Module 6 Project Planning Presenter Notes
Transcript of Module 6 Project Planning Presenter Notes
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 1/7
Need – flipcharts for watsanlogframe indicators, Presenter notes.Handouts – Prepared handout,Project Cycle Mgmt Toolkit Handout10 & 13 Pages 54, 55, 58, 59,Watsan Logframe
.. And to demonstrate it to donorsand others
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 2/7
This is done at the planning stage,so if the project proposal is alreadyaccepted then these are set, butthan can be changed (withagreement).
No detail – go on to next 3 slides
This is often expressed as.. (go tonext slide)
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 3/7
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 4/7
Directional – if you ask only ‘what isthe increase’ you may miss adecreaseDimensional – ‘what colour shirt’gives an array of answers, ‘howbright is the shirt’ gives a linear progressionDiscrete – scientific repeatable typeof measure
Eg a national census figure would beno good if it takes place only every 5years
Next slide for example
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 5/7
If “all births” how do you measurethat – are they reportedIf all HIV+ how do you get the figureif they are not all diagnosed?
8/7/2019 Module 6 Project Planning Presenter Notes
http://slidepdf.com/reader/full/module-6-project-planning-presenter-notes 6/7