Mohamedaaz_cv2015-2-

7
Address: 31 El-Adl st. Tersa st. El-Haram , Giza , Egypt Phone: 012-23422982 / +202-35852488 E-mail: [email protected] , [email protected] Objective: Seek a career in a suitable field within a challenging environment that allows me for personal growth and the ability to make an achievement. I hope to work in my profession as a Mechanical Engineer in Design, Maintenance, construction or Erecting. I hope continue working in international companies like first job. Education University degree: Bachelor degree in engineering Department: Power Mechanical Engineering University: AL-AZAHAR University Graduation year: 2007 Grade: Good Graduation project grade: Excellent Language skills Arabic language: Mother Tongue English language: Good in Speaking, Writing & Reading Computer skills -Operating systems: (Windows XP, 2000 server & Windows 7). -Programs: Microsoft Office (Excel, Word, Power Point, Access) Microsoft Project AutoCAD Adobe Acrobat Professional. _____________________________________________________________________ PERSONNEL INFORMATION Date of Birth : 9/May/1982. Nationality : Egyptian. Military Status: Exempted.

Transcript of Mohamedaaz_cv2015-2-

Page 1: Mohamedaaz_cv2015-2-

Address: 31 El-Adl st. Tersa st. El-Haram , Giza , Egypt

Phone: 012-23422982 / +202-35852488

E-mail: [email protected] , [email protected]

Objective:

Seek a career in a suitable field within a challenging environment that allows me for

personal growth and the ability to make an achievement. I hope to work in my

profession as a Mechanical Engineer in Design, Maintenance, construction or

Erecting. I hope continue working in international companies like first job.

Education

University degree: Bachelor degree in engineering

Department: Power Mechanical Engineering

University: AL-AZAHAR University

Graduation year: 2007

Grade: Good

Graduation project grade: Excellent

Language skills

Arabic language: Mother Tongue

English language: Good in Speaking, Writing & Reading

Computer skills

-Operating systems: (Windows XP, 2000 server & Windows 7).

-Programs:

Microsoft Office (Excel, Word, Power Point, Access)

Microsoft Project

AutoCAD

Adobe Acrobat Professional.

_____________________________________________________________________

PERSONNEL INFORMATION

Date of Birth : 9/May/1982.

Nationality : Egyptian.

Military Status: Exempted.

Page 2: Mohamedaaz_cv2015-2-

Experience

FROM 17/Nov/2007 to 30/May/2012

Profession: Mechanical Engineer

Company: Vinci Construction International French Company

Project: Greater Cairo Metro Line 3 Phase 1

Job Description: I worked in Tunnel construction (TBM) departments in this company.

1- Tunnel Construction Team ( Tunnel Boring Machine).

Follow installation and erection of “TBM” Machine.

Prepare and flow the stock of rings.

Manager the rings transportation from factory.

Follow the rate of ring consumption to connect with factory and contractors.

Follow the batch plant.

Revise the reports of batch plant and compeer between the consumption and stock.

Follow the team of batch plant and evaluate.

Operator for “MS” mud station for separation and treatment bentonite.

Adjust it for working with soil.

Preparation the calculation for consumption of material.

Plan the quantity required according to consumption sheet.

Preparation the plan for maintenance for equipment’s.

Training my teamwork to work under pressure during “TBM” excavation.

Follow and check on all equipment’s by self.

Manage teamwork for finish problem quickly.

Responsible all maintenance for all pumps and motor for dewatering.

Check for electricity room during shift by self.

Check for all station all the time.

Prepare the ring report with time and soil information and material consumption.

Prepare shift report for station by time with problem and maintenance.

Responsible evacuated the old mud and the dumping area.

Prepare report about mud removal and calculation the amount for evacuate.

Page 3: Mohamedaaz_cv2015-2-

Explain to labors about start pumps and how can be stop.

Explain to labors principals of safety for maintenance and operating pumps.

Explain to labors what we will do if any problem in station.

Prepare order of maintenance during holyday or weekend.

Follow the back fining of tunnel.

Prepare the plane for back filing and mange it.

Calculation the consumption of concrete for back filing.

Inspect for earth work of tunnel.

Enter all ring reports and shift reports in computer.

Follow up the site and record everything on access sheet.

Search and prove the date recorded on access sheet.

Check of personal, Equipment and Material for every part of works.

Account and drawing for some of concrete or steel structure.

Account the cost for the steps of works.

Estimate the time of work for equipment’s.

Work technical office Engineer.

Responsible for Documentation of all site documents.

Prepare all the site reports.

Drawing sketches with all as built survey existing utilities.

Follow up the sites manpower updating with project budget.

Follow evacuate of excavated material from sites and all the material delivered.

Manage the contractors for sand removal.

Manage the contractors for cement supply.

Manage the contractors for bentonite removal.

Coordination between contractors.

Evaluation for all team.

Preparation the sheet for cost of material.

Prepare the comparison between the estimated and real material consumption.

Prepare the test of soil with bentonite to know the consumption.

Prepare the test for cement with bentonite to know how to be treatment.

Page 4: Mohamedaaz_cv2015-2-

FROM 01/10/2013 until Now

Profession: Sr. Mechanical Engineer

Company: DETAC

Project: MIVIDA

Project Manager: Turner.

Consultant: EGEC & Sites

1- Parcel 2 Package 42# (52 Villa)

2- Parcel 7 Package 55# (146 Villa)

3- Hard scab ( Fountain and Guard Room)

Job Description: HVAC and Plumping Works for fully finish of villas. Note: - All AC units are split and copper pipe install throw walls.

1- Responsible about Air Condition.

Select samples for consultant approval.

Preparation shop drawing for installation indoor and outdoor unites of AC.

Preparation coordination drawing between MEP and archer drawings.

Preparation drain pipe for AC.

Preparation as built drawing for installation indoor and outdoor unites of AC.

2- Responsible about Plumping.

Select samples for consultant approval.

Preparation shop drawing of water supply for bathroom and others.

Preparation shop drawing of west line of bathroom.

Preparation as built drawing of water supply for bathroom and others.

Preparation as built drawing of west line of bathroom.

Design the manhole for all drain of west and connection with main line.

Adjust all level of drain line from main to sources.

Surviving the martial required for project and makes a request order.

3- Responsible about Fountain.

Preparation a planning for the project.

Coordinate with Civil Engineers for works.

Survey the material and follow the budget

Preparation shop drawing for fountain.

Select samples for consultant approval.

Design the valves room..

Coordination between sub-contractors.

Follow up site and preparation reports.

Page 5: Mohamedaaz_cv2015-2-

FROM 01/01/2013 To 30/09/2013

Profession: Mechanical Engineer Company: DETAC

Project: Eastern Company.

1- Administrative Offices Building

2- Increases efficiency of general firefighting for all industrials.

Job Description: Firefighting and Plumping Works. Note: - About increase the efficiency of firefighting of industrials the main line 12” with 1500 m length, 6” with 13800m length, 4” with 1900m length and else. Budget of this project’s 15,000,000 EGP.

1- Responsible about Fire Fighting.

Preparation a planning for the project.

Coordinate with Civil Engineers for works.

Survey the material and follow the budget

Select samples for consultant approval.

Preparation shop drawing for pipe line of fire hydrant.

Design the valves room.

Preparation schedule of works according to importance and cash flow.

Coordination between sub-contractors.

Follow up site and preparation reports.

2- Responsible about Plumping.

Select samples for consultant approval.

Preparation shop drawing of water supply for bathroom and others.

Preparation shop drawing of west line of bathroom.

Design the manhole for all drain of west and connection with main line.

Adjust all level of drain line from main to sources.

Surviving the martial required for project and makes a request order.

3- Responsible about Air Condition.

Select samples for consultant approval.

Preparation shop drawing for installation indoor and outdoor unite of AC.

Calculate the thermal load.

Preparation drain pipe for AC.

Page 6: Mohamedaaz_cv2015-2-

FROM 01/04/2012 to 31/12/2012

Profession: Mechanical Engineer Company: SAIFCO- AL SHAFAR

Project: MIVIDA PROJECT- MIVIDA OFFICE PARK

Job Description: Air Conditioning, Firefighting and Electro Mechanic Works. Note: - About project 4 buildings same design but mirror each one have 3 levels similar for offices, roof for services of building equipment’s, upper roof for fans of ventilations, and basement for barking cars. Each level have firefighting, ventilation, fire alarm, smoke motorize exhaust and else.

1- Responsible about HVAC( Het Ventilation and Air Condition )

Calculate the thermal lode for AC and specification of fans.

Design for Duct according to SMAC.

Purchasing fans and installation.

Select samples for consultant approval.

Preparation the planning of works.

Coordinate with Civil Engineers for works.

Survey the material and follow the storage area.

Preparation shop drawing for workshop.

Follow up site and preparation reports.

2- Responsible about Plumping.

Select samples for consultant approval.

Preparation shop drawing of water supply for bathroom and others.

Preparation shop drawing of west line of bathroom.

Design the manhole for all drain of west and connection with main line.

Adjust all level of drain line from main to sources.

Surviving the martial required for project and makes a request order.

Preparation drain pipe for AC

3- Responsible about Fire Fighting.

Design firefighting system according to NFPA.

Calculations the flow and pressure of pumps for system.

Design the pipe line and estimation the friction loss in pipe

Select samples for consultant approval.

Preparation the planning of works.

Coordinate with Civil Engineers for works.

Survey the material and follow the storage area.

Preparation shop drawing for workshop.

Follow up site and preparation reports.

Page 7: Mohamedaaz_cv2015-2-

Summer Training

SUMMER 2006 from 20-August-2006 to 27-August-2006 Trained in BADR ELDIN owner of petroleum.

Job Description: Train in Field extraction for petroleum (desert west "bad 1”).

SUMMER 2006 from 1-July-2006 to 13-July-2006 Trained in KIA MOTORS & KOMATSO agent.

Job Description: Train in KAI Car & KOMATSO Conservancy.

SUMMER 2005 from 18-August-2005 to 31-August-2005 Trained in GASCO Company.

Job Description: Train in Field in Alexander for separation of natural gas to CH4, C2H6 .

SUMMER 2005 from 10-July-2005 to 22-July-2005 Trained in Bavarian Auto Manufacturing Company.

Job Description: Train in BMW cars industry.

SUMMER 2004

Trained in Peugeot agent.

Job Description: Train in Express Conservancy.

SUMMER 2003 Trained in Vinci Company.

Job Description:

Tran in Structuring Metro Line 2.Construction SAKYET MAKES station in Giza