Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement...

21
Module 12 Module 12 STEPS 6 & 7 STEPS 6 & 7 Negotiation of PMP/FCSA Negotiation of PMP/FCSA and Execution of and Execution of Feasibility Cost Sharing Feasibility Cost Sharing Agreement Agreement Civil Works Orientation Course - FY 11

Transcript of Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement...

Module 12Module 12

STEPS 6 & 7STEPS 6 & 7 Negotiation of PMP/FCSANegotiation of PMP/FCSA

and Execution of Feasibility and Execution of Feasibility Cost Sharing AgreementCost Sharing Agreement

Module 12Module 12

STEPS 6 & 7STEPS 6 & 7 Negotiation of PMP/FCSANegotiation of PMP/FCSA

and Execution of Feasibility and Execution of Feasibility Cost Sharing AgreementCost Sharing Agreement

Civil Works Orientation Course - FY 11

OBJECTIVES:OBJECTIVES:OBJECTIVES:OBJECTIVES:

The module will discuss the following:

Understand the purpose of the PMP

and FCSA. Define the major components of both.

Reconnaissance Phase:Reconnaissance Phase:Reconnaissance Phase:Reconnaissance Phase:

Begins when District receives Federal funds to conduct study.

Ends when the District Engineer signs the feasibility cost-sharing agreement.

Begins when District receives Federal funds to conduct study.

Ends when the District Engineer signs the feasibility cost-sharing agreement.

STEP 6STEP 6 - Negotiation of - Negotiation of Project Management Plan Project Management Plan (PMP) and Feasibility Cost (PMP) and Feasibility Cost Sharing Agreement (FCSA)Sharing Agreement (FCSA)

Have you heard any of these?Have you heard any of these?

PMPs are not useful.

We don’t manage by PMPs.

PMPs are a waste of time.

PMPs are PM products.

What is a PMP ?What is a PMP ? Agreement by all parties on how to conduct the

feasibility study – the scope of work for the study performance and review

Basis for managing tasks, costs, and schedules Includes the desires/interests of the sponsor(s) and the Corps Should reflect coordination with resource agencies and key

stakeholder groups Guide the development and delivery of an entire project often

using a phased approach ie: feasibility report

PMP

HQUSACE PMP Guidance:HQUSACE PMP Guidance:

ER 1105-2-100 “Guidance for Conducting Civil Works Planning Studies”

EC 1105-2-208 “Preparation and Use of Project Study Plans”

EC 1165-2-209 “Civil Works Review Policy”

Collaboration between Collaboration between Non-Federal SponsorNon-Federal Sponsor

andandDistrict Study TeamDistrict Study Team

Collaboration between Collaboration between Non-Federal SponsorNon-Federal Sponsor

andandDistrict Study TeamDistrict Study Team

Project ManagerPlanning LeadEngineerEconomistEnvironmentalistRealty Specialist

HydrologistGeologistCounselCost EstimatorOthers as needed

Contract between each Contract between each discipline, the project discipline, the project

manager, & the local sponsormanager, & the local sponsor

Contract between each Contract between each discipline, the project discipline, the project

manager, & the local sponsormanager, & the local sponsor

Five Questions To AnswerFive Questions To Answer

WhyWhy WhoWho

What What WhenWhen

HowHow

??

??????

??

Project Management PlanProject Management Plan

Gather input based on Scopes of Work

Set up “draft” schedule & costs associated with tasks

Develop Review Plan

Negotiate agreement

Required Content of PMP:Required Content of PMP:

Detailed Description Product Work Breakdown Structure Responsibility Assignment Matrix Study Cost Estimate and Schedule Coordination/Communication Procedures Risk Management Change Management Review Plan (includes DQC/ATR/IEPR)

PMP

Feasibility Cost Sharing Feasibility Cost Sharing Agreement Agreement

ER 1105-2-100

ER 1105-2-100

See New Model Agreement!!

WRDA 86 Section 105 - WRDA 86 Section 105 - Established 50/50 cost sharing.Established 50/50 cost sharing.

[Does not apply to study of Nation’s [Does not apply to study of Nation’s system of inland waterways]system of inland waterways]

WRDA 86 Section 105 - WRDA 86 Section 105 - Established 50/50 cost sharing.Established 50/50 cost sharing.

[Does not apply to study of Nation’s [Does not apply to study of Nation’s system of inland waterways]system of inland waterways]

$$$$ $$$$

Negotiable Items of FCSA:Negotiable Items of FCSA:

Project Mgmt. Plan Task Responsibility Task Description Task Milestone

Study Schedule Study Cost Mix of Cash /In-Kind

Negotiable Items: Negotiable Items: (cont.)(cont.)

FCSA Cost Amendment Trigger

Executive Committee Members

Use of Other Federal Funds (new – WRDA 07!!)

Coordination Procedures

Product Review Procedures

Non Negotiable Items:Non Negotiable Items:

Cost Sharing Percentage Lobbying Document Compliance with Laws and the

Principles & Guidelines Boilerplate Provisions

Boilerplate Provisions:Boilerplate Provisions:

Disputes Maintenance of Records Relationship to Parties Officials not to Benefit Federal and State Laws Covenant Against Contingent Fees Termination or Suspension

Reconnaissance Phase Reconnaissance Phase DocumentsDocuments

STEP 7STEP 7 - Execution of FCSA - Execution of FCSA

The District Engineer and the head of the non-Federal entity sign and execute the FCSA.

Usually a “media event”