mohammed_fayed_cv_4 (1)

5
Mohamed Hassan fayed Mohamed foad galal st , ibrahimia, Alexandria, Egypt Tel: 03 5917439 Mobile: -01142202885 Email:[email protected] D.o.B. 9 July 1988 EDUCATION 9/2010 ــ3/2015 M. Sc. Master of Engineering in SOUND ANALYSIS and ACOUSTIC TREATMENT 9/2005 9/2010 B. Sc. Bachelor of engineering, Alexandria University, Faculty of Engineering - Mechanical Department - Alexandria Egypt 1998 2005 El Nasr boys English School PROJECT Gas Liquefaction and Separation including: Air separation N2 , O2&Ar”, Noble Gas Separation “Xe, Kr & Ne”, also we discussed the Liquefied natural gas L N G, liquefied petroleum gas L P Gseparation including power consumption, purity & Economical study for liquefaction; under supervised of Dr. Abd El Hammid Attia head of mechanical engineering mechanical department in Alexandria university QUALIFICATIONS Grading: Overall GPA : GOOD Project grade : EXCELLENT WORK EXPERIENCE Current date WorkingE.C.G (ENGINEERING CONSALTUNT GROUP) Mechanical engineer in Energy and Electro- mechanical division. Responsibilities: over 4 years in the design of steam, hot water, compressed air, fuel, treated water, dialysis and water networks also selection of hot water and steam boilers, compressors, water and industrial pumps. Also design of water treatment plant pump rooms and selection of water treatment plant mechanical equipment and design of reverse osmosis plants (RO). Experience covers international airports, industrial estates; chemical and petrochemical plants, pumping stations and treatment plants (Reverse osmosis plants) . WorkingMANTRAC Maintenance engineer in heavy duty equipment, specialized in hydraulic circuit analysis and hydraulic circuit Malfunctions analysis and hydraulic overhauls WorkingKOMATSU Maintenance engineer in diesel engines overhaul 2/8/2009 13/8/2009Trainee MANTRAC Practical knowledge in CATERPILLAR dealer in Egypt 21/26/2009 30/7/2009 Trainee KOMATSU

Transcript of mohammed_fayed_cv_4 (1)

Page 1: mohammed_fayed_cv_4 (1)

Mohamed Hassan fayed Mohamed foad galal st , ibrahimia, Alexandria, Egypt

Tel: 03 5917439 Mobile: -01142202885 Email:[email protected] D.o.B. 9 July 1988

EDUCATION

M. Sc. Master of Engineering in SOUND ANALYSIS and 3/2015 ــ 9/2010ACOUSTIC TREATMENT

9/2005 –9/2010 B. Sc. Bachelor of engineering, Alexandria University, Faculty of Engineering - Mechanical Department - Alexandria Egypt

1998 – 2005 El Nasr boys English School

PROJECT

Gas Liquefaction and Separation including:

Air separation “N2 , O2&Ar”, Noble Gas Separation “Xe, Kr & Ne”, also we discussed the Liquefied natural gas “L N G“, liquefied petroleum gas L P G” separation including power consumption, purity &

Economical study for liquefaction; under supervised of Dr. Abd El Hammid Attia head of

mechanical engineering mechanical department in Alexandria university

QUALIFICATIONS

Grading:

Overall GPA : GOOD Project grade : EXCELLENT

WORK EXPERIENCE Current date Working–E.C.G (ENGINEERING CONSALTUNT GROUP)

Mechanical engineer in Energy and Electro- mechanical division.

Responsibilities: over 4 years in the design of steam, hot water, compressed air, fuel, treated water, dialysis and water networks also selection of hot water and steam boilers, compressors, water and industrial pumps. Also

design of water treatment plant pump rooms and selection of water treatment plant mechanical equipment and design of reverse osmosis plants (RO).

Experience covers international airports, industrial estates; chemical and petrochemical plants, pumping stations and treatment plants (Reverse osmosis plants).

Working–MANTRAC

Maintenance engineer in heavy duty equipment, specialized in hydraulic circuit analysis and hydraulic circuit Malfunctions analysis and hydraulic overhauls

Working–KOMATSU

Maintenance engineer in diesel engines overhaul

2/8/2009 – 13/8/2009Trainee –MANTRAC

Practical knowledge in CATERPILLAR dealer in Egypt

21/26/2009 – 30/7/2009 Trainee – KOMATSU

Page 2: mohammed_fayed_cv_4 (1)

Practical knowledge in heavy equipment machinery and power generation

18/7/2008 – 7/8/2008Trainee – Alexandria National Refining and petrochemicals (ANERPC)

Refining and petrochemicals industry

1/7/2008 – 17/7/2008Trainee – KOMATSU

Practical knowledge in positive displacement pumps and their faults

1/7/2007 – 1/8/2007Trainee – MANTRAC

Practical knowledge in heavy equipment machinery and power generation

SKILLS COMPUTER PROFICIENCY –

MS OFFICE “international computer driving licenses from UNISCO”

AUTOCAD 2D

REVIT MEP

PIPE FLOW EXPERT

AUTODESK PLANT 3D

CESAR 2

PDMS

MAT LAB “from scientific computational science from faculty of engineering”

C++programing language “from American university in Cairo centre for adult and

continuing education in cooperation with the Arab academy of science and technology ’

PLC automatic control course “certificate from JELECOM, A.D.PANASONIC”

EES equation solver program (Engineering Equation Solver)

HYSIS simulation and study of LNG and LPG liquefaction plants

NET SURFING

DRIVING LICENCE

LANGUAGES

ARABIC mother tongue

ENGLISH –EXCELLENT “certificate from:

EL NASR BOYS SCHOOL

SYLLABUS ACADEMY “CONVERSATION COURSE”

ATTENDING PREPARATION COURSE OF TOFEL IN MINISTRY OF DEFENCE LANGUAGE INSTITUTE

CONVERSATION COURSE” IN MINISTRY OF DEFENCE LANGUAGE INSTITUTE

Page 3: mohammed_fayed_cv_4 (1)

MILITARY SERVICE Done from 1/3/2011 to 1/3/2012

INTERESTS & ACTIVITIES Football, Basketball, Swimming, Computer Games, Cycling, playing chess

Introduction to First Aid course

REFERENCES Available on Request.

Experience during working in ECG 2012-Date, ECG Engineering Consultants Group S.A., Cairo, Egypt; Piping / rotating

equipment Engineer / mechanical Department – Energy and electromechanical Division. Duties include design, drawing reviewing, Technical Specification and 3 D Modelling and Technical Evaluation for the mechanical and industrial projects Experienced in piping/mechanical design and detailed engineering of mechanical equipment. Participated in the following projects

AL-MASSA PARK AT THE NEW CAPITAL The client is developing approximately 25 feddans located at the New Capital. The aim of the development is to construct a high-end, luxurious hotel. The project comprises hotel buildings, chalets, day-use villas, and a golf course.

DESIGN REVIEW & RECTIFICATION SERVICES FOR SULAIMAN AL-RAJHI HOSPITAL (300 BEDS)

On a plot area of 85,000 m2, the hospital consists of a basement, ground floor, and 8 floors with a built-up area of 94,820 m2. Design of potable water treatment plant for the hospital and dialysis water treatment plant.

DETAILED DESIGN FOR PUMP STATIONS AND VAPOR RECOVERY UNITS

Design of fire-alarm and fire-fighting systems aiming to protect the Nasr Petroleum Company project elements.

EXTENSION OF JOTUN PAINTING MANUFACTURING PLANT

FIREFIGHTING AND FIRE ALARM SYSTEM FOR SCALLA AT ZEYTIAT PORT DESIGN OF FOUR SITES IN THE SOUTH REGION FOR TSAUDI MINISTRY OF

HOUSING

The project comprises the design of four sites with a total area of 7,454,917 m2: Sharq Al-Jamiah in Najran (5,341,013 m2), Haroob in Jazan (969,811 m2), Al-Hidabi in Jazan (417,551m2), and Al-Yahya & Al-Zaidan in Jazan (726,542 m2).

CAIRO MEDICAL CENTER RENOVATION

The hospital comprises a two-floor basement and 11 aboveground floors, with a total built-up area of 14,465 m2. The project aims at shifting the hospital's customer base from B/C class customers to A/B class customers (middle to upper-middle class)

CALL-OFF DESIGN CONSULTANCY SERVICES FOR CITYGATE HURGHADA

The project comprised the design of RO plant of 54000 m3/day MOH SITES AT NORTHERN REGION KSA

The project comprised the design of RO plants TWO TOWERS IN LUSAIL AREA

The project comprised the design of two mixed use towers of plots (5870m2) located in the corner of two major roads within the development. The total Built-up Area: 20545m2.

Page 4: mohammed_fayed_cv_4 (1)

NEW CHEMICAL PLANT AT WADI ELNATRON INDUSTRIAL The Client intends to construct a new Chemical Plant. The land area is approximately 38,000m2 (Phase 1 land area = 160m X 144m). Allowable footprint area shall be 26% of land area, and maximum height shall be 15m. The new chemical plant shall be designed to include the following components: production and drumming unit buildings; administration building(s); electric and substations; nitrogen/air generators; waste-water treatment plant area and pump room; secondary raw material air-conditioned warehouse; monomers storage area; fire fighting foam system and storage; and fire water tank / raw water tank and fire pump room.

SOLVAY SODIUM CARBONATE PLANT - SHAHRAZAD PHASE 2 PROJECT

The project comprised the installation of a new distillation line, a new concentration column, and the revamping of the absorption sector including ammonia receiving station and rationalization of the water cooling sector to increase the production capacity from 130,000 tons/year to be 200,000 tons/year.

GENERAL DIRECTORATE OF MILITARY WORKS (GDMW) RIYADH MEDICAL COMPLEX

Detailed design of the Core Medical Hospital and Emergency Medical Centre, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, Central

Laboratory, Pharmacy, Medical Administration Building and Conference Centre, parking structure, infrastructure design for medical and service zone, infrastructure design for main roads of residential and university zones and utilities buildings.

The scope included the design of:

30,000 m3/day brackish water reverse osmosis desalination plant.

20,000 m3/day medical zone filtration plant.

70,000 kG/hr steam production facility (boiler house) designed to be extended to 300,000 kG/hr in phase 5 of the project.

8000 m3/day polishing water treatment plant for polishing & treatment of medical wastes.

UPGRADE OF FIRE FIGHTING SYSTEM FOR RAS GHAREB PETROLEUM TREATMENT STATION

This renovation includes the entire fire fighting and fire alarm systems which shall cover all of the crude oil tanks in addition to the new control room.

The new fire fighting system shall include new fire water tank, new fire pump station, number of foam bladder tanks for the protection of the crude oil tanks, cooling nozzles for water cooling systems for some of the crude oil tanks and necessary piping and supports.

PETROLEUM INSTITIUE RESEARCH CENTRE MODIFICATIONS IN ADNOC IN ABOU DHABI

PHASE 2 OF NEW NATURAL GAS LIQUID (NGL) SUPPORT CAMPUS AT MESAIEED

The facility consists of new NGL laboratory, new administration building, canteen building, mosque, and central workshop, and transport depot, fuel vending facility, warehouse and stores.

The facility includes new NGL laboratory building including metallurgy and corrosion laboratory, finished product laboratory, sulphur laboratory, gas chromatograph laboratory, analytical laboratory, physical laboratory and environmental laboratory.

MASTER PLANNING & INFRASTRUCTURE DESIGN OF 8 SITES IN KSA

The Project consists of eight land parcels, four sites are located in the north region and the other four located in the south region. The site areas range from 100,000m 2 to 680,000m2.

FARWANIYA HOSPITAL

Page 5: mohammed_fayed_cv_4 (1)

With a total built-up area of 250,000m2, the 834-hospital includes inpatient beds and 21 labour and delivery rooms. The facility comprises of four buildings: the hospital building

(199,608m2), the outpatient building (30,107m2); the dental centre building (16,681m2); the central nutrition & food service building (3,541m2).

AUTOMATIC FIRE FIGHTING, FIRE ALARM AND GAS DETECTION SYSTEMS FOR STEEL TANKS

POTABLE WATER SUPPLY SYSTEM FOR NEW AIR TRAFFIC CONTROL TOWER

CAIRO INTERNATIONAL MEDICAL CITY The project land area is 50,000m2, the plot area is 14,000m2 and the BUA is 85,000m2.

MARS EGYPT - SITE DEVELOPMENT PROJECT

The project comprised the construction of plant extension with steel structure 9, 12 and 15 meter high, with an area of 81,043m2 including utilities, infrastructure works and fence around all the plant with two new gates.

MASTER PLANNING & INFRASTRUCTURE DESIGN OF PACKAGE 4 (7 SITES IN KSA)

The Project Consists of seven land parcels in KSA ranging from 191,140 m2 to 2,678,499 m2. Total area of the seven parcels is 7,433,767.

Participate in estimating mechanical man hours in the following proposals:

SELECTION OF PRIVATE INVESTOR TO DEVELOP AND OPERATE KIGALI BULK WATER PROJECT.

ALUMINUM FOIL ROLLING PLANT. FEED FOR CONSTRUCTION OF ROADS IN DUKHAN FSP AREA.

CENTRALISED WASTWATER AND SEWAGE TREATMENT PLANT AT HALUL ISLAND.

AL SHAMAL SEWAGE TREATMENT FACILITY.

ENGINEERING CONSULTANCY SERVICES FOR MAJRADAH WATER TREATMENT PLANT.

SALES GAS BACK UP PIPELINE AND PIPING SUPPLY PROJECT FROM TRAIN 6&7 TO QP.

ENGINEERING CONSULTANCY SERVICES FOR MAJRADAH WATER TREATMENT PLANT.

ACCBC- NEW JUICE PLANT IN CAIRO, EGYPT.

SUPPLY AND ERECTION WITH O & M SERVICES OF DOHA SWRODESALINATION PLANT.

FIRE WATER SYSTEM FOR NORTH PIER PUMPING AND MONITORING STATION.

RE ROUTING OF EXISTING 34" FUEL GAS LINE FROM BURGAN TO AL ZOUR. SUPPLY AND ERECTION WITH O & M SERVICES OF DOHA SWRO DESALINATION

PLANT.

SALES GAS BACK UP PIPELINE AND PIPING SUPPLY PROJECT FROM TRAIN 6&7 TO QP.

BO ISLANDS.

VISITORS CENTRE FOR QATAR FOUNDATION.

THE NEW BLADE FACTORY AT AIN SOKHNA. DESIGN & BUILD CP14B INFRASTRUCTURE.

ALAT & KARAKUL WATER SUPPLY.

EOI FOR-THE-USE-OF-RENEWABLE-ENERGY-FOR-PUMPING IRRIGATION WATER.