Modular Home Seminar
-
Upload
riverview-homes-inc -
Category
Business
-
view
1.402 -
download
1
Transcript of Modular Home Seminar
Riverview Homes Inc. Modular Seminar
Welcome Guests!
2
Introductions: Riverview
ROBERT FANELLI, President of Riverview Homes Inc.
3
Introductions: Financing
Venture Settlements: Kelly Hayden
West Penn Mortgage: Michelle Gaudino
Gold Coast Construction Loans: Trisha Pollock
4
Introduction: Manufacturer
Pennwest Modular Homes: TODD GRIFFITH, Sales Manager GENA COLWELL, Sales Rep
5
This Evenings Itinerary:
Information About: Riverview Homes Modular Homes
Pennwest PresentationFinance Seminar
Venture Settlement Inc. West Penn Mortgage Inc. Gold Coast Construction Loans
6
Riverview Homes Inc. Facts:
Has been in the housing industry since 1970
Has been providing QUALITY housing to the Tri-state area for over 39 years
Now run by the second generation of the original owners
Robert Fanelli
Douglas Rehak
John Fanelli
7
Riverview Homes Inc. Facts:
Largest factory built home builder in the Northeastern U.S.
8 sales centers $8 million worth of
inventory set up and ready for you to view
Over 100 model homes on display
Over 25,000 satisfied home owners since 1970
8
Located in: Butler Carmichaels Clarion Edgewood Greensburg New Alexandria Prospect Vandergrift
All models priced as displayed Fully furnished & decorated All homes are unlocked during
business hours
Sales Centers:
9
Employees:
Employs 67 professionals8 sales managers have a
combined 170+ years of experience
42% of employees - 10+ years30% of employees - 20+ years21% of employees - 25+ yearsHomeowners always have
access to RHI management and owners
10
Associations:
Riverview is a member of: PMHA Several Professional
Builders Associations StrongLand Chamber
of Commerce
11
Political Activities:
John Fanelli PMHA Board, Chairman - Southwest Region
Doug Rehak Governor Ed Rendell’s - Uniform Construction Code
Review and Advisory Council
12
Service Department:
40% of employees and one owner is dedicated solely to service & installation
500+ years of combined crew experience in setting and servicing manufactured and modular homes
Experts in every field of construction
13
PA DCED Licensed Installers:
All set foreman are PA licensed installers
Most managers are PA licensed installers
2 owners are PA licensed installers
14
Housing Codes in PA:
Basically 2 Codes to build new homes to in PA:
HUD Code IRC 2006
15
What Riverview Homes Offers:
2 HUD Manufacturers: HUD code single and multi section homes 8 Different product lines & price points within two Manufacturers
16
What Riverview Homes Offers:
4 Modular Manufacturers: 7 different product lines & price points
Pinecrest Modular Ranch
17
What Riverview Homes Offers:
RanchCapeChalet
Two StorySplit LevelsBi Levels
18
Ranch:
19
Cape:
20
Chalet:
21
Two Story:
22
What Riverview Homes Offers:
Spec Homes
23
What Riverview Homes Offers:
Riverview Homes also Offers: Pre-owned homes Homes set up in manufactured housing
communities
24
What Riverview Homes Offers:
Hundreds of floor plans and styles
25
For More Information:
Visit A Riverview Homes Sales Center ! 8 Locations Throughout Western PA
Or ask any of the Riverview personnel here today
26
For More Information:
Please visit our Website: www.RiverviewHomesInc.com
27
What is a Modular Home?
Modular homes are built in multiple sections, which are manufactured in a remote facility and then delivered to their intended site of use.
The sections are assembled into a single residential/commercial building using either a crane or roll on system.
28
Advantages of Modular Homes:
Built in a factory Time Costs Engineered
individually Lending Packages Homeowner as the
general contractor
29
Built in a Factory:
Modular Housing is built to the IRC 2006 building code
None of the materials are exposed to weather
Built in climate controlled facility
Stringent inspection process
Transported to your home site in sections
Home is completed on site
30
31
Time:
Saves time on construction Generally can be finished
in 60 - 120 days after set on basement
Production time varies from factory to factory
Homeowner controls many of the factors that affect the time line of the process
32
Costs:
Remove the weather related costs
Remove problems associated with site built houses
Materials are always dry Home is always dry Eliminates waste of building
materials Eliminates wasted man hours
during construction process Reduces costs to builder and
homeowner
33
Engineered Individually:
Engineered before being built
Makes certain any changes will work
Cost effective to engineer the change first
Reworked on paper Won’t have to be
reworked in the field
34
Lending Packages:
Lending packages are already established in most cases
Avoids delays in financing process
Modular financing will finalize faster than conventional financing
35
General Contractor:
Homeowner is the general contractor
Riverview is never the general contractor
Allows homeowner to control:
Sub contractors When sub contractors are
paid This doesn’t happen in site
built houses
36
Energy Star:
U.S. Environmental Protection Agency
Protect our environment with energy-efficient products and practices
The energy star label on a new home means it is significantly more efficient than a code-built model
37
Energy Star:
Benefits of Energy Star Home: Lower ownership cost More comfort Good for the environment
Energy Saving Features: Efficient heating and cooling equipment High efficiency water heaters Properly installed insulation High-performance windows Tight construction and sealed ducts
38
Choose Riverview Homes!
39
Pennwest Modular Homes:
TODD GRIFFITH, Sales Manager
GENA COLWELL, Sales Rep