil database tool3.7 Carry out the chemical analyses of soils sampled during the campaigns. The lab analyses will take place in the Falklands. 3.8 Identify and document which laboratory analyses approaches, used throughout the project, can support a long term monitoring program for quantifying chemical and biological soil properties and for assessing soil health3.9 Pull out the main outcomes from the laboratory analyses (chemical and biological) and plan for publishing them on a scientific paper

Output 4 - WP3: Development of soil spatial database and interactive tool4.1 Liaise with other project participant to ensure that the data management plan is adopted, filled in and kept up-to-date. Include the data management plan to the report to be submitted to the funding organisation4.2 Talk to project partners to understand and define how they need to access and share the data collected and analysed and in which form. Write the methodology and make it available online.4.3 Design the spatial database for the national soil map and the interpretative tool on soil properties, carbon storage and erosion risk in PostgreSQL and link it to QGIS and a to the project based webGIS service4.4 Check that data are documented, open access, quality checked, stored and backed-up in the secure server at the local data centre in the Falkland Islands and on a cloud server for the overseas project partners4.5 Engage the stakeholders to identify which information requirements are needed for the online and freely available interpretative soil and erosion risk tool. Write a short report to describe the outcomes of the stakeholders engagement4.6 Use stakeholders' feedbacks to ensure that the interpretative tool can be simply accessed and understandable by them and easily managed by SAERI data manager. Write a short report to describe the various steps made to generate the interactive tool4.7 Test and assess the interactive tool on farmer attitude and economic performance of the farms. Use the results in a feedback loop to modify the tool and make it more efficient and valuable and more able to be adopted into policy decisions4.8 Publish the final maps online through webGIS service4.9 Publish the interactive tool online at the Department of Agriculture webpage

Output 5 – WP 4: Knowledge transfer workshops and training courses5.1 Run 2 workshops on farms and in Stanley (one each) on soil health and training agricultural advisors and habitat restoration officer on how to collect soil samples for future chemical/biological analyses and for soil properties monitoring5.2 Prepare 2 workshops on farms and in Stanley (one each) on what the Earth Observation techniques can tell about soils, erosion and peatlands.5.3 Deliver 2 workshops on farms and in Stanley on how to use the interactive tool, how to keep it up-to-date and how to monitor soil health/erosion/greenhouse gases emission in the long term5.4 Deliver 2 workshops on farms and in Stanley (one each) to describe the soils of the Falklands and how the soil campaign took place5.5 Present the results at the annual winter meeting for rural landowners - Farmers’ Week5.6 Promote the project by allowing volunteers, including interested high school students, to join the PM and the project partners on fieldwork and laboratory analyses (in the Falklands)5.7 Promote the Falkland Islands soil work to other UKOTs

9

Page 14: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

3 Monitoring and evaluation plan

(colour-coding for activities that are only completed once: green completed, red overdue)Activity Indicator Evidence/data

requiredWhere evidence / data

is to be sourcedFrequency

How often will it be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

1.1 Draft and sign Project Partners MoU

An MoU agreed and signed by all partners by May 2018.

Signed MoU document

MoU available on the SAERI Soil Mapping webpage and on the project google drive

Once Project Management Group (PMG)

Drafting to be led by project manager, with technical/contractual input by SAERI Deputy Director – Business and Programmes & Deputy Director - Innovation

1.2 Advertise the PM role and recruit by August 2018

Advertisement published and employment contract agreed

Signed contract of employment

Filed on Breathe HR Once SAERI Deputy Director – Business and Programmes & Deputy Director - Innovation

Recruitment process led by SAERI Deputy Director – Business and Programmes & Deputy Director - Innovation

1.3 Hold Quarterly PMG meetings

A Project Management Group (PMG) meeting held every 3 months starting May 2018.

Minutes from PMG meetings

Approved PMG minutes on the SAERI Soil Mapping webpage and on the project google drive.

PMG meeting draft minutes will be available one month after meeting. Meetings are scheduled every three months.

Project Management Group (PMG)

Meeting to be chaired by SAERI Deputy Director – Innovation or PM. Minutes taken by PM.

1.4 Hold bi-annual PSG meetings

A Project Stakeholders group (PSG) meeting held every 6 months starting May 2018.

Minutes from PSG meetings

Approved PSG minutes on the SAERI Soil Mapping webpage and on the project google drive.

PSG meeting draft minutes will be available one month after meeting. Meetings are scheduled

Project Management Group (PMG)

Meeting to be chaired by PM. Drafting of minutes by PM.

10

Page 15: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

every six months.1.5 Quarterly project webpage update

At least 1 project webpage created by April 2018, and at least 1 update to the page made every 3 months

Project information on webpage up to date

Project webpage Quarterly Project Management Group (PMG)

Webpage to be created and updated by SAERI lead for webpages, content provided by PM.

1.6 Write the monitoring and evaluation plan

Monitoring and Evaluation Plan submitted by October 2018

Completed Monitoring and Evaluation Plan

On the SAERI Soil Mapping webpage

Once Project Management Group (PMG)

Drafting by PM, signed off by all people mentioned in the plan.

1.7 Write final project report and scientific papers

Final project report submitted by July 2020 and prepare scientific papers by July 2020

Final report & scientific papers

Report published on project webpage and disseminated to relevant stakeholders.Scientific papers submitted for publication

Once, at end of project

Project Management Group (PMG)

Report drafting will be undertaken by project manager – the other project partners will contribute with summaries and draft sections on their contribution to specific work packages

2.1 Meeting in Cambridge with all UK based project partners and overseas partners joining via skype

Meeting to draw an action plan for the desk-based data analyses, the soil campaign and laboratory works by May 2018

Minutes from meeting

Minutes published on project webpage

Once Project Management Group (PMG)

Meeting chaired by and minutes taken by temporary PM (SAERI’s GIS specialist and data manager)

2.2 Acquire necessary field equipment and consumables and ship it to the Falklands if not bought on the islands

Purchase list of all equipment and consumables to be shipped, compiled and ordered by mid-September 2018. All remaining equipment and consumables to be purchased by mid-November 2018

All required equipment and consumables present.

Equipment to be stored at SAERI office.

Once Project Management Group (PMG) for equipment and consumable list, PM to check if orders are complete

PMG will provide advice on what is required. Local sourcing of equipment and consumables will be assisted by SAERI logistics officer, some equipment and consumables will be brought in luggage via

11

Page 16: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

the airbridge by SAERI Executive Director and Deputy Director - Innovation

2.3 Plan soil campaign Liaise with SAERI logistics officer for the preparation of the fieldwork on farms and in Stanley

List with sampling dates, sampling locations and relevant accommodation

List with arrangements on google drive for the project partners and hanging up at SAERI office.

Ongoing (lessons learned from each day in the field will feed into the following fieldwork, therefore fieldwork plans might change continuously)

Project Management Group (PMG)

SAERI’s logistics officer will assist with gaining permission from landowners and planning fieldwork.

2.4 Identify suitable satellite imagery (Sentinel 2) and decide which Digital Soil Mapping methods are the most appropriate for the Falkland Islands.

Prepare a report which outlines which imagery is to be used and which methods are to be applied by June 2018

Desk study report Report on project webpage and on the project google drive.

Once Project Management Group (PMG)

This will be drafted by JHI to be approved by the PMG

2.5 Carry out the pre-processing and processing of the identified satellite imagery

Issue the first soil map by the end of October 2018

Map Map on project webpage and on the project google drive.

Once Project Management Group (PMG)

This will generated by JHI.

2.6 Prepare new versions of the maps (soil/peatlands/erosion) on the basis of the ground-truthed points collected by the soil surveyors.

Make the maps available to the stakeholders by end of April 2019

Online maps On WebGIS, link on project webpage

Once Project Management Group (PMG)

JHI and SAERI’s GIS specialist and data manager

2.7 Write the soil survey methodology

Soil survey methodology agreed and protocol written by mid-November

Soil survey methodology protocol

On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft protocol, PMG will decide on aspects to be

12

Page 17: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

2018 incorporated2.8 Carry out the soil campaign in the Falkland Islands and write a short fieldwork report at the end of each campaign

Three soil campaigns co-ordinated for November 2018, February 2019 and November 2019 and reports produced one month after each campaign

Soil survey reports

On project webpage and on the project google drive.

January 2019, April 2019, January 2020

Project Management Group (PMG)

Soil campaign carried out and reports written by PM and soil surveyor

2.9 Process and analyse the data collected during the soil campaign

Make processed data available to project partners within one month after each soil campaign.

Data file On project google drive January 2019, April 2019, January 2020

Project Management Group (PMG)

Data processes and analysed by PM and soil surveyor with assistance of PMG

2.10 Combine ancillary data (elevation, habitat and weather) and soil physical properties to estimate erosion risk and generate a map

Generate erosion map by June 2020

Online maps On WebGIS, link on project webpage

Once Project Management Group (PMG)

JHI and SAERI’s GIS specialist and data manager

2.11 Remote sensing analyses continue to be updated to include data coming from then soil campaign.

The final maps of soil, peatlands, erosion extent and risk are delivered to the stakeholders by June 2020

Online maps On WebGIS, link on project webpage

Once Project Management Group (PMG)

JHI and SAERI’s GIS specialist and data manager

3.1 Check which equipment and consumables are needed to carry out laboratory analyses in the Falklands and subsequently buy and ship what is missing

Purchase list of all equipment and consumables to be shipped, compiled and ordered by mid-September 2018. All remaining equipment and consumables to be purchased by mid-November 2018

All required equipment and consumables present.

Equipment to be kept at the (DoA)

Once Project Management Group (PMG) for equipment and consumable list, lab technician at DoA to check if orders are complete

DoA / FIG will identify which equipment and consumables need to be included in the overall purchase list.

13

Page 18: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

3.2 Identify how many soil samples should be collected for DNA sequencing and from which areas

Soil survey methodology agreed and protocol written by mid-November 2018

Soil survey methodology protocol

On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft protocol, PMG will decide on aspects to be incorporated

3.3 Adopt current accepted metrics and standards to measure soil health and DNA sequencing. Write a report and make it available online

Protocol on DNA sequencing methodology and lab analyses methodology produced by December 2018

Protocol On project webpage and on the project google drive.

Once Project Management Group (PMG)

NHM will draft the protocol for DNA sequencing whereas DoA / FIG will draft the protocol on the soil lab analyses

3.4 Define with the soil surveyors and the laboratory technician the standard methods of soil collection and storage. If necessary run a training course

Soil survey methodology agreed and protocol written by mid-November 2018

Soil survey methodology protocol

On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft protocol, PMG will decide on aspects to be incorporated

3.5 Assess the sustainability of soil management practices by sequencing analysis for soil microorganisms

Report with interpretation of microbiology data by December 2019

Report On project webpage and on the project google drive.

Once Project Management Group (PMG)

NHM will draft report

3.6 Provide interpretation of the results from analyses so that they can be explained in a way that is accessible to local stakeholders and all users of the interpretative soil database tool

Report with interpretation of microbiology data and chemical analyses by December 2019

Report On project webpage and on the project google drive.

Once Project Management Group (PMG)

NHM will draft report on microbiology, DoA / FIG will draft report on chemical analyses

3.7 Carry out the chemical analyses of

Chemical analyses and collation of data

Data file On the project google drive.

Once Project Management

DoA / FIG will carry out chemical analyses

14

Page 19: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

soils sampled during the campaigns.

completed by December 2019

Group (PMG) and prepare data file

3.8 Identify and document which laboratory analyses approaches, used throughout the project, can support a long term monitoring program for quantifying chemical and biological soil properties and for assessing soil health

PMG will discuss which approaches to include in long-term monitoring and write an advisory report by July 2020

Long-term monitoring report

On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft report

3.9 Pull out the main outcomes from the laboratory analyses (chemical and biological) and plan for publishing them on a scientific paper

Prepare scientific paper and submit to relevant journal by July 2020

Scientific paper with submission confirmation

Relevant scientific journal (if accepted for publication)

Once Project Management Group (PMG)

PM will draft paper and submit, project partners will contribute with relevant sections

4.1 Liaise with other project participant to ensure that the data management plan is adopted, filled in and kept up-to-date.

Data management plan prepared by October 2018

Data management plan

On project google drive. Quarterly updates Project Management Group (PMG)

PM will draft the management plan and will update it with assistance of SAERI’s GIS specialist and data manager

4.2 Talk to project partners to understand and define how they need to access and share the data collected and analysed and in which form. Write the methodology and make it available online.

Prepare protocol for data sharing by June 2018

Protocol On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft protocol

4.3 Design the spatial SAERI server to be set up Ensure SAERI has Confirmation from Once Project This will be prepared

15

Page 20: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

database for the national soil map and the interpretative tool on soil properties, carbon storage and erosion risk in PostgreSQL and link it to QGIS and a to the project based webGIS service

in orderto store database in PostgreSQL and datasets collected throughout the project by June 2018

prepared for the new database

SAERI’s GIS specialist and data manager

Management Group (PMG)

by SAERI’s GIS specialist and data manager

4.4 Check that data are documented, open access, quality checked, stored and backed-up in the secure server at the local data centre in the Falkland Islands and on a cloud server for the overseas project partners

Continuous correct storage of data

Presence of data on local data centre and on a cloud server.

Confirmation from SAERI’s GIS specialist and data manager

Quarterly Project Management Group (PMG)

Checked by PM and SAERI’s GIS specialist and data manager will

4.5 Engage the stakeholders to identify which information requirements are needed for the online and freely available interpretative soil and erosion risk tool. Write a short report to describe the outcomes of the stakeholders engagement

Stakeholder feedback to be collated at workshop (see 5.3) engagement works

Report with stakeholder feedback

On project webpage and on the project google drive.

Once Project Management Group (PMG)

Prepared by SAERI’s GIS specialist and data manager

4.6 Use stakeholders' feedbacks to ensure that the interpretative tool can be simply accessed write a short report to describe the various

Report on how interpretative tool was generated

Report On project webpage and on the project google drive.

Once Project Management Group (PMG)

Prepared by SAERI’s GIS specialist and data manager

16

Page 21: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

steps made to generate the interactive tool4.7 Test and assess the interactive tool on farmer attitude and economic performance of the farms. Use the results in a feedback loop to improve the tool

Preparation of temporary feedback tool by December 2019. Workshop with stakeholders (see 5.3) will provide feedback for improvement

Report on stakeholders’ impression of the interactive tool

On project webpage and on the project google drive.

Once Project Management Group (PMG)

Prepared by PM and SAERI’s GIS specialist and data manager

4.8 Publish the final maps online through webGIS service

Publication of maps by July 2020

Maps On WebGIS, link on project webpage

Once Project Management Group (PMG)

Established by SAERI’s GIS specialist and data manager

4.9 Publish the interactive tool online at the Department of Agriculture webpage

Publication of interactive tool by July 2020

Interactive Tool On DoA webpage, link on project webpage

Once Project Management Group (PMG)

Established by SAERI’s GIS specialist and data manager

5.1 Deliver two workshops on soil health and training on how to collect soil samples for future chemical/biological analyses and for soil properties monitoring

One workshop in camp and one in Stanley for landowners, the public, agricultural advisors and habitat restoration officers in the last quarter of year 2 (January to March 2020)

Workshop report and article in local newspaper

Workshop report on project webpage and on the project google drive.Article in local newspaper

Once Project Management Group (PMG)

PMG will develop this with assistance of SAERI’s logistics officer

5.2 Deliver two workshops on what the Earth Observation techniques can tell about soils, erosion and peatlands.

One workshop in camp and one in Stanley for landowners, the public, agricultural advisors and habitat restoration officers in the last quarter of year 2 (January to March 2020)

Workshop report and article in local newspaper

Workshop report on project webpage and on the project google drive.Article in local newspaper

Once Project Management Group (PMG)

PMG will develop this with assistance of SAERI’s logistics officer

5.3 Deliver two workshops on how to use the interactive tool, how

One workshop in camp and one in Stanley for landowners, the public,

Workshop report and article in local newspaper

Workshop report on project webpage and on the project google drive.

Once Project Management Group (PMG)

PMG will develop this with assistance of SAERI’s logistics

17

Page 22: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

Activity Indicator Evidence/data required

Where evidence / data is to be sourced

FrequencyHow often will it

be measured

Responsibility

Who will measure it

Resources (time, £, staff, input from

others)

to keep it up-to-date and how to monitor soil health/erosion/greenhouse gases emission in the long term

agricultural advisors and habitat restoration officers in the last quarter of year 2 (January to March 2020)

Article in local newspaper.

officer and SAERI’s GIS specialist and data manager

5.4 Deliver two workshops to describe the soils of the Falklands and how the soil campaign took place

One workshop in camp and one in Stanley for landowners, the public, agricultural advisors and habitat restoration officers in the last quarter of year 2 (January to March 2020)

Workshop report and article in local newspaper

Workshop report on project webpage and on the project google drive.Article in local newspaper

Once Project Management Group (PMG)

PMG will develop this with assistance of SAERI’s logistics officer

5.5 Present the results at the annual winter meeting for rural landowners - Farmers’ Week

Presentation delivered in July 2020

Presentation On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft presentation, PMG add sections and provide feedback

5.6 Promote the project by allowing volunteers, including interested high school students, to join the PM and the project partners on fieldwork and laboratory analyses (in the Falklands)

Advertise for volunteers in local newspaper.Liaise with school to give presentation and to offer the opportunity for school trips. for fieldwork and a visit to the laboratory

Advert, school presentation, report on school field trip

Advert in local newspaper, presentation and report on project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will advertise, liaise with school and arrange opportunities with assistance of SAERI’s logistics officer

5.7 Promote the Falkland Islands soil work to other UKOTs

Write articles to be published in SAERI’s newsletter and across UKOTs networks by July 2020

Articles On project webpage and on the project google drive.

Once Project Management Group (PMG)

PM will draft articles

18

Page 23: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

4 Roles & Responsibilities

Role Responsibilities

Project Manager

The project manager leads on the day to day running of the project, including coordinating the project partnership, providing secretariat for the PMG and chairing the PSG. The project manager shall be accountable for the financial management of the Darwin project budget, and ensure the project is delivered on time and on budget.

Project Leader

The project leader will be responsible for the technical direction of the project and will be the main point of contact for Darwin. In addition, they shall be the person responsible for ensuring any grant meets the relevant Terms and Conditions. Finally, the Project Leader and their organisation are responsible for the health and safety of all staff working full and part time on their project.

Project Management Group (PMG)

Project Management Group (PMG) shall monitor and steer the project, ensuring it aligns with the project proposal document, and ensuring that the project delivers its outputs on time, and on budget. The PMG will also approve the Monitoring and Evaluation plan at the start of the project, and sign off its implementation throughout the project duration. Finally, the PMG provides high level decisions regarding any changes to the Project Management Plan (log frame), and will review relevant documents associated with this, such as the project risk register and the issues log.

Project Stakeholder Group (PSG)

The Project Stakeholder Group provides an advisory role, and is a forum to gather and assimilate the collective views about the project from land owners, land managers and conservationists within the Falkland Islands. It also allows the stakeholder community to contribute local knowledge and expertise to the project, ensuring that the resulting products are based on best available information and are ‘fit for purpose’.

19

Page 24: Monitoring and Evaluation (M&E) Plan Template · Web viewOutput 3 - WP2: Assessment of the sustainability of soil management practices and of soils physical, chemical and microbiological

5 Data Management

SAERI operates a strict data managment policy for Darwin Plus projects, which this project shall comply with. This includes, but is not limited to:

The provision of Research Permits from FIG.

The provision of metadata for project delivery data layers

Submission of final datasets to the IMS-GIS data centre as required by the data management policy.

A more detailed guide to data managment provision under this project can be viewed here: http://www.south-atlantic-research.org/guide-for-researchers/d-data-management