i · i 'j ! \1inutes of the 12 111 I \lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting to the River Re juvenation Committee (RRC) wa- held on 31/05/2019 in the conf' erence hall of the Secretariat under the Chairmanship of Secretary, Environment. The f ollowing members wer e present for the meeting:- I. Mr. Govind Jaiswal IAS, Secretary (Environment), Secretariat, Alto- Por vorim. J Mr . Ravi Jh~1 !As, Director, Department of Environment. 3. Mr. Pramod Badami, Superintending Engineer (S.E.), Water Resources Dept. (\VRD). 4. Mr. Rajan Satardekar, Director, Directorate of Panchayat, Pana ji 5. Dr. Anand Palekar, Dv. Director, Directorate of Health Services (DIJS) 6. Mr. Prashant Kamat, Functional Manager, Directorate of Industries, Trade and Commerce (DJTC). 7. Dr. T a r iq Thomas, IAS, Director f or Municipal Administration (DMA). 8. Mr. Ulhas Kcr kar, S.E. V, Public Works Dcpa11ment (P\VD). 9. Mr . Umcsh Kulkarni, Chief Engineer, P\ \ /D. 1 O.i \1r. P. B. Sheldarkar, I VI. D., Sewer age infrastructure Dcvclopmen: Corporation of Goa Limited (SJDCGL). Page 1 of 25

Transcript of MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111...

Page 1: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

i 'j

!\1inutes of the 12111

I\lceting of River Rejuvenation Committee {RRC')

held on 31" 1\1av 2019

The twelfth meeting to the River Rejuvenation Committee (RRC) wa­

held on 31/05/2019 in the conf'erence hall of the Secretariat under the

Chairmanship of Secretary, Environment. The following members were present

for the meeting:-

• I. Mr. Govind Jaiswal IAS, Secretary (Environment), Secretariat, Alto­ Porvorim.

J Mr. Ravi Jh~1 !As, Director, Department of Environment.

3. Mr. Pramod Badami, Superintending Engineer (S.E.), Water Resources Dept. (\VRD).

4. Mr. Rajan Satardekar, Director, Directorate of Panchayat, Panaji

5. Dr. Anand Palekar, Dv. Director, Directorate of Health Services (DIJS)

• 6. Mr. Prashant Kamat, Functional Manager, Directorate of Industries,

Trade and Commerce (DJTC).

7. Dr. Tariq Thomas, IAS, Director for Municipal Administration (DMA).

8. Mr. Ulhas Kcrkar, S.E. V, Public Works Dcpa11ment (P\VD).

9. Mr. Umcsh Kulkarni, Chief Engineer, P\\/D.

1 O.i\1r. P. B. Sheldarkar, IVI. D., Sewerage infrastructure Dcvclopmen: Corporation of Goa Limited (SJDCGL).

Page 1 of 25

Page 2: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

'• 11.Ms. Megha Kerkar. Superintendent of Fisheries.

12.Capt. Premlal Sirsaikcr, Dy. Col-., Captain of' Ports.

13.Mrs. Neha A. N. Panvelkar, Dy. Dir. ( I, IJ & lll), Department ot Mines and Geology (D\1GJ.

J 4.Mr. Sudesh Sangodkar, Manager (Civil), Goa State Infrastructure Development Corporation (GSJDC).

15.Mr. CliffordD'Mello, Asst. Tourism Officer, Directorate of Tourism.

16.Mrs. Fiona A. Cardozo, Dy. Director, Directorate of Panchayats (DoP).

• 17.l\1rs, Siddhi Halarnkar, Additional DoP .

18.Mr. Sanjeev Joglekar, OSD, Department of Science and Technology (DST).

19.Dr. Umesh Kamat, Asst. Lecturer, Goa Medical College.

20.Dr. Shamila Monteiro, Member Secretary, Goa-PCB/ Secy., (RRC).

The Member Secretary, Goa-PCB welcomed the Chairman and other

Members of the Committee. The status of the action plan as submitted to the

NGT for rejuvenation of eleven polluted river-stretches were taken up:

• , Sr. ,- Action Stratcg;_rll.ivcr ·- Agency ·1 imc I N:i. I . Stretch Frame

~ r-iver >- Priority- III (From J\lobor to Khareband i\Iadgaon)

T- ;·Natural-· - lrcatme;; I Khaieb-:ind S]t)C(il. i I 8 ,1;;;11,h, Waler samples (24 in

(SIB!·; Phvtorid Beds) 1 to Mobor I nos.) collected 1rnm l.J

L___

i will be installed

inuncdiatclv m

eighteen months

Present Status

identified nallahs und analysed throuuh M i<c,

I C

_1___ J 1TA Labs. Margno ---

Page 2 of 25

Page 3: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

Sr. i Action Stratci,,':' River · Agency i Time No. I Stretch I - Frame - ' +- - i alona lllC banks in/ ·1 i indicate

I , - I - I order to avoid the I I HoD

I pollution I I I ! I I I

Present Status

"faecal

that D.O and

are

\\ itinn

prescribed limits while.

cnlliform' lS

marginally exceeds the

limit.

It was also informed that

the \:VRD has provided

the f1ood-levels data .

It was clarified that the

Quotations towards

design of treatment

i.-rimpr~~;:·eme11t and

[ gradation of

I rnethodology (lo be done

I within the channel as 110 ,

I place is available ul,mg i

the banks of these nalass

will be completed in two­

months and construction

would be completed hy

March 2020.

Further. as instructed the

Goa-PCB bas issued

'SCN directions· to

_,

I _L_ ---I-- up I Klrnrehand 1

- I the I to Mohor !

__ j_ __ _J_

!

I

-1 9 months

i

J_

SGPDA to treat the

I \Vast.e, being

, 0!1-Sih:'. _J __ j The

I that !

generated

(Dl'vV\) informed

a .Joint Survey will

Page 3 of 25

Page 4: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

~r. I Action Strategy I ~o.. .

I existing Solid\Vastc

Management faciln;

including collection I

system,

facilities

composting

and erection I of material recovery

facilities / storage

shed for non-

biodegradable waste

at Sonsoddo Margaon

• -- ,- - --

3. I De weeding Khare band

to Mobor

L

------

River Agency __ Strctrh_t_

_J __ L

' I I __

WRIJ

1 -1-i-mc

Frame Present Status

be continued along with

Directorate of 1 !ealth

r Services (DHS) mid

Directorate of Panchayar

(DoP) to identify those

notices

issued

Prcscntlv.

discharging

sewage and disposing

solid waste m water

bodies. Notices will he

subsequently.

DHS has

issued 715 notices to

households to comply

within 60 days from da:e

of issuance.

'directions'

issued to bulk waste

generators.

On expiry

In addition. I I have been ·

of the

stipulated period of s1xt) -

; days, DHS will proceed I

I with disconnection of

I ~~vater-sup~ly / electricity

~nths i Estimates have been

completed. Tenders have

been issued and 'work

order· to be issued b\

October 2019. It has been

made mandatory that the

needs to m:ii111a111

Page 4 of 25

Page 5: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

-----------

Sr. r()· j4

Action Stratc~y Time j Stretch Frame --r·· I the system for three-

- _ __ \·ears.

so

River A.gene~

.,._ ••. :._., •• 0 •• ,,~ ,,...,,.,.., ••. I Khareband SlDCGL- fis months I Proposal is under way.

of treated sewage 1

1

to Mohor

from the Sewage , I

I treatment plant at ·

Navelim for flushing

and maintaining E- , I flow during dry

WCdSOJL nstallation of DO Khare band I WRD • ! I

I i control measures to Mobor

Present Status

I

18 months I Estimates have been

completed. Tenders have

been issued and 'work

order' to be issued by

October 2019. It has been

made mandatory that the

firm needs to maintain

the system for three-

years.

Talpona River- Priority- IV (from Talpona to Gokarna Math

Poinginium)

I I. i) Clear the solid I Along the I Dircctora I 6 months

waste dumped I Canacona

along the bank

ii) Prevent further

solid waste

dumping along the

bank of the River.

l_j _

te of

a) Talpona Panchay

h) Poingini at.

um

DoP informed

priority will be given to

villages located along the

polluted river-stretches

and model villages. I k

also stated

installation of

that

that

win:

meshes has been initiated _L__ ------

Page 5 of 25

Page 6: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

-~

I ~ •.. ·1

. No.

i I I

I

I I

I L i _----~- 2. I Improvement to ; a) 1 alpona I Respect!

collection system. and b) Poingini j vc i . .

I erection of material um Village

recovcrv facilities / [ Panchay

Action Strategy

storage shed for non­

biodegradable waste

ll1 the village

Panchavat areas alone : • L !

the banks of Talpona

: River.

l~ Providing - ---- toil_c_t+-­

! facilities at Talpona

fishing jetty

~--

4. j Proposed S\V!v1

. I 'faci'.ity at Curchorcm

[_ -~~'._mg ~---1 PD anJ !

River Stretch

Agency Time Frame

at

tc

and

Directora

of

Panchay I I at ' '

_ _J_Departm

I ent of

12 months

Present Status

i m storm-water drains so I as to avoid an: solid

waste entering into the

main river-channel.

Tenders to be finalised in

one-week time.

! Further. he clarified that !

directions have been

issued to clear-off the

black-spots. Accordingly.

Bye-laws to be amended

within 02-weeks.

DoP informed that this

i matter is taken up in the

Solid Waste Action Plan

submitted

606/2018 matter.

\Vask

___ j Ma~~gc ----

111 the

6 months !t was Informed that

construction of 02-scatcr

toilets would be

completed by 06 moths.

18 months I The matter is pending

with the CiSJDC.

Page 6 of 25

Page 7: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

ISr. I Adio~~ Stnt~Cb'}~-Ll-,. Rh er I No. Stretch ~ -- I the csti1~1atcd cost the : - -- -

I work is 190.00 (:r.

Ibis facility will be i

operational in next 18

----------·--~---

Present Status

months. _[ _ J_

Agency

E'·- ( orporat I

ion

Time Frame

Mandovi River-Priority- IV - (from Panjim to Volvoi)

i .. -+

I. I Disconnection of I Panjim to Directora

direct discharges of Volvoi tc of

domestic sewage into a) Bctqui- Panchay

the Mandovi. Candola at,

River/storm water b) Marccm - Directora

drains/ nallah. Tivrem- te of;

, Disconnection of Orgao Health

the direct c) Arnona Services:

discharge into the d) Navelim

nvcr or through c) Candela.

storm water drain/ I Volvoi

06 months I The OMA informed that

a Joint Survey is being ,

l carried out with Dept of

Health and DoP to

identify those notices

discharging sewage and

disposing solid waste in

water bodies. Notices

will be issued

sub seq uentl y.

Natlah. J) Panchava

, Construction of t St.

septic tank and Estcvam

soak pits by g) Sc-old

• residential houses Goa. I I month

and monitoring the h) Salvador-

frequent cleaning Do-

the septic tanks in I Mundo

I order to avoid i i) Pe11ha de

untreated domestic : France ' LJ sewage discharge I j) Reis

m to the natural Magus

Page 7 of 25

Page 8: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

tEI- Action Strategy ----j{j,~~r· j Agency Time Present Status

Stretch Frame t· _J___ ------- ---- --- ' drains k) Panchava

, Initiating action l Neru! .

under the Water

act including

levying of fines for

commercial

establishment

i 2 .

under

pay

Pollutant

principal.

(within 1 month)

a) lmprovcrnent to I a) Bct(jui- I Respecti 16 months I DoP informed that this

collection svstem. Candola

and ensuring b) Marcem -

collection or Tivrcm-

segregated waste. Orcao b

c) Amona

d) Navclim

e) Candola,

Volvoi

I) Panchaya

t St.

Estevam

g) Se-old

Goa.

h) Salvador-

b) Installation of Bio- I Do-

digester having

at Rainguinim by

the Goa Waste

Mundo

capacity I 00 TPD I i) Penha-

De­

france

ve

Village

Panchav • I I

at and j

Dircctora 1 ! '

te of ;I

Panchay , i at

matter is taken up in the

Solid Waste Action Plan

submitted

I CiO(i/2018 matter.

I I MD, G\VMC informed

I that EIA report 111

: response to "Integrated ;

Solid

submitted

Nagpur

conducting

bearing.

ll1

and

the

Waste

Management Facility' at

Bainguinim has been

bv NEERL a

would

process it further for

public

Page 8 of 25

Page 9: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

River Stretch

Corporation.

3.

s~.~S-;;atcgy No, -t---:. - .

- I -- ~1anagcmc1~l--·1T) Reis

I

Maeos

, k) Pan:l;aya

I l Ncrul

toilet I a) I{FI Providing

facility and sanitation h) Volvoi

facility for fishing i c) Marcel

Jetty at IFFI, Volvoi

& Marcem

Agency I Time Frame

,-- - ----+----- -------,--

12 months

Present Status

------

4.

L

Captain

uf Port &

SlllCGL

[ Saramanus Ramp. - . ····1---------------+- -----+----!

12 months ! Work handed over w

GSIDC and work will be

Existing 8 toilets, 7 a) Fishing Dept. of

Bath rooms, 7 urinals Jetty at Fisheries

at the fisheries Malim

. complex Malim

J Betim, Goa managed

I by Sulabh I

i International Social

Servin: Organization

I'orvorim Goa. The J.O

seated toilet block is

proposed along the

waste water treatment

, p!anl of 40 KU). The

: work is been carried

out through Goa State

Infrastructure

Development

Corporation. ·-·- -·------------

CoP has already fitted

Bio toilets at Adpai and

is proposed to install 2 at

Vashi. Permanent toiletrs

have been constructed at !

volvoi. Ribander and 1

completed

31/05/2019.

Page 9 of 25

Page 10: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

Sr. -------~cti~;~-st;;1tq.,~- l River I -A~cncy·- r No. ! Stretch I

n I he up gradation of-1 STP al I P\VD.

Sewage Treatment i Pano. I Goa

i Plant at Pattu, Plaza at I Panjim.

Panj irn 1s under

progress bv P\VD.

Goa and expected to

he completed 111 one

Chapora R"' r L nc. - Prio · . ---:;::=--;:--_J • Taluk t riry V - (from Al a o Morjim) orna Fort ' Perncm ! -----

1

i

vear. ! .,

Time Frame

18 months

Present Status : -- -- - --- -----i

It is informed that the !

plant \\ill be operational

by Dec. 2020.

-~- -~- I. Disconnection of Alorna Ion • I direct discharges of, to Morjim

domestic sewage into !

the Chapora

River/storm water

drains/ Nallah.

I > Disconnection of

the direct

discharge into the

river/storm water

drain/Nal!ah.

• I I r Installation of Bio

toilets

,... Construction of

septic tank and

soak pits bv

residential houses.

s

~~provement to a) /\Joma L_ -----------

I ___ _J

Directora i 6 months

tc of

Panchay

at and

Directora I I te of '

I Health

The Dl"v1A informed that

a Joint Survey is being

carried out with Dept or Health and DoP to

identify those

discharging sewage and

disposing solid waste in

water bodies. Notices

will be issued

subsequently.

. -i- ----- . - Respect! I 12 months I DoP mformed that tins

I

Page 10 of 25

Page 11: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

I-Sr T Action Strategy -- f Uh~ -I Agency -T- o. _ __ --h- S!~·tch _ _ _J ~ollect10n system. and b) Casa\~e I

' I :rection of material em I Village ,

recovery facilities cJ 0

storage shed for non- d) D

biodegradable waste

111 the village

Panchayat areas along

the banks of Chapora

River

• ' ·'.

zonm

irnrgal

1111

c) Tuern

I) Parcem

g) Aganva

da

h) Chopde

m

i) Mmjim

j) Mcnecu

nn

k) Pima

I) Nadora

m) Rivara

n) Col vale

o) Camurli

111

i p) Oxel

q) Siolim

Waste

Directora

te

Panchay

at

l

r) Assagai-, s) Anjuna

----+--- . .. Expansion of Saligao

Management

of

---,------ - Time ~ Present Status Frame

matter is taken up in the I

Solid Waste Acuon Plan 1

submitted m

606/20 I 8 matter.

the

facility from 1 )'i tons :

per day to 250 f 20%

(300 tons per day).

Project cu::;l i.e. 82 er.

l • + tj·--·-· --- --- is pending : -- The matter . 9 months DC ' . I the GSI . \Vll 1

_ _j_ _ _J _ I _ _ _j _

Page 11 of 25

Page 12: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

-~ ----:-·--,------:-- ---: - -- - - - - - - . -- -T- -- - - - ;-- -- - - --;-- - - - - - - - - - ii Sr. 1

1 Actwn Strategy I Rn er I Agency I fimc ' Present Status N, I s· h , I F' I

~- ~·~------------~ __ _'.: trct~- ! _J__~;un~_j _ I 4· I Providing toilet I 1 Depanrn I 6 months I It was informed that the

1 I I C ·1·' ('I ! I I ' ' ' racr rncs at . 1apora I I ent of j work oi providing a Im let

1 I I I I ' I fishing jetty I Fisheries I I block of 02-scatcrs has ' I I I I I I I I been awarded to the I I I I I I ! I I I PWD ,--1 , _l_ , _j - '

~

Tcrckhol River - Priority - V: I :'

I ' I. . l)isconnection of (Along 1 Directora 16 months / The DMA informed that 1

/ direct discharges of I Terekhol I tc of/· a Joint Survev is beinn

/ / Jomestic sewage into I River Panchay , carried out wi;h Dept ,,;-

. Health and Dop to

identii)i those notices

discharging sewage and

the Tcrekhol a) Tambosa at and

I / River/storm water b) Nanerwa Directora • drains/ Nallahs. I da te of

.,... Disconnection of I c J Bhalkhaj I Health I the direct I an

discharge into the / d) Qucrim -

I

! r Installation of

I Bio-toilet.

I .. C ' j I Y onstruct1011 o j / septic tank and j

I soak pits b) / / I

11

j rcsidcntia! J j I

J houses / j +I j

1

12- -~11p,rncmcnt-and-c;J-aJ Querim-tRespecti 12 months fool' 1;formed Oia~~I~

/ gradation of the / Tiracol , vc I I matter is taken up in the I I existing Solid Waste I b) l'aliyeml I Village ,I Solid \Vastc Action Plan

/ / Management Facility/ c) Corgao Panchay I I submitted m Ille'

l I including collection f d) Pcrncm I at and j f 606/2018 matter __ J___ I ·--~~ .

river/storm water

drains/Nallahs .

Tiracol

disposing solid waste in

water bodies. Notices

will be issued

subsequently.

Page 12 of 25

Page 13: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

/ ~;~-j~\ction Strategy I

INo., _ -~ ----r;;siem and erection of I -

_ I matenal recovery

facilities

shed for

biodegradable waste

m the

storage

village i

River Stretch mutucip

al

council

non- I c) Casne

Ambcrc

Il1

T Agency ! Time

Frame Present Status

Directora

te of

Panchay

i at

panchayat areas along porosca

the banks of T erckhol dem •

River. ! t) Tambox

em-

Mopa-

Uguem

g) Torxern

~-1 Expansion -- of··saligao

Waste Management I

[ facility from 125 tons ' per day to 250 + 20%

(300 tons per day). ' ' I Project cost i.e. 82 er. ' ----------

9 months

I. ···------------------

Disconnection Cure

of direct discharges of I harem to

' domestic sewage into I Madkai

the 7.uari River/storm

water drains/ Nallahs.

>- Disconnection of

D 6

irectoratc I months

of

The matter is pending

with the GSIDC.

'-· ----.------~----- Zuari River- Priority - V - (from Curchorcm to Madkai)

the direct

discharge mto the

Panchay

at and

Directora

te of

Health

The DMA informed that

a Joint Survey is being

i carried out with Dept. or i Health and DoP to

identify those notices

discharging sewage and

I disposing solid waste in

i water bodies. Notices

Page 13 of 25

Page 14: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

r Installation of Bio-

toilet.

;,,,- Construction

Action Strategy ! -- Rh:er ! Ag:~c0 -l"in~- _____ -l_2trdd1 - l---···--1··· Fr;~mc

river/storm waler i 1

drains/Nallahs. , I I

I of\

I~ I soak pits by ;

__ , residential house; I _ _ 2. I ~) Savorde I •

i . Improvement I m

'

septic tank and

Present Status I

I wif1·-- -~-

I subsequently.

issued

and up gradation of

the existing Solid

Waste Management

Facility including

collection system and

erection of material

recovery facilities/ I 1 storage shed for non-

biodegradable waste

, in the village

panchayat areas along

the banks of Zuari

River.

Establishment

of toilets at Fishing

; Jelly m Cortalirn in 1

·1 one vcar. L_ - -

b) Panchw

adi

Ill

i) Neurn

j) St.

i

- - ~ I~~-~- -- i_ t- lDoP informed that this 1

R . 12 1 matter is taken up in the I

Lawrcnc

e(Agasa

im)

kl St.

Andre (

Vdha)

11) Siridao

- pale

J

espective I months

Village

c) Shiroda Panchay

d) Borim at and

e) Wadi -- Directora

talaulim te of

f) Durbhat Panchay

g) Bandora at

h) Marcai

Solid Waste Action Pian

submitted m

60612018 matter.

the

NoC from the Panchayat

has been received and i

work shull be taken up on i

priority.

I

Page 14 of 25

Page 15: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

r----- ---------- ----------,------- Sr. ; Action Stratci,•y , River i Agency I Time i!

~ No. r - : m:tretch /---/ Frame t- - 1 : i Curchor I /

crn-. j

kakora

nJ Macaso

Establishment of

S\Vl'v1 facility at

na

o) Curtori

I Curchorem of I 00 tpd

I p) Rachol j capacity within 18 1

/ months at cost of Rs

I I 90 Cr.

I 11 This will cater .

1 .

Que osr j / to Qucpem, Sangucm, m I

I I and Dharbandora , 1

I I j r) Sancoa , I -

1 Ialuka I I I ~. r - 0 ""°'' "' ,J D O t oC has been rccei ,,,o 1 / for Fishing .Jetty at / cpartmcn I months / from the Panchayat and

I Cortalim I t of J j the GSJDC: has been

/ J Fisheries f f requested to carry out the

[ I j f j work. t-;,-i--------t~----- ----t-----r------- 1

4· I I I .

J I The underground SIDCGL 112 months I Ponda-Curti STP matter

I / sewerage scheme in j is subjudice. Handora

.1 progress for Panda J I I plant is given in favour I nnmicipal area I

m

Lotoliu

l1l

q) Cortali

m-

Present Status

including Curti, ii I I ! rctcndcred. ln respect or

1 Bandora. Kavclcm I J I I work al Kavlem, 5.Y>O ()I ____________________ L ,_ ----- --

of SIDCG L and has to be

Page 15 of 25

Page 16: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

Sr. i' Action Strategy 11 ,Rh·LT

11 Agency ! Time Present Status

No._ I I _Stretch _J J . Frame_l --·-----·--- . l Undir and area close I j r i' vork has been I

to Kap/cshwari nallah J I i completed.

which forthcr joins !he J / /

Zuari River. Three I I j Further, it was inform.__-d

STP's are proposed at / that in respect of

Corti. Kavelem and / Sanquelim STP, the

Bandorn of capacity / J GSIDC has agreed to la)

8MLD, 15MLD and J pipeline (i.c. 200-mctcrs

,-- ~--· - ·-

l 5MLO respectively.

At present 70%

/ sewerage network is I / laid and l 5MLD STP

· at Kavclem 1s 10

progress. Sewerage 1·

scheme with I MLD I STP is commissioned I

for Durbhat village I

which is on the bank

on River Zuari. This

of 'missing line ') emd

accordingly, the work to

be

thereafter.

commenced

• STP

commissioned

was

111

September 2017 and is

running successfuJJy.

The total cost of all

I the projects mentioned [ above is 536 er.

, __ _j___ ----

I I I I I i

·~'-------·- -j- -- ·- - --- 1

Khandepar- Priority V- (from Opa Ponda & Cod Ii- u/s of I

I i Opa \Vater wot-ks)

,f--· -- ---,-:- ---.-------------:-,_·---:-- -- -,- ---.-···-·-r-:- --- -- 1---:-~ ·- --. --- --··--- 1 I· I Disconnection of i Coc!l1 to L'is I Directora j 6 months I ! he DMA rnformed that L __ J ~ _J ~-- --'--- -- -- ·- --

Page 16 of 25

Page 17: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

- T--- ---- - - - -- -·- --- ----, ----- - --- - - -,---- --- - -

I Sr. I Action Strategy I_ River j Agency I Time I Present Status 1

I No. . I Stretch I Frame l i . - ---j-- - - - -·-·--------1----i------- -------- --- -

direct discharges of I of Opa I te of I a Joint Survey is being i_

domestic se\\ a!2.C into I water works [ Panchav 1

1

. \ carried out with Dept of 1

. , - I !

the Khandepar. a) Khandcp \ at'. I ] """ and DoP to !1 I River/storm water ar j Directora ] identify those ·

drains/ nallah. b) Usgao [ te of\ \ discharging sewage and Health 1 I disposing solid waste in

11

> Disconnection

the

of

direct

discharge imo the

river/storm water

drain/ Nallah.

:..- Construction of

septic tank and ]

soak pits by j residential houses ·

and monitoring the

frequent cleaning

the septic tanks in

order to avoid

untreated domestic

Services; water bodies.

will be

subsequently.

Notices '!

issued I i

I

• I ) I sewage discharge

\ '1 in to the natural I ]

I ] drains. I l_ . I ---- ------------ -- _L---+------ - -- l ] Assonora - Priority -V - from Assonora to Sirsaim [ I

I]-_ - I Disconnection of [ Assonor; to Directora 16 months j The DMAinforrncd that-'1 [ direct discharges of \J/s of te of\ a Joint Survey is being

I ] domestic sewage into . Sirsaim Panchay I carried out with Dept of

I j the Asscnora. River 1

1

a) J\ssonora at, ] ] Health and l)l)p to

) I /storm water drains/ b) Sirsaim Dircctora I I identify those i

] [ nallah.

. I I . .L.. --- ------

. tc of

1. Health -- - -- J __ - _j_

] discharging sewage and

1. disposing solid waste in J ----- -

Page 17 of 25

Page 18: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

l~·l -~: J No. I . . of , + ,---i'Jisconnect10n j

direct the

Action StralcJ.,':'' I

discharge into the

river/storm water

drain/Nallah.

:r Installation of Bio

toilets along the

river stretch for

residential areas.

'r Construction of

septic tank and

River --T :~gcn~- Stretch 1 ) Frame , _

r Services;[' I water . b ,.

·1 I will be . i , subsequently.

Time ---1 Present Status

----0 Notices

soak pits by

residential houses

and monitoring the

frequent cleaning

the septic tanks in

order to avoid

untreated domestic

sewage discharge

in to the natural

• I [kdrains. --i-------

1

~2 - ·· - ·-,-'j-~) Assm~-r-~- [ Respecti 12 months , . Improvement o

collection system, and I b)Sirsaim

erection of material i

' recovery facilities /

storage shed for non­

biodegradable waste

111 the village

Panchayat areas along

the banks of_ Assonon~L _

ve

Village

Panchay

at and

Directora

· le of

J Panchay :

at _J_ -·-·· - -

DoP informed that this

matter is taken up in the

Solid Waste Action Plan

submitted 111

606/2018 matter.

the

Page 18 of 25

Page 19: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

Present Status

,::;- ' --:-,- - ' - .- ---:-· -- - --, .,. ,

I, Sr. . Actwn Strategy ,1

River ·1 Agency i . I tmc 1

1 No. L Stretch . --+ Frame ,

I [ Ri,cr j [ • ~ _

~ j E;pan;io~oi=-salig~(~T - -- -I - -¾-months · The 1~1atter is pending

j Waste Management I [ I I with the CiSIDC.

I

facility from_ 125 tons ,'

. per day to 2)0 + 20% I

j (300 tons per day). I __ t·ojcct_ cost i.e. 82 er. L [ i

Valvanti River - Priority - Y- from Poriem to Sanquelim-1 Bicholim

I. --1 Disconnection ;f / Poriem 10

1 direct discharges of I Sanquelim I te

j domestic sewage into . a) Poriem [ Panchay

I th.e' Valvanti. b) Honda 1 River/storm water c) Karapur

I drains/ nallah. &

I > Disconnection of

, the direct

I

2.

discharge into the

river/storm water

drain/Nallah.

, Installation of l3io

toilets ! > Construction of

Sarvona

Directora

of

septic tank and I

soak pits by 1

residential houses. I ________ ,, ---·--

a) Improvement to a) Poriem

collection system. I h) Honda and erection of I c) Karapur

at,

Dircctora

te

Health

of

Services;

Rcspecti

i ve

I Village_

6 months The DMA informed

a Joint Survey is being

carried out with Dept of

Health

water

will

and

bodies.

be

subsequently.

DoP

thnt I

identify those notices

discharging sewage and 1

disposing solid waste i11

to i

Notices

issued

·----- 12 months i DoP informed that this

matter is taken up in the

Solid Waste Action P!an

Page 19 of 25

Page 20: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

Sr. : No. '

Action Strategy

River 1A;cncy Stretch

material re-,-.,-l\-e-1-·;-- t---&~---- I Panchay

facilities .1 storage

shed for non-

biodegradable

waste

ll1 the

village Panchayat

areas along the

hanks of Valvanti

River.

b) Improvement and

Up gradation of

the existing Solid

Waste

Management

Facility of

Sanquelim

Municipal

Council;

installation of

biogas plant of .1

tons per day and

construction of

storage shed.

Sarvona I at

3. i Expansion of Snligao

i Waste Management

! facility from 125 tons

per day to 250 + 20%

(300 tons per day).

Project cost i.e. 82 er.

a) Pcrncm

b) Bardez

c) Bicholi

m&

d) Sattari

talukas

in North

Directora

te

and

of

Panchay

at

,--- .

Time I Present Status Frame

1 submitted 111

! 606/2018 matter.

-- --- 1 he

·---+------ ·-------------- 9 months ! The matter is pending

with the GSIDC.

Page 20 of 25

Page 21: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

~-r. I Acti~n Strategy \ - Riv er lAgcncy_l_ Ti~;:--1 - Present Status

I No. '· --+ s~;:ch _ +-----' _Frame1 _ l _ t District. I I I

I ~ Commissioning oi' a) Sai1quciifs1DCGL 112rnonth;Ti~tal ~etworkle~g1i1 "

, I extsnng sewerage I :1 _ .

1

. [ 2900111. Te.sted nct,york b) _, wards I length 1s 198Um.

network and STP 0.8

MU) capacity.

(Covering 3 wards)

1.e.

Bandhar

wada,

Muslim

Wada

Muzar

wada &

Gokuhv

adi

f------L-----~~~l_-~

Network balance to be i

tested 920111. It IS

observed during testing

that 270111 is blocked.

There is proposed for

replacement of 200111.

The time required for

rectification of manholes.

replacement of main

sewer line within 8

Bicholim River- Priority- V - from Bich.olim to Curchirem t------------ jl I. I Disconnection of' Curchirem [ Directora 6 months The DMA informed that

direct discharges of to 13icholim , te or a Joint Survey is being , domestic sewage into i a) Curchire I Panchay

months.

the Bicholim. I m I at and

River/storm water [ b) Bicholi Directora

! drains/ nallah. m te or ' r Disconnection of Municip I Health,

the direct al ULB.

discharge into the Council

river/storm water I c) Ona-

carried out \Vith' Dept of I

Health and DoP to ·

identify those

discharging sewage and

disposing solid waste m

· water

I will

bodies. Notices

be issued

drain/Nallah. .. Mauling

, Installation or ~~~~-1~---~----- .. ·'··---

subsequently.

__ _j __

Page 21 of 25

Page 22: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

C ~~ No. 1

- ' toilets

Construction of

River -T'-\g;ncy 1- Tim~ I Present Status Stretch __ - · I Fram~ : _

d) Karapur I ! T -Sarvan

1

septic tank and c) /\mona

soak pits hy f) Pilgao

residential houses

and monitoring the

frequent cleaning

the septic tanks in

order to avoid

untreated domestic

sewage discharge • I I 111 to the natural I ' drains. -~1 ---

2. a)lmprovement to a) Curchire Respccti I collection system, m ve ULB and erection of b) Bicholi &

material recovery 01 Village

facilities I storage Municip Panchay

shed for non- al at and

biodegradable waste Council Dircctora i

--1

I

12 ;onths I Il;P int~rmed that this '

matter is taken up in the

Solid Waste Action Plan I

submitted in the [

\ 606/2018 matter.

• m the Municipal ' c) Ona- I te of

I Council. village Mauling Panchay I 6 months

Panchayat areas uem at

alona the banks or d) Karapur

Bicholim River. -Sarvan

b) Improvement e) J\mona

and up gradation or I) Pilgao

the existing Solid 1

Waste Manaacrnent

i I

facility of Bi:holirn ! L. L_-----~-- . ' , ---------

Page 22 of 25

Page 23: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

~- A~:tion Strategy - _ .. Rh er Agen~;-T- Time ~)resent Status !

~~ _ Stretch I Frame _ _ _ I Municip~~l ~C_o_u_n_c~il-;~!- -------- - ·---~----t- ----- - 1

' a) Curchirc I 9 months _,. l-xpansion of Saligao

Waste 111

Management facilitv b) Bicholi

The matter is pending

with the GSIDC

from 125 tons 111

per day to 250 + 20% Municip

al

Council

c) Ona-

Mauling

ucrn

d) Karapur

-Sarvan

c) Amona I I l) Pilgao '

----- -- Sinqucrim River- Priority- V- from Candolim to Ga

Nerul ------ ----- -------------- ----·---- I. Disconnection of Candolim Director

direct discharges or Bridge to te (

domestic sewage into Ganpati Panchay

the Sinquerim. Temple at,

River/storm water (Nerul) Director

drains/ nallah. d) Pilerne- <e (

' i Health > Disconnection of Marra

the direct , e) Candoli i Service: discharge 111to the 111

nvcr or through n Reis-

storm water drain/ lVlagos

Nallah. g) Ncrul

ncsh Temple,

a I 6 months I The DMA informcd-thc;t1

a Joint Survey is being

carried out with Dept or Health and DoP lo

a

f

I

~--1

identify those notices

discharging sewage and

disposing solid waste in

water bodies. Notices

will be issued

subsequently.

I _____ j

Page 23 of 25

Page 24: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

' ,-- --1- --. . --- - ,- . -- ~ -- -----,., - . - I. Sr. Action Su-atcgy I R1vcr~Agcncy j I rmc I

J\o. I _ ~ Stretch _ _ -I Frame ! J· ,I r Installation of Bio

1

. -- . -- --- --f-· J I toilets along the j j

I ) river stretch. . i I c· . 1 I r .onstrucuon o i

septic tank and I

- by I

Present Status

I

~

soak pits

residential houses

and monitoring the

frequent cleaning

the septic tanks in

order to avoid

untreated domestic

sewage discharge

I !l to the natural

drains. ----------

a) Improvement to a) Pileme- collection system, Marra

and ensunng b) Candoli

collection of m segregated waste c) Reis-

b) Improvement and Magos

• _, .

I . 1 I trawlers near Nerul.

L_L - --

Rcspccti I 6rnonths vc

Village

Panchay

at and

Directora

l 1p gra(~ation ~f I d) Ncrul I tc of.

the existing Solid I Panchay I \\'astc I ~t I

k- ,_1anagcm~-- j + __ I_ ~ _ --1 Providing toilet I .

1

Dcpartm 16 months I The Department has :

facility and sanitation , en! of, , proposed to provide 02-

seater toilet facility at facility for Fishing Fisheries

_ _L~L

DoP informed that this . k . I 1 matter 1s ta 'en up m t 1c I

Solid Waste Action Plan j

submitted 111

1

606/20 I 8 matter.

i Ncrul

__ j__~ccording\~::_ the

the

Ramp.

work

Page 24 of 25

Page 25: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting

--- ----' Action Strategy I

I Stretch -----+------+---------------

Ll [ __ __ PWD.

--- -T-

! Agency River Time Frame

Present Status

Based on the above-referred status-update, the Secretary

(Environment) directed the officials from (i) Directorate of Municipal

Administration (DMS), (ii) Directorate of Panchayat (DoP) and (iii)

Directorate of Health Services (DI-!S) to complete the joint survey-cum­

inspection on priority and submit a comprehensive compilation as per eleven

polluted river-stretches giving details namely (a) No. of units /

establishments inspected, (b) No. of observed violations as per provisions of

PI-!C I SWM Rules, as applicable, ( c) No. of Notices issued to units /

establishments, (d) No. of responses /replies received from units /

establishments within 60-days period, ( c) Actions initiated ti.e.

disconnection o_f water-supply /electricity) against units/ establishments for

non-compliance / non-submission of reply/responses to Notices issued, if

any .

• Further, he also instructed that list of 'commercial establishments'

which have noted to be violating the provisions under PI-!C Act / SWM

Rules, be forwarded to the Goa-PCB, who in turn would issue necessary

'directions/ SCNs's' and seek timely compliance within definite time-frame,

failing which closure directions be issued, thereafter.

.g_.j. {,,..- Dr. Shami la Monteiro,

rMembcr Sccrctaty, Goa-PCB/ M. S., (RRC-Goa)

Page 25 of ZS