![Page 1: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/1.jpg)
i·
i 'j
!\1inutes of the 12111
I\lceting of River Rejuvenation Committee {RRC')
held on 31" 1\1av 2019
The twelfth meeting to the River Rejuvenation Committee (RRC) wa
held on 31/05/2019 in the conf'erence hall of the Secretariat under the
Chairmanship of Secretary, Environment. The following members were present
for the meeting:-
• I. Mr. Govind Jaiswal IAS, Secretary (Environment), Secretariat, Alto Porvorim.
J Mr. Ravi Jh~1 !As, Director, Department of Environment.
3. Mr. Pramod Badami, Superintending Engineer (S.E.), Water Resources Dept. (\VRD).
4. Mr. Rajan Satardekar, Director, Directorate of Panchayat, Panaji
5. Dr. Anand Palekar, Dv. Director, Directorate of Health Services (DIJS)
• 6. Mr. Prashant Kamat, Functional Manager, Directorate of Industries,
Trade and Commerce (DJTC).
7. Dr. Tariq Thomas, IAS, Director for Municipal Administration (DMA).
8. Mr. Ulhas Kcrkar, S.E. V, Public Works Dcpa11ment (P\VD).
9. Mr. Umcsh Kulkarni, Chief Engineer, P\\/D.
1 O.i\1r. P. B. Sheldarkar, IVI. D., Sewerage infrastructure Dcvclopmen: Corporation of Goa Limited (SJDCGL).
Page 1 of 25
![Page 2: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/2.jpg)
'• 11.Ms. Megha Kerkar. Superintendent of Fisheries.
12.Capt. Premlal Sirsaikcr, Dy. Col-., Captain of' Ports.
13.Mrs. Neha A. N. Panvelkar, Dy. Dir. ( I, IJ & lll), Department ot Mines and Geology (D\1GJ.
J 4.Mr. Sudesh Sangodkar, Manager (Civil), Goa State Infrastructure Development Corporation (GSJDC).
15.Mr. CliffordD'Mello, Asst. Tourism Officer, Directorate of Tourism.
16.Mrs. Fiona A. Cardozo, Dy. Director, Directorate of Panchayats (DoP).
• 17.l\1rs, Siddhi Halarnkar, Additional DoP .
18.Mr. Sanjeev Joglekar, OSD, Department of Science and Technology (DST).
19.Dr. Umesh Kamat, Asst. Lecturer, Goa Medical College.
20.Dr. Shamila Monteiro, Member Secretary, Goa-PCB/ Secy., (RRC).
The Member Secretary, Goa-PCB welcomed the Chairman and other
Members of the Committee. The status of the action plan as submitted to the
NGT for rejuvenation of eleven polluted river-stretches were taken up:
• , Sr. ,- Action Stratcg;_rll.ivcr ·- Agency ·1 imc I N:i. I . Stretch Frame
~ r-iver >- Priority- III (From J\lobor to Khareband i\Iadgaon)
T- ;·Natural-· - lrcatme;; I Khaieb-:ind S]t)C(il. i I 8 ,1;;;11,h, Waler samples (24 in
(SIB!·; Phvtorid Beds) 1 to Mobor I nos.) collected 1rnm l.J
L___
i will be installed
inuncdiatclv m
eighteen months
Present Status
identified nallahs und analysed throuuh M i<c,
I C
_1___ J 1TA Labs. Margno ---
Page 2 of 25
![Page 3: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/3.jpg)
Sr. i Action Stratci,,':' River · Agency i Time No. I Stretch I - Frame - ' +- - i alona lllC banks in/ ·1 i indicate
I , - I - I order to avoid the I I HoD
I pollution I I I ! I I I
Present Status
"faecal
that D.O and
are
•
\\ itinn
prescribed limits while.
cnlliform' lS
marginally exceeds the
limit.
It was also informed that
the \:VRD has provided
the f1ood-levels data .
•
It was clarified that the
Quotations towards
design of treatment
i.-rimpr~~;:·eme11t and
[ gradation of
I rnethodology (lo be done
I within the channel as 110 ,
I place is available ul,mg i
the banks of these nalass
will be completed in two
months and construction
would be completed hy
March 2020.
Further. as instructed the
Goa-PCB bas issued
'SCN directions· to
_,
I _L_ ---I-- up I Klrnrehand 1
- I the I to Mohor !
__ j_ __ _J_
!
I
-1 9 months
i
J_
SGPDA to treat the
I \Vast.e, being
, 0!1-Sih:'. _J __ j The
I that !
generated
(Dl'vV\) informed
a .Joint Survey will
Page 3 of 25
![Page 4: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/4.jpg)
•
~r. I Action Strategy I ~o.. .
I existing Solid\Vastc
Management faciln;
including collection I
system,
facilities
composting
and erection I of material recovery
facilities / storage
shed for non-
biodegradable waste
at Sonsoddo Margaon
• -- ,- - --
3. I De weeding Khare band
to Mobor
L
------
River Agency __ Strctrh_t_
_J __ L
' I I __
WRIJ
1 -1-i-mc
Frame Present Status
be continued along with
Directorate of 1 !ealth
r Services (DHS) mid
Directorate of Panchayar
(DoP) to identify those
notices
issued
Prcscntlv.
discharging
sewage and disposing
solid waste m water
bodies. Notices will he
subsequently.
DHS has
issued 715 notices to
households to comply
within 60 days from da:e
of issuance.
'directions'
issued to bulk waste
generators.
On expiry
In addition. I I have been ·
of the
stipulated period of s1xt) -
; days, DHS will proceed I
I with disconnection of
I ~~vater-sup~ly / electricity
~nths i Estimates have been
completed. Tenders have
been issued and 'work
order· to be issued b\
October 2019. It has been
made mandatory that the
needs to m:ii111a111
Page 4 of 25
![Page 5: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/5.jpg)
-----------
Sr. r()· j4
Action Stratc~y Time j Stretch Frame --r·· I the system for three-
- _ __ \·ears.
so
River A.gene~
.,._ ••. :._., •• 0 •• ,,~ ,,...,,.,.., ••. I Khareband SlDCGL- fis months I Proposal is under way.
of treated sewage 1
1
to Mohor
from the Sewage , I
I treatment plant at ·
Navelim for flushing
and maintaining E- , I flow during dry
WCdSOJL nstallation of DO Khare band I WRD • ! I
I i control measures to Mobor
Present Status
•
I
18 months I Estimates have been
completed. Tenders have
been issued and 'work
order' to be issued by
October 2019. It has been
made mandatory that the
firm needs to maintain
the system for three-
years.
Talpona River- Priority- IV (from Talpona to Gokarna Math
Poinginium)
I I. i) Clear the solid I Along the I Dircctora I 6 months
waste dumped I Canacona
along the bank
ii) Prevent further
solid waste
dumping along the
bank of the River.
l_j _
te of
a) Talpona Panchay
h) Poingini at.
um
DoP informed
priority will be given to
villages located along the
polluted river-stretches
and model villages. I k
also stated
installation of
that
that
win:
meshes has been initiated _L__ ------
Page 5 of 25
![Page 6: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/6.jpg)
-~
•
•
I ~ •.. ·1
. No.
i I I
I
I I
I L i _----~- 2. I Improvement to ; a) 1 alpona I Respect!
collection system. and b) Poingini j vc i . .
I erection of material um Village
recovcrv facilities / [ Panchay
Action Strategy
storage shed for non
biodegradable waste
ll1 the village
Panchavat areas alone : • L !
the banks of Talpona
: River.
l~ Providing - ---- toil_c_t+-
! facilities at Talpona
fishing jetty
~--
4. j Proposed S\V!v1
. I 'faci'.ity at Curchorcm
[_ -~~'._mg ~---1 PD anJ !
River Stretch
Agency Time Frame
at
tc
and
Directora
of
Panchay I I at ' '
_ _J_Departm
I ent of
12 months
Present Status
i m storm-water drains so I as to avoid an: solid
waste entering into the
main river-channel.
Tenders to be finalised in
one-week time.
! Further. he clarified that !
directions have been
issued to clear-off the
black-spots. Accordingly.
Bye-laws to be amended
within 02-weeks.
DoP informed that this
i matter is taken up in the
Solid Waste Action Plan
submitted
606/2018 matter.
\Vask
___ j Ma~~gc ----
111 the
6 months !t was Informed that
construction of 02-scatcr
toilets would be
completed by 06 moths.
18 months I The matter is pending
with the CiSJDC.
Page 6 of 25
![Page 7: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/7.jpg)
ISr. I Adio~~ Stnt~Cb'}~-Ll-,. Rh er I No. Stretch ~ -- I the csti1~1atcd cost the : - -- -
I work is 190.00 (:r.
Ibis facility will be i
operational in next 18
----------·--~---
Present Status
months. _[ _ J_
Agency
E'·- ( orporat I
ion
Time Frame
Mandovi River-Priority- IV - (from Panjim to Volvoi)
i .. -+
•
I. I Disconnection of I Panjim to Directora
direct discharges of Volvoi tc of
domestic sewage into a) Bctqui- Panchay
the Mandovi. Candola at,
River/storm water b) Marccm - Directora
drains/ nallah. Tivrem- te of;
, Disconnection of Orgao Health
the direct c) Arnona Services:
discharge into the d) Navelim
nvcr or through c) Candela.
storm water drain/ I Volvoi
06 months I The OMA informed that
a Joint Survey is being ,
l carried out with Dept of
Health and DoP to
identify those notices
discharging sewage and
disposing solid waste in
water bodies. Notices
will be issued
sub seq uentl y.
Natlah. J) Panchava
, Construction of t St.
septic tank and Estcvam
soak pits by g) Sc-old
• residential houses Goa. I I month
and monitoring the h) Salvador-
frequent cleaning Do-
the septic tanks in I Mundo
I order to avoid i i) Pe11ha de
untreated domestic : France ' LJ sewage discharge I j) Reis
m to the natural Magus
Page 7 of 25
![Page 8: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/8.jpg)
tEI- Action Strategy ----j{j,~~r· j Agency Time Present Status
Stretch Frame t· _J___ ------- ---- --- ' drains k) Panchava
, Initiating action l Neru! .
under the Water
act including
levying of fines for
commercial
establishment
•
•
i 2 .
under
pay
Pollutant
principal.
(within 1 month)
a) lmprovcrnent to I a) Bct(jui- I Respecti 16 months I DoP informed that this
collection svstem. Candola
and ensuring b) Marcem -
collection or Tivrcm-
segregated waste. Orcao b
c) Amona
d) Navclim
e) Candola,
Volvoi
I) Panchaya
t St.
Estevam
g) Se-old
Goa.
h) Salvador-
b) Installation of Bio- I Do-
digester having
at Rainguinim by
the Goa Waste
Mundo
capacity I 00 TPD I i) Penha-
De
france
ve
Village
Panchav • I I
at and j
Dircctora 1 ! '
te of ;I
Panchay , i at
matter is taken up in the
Solid Waste Action Plan
submitted
I CiO(i/2018 matter.
I I MD, G\VMC informed
I that EIA report 111
: response to "Integrated ;
Solid
submitted
Nagpur
conducting
bearing.
ll1
and
the
Waste
Management Facility' at
Bainguinim has been
bv NEERL a
would
process it further for
public
Page 8 of 25
![Page 9: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/9.jpg)
•
•
River Stretch
Corporation.
3.
s~.~S-;;atcgy No, -t---:. - .
- I -- ~1anagcmc1~l--·1T) Reis
I
Maeos
, k) Pan:l;aya
I l Ncrul
toilet I a) I{FI Providing
facility and sanitation h) Volvoi
facility for fishing i c) Marcel
Jetty at IFFI, Volvoi
& Marcem
Agency I Time Frame
,-- - ----+----- -------,--
12 months
Present Status
------
4.
L
Captain
uf Port &
SlllCGL
[ Saramanus Ramp. - . ····1---------------+- -----+----!
12 months ! Work handed over w
GSIDC and work will be
Existing 8 toilets, 7 a) Fishing Dept. of
Bath rooms, 7 urinals Jetty at Fisheries
at the fisheries Malim
. complex Malim
J Betim, Goa managed
I by Sulabh I
i International Social
Servin: Organization
I'orvorim Goa. The J.O
seated toilet block is
proposed along the
waste water treatment
, p!anl of 40 KU). The
: work is been carried
out through Goa State
Infrastructure
Development
Corporation. ·-·- -·------------
CoP has already fitted
Bio toilets at Adpai and
is proposed to install 2 at
Vashi. Permanent toiletrs
have been constructed at !
volvoi. Ribander and 1
completed
31/05/2019.
Page 9 of 25
![Page 10: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/10.jpg)
Sr. -------~cti~;~-st;;1tq.,~- l River I -A~cncy·- r No. ! Stretch I
n I he up gradation of-1 STP al I P\VD.
Sewage Treatment i Pano. I Goa
i Plant at Pattu, Plaza at I Panjim.
Panj irn 1s under
progress bv P\VD.
Goa and expected to
he completed 111 one
Chapora R"' r L nc. - Prio · . ---:;::=--;:--_J • Taluk t riry V - (from Al a o Morjim) orna Fort ' Perncm ! -----
1
i
vear. ! .,
Time Frame
18 months
Present Status : -- -- - --- -----i
It is informed that the !
plant \\ill be operational
by Dec. 2020.
-~- -~- I. Disconnection of Alorna Ion • I direct discharges of, to Morjim
domestic sewage into !
the Chapora
River/storm water
drains/ Nallah.
I > Disconnection of
the direct
discharge into the
river/storm water
drain/Nal!ah.
• I I r Installation of Bio
toilets
,... Construction of
septic tank and
soak pits bv
residential houses.
s
~~provement to a) /\Joma L_ -----------
I ___ _J
Directora i 6 months
tc of
Panchay
at and
Directora I I te of '
I Health
The Dl"v1A informed that
a Joint Survey is being
carried out with Dept or Health and DoP to
identify those
discharging sewage and
disposing solid waste in
water bodies. Notices
will be issued
subsequently.
. -i- ----- . - Respect! I 12 months I DoP mformed that tins
I
Page 10 of 25
![Page 11: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/11.jpg)
I-Sr T Action Strategy -- f Uh~ -I Agency -T- o. _ __ --h- S!~·tch _ _ _J ~ollect10n system. and b) Casa\~e I
' I :rection of material em I Village ,
recovery facilities cJ 0
storage shed for non- d) D
biodegradable waste
•
111 the village
Panchayat areas along
the banks of Chapora
River
• ' ·'.
zonm
irnrgal
1111
c) Tuern
I) Parcem
g) Aganva
da
h) Chopde
m
i) Mmjim
j) Mcnecu
nn
k) Pima
I) Nadora
m) Rivara
n) Col vale
o) Camurli
111
i p) Oxel
q) Siolim
Waste
Directora
te
Panchay
at
l
r) Assagai-, s) Anjuna
----+--- . .. Expansion of Saligao
Management
of
---,------ - Time ~ Present Status Frame
matter is taken up in the I
Solid Waste Acuon Plan 1
submitted m
606/20 I 8 matter.
the
facility from 1 )'i tons :
per day to 250 f 20%
(300 tons per day).
Project cu::;l i.e. 82 er.
l • + tj·--·-· --- --- is pending : -- The matter . 9 months DC ' . I the GSI . \Vll 1
_ _j_ _ _J _ I _ _ _j _
Page 11 of 25
![Page 12: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/12.jpg)
-~ ----:-·--,------:-- ---: - -- - - - - - - . -- -T- -- - - - ;-- -- - - --;-- - - - - - - - - - ii Sr. 1
1 Actwn Strategy I Rn er I Agency I fimc ' Present Status N, I s· h , I F' I
~- ~·~------------~ __ _'.: trct~- ! _J__~;un~_j _ I 4· I Providing toilet I 1 Depanrn I 6 months I It was informed that the
1 I I C ·1·' ('I ! I I ' ' ' racr rncs at . 1apora I I ent of j work oi providing a Im let
1 I I I I ' I fishing jetty I Fisheries I I block of 02-scatcrs has ' I I I I I I I I been awarded to the I I I I I I ! I I I PWD ,--1 , _l_ , _j - '
~
Tcrckhol River - Priority - V: I :'
I ' I. . l)isconnection of (Along 1 Directora 16 months / The DMA informed that 1
/ direct discharges of I Terekhol I tc of/· a Joint Survev is beinn
/ / Jomestic sewage into I River Panchay , carried out wi;h Dept ,,;-
. Health and Dop to
identii)i those notices
discharging sewage and
the Tcrekhol a) Tambosa at and
I / River/storm water b) Nanerwa Directora • drains/ Nallahs. I da te of
.,... Disconnection of I c J Bhalkhaj I Health I the direct I an
discharge into the / d) Qucrim -
I
! r Installation of
I Bio-toilet.
I .. C ' j I Y onstruct1011 o j / septic tank and j
I soak pits b) / / I
11
j rcsidcntia! J j I
J houses / j +I j
1
12- -~11p,rncmcnt-and-c;J-aJ Querim-tRespecti 12 months fool' 1;formed Oia~~I~
/ gradation of the / Tiracol , vc I I matter is taken up in the I I existing Solid Waste I b) l'aliyeml I Village ,I Solid \Vastc Action Plan
/ / Management Facility/ c) Corgao Panchay I I submitted m Ille'
l I including collection f d) Pcrncm I at and j f 606/2018 matter __ J___ I ·--~~ .
river/storm water
drains/Nallahs .
•
Tiracol
disposing solid waste in
water bodies. Notices
will be issued
subsequently.
Page 12 of 25
![Page 13: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/13.jpg)
/ ~;~-j~\ction Strategy I
INo., _ -~ ----r;;siem and erection of I -
_ I matenal recovery
•
facilities
shed for
biodegradable waste
m the
storage
village i
River Stretch mutucip
al
council
non- I c) Casne
Ambcrc
Il1
T Agency ! Time
Frame Present Status
Directora
te of
Panchay
i at
•
panchayat areas along porosca
the banks of T erckhol dem •
River. ! t) Tambox
em-
Mopa-
Uguem
g) Torxern
~-1 Expansion -- of··saligao
Waste Management I
[ facility from 125 tons ' per day to 250 + 20%
(300 tons per day). ' ' I Project cost i.e. 82 er. ' ----------
9 months
I. ···------------------
Disconnection Cure
of direct discharges of I harem to
' domestic sewage into I Madkai
the 7.uari River/storm
water drains/ Nallahs.
>- Disconnection of
D 6
irectoratc I months
of
The matter is pending
with the GSIDC.
'-· ----.------~----- Zuari River- Priority - V - (from Curchorcm to Madkai)
the direct
discharge mto the
Panchay
at and
Directora
te of
Health
The DMA informed that
a Joint Survey is being
i carried out with Dept. or i Health and DoP to
identify those notices
discharging sewage and
I disposing solid waste in
i water bodies. Notices
Page 13 of 25
![Page 14: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/14.jpg)
r Installation of Bio-
toilet.
;,,,- Construction
•
Action Strategy ! -- Rh:er ! Ag:~c0 -l"in~- _____ -l_2trdd1 - l---···--1··· Fr;~mc
river/storm waler i 1
drains/Nallahs. , I I
I of\
I~ I soak pits by ;
__ , residential house; I _ _ 2. I ~) Savorde I •
i . Improvement I m
'
septic tank and
Present Status I
I wif1·-- -~-
I subsequently.
issued
and up gradation of
the existing Solid
Waste Management
Facility including
collection system and
erection of material
•
recovery facilities/ I 1 storage shed for non-
biodegradable waste
, in the village
panchayat areas along
the banks of Zuari
River.
Establishment
of toilets at Fishing
; Jelly m Cortalirn in 1
·1 one vcar. L_ - -
b) Panchw
adi
Ill
i) Neurn
j) St.
i
- - ~ I~~-~- -- i_ t- lDoP informed that this 1
R . 12 1 matter is taken up in the I
Lawrcnc
e(Agasa
im)
kl St.
Andre (
Vdha)
11) Siridao
- pale
J
espective I months
Village
c) Shiroda Panchay
d) Borim at and
e) Wadi -- Directora
talaulim te of
f) Durbhat Panchay
g) Bandora at
h) Marcai
Solid Waste Action Pian
submitted m
60612018 matter.
the
NoC from the Panchayat
has been received and i
work shull be taken up on i
priority.
I
Page 14 of 25
![Page 15: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/15.jpg)
r----- ---------- ----------,------- Sr. ; Action Stratci,•y , River i Agency I Time i!
~ No. r - : m:tretch /---/ Frame t- - 1 : i Curchor I /
crn-. j
kakora
nJ Macaso
Establishment of
S\Vl'v1 facility at
•
na
o) Curtori
I Curchorem of I 00 tpd
I p) Rachol j capacity within 18 1
/ months at cost of Rs
I I 90 Cr.
I 11 This will cater .
1 .
Que osr j / to Qucpem, Sangucm, m I
I I and Dharbandora , 1
I I j r) Sancoa , I -
1 Ialuka I I I ~. r - 0 ""°'' "' ,J D O t oC has been rccei ,,,o 1 / for Fishing .Jetty at / cpartmcn I months / from the Panchayat and
I Cortalim I t of J j the GSJDC: has been
/ J Fisheries f f requested to carry out the
[ I j f j work. t-;,-i--------t~----- ----t-----r------- 1
4· I I I .
J I The underground SIDCGL 112 months I Ponda-Curti STP matter
I / sewerage scheme in j is subjudice. Handora
.1 progress for Panda J I I plant is given in favour I nnmicipal area I
m
Lotoliu
l1l
q) Cortali
m-
•
Present Status
including Curti, ii I I ! rctcndcred. ln respect or
1 Bandora. Kavclcm I J I I work al Kavlem, 5.Y>O ()I ____________________ L ,_ ----- --
of SIDCG L and has to be
Page 15 of 25
![Page 16: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/16.jpg)
•
Sr. i' Action Strategy 11 ,Rh·LT
11 Agency ! Time Present Status
No._ I I _Stretch _J J . Frame_l --·-----·--- . l Undir and area close I j r i' vork has been I
to Kap/cshwari nallah J I i completed.
which forthcr joins !he J / /
Zuari River. Three I I j Further, it was inform.__-d
STP's are proposed at / that in respect of
Corti. Kavelem and / Sanquelim STP, the
Bandorn of capacity / J GSIDC has agreed to la)
8MLD, 15MLD and J pipeline (i.c. 200-mctcrs
,-- ~--· - ·-
l 5MLO respectively.
At present 70%
/ sewerage network is I / laid and l 5MLD STP
· at Kavclem 1s 10
progress. Sewerage 1·
scheme with I MLD I STP is commissioned I
for Durbhat village I
which is on the bank
on River Zuari. This
of 'missing line ') emd
accordingly, the work to
be
thereafter.
commenced
• STP
commissioned
was
111
September 2017 and is
running successfuJJy.
The total cost of all
I the projects mentioned [ above is 536 er.
, __ _j___ ----
I I I I I i
·~'-------·- -j- -- ·- - --- 1
Khandepar- Priority V- (from Opa Ponda & Cod Ii- u/s of I
I i Opa \Vater wot-ks)
,f--· -- ---,-:- ---.-------------:-,_·---:-- -- -,- ---.-···-·-r-:- --- -- 1---:-~ ·- --. --- --··--- 1 I· I Disconnection of i Coc!l1 to L'is I Directora j 6 months I ! he DMA rnformed that L __ J ~ _J ~-- --'--- -- -- ·- --
Page 16 of 25
![Page 17: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/17.jpg)
- T--- ---- - - - -- -·- --- ----, ----- - --- - - -,---- --- - -
I Sr. I Action Strategy I_ River j Agency I Time I Present Status 1
I No. . I Stretch I Frame l i . - ---j-- - - - -·-·--------1----i------- -------- --- -
direct discharges of I of Opa I te of I a Joint Survey is being i_
domestic se\\ a!2.C into I water works [ Panchav 1
1
. \ carried out with Dept of 1
. , - I !
the Khandepar. a) Khandcp \ at'. I ] """ and DoP to !1 I River/storm water ar j Directora ] identify those ·
drains/ nallah. b) Usgao [ te of\ \ discharging sewage and Health 1 I disposing solid waste in
11
•
> Disconnection
the
of
direct
discharge imo the
river/storm water
drain/ Nallah.
:..- Construction of
septic tank and ]
soak pits by j residential houses ·
and monitoring the
frequent cleaning
the septic tanks in
order to avoid
untreated domestic
Services; water bodies.
will be
subsequently.
Notices '!
issued I i
I
• I ) I sewage discharge
\ '1 in to the natural I ]
I ] drains. I l_ . I ---- ------------ -- _L---+------ - -- l ] Assonora - Priority -V - from Assonora to Sirsaim [ I
I]-_ - I Disconnection of [ Assonor; to Directora 16 months j The DMAinforrncd that-'1 [ direct discharges of \J/s of te of\ a Joint Survey is being
I ] domestic sewage into . Sirsaim Panchay I carried out with Dept of
I j the Asscnora. River 1
1
a) J\ssonora at, ] ] Health and l)l)p to
) I /storm water drains/ b) Sirsaim Dircctora I I identify those i
] [ nallah.
. I I . .L.. --- ------
. tc of
1. Health -- - -- J __ - _j_
] discharging sewage and
1. disposing solid waste in J ----- -
Page 17 of 25
![Page 18: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/18.jpg)
l~·l -~: J No. I . . of , + ,---i'Jisconnect10n j
direct the
Action StralcJ.,':'' I
•
discharge into the
river/storm water
drain/Nallah.
:r Installation of Bio
toilets along the
river stretch for
residential areas.
'r Construction of
septic tank and
River --T :~gcn~- Stretch 1 ) Frame , _
r Services;[' I water . b ,.
·1 I will be . i , subsequently.
Time ---1 Present Status
----0 Notices
soak pits by
residential houses
and monitoring the
frequent cleaning
the septic tanks in
order to avoid
untreated domestic
sewage discharge
in to the natural
• I [kdrains. --i-------
1
~2 - ·· - ·-,-'j-~) Assm~-r-~- [ Respecti 12 months , . Improvement o
collection system, and I b)Sirsaim
erection of material i
' recovery facilities /
storage shed for non
biodegradable waste
111 the village
Panchayat areas along
the banks of_ Assonon~L _
ve
Village
Panchay
at and
Directora
· le of
J Panchay :
at _J_ -·-·· - -
DoP informed that this
matter is taken up in the
Solid Waste Action Plan
submitted 111
606/2018 matter.
the
Page 18 of 25
![Page 19: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/19.jpg)
Present Status
•
•
,::;- ' --:-,- - ' - .- ---:-· -- - --, .,. ,
I, Sr. . Actwn Strategy ,1
River ·1 Agency i . I tmc 1
1 No. L Stretch . --+ Frame ,
I [ Ri,cr j [ • ~ _
~ j E;pan;io~oi=-salig~(~T - -- -I - -¾-months · The 1~1atter is pending
j Waste Management I [ I I with the CiSIDC.
I
facility from_ 125 tons ,'
. per day to 2)0 + 20% I
j (300 tons per day). I __ t·ojcct_ cost i.e. 82 er. L [ i
Valvanti River - Priority - Y- from Poriem to Sanquelim-1 Bicholim
I. --1 Disconnection ;f / Poriem 10
1 direct discharges of I Sanquelim I te
j domestic sewage into . a) Poriem [ Panchay
I th.e' Valvanti. b) Honda 1 River/storm water c) Karapur
I drains/ nallah. &
I > Disconnection of
, the direct
I
2.
discharge into the
river/storm water
drain/Nallah.
, Installation of l3io
toilets ! > Construction of
Sarvona
Directora
of
septic tank and I
soak pits by 1
residential houses. I ________ ,, ---·--
a) Improvement to a) Poriem
collection system. I h) Honda and erection of I c) Karapur
at,
Dircctora
te
Health
of
Services;
Rcspecti
i ve
I Village_
6 months The DMA informed
a Joint Survey is being
carried out with Dept of
Health
water
will
and
bodies.
be
subsequently.
DoP
thnt I
identify those notices
discharging sewage and 1
disposing solid waste i11
to i
Notices
issued
·----- 12 months i DoP informed that this
matter is taken up in the
Solid Waste Action P!an
Page 19 of 25
![Page 20: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/20.jpg)
Sr. : No. '
Action Strategy
•
River 1A;cncy Stretch
material re-,-.,-l\-e-1-·;-- t---&~---- I Panchay
facilities .1 storage
shed for non-
biodegradable
waste
•
ll1 the
village Panchayat
areas along the
hanks of Valvanti
River.
b) Improvement and
Up gradation of
the existing Solid
Waste
Management
Facility of
Sanquelim
Municipal
Council;
installation of
biogas plant of .1
tons per day and
construction of
storage shed.
Sarvona I at
3. i Expansion of Snligao
i Waste Management
! facility from 125 tons
per day to 250 + 20%
(300 tons per day).
Project cost i.e. 82 er.
a) Pcrncm
b) Bardez
c) Bicholi
m&
d) Sattari
talukas
in North
Directora
te
and
of
Panchay
at
,--- .
Time I Present Status Frame
1 submitted 111
! 606/2018 matter.
-- --- 1 he
·---+------ ·-------------- 9 months ! The matter is pending
with the GSIDC.
Page 20 of 25
![Page 21: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/21.jpg)
•
~-r. I Acti~n Strategy \ - Riv er lAgcncy_l_ Ti~;:--1 - Present Status
I No. '· --+ s~;:ch _ +-----' _Frame1 _ l _ t District. I I I
I ~ Commissioning oi' a) Sai1quciifs1DCGL 112rnonth;Ti~tal ~etworkle~g1i1 "
, I extsnng sewerage I :1 _ .
1
. [ 2900111. Te.sted nct,york b) _, wards I length 1s 198Um.
•
network and STP 0.8
MU) capacity.
(Covering 3 wards)
1.e.
Bandhar
wada,
Muslim
Wada
Muzar
wada &
Gokuhv
adi
f------L-----~~~l_-~
Network balance to be i
tested 920111. It IS
observed during testing
that 270111 is blocked.
There is proposed for
replacement of 200111.
The time required for
rectification of manholes.
replacement of main
sewer line within 8
Bicholim River- Priority- V - from Bich.olim to Curchirem t------------ jl I. I Disconnection of' Curchirem [ Directora 6 months The DMA informed that
direct discharges of to 13icholim , te or a Joint Survey is being , domestic sewage into i a) Curchire I Panchay
months.
the Bicholim. I m I at and
River/storm water [ b) Bicholi Directora
! drains/ nallah. m te or ' r Disconnection of Municip I Health,
the direct al ULB.
discharge into the Council
river/storm water I c) Ona-
carried out \Vith' Dept of I
Health and DoP to ·
identify those
discharging sewage and
disposing solid waste m
· water
I will
bodies. Notices
be issued
drain/Nallah. .. Mauling
, Installation or ~~~~-1~---~----- .. ·'··---
subsequently.
__ _j __
Page 21 of 25
![Page 22: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/22.jpg)
C ~~ No. 1
- ' toilets
Construction of
River -T'-\g;ncy 1- Tim~ I Present Status Stretch __ - · I Fram~ : _
d) Karapur I ! T -Sarvan
1
septic tank and c) /\mona
soak pits hy f) Pilgao
residential houses
and monitoring the
frequent cleaning
the septic tanks in
order to avoid
untreated domestic
sewage discharge • I I 111 to the natural I ' drains. -~1 ---
2. a)lmprovement to a) Curchire Respccti I collection system, m ve ULB and erection of b) Bicholi &
material recovery 01 Village
facilities I storage Municip Panchay
shed for non- al at and
biodegradable waste Council Dircctora i
--1
I
12 ;onths I Il;P int~rmed that this '
matter is taken up in the
Solid Waste Action Plan I
submitted in the [
\ 606/2018 matter.
• m the Municipal ' c) Ona- I te of
I Council. village Mauling Panchay I 6 months
Panchayat areas uem at
alona the banks or d) Karapur
Bicholim River. -Sarvan
b) Improvement e) J\mona
and up gradation or I) Pilgao
the existing Solid 1
Waste Manaacrnent
i I
facility of Bi:holirn ! L. L_-----~-- . ' , ---------
Page 22 of 25
![Page 23: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/23.jpg)
~- A~:tion Strategy - _ .. Rh er Agen~;-T- Time ~)resent Status !
~~ _ Stretch I Frame _ _ _ I Municip~~l ~C_o_u_n_c~il-;~!- -------- - ·---~----t- ----- - 1
' a) Curchirc I 9 months _,. l-xpansion of Saligao
Waste 111
Management facilitv b) Bicholi
The matter is pending
with the GSIDC
•
•
from 125 tons 111
per day to 250 + 20% Municip
al
Council
c) Ona-
Mauling
ucrn
d) Karapur
-Sarvan
c) Amona I I l) Pilgao '
----- -- Sinqucrim River- Priority- V- from Candolim to Ga
Nerul ------ ----- -------------- ----·---- I. Disconnection of Candolim Director
direct discharges or Bridge to te (
domestic sewage into Ganpati Panchay
the Sinquerim. Temple at,
River/storm water (Nerul) Director
drains/ nallah. d) Pilerne- <e (
' i Health > Disconnection of Marra
the direct , e) Candoli i Service: discharge 111to the 111
nvcr or through n Reis-
storm water drain/ lVlagos
Nallah. g) Ncrul
ncsh Temple,
a I 6 months I The DMA informcd-thc;t1
a Joint Survey is being
carried out with Dept or Health and DoP lo
a
f
I
~--1
identify those notices
discharging sewage and
disposing solid waste in
water bodies. Notices
will be issued
subsequently.
I _____ j
Page 23 of 25
![Page 24: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/24.jpg)
' ,-- --1- --. . --- - ,- . -- ~ -- -----,., - . - I. Sr. Action Su-atcgy I R1vcr~Agcncy j I rmc I
J\o. I _ ~ Stretch _ _ -I Frame ! J· ,I r Installation of Bio
1
. -- . -- --- --f-· J I toilets along the j j
I ) river stretch. . i I c· . 1 I r .onstrucuon o i
septic tank and I
- by I
•
Present Status
•
I
~
soak pits
residential houses
and monitoring the
frequent cleaning
the septic tanks in
order to avoid
untreated domestic
sewage discharge
I !l to the natural
drains. ----------
a) Improvement to a) Pileme- collection system, Marra
and ensunng b) Candoli
collection of m segregated waste c) Reis-
b) Improvement and Magos
• _, .
I . 1 I trawlers near Nerul.
L_L - --
Rcspccti I 6rnonths vc
Village
Panchay
at and
Directora
l 1p gra(~ation ~f I d) Ncrul I tc of.
the existing Solid I Panchay I \\'astc I ~t I
k- ,_1anagcm~-- j + __ I_ ~ _ --1 Providing toilet I .
1
Dcpartm 16 months I The Department has :
facility and sanitation , en! of, , proposed to provide 02-
seater toilet facility at facility for Fishing Fisheries
_ _L~L
DoP informed that this . k . I 1 matter 1s ta 'en up m t 1c I
Solid Waste Action Plan j
submitted 111
1
606/20 I 8 matter.
i Ncrul
__ j__~ccording\~::_ the
the
Ramp.
work
Page 24 of 25
![Page 25: MOM 12th RRCgoaspcb.gov.in/Media/Default/RCC/MOM_12th RRC.pdfi· i 'j !\1inutes of the 12 111 I\lceting of River Rejuvenation Committee {RRC') held on 31" 1\1av 2019 The twelfth meeting](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa587a8411e927f43bbfbf/html5/thumbnails/25.jpg)
--- ----' Action Strategy I
I Stretch -----+------+---------------
Ll [ __ __ PWD.
--- -T-
! Agency River Time Frame
Present Status
•
Based on the above-referred status-update, the Secretary
(Environment) directed the officials from (i) Directorate of Municipal
Administration (DMS), (ii) Directorate of Panchayat (DoP) and (iii)
Directorate of Health Services (DI-!S) to complete the joint survey-cum
inspection on priority and submit a comprehensive compilation as per eleven
polluted river-stretches giving details namely (a) No. of units /
establishments inspected, (b) No. of observed violations as per provisions of
PI-!C I SWM Rules, as applicable, ( c) No. of Notices issued to units /
establishments, (d) No. of responses /replies received from units /
establishments within 60-days period, ( c) Actions initiated ti.e.
disconnection o_f water-supply /electricity) against units/ establishments for
non-compliance / non-submission of reply/responses to Notices issued, if
any .
• Further, he also instructed that list of 'commercial establishments'
which have noted to be violating the provisions under PI-!C Act / SWM
Rules, be forwarded to the Goa-PCB, who in turn would issue necessary
'directions/ SCNs's' and seek timely compliance within definite time-frame,
failing which closure directions be issued, thereafter.
.g_.j. {,,..- Dr. Shami la Monteiro,
rMembcr Sccrctaty, Goa-PCB/ M. S., (RRC-Goa)
Page 25 of ZS