Module 04 Flexi EDGE BTS Commissioning & Integration

32
Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 1 © Nokia Siemens Networks Module 04 Flexi EDGE BTS Commissioning & Integration

description

edge

Transcript of Module 04 Flexi EDGE BTS Commissioning & Integration

Page 1: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 1 © Nokia Siemens Networks

Module 04Flexi EDGE BTS Commissioning & Integration

Page 2: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 2 © Nokia Siemens Networks

Objective

After completing this module, the participant will be able to:

Theory/Practical:• Install Element Manager to their PC • Use the tool “Element Manager”• Commission Flexi EDGE BTS with Element Manager• Explain the concept of “file-based commissioning”• Show how legal and illegal system configurations are detected in Element

Manager• List the elements to be checked when verifying the Flexi EDGE BTS is transmitting

“On-Air”• Demonstrate checking, listing and reporting all Flexi EDGE BTS alarms or contrary

“On-Air” indications• Carry out a GSM/EDGE test call (network permitting)

Page 3: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 3 © Nokia Siemens Networks

Contents

Focus• New Features in Flexi EDGE BTS Manager• Changes from Ultrasite BTS Manager, HW Configurator and E1/T1 Manager

Topics• General overview• Connectivity• Log files• Customer v Developer version• Commissioning• Remote Troubleshooting

Assumptions• Familiarity with Ultrasite tools

– CX BTS Manager– HW Configurator– E1/T1 Manager

• Basic familiarity with Flexi EDGE BTS hardware units

Page 4: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 4 © Nokia Siemens Networks

Properties/EventsLogical BTS view

Alarms view

Navigation bar

Connection feedback

Flexi EDGE BTS Manager OverviewMain Windows

Page 5: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 5 © Nokia Siemens Networks

Flexi EDGE BTS Manager OverviewNew Features

Flexi-EDGE supports most of the features of CX BTS Manager. The following slides describe the new or changed functionality.

Page 6: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 6 © Nokia Siemens Networks

Flexi EDGE BTS Manager OverviewImproved Commissioning

Remote recommissioning• Minimum requirement is an OMUSIG linkFile based commissioning (SCF)• Complete SCF

– All parameters for that site in a single file– "One-click" commissioning

• Template (“EasyWizard”) SCF– EasyWizard product is available for Ultrasite– Allows commissioning by an inexperienced user– Only site specifics need to be entered (eg BCF ID, serial numbers, ...)– Trials have shown that a secretary can commission the site with no training

• "Partial SCF"– An incomplete file that needs to be completed by the commissioner– Provides full flexibility but requires a more competent commissioner– Required for those sites that do not have standard configurations

• "Fallback"– When connected to a commissioned site the existing SCF is uploaded– If there are problems with the new configuration the old configuration can be restored

Page 7: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 7 © Nokia Siemens Networks

Flexi EDGE BTS Manager OverviewAutodetected RF Cabling

Standard configurations do not need RF cabling to be defined by the commissioner• Exception: Antenna cabling cannot be autodetected – still

must be manually enteredNo need for "HW Configurator"-type tool• Cabling may still be defined manually for configurations not in

the list of standard configurations (list to be supplied in material)

• MHA and VSWR settings entered in commissioning wizard

Page 8: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 8 © Nokia Siemens Networks

Flexi EDGE BTS Manager OverviewIntegrated transmission management

Seamless E1 and E1/T1 management• Separate application for Microwave links• Microwave payload appears as “virtual” E1 linesConsolidated alarm list• BTS and transmission alarms shown in a single list

Page 9: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 9 © Nokia Siemens Networks

Flexi EDGE BTS Manager OverviewEthernet local connectivity

Faster connection speedEthernet port standard on all recent laptops• Serial ports being phased out; Ultrasite BTS Manager

connection may require a USB-Serial converterFaster SW download speed

Page 10: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 10 © Nokia Siemens Networks

Task based user interface• Reduced number of "pop-ups“ means less

interruptionImmediate feedback in case of user error• User can learn from mistakes

Aligned with look and feel of Flexi-WCDMA BTS ManagerEasy transition from CX BTS Manager• Common terms used• Menu names and content similarObject actions not hidden behind right-mouse click

Flexi EDGE BTS Manager OverviewUser Interface improvements

Page 11: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 11 © Nokia Siemens Networks

Flexi EDGE BTS Manager ConnectivityLocal

Connect via LMP on ESMABTS Connection settings• IP Address: 192.168.255.131• Port: 27500• Not changeable by customer• Lab setup – IP Address may be

differentRecommended laptop settings (customer)• IP Address: 192.168.255.130• Subnet Mask: 255.255.255.128• Default Gateway: 192.168.255.129Personal Firewall may need to allow access to local network• eg ZoneAlarmPersonal Firewall needs to allow local SW download• Incoming TCP port 27501

Page 12: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 12 © Nokia Siemens Networks

Same connectivity as Ultrasite• via Netact• requires operational OMUSIG link

GCS database – as UltrasiteConnection Tool – as Ultrasite

Flexi EDGE BTS Manager ConnectivityRemote

Page 13: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 13 © Nokia Siemens Networks

Management Interface Version (MIV)Version of interface between BTS Manager and BTSMinor mismatch – some features may not be availableMajor mismatch – should only download BTS SW

Flexi EDGE BTS Manager ConnectivityMIV

Page 14: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 14 © Nokia Siemens Networks

Comprehensive dump of site parameters – investigate off-site• Host info• HW Versions• SW Versions• Alarms Report• Diagnostic Reports• Q1 Devices• Traffic Trace• Object Properties• HW Unit Properties• SCF• Passive Units• TX Cabling

• RX Cabling• Antenna Cabling• EAC Inputs• EAC Outputs• BTS_CONF_DATA• RSSI• Raw Alarms

Flexi EDGE BTS Manager Log FilesSite Information Report (1/3)

Page 15: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 15 © Nokia Siemens Networks

Viewing SIR in Excel 2003Load .xml fileSelect “Use the XML Source task pane”Drag entries in the XML map onto sheet

(continued)

Flexi EDGE BTS Manager Log FilesSite Information Report (2/3)

Page 16: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 16 © Nokia Siemens Networks

Select Data->XML->Refresh XML Data

Flexi EDGE BTS Manager Log FilesSite Information Report (3/3)

Page 17: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 17 © Nokia Siemens Networks

Sent to the BTS during commissioningCan be uploaded locally and remotely anytime*

Generated dynamically when uploaded to BTS Manager – always up-to-dateUpdates via Q1 (runtime Transmission) are included in uploaded SCF“Partial” SCFs can be used as commissioning templatesNot intended to be manually edited – SCF “editor” is Commissioning Wizard

Example SCF supplied with course material

*Remote upload requires a remote link and therefore a commissioned BTS

Flexi EDGE BTS Manager Log FilesSCF

Page 18: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 18 © Nokia Siemens Networks

BTS Manager

Internet Explorer

Excel 2003

Flexi EDGE BTS Manager Log FilesObject Properties

Page 19: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 19 © Nokia Siemens Networks

Created by the BTSIn Ultrasite it is created by the BTS Manager

Can be uploaded locally and remotely at any timeUpdates after “commissioning”• 2hr tracing of EAC inputs• Changes to transmission settings

eg EDAP change from BSC

Flexi EDGE BTS Manager Log FilesCommissioning Report (1/4)

Page 20: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 20 © Nokia Siemens Networks

ContentsExecutive SummaryOldest entries first!

******************************************************************************************************************************************************EXECUTIVE SUMMARY******************************************************************************************************************************************************BTS Commissioning ReportMonday, Jan 22, 2007 15:17:35***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : SUCCESSFULCommissioning test timer expired***************************************************************************BTS Undo Commissioning ReportWednesday, Jan 24, 2007 09:35:46***************************************************************************Undo Commissioning type: ERASE BYPASS***************************************************************************

BTS Commissioning ReportMonday, Feb 05, 2007 11:52:24***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : PARTIALLY FAILEDPower Cable Test failure for TRX boxes******************************************************************************************************************************************************

******************************************************************************************************************************************************EXECUTIVE SUMMARY******************************************************************************************************************************************************BTS Commissioning ReportMonday, Jan 22, 2007 15:17:35***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : SUCCESSFULCommissioning test timer expired***************************************************************************BTS Undo Commissioning ReportWednesday, Jan 24, 2007 09:35:46***************************************************************************Undo Commissioning type: ERASE BYPASS***************************************************************************

BTS Commissioning ReportMonday, Feb 05, 2007 11:52:24***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : PARTIALLY FAILEDPower Cable Test failure for TRX boxes******************************************************************************************************************************************************

Newest entry

Flexi EDGE BTS Manager Log FilesCommissioning Report (2/4)

Page 21: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 21 © Nokia Siemens Networks

Details• Cabling Status Report• BTS Logical Configuration

– BTS Site Information– Sector Configuration

• Usability Status in TRXs• Fast Tuning Status• BTS HW Versions• BTS SW Versions• Abis Test Results• TRX Test Results• BTS Alarms Test

• External TREs in Q1 Port• Cabling Details• Antenna Info• Diversity Usage• LIF Settings• Synchronisation• Abis Termination• Cross Connections• EAC Input Line Status• EAC Output Line Status• Cabling Status Report

Flexi EDGE BTS Manager Log FilesCommissioning Report (3/4)

Page 22: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 22 © Nokia Siemens Networks

Commissioning Report Structure Overview

******************************************************************************************************************************************************EXECUTIVE SUMMARY******************************************************************************************************************************************************BTS Commissioning ReportMonday, Jan 22, 2007 15:17:35***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : SUCCESSFULCommissioning test timer expired***************************************************************************BTS Undo Commissioning ReportWednesday, Jan 24, 2007 09:35:46***************************************************************************Undo Commissioning type: ERASE BYPASS

BTS SW Versions===============

File Name VersionRunning Package BTS_1001.062 1.1.62

File Name VersionActive package BTS_1001.062 1.1.62

SM1_1000.062 1.0.62SM2_1000.062 1.0.62SM3_1000.062 1.0.62SM4_1000.062 1.0.62SM5_1000.062 1.0.62SM6_1000.062 1.0.62SM7_1000.062 1.0.62TM1_1000.062 1.0.62RM1_1000.062 1.0.62CFG_1001.062 1.1.62

File Name VersionStandby package ********.*** 0.0.0***************************************************************************

Abis Test Results=================Object TS FER BER Transmission EDAP TS EDAP START Test Status

Delay BITTRX3 0 0.00000000 0.00000000 Not Measured NA NA OKTRX3 1 0.00000000 0.00000000 Not Measured NA NA OKTRX3 2 0.00000000 0.00000000 Not Measured NA NA OKTRX3 3 0.00000000 0.00000000 Not Measured NA NA OKTRX3 4 0.00000000 0.00000000 Not Measured NA NA OK

******************************************************************************************************************************************************EXECUTIVE SUMMARY******************************************************************************************************************************************************BTS Commissioning ReportMonday, Jan 22, 2007 15:17:35***************************************************************************Commissioning phase of SCF : FULL

Commissioning Result : SUCCESSFULCommissioning test timer expired***************************************************************************BTS Undo Commissioning ReportWednesday, Jan 24, 2007 09:35:46***************************************************************************Undo Commissioning type: ERASE BYPASS

BTS SW Versions===============

File Name VersionRunning Package BTS_1001.062 1.1.62

File Name VersionActive package BTS_1001.062 1.1.62

SM1_1000.062 1.0.62SM2_1000.062 1.0.62SM3_1000.062 1.0.62SM4_1000.062 1.0.62SM5_1000.062 1.0.62SM6_1000.062 1.0.62SM7_1000.062 1.0.62TM1_1000.062 1.0.62RM1_1000.062 1.0.62CFG_1001.062 1.1.62

File Name VersionStandby package ********.*** 0.0.0***************************************************************************

Abis Test Results=================Object TS FER BER Transmission EDAP TS EDAP START Test Status

Delay BITTRX3 0 0.00000000 0.00000000 Not Measured NA NA OKTRX3 1 0.00000000 0.00000000 Not Measured NA NA OKTRX3 2 0.00000000 0.00000000 Not Measured NA NA OKTRX3 3 0.00000000 0.00000000 Not Measured NA NA OKTRX3 4 0.00000000 0.00000000 Not Measured NA NA OK

Oldest summary

Newest summary

Oldest details

Newest details

Flexi EDGE BTS Manager Log Files Commissioning Report (4/4)

Page 23: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 23 © Nokia Siemens Networks

Commissioning Wizard has two parts1. Collect parameters via Wizard screens to

construct an SCF2. Send SCF to BTS and monitor progress

Existing SCF automatically uploaded from BTS*

SCF provides lots of flexibility in commissioning process“One-Click” commissioning – load complete SCF, send to BTSEasyWizard commissioning – based on predefined templates, enter site specificsFile-based commissioning – load a partial SCF with some parameters, enter the restCompletely manual – enter all commissioning parameters via wizard screens

Experienceneeded

Less

More

Preparationneeded

Less

More

*SCF upload from uncommissioned BTS is coming in pre-3

Flexi EDGE BTS Manager CommissioningOverview

Page 24: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 24 © Nokia Siemens Networks

“Offline” commissioning = SCF “editor”Supports the online commissioning scenarios• EasyWizard Hardware template• EasyWizard Transmission template• Complete, site-specific SCF• Partial SCFAny SCF can be based on an SCF uploaded from an operational BTS

Flexi EDGE BTS Manager CommissioningOffline

Page 25: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 25 © Nokia Siemens Networks

Undo commissioning puts BTS in uncommissioned stateUndo not available remotely“remove traffic bypass capacity”• If checked, all transmission settings are removed – affects other BTS’s in

chained configurations• If not checked only these transmission settings are removed:

– Abis allocations– Abis protections

Downstream traffic affected Downstream traffic not affected

Flexi EDGE BTS Manager CommissioningUndo

Page 26: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 26 © Nokia Siemens Networks

HW Template contains all but site specific parameters (.epb)Transmission template contains ALL transmission parameters (.ept)• Commissioner cannot change transmission parametersDuring commisioning, Commisioner can only enter:

• Site info: BCF Id, Site Name, Location, etc• Antenna settings: MHA type, VSWR limits, etc• Battery backup settings: type, installation date, etc• Passive unit Serial Numbers and Product IDs

Transmission settings cannot be changed by the Commissioner

Flexi EDGE BTS Manager CommissioningEasyWizard

Page 27: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 27 © Nokia Siemens Networks

Settings of an already commissioned BTS can be changedBTS Manager calculates if recommissioning is needed• “recommissioning” requires a BCF resetRecommissioning triggered by:• Tranmission PIU type changed• Interface type changed, eg E1 to T1• RF cabling detection type changes from autodetected to manual or vice-

versa• BCF is not in supervisory or configuring when SCF sent*• Automatic upload of SCF from BTS fails

– Uploaded SCF is needed to determine the changes, if there is no uploaded SCF then BTS Manager has to send all parameters again -recommissioning

*This restriction may be lifted in the final customer release

Flexi EDGE BTS Manager CommissioningModifying Settings

Page 28: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 28 © Nokia Siemens Networks

Remote connection requires operational OMUSIG• BTS must be in commissioned stateChanges to BCF ID or OMUSIG location will result in loss of remote link• BSC changes needed to re-establish connection• If BCF ID changed then remote connection parameters need to be changed• Warning given in each caseUndo commissioning not available• Considered too risky • Can only be recovered by site visit

Flexi EDGE BTS Manager CommissioningRemote Connection

Page 29: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 29 © Nokia Siemens Networks

FlexiHub Manager used to configure microwave parametersMicrowave capacity appears as “virtual” E1 lines (upto 16)Virtual E1 lines configured just like “real” E1 linesMicrowave link must be operational before SCF is sent to BTS for successFlexiHub Manager can be launched from Flexi EDGE BTS Manager

Flexi EDGE BTS Manager CommissioningMicrowave

Page 30: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 30 © Nokia Siemens Networks

Progress lights• Ongoing – blue• Finished – green• Failed – redCommissioning result• Success• Partial failure

– Some TRXs missing vs Logical configuration– Abis Loop test failure on TCH– Abis Loop test failure on EDAP– TRX test failure– RF cabling autodetect alarms– VSWR alarm– Some capacity missing for TRXs– Logical config parameters mismatch with HW (wrong band)– HW mismatch between detected units

• Failure– OMUSIG not found – BTS waiting for LAPD– BCF ID mismatch with BSC (restriction may be removed in final release)– No TRX present (if BSC configuration contains at least one TRX)

Flexi EDGE BTS Manager CommissioningProgress & Failures

Page 31: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 31 © Nokia Siemens Networks

All features are supported in remote case, except the following:• Reset into local mode (BTS Control->Disable Abis) – this would need a

local visit to reset back into a BSC connected state• RTC tuning – can only be done without BSC connection• Undo Commissioning - considered too riskyTRX tests that require external hardware

Flexi EDGE BTS Manager Remote Troubleshooting Limitations

Page 32: Module 04 Flexi EDGE BTS Commissioning & Integration

Soc Classification level Flexi EDGE BTS Installation and Commissioning / July 2008 32 © Nokia Siemens Networks

Output of each powerconnector can becontrolledNeeded for live adding/removing unitsUnder BTS controlIntelligent ShutdownoperatesUnder User controlIntelligent Shutdowncommands are ignoredUser is informed if they connect to a BTS with power outputs not under BTS controlIn remote connection, only option is to give control back to BTS

Flexi EDGE BTS Manager – Power Control